Search NASA⌕ Search

SEARCH · Search NASA

Results for “beam loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Analysis of Experimental Investigations of the Planing Process of the Surface of Water

Pressure distribution and spray measurements were carried out on rectangular flat and V-bottom planing surfaces. Lift, resistance, and center of pressure data are analyzed and it is shown how these values may be computed for the pure planing procees of a flat or V-bottom suface of arbitrary beam, load and speed, the method being illustrated with the aid of an example.

Sottorf, W.↗

Mechanical Testing of MLCCs

Cracking of multilayer ceramic capacitors, MLCCs, remains a serious problem for space systems. This problem increases substantially for large size capacitors and in cases when manual soldering is involved or the system experiences mechanical shock or vibration. In any case, a fracture occurs when the sum of external and internal mechanical stresses exceeds the strength of the part. To reduce the probability of cracking, the level of stress should be reduced, e.g. by optimizing the assembly workmanship and rules for board design, and the strength of the parts increased by selecting the most mechanically robust capacitors. The latter might possibly be achieved by selecting MLCCs based on the in-situ measurements of mechanical characteristics using four types of tests: flexural strength, hardness, fracture toughness, and flex bend testing. Note that military specifications MIL-PRF-123 and MIL-PRF-55681 do not have requirements for mechanical testing of the parts. However, specifications for automotive industry components employ two types of mechanical tests: beam load (break strength) test per AEC-Q200-003 and board flex test per AEC-Q200-005. A recent military specification for thin dielectric capacitors, MIL-PRF-32535, has one mechanical test, board flex testing, that is similar to AEC-Q200-005. The purpose of this report was assessment of the efficiency of different mechanical tests for selection robust capacitors and comparison of mechanical characteristics of Base Metal Electrode (BME) and Precious Metal Electrode (PME) capacitors. The report has three parts related to the first three mechanical tests mentioned above.

Precious Metal Electrode (PME) capacitors↗

Dispersion And Energy Compensation in High-Gradient Linacs for Lepton Colliders

The shape of an rf pulse is distorted due to dispersion encountered in acceleration through traveling-wave linear accelerator structures. Simulations are made to ascertain the severity of this distortion in cavities designed to operate at various group velocities. The pulse suffers maximum degradation when propagated through accelerating cavities with a phase advance per cell in the vicinity of {pi}, where the group velocity reaches its minimum value. Several cavities are simulated to study the pulse distortion and compared with experiments performed on a high phase advance structure H60VG3, which has a phase advance of 5{pi}/6 per cell. A circuit model and a mode matching code are used to perform these simulations on accelerating structures consisting of multiple cells. Beam loading is taken into account and the implications on energy dispersion are also analyzed. Means of mitigating for this energy deviation are discussed.

43 PARTICLE ACCELERATORS↗

CLIC Crab Cavity Design Optimisation for Maximum Luminosity

The bunch size and crossing angle planned for CERN's compact linear collider CLIC dictate that crab cavities on opposing linacs will be needed to rotate bunches of particles into alignment at the interaction point if the desired luminosity is to be achieved. Wakefield effects, RF phase errors between crab cavities on opposing linacs and unpredictable beam loading can each act to reduce luminosity below that anticipated for bunches colliding in perfect alignment. Unlike acceleration cavities, which are normally optimised for gradient, crab cavities must be optimised primarily for luminosity. Accepting the crab cavity technology choice of a 12 GHz, normal conducting, travelling wave structure as explained in the text, this paper develops an analytical approach to optimise cell number and iris diameter.

43 PARTICLE ACCELERATORS↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Design of a Marx-Topology Modulator for FNAL Linac

The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster beam cycle rate while maintaining the same intensity per cycle, the same uptime, and the same residual activation in the enclosure. For the Linac, the main focus within PIP is to address reliability. One of the main tasks is to replace the present hard-tube modulator used on the 200 MHz RF system. Plans to replace this high power system with a Marx-topology modulator, capable of providing the required waveform shaping to stabilize the accelerating gradient and compensate for beam loading, will be presented, along with development data from the prototype unit.

43 PARTICLE ACCELERATORS↗

Capture, acceleration and bunching rf systems for the MEIC booster and storage rings

The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of accelerators. The electron collider ring accepts electrons from CEBAF at energies from 3 to 12 GeV. Protons and ions are delivered to a booster and captured in a long bunch before being ramped and transferred to the ion collider ring. The ion collider ring accelerates a small number of long ion bunches to colliding energy before they are re-bunched into a high frequency train of very short bunches for colliding. Two sets of low frequency RF systems are needed for the long ion bunch energy ramping in the booster and ion collider ring. Another two sets of high frequency RF cavities are needed for re-bunching in the ion collider ring and compensating synchrotron radiation energy loss in the electron collider ring. The requirements from energy ramping, ion beam bunching, electron beam energy compensation, collective effects, beam loading and feedback capability, RF power capability, etc. are presented. The preliminary designs of these RF systems are presented. Concepts for the baseline cavity and RF station configurations are described, as well as some options that may allow more flexible injection and acceleration schemes.

Wang, Shaoheng↗

Progress on the Proton Power Upgrade of the Spallation Neutron Source

The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Labor-atory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be ac-complished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macropulse). Installation of 28 additional superconduct-ing cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodated primar-ily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and ex-traction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be con-structed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Criti-cal Decision 1 in 2017 to ratify the project conceptual design and cost range.

Champion, Mark S↗

Performance of Ferrite Vector Modulators in the LLRF System of the Fermilab HINS 6-Cavity Test

The High Intensity Neutrino Source (HINS) 6-cavity test is a part of the Fermilab HINS Linac R&D program for a low energy, high intensity proton Hsup>- linear accelerator. One of the objectives of the 6-cavity test is to demonstrate the use of high power RF Ferrite Vector Modulators(FVM) for independent control of multiple cavities driven by a single klystron. The beamline includes an RFQ and six cavities. The LLRF system provides a primary feedback loop around the RFQ and the distribution of the regulated klystron output is controlled by secondary learning feed-forward loops on the FVMs for each of the six cavities. The feed-forward loops provide pulse to pulse correction to the current waveform profiles of the FVM power supplies to compensate for beam-loading and other disturbances. The learning feed-forward loops are shown to successfully control the amplitude and phase settings for the cavities well within the 1 % and 1 degree requirements specified for the system.

79 ASTRONOMY AND ASTROPHYSICS↗

Method for energy recovery of spent ERL beams

A method for recovering energy from spent energy recovered linac (ERL) beams. The method includes adding a plurality of passive decelerating cavities at the beam dump of the ERL, adding one or more coupling waveguides between the passive decelerating cavities, setting an adequate external Q (Qext) to adjust to the beam loading situation, and extracting the RF energy through the coupling waveguides.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 μs pulse at 15 Hz. It consists of 54 individual Marx cells, each containing a 639 μF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capacitive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 µs pulse at 15 Hz. It consists of 54 indi-vidual Marx cells, each containing a 639 µF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capaci-tive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

LLRF System Analysis for the Fermilab PIP-II Superconducting LINAC

PIP-II is a superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of cavities with five different acceleration \(β\). The LLRF system for the linac has to provide field and resonance control for a total of 125 RF cavities. Various components of the LLRF system have been tested with and without beam at the PIP-II test stands. The LLRF system design is derived from the LCLS-II project with its self-excited loop architecture used in the majority of the cryo-modules. The PIP-II beam loading at 2 mA is much higher than the LCLS-II linac. The control system architecture is analyzed and evaluated for the operational limits of feedback gains and their ability to meet the project regulation requirements for cavity field amplitude and phase regulation.

Varghese, P. [Fermilab] (ORCID:0009000925131983)↗

Modeling the LLRF Control of a Multi-Cavity RF Station for Project-X

Fermilab’s High Intensity Neutrino Source (HINS), the 325 MHz low energy section of Project X consists of an RFQ, 18 copper cavities and a section of superconducting spoke resonator cavities, all driven by a single 2.5 MW klystron. Each cavity has a high power ferrite vector modulator which provides individual RF power control. This paper proposes a scheme that optimizes RF drive and vector modulator control. The different gradients, acceleration phase angles, unloaded Q’s and beam loading are taken into account to optimize the cavities detuning angles, forward power, and loaded Q’s. This scheme makes an efficient use of the klystron’s high bandwidth ability to modulate the forward power, hence minimizing the burden on the high power vector modulator during the RF pulse. The proposed method is explained in details, a parameter sensitivity analysis is performed and the impact on the total power consumption for the RF station is calculated.

Branlard, J.↗

Probabilistic evaluation of initiation time in RC bridge beams with load-induced cracks exposed to de-icing salts

In this study, a reliability-based method for predicting the initiation time of reinforced concrete bridge beams with load-induced cracks exposed to de-icing salts is presented. A practical model for predicting the diffusion coefficient of chloride ingress into load-induced cracked concrete is proposed. Probabilistic information about uncertainties related to the surface chloride content and the threshold chloride concentration has been estimated from a wide review of previous experimental or statistical studies. Probabilistic analysis to estimate the time to corrosion initiation with/without considering the effect of the load-induced cracks on the chloride ingress into concrete has been carried out. Results of the analysis demonstrate the importance of considering the effect of the load-induced cracks for correct prediction of corrosion initiation in RC bridge beams exposed to chlorides.

36 MATERIALS SCIENCE↗

Large deflections of a cantilever beam under arbitrarily directed tip load

The nonlinear beam equation was integrated numerically in a direct fashion to obtain results for large deflections of cantilevers under tip loads of arbitrary direction. A short BASIC computer program for performing this integration is presented. Results for selected load cases are presented. The numerical process is performed rapidly on a modern microcomputer, and comparisons with results from closed form solutions show that the process is accurate.

Mccomb, H. E., Jr.↗