Environmental Air Monitoring at LANL: 2023 External Program Assessment [Slides]

Radioactive Air Emissions Management evaluates radiological impacts of LANL operations on members of the public, identifies and quantifies releases, and assesses impacts. It is not directly affiliated with cleanup operations or programmatic work and has independent oversight. The focus areas in Environmental Compliance Programs are stack emissions measurements, ambient air measurements, minor source operations evaluations, data management and quality assurance, collaboration with Meteorology program, and collaboration with Dose Assessment program (EPC-ES).

54 ENVIRONMENTAL SCIENCES↗

NDA Systems Deployed at the Savannah River Site

SRNL’s Nuclear Measurements group develops and implements equipment, methods, and techniques to rapidly provide answers to challenging measurement questions in the areas of: • Environmental Monitoring • Legacy Waste Cleanup • Defense Material •Surplus Defense Material • Customers want: • Good, Fast, Cheap –pick three • Simple

Whiteside, Tad↗

HIGHLY-EFFICIENT 20-MW L-BAND MULTI-BEAM KLYSTRON

The overall goal of this project was to develop and demonstrate a novel two-stage multi-beam klystron (TS-MBK) for use in accelerator, medical, national security, medical, and environmental cleanup applications. The novelties embodied in the TS-MBK design include use of hollow beams to obtain strong coupling to cavities, and post acceleration after bunching to reduce the beam’s energy spread to allow an exceptional electronic efficiency that we predict can reach 90%. During Phase I of this project, Omega-P R&D refined its conceptual design of the 1.0 GHz TS-MBK, and collector design and cooling requirements for several levels of average power output. If, as was the case, it turned out that estimated costs for fabrication and testing of a full 12-beam TS-MBK prototype would exceed available Phase II funding, our Plan-B would have be adopted. In it, a single-beam version would have been designed and built, with all specifications identical to the 12-beam version, except that the average power level would be reduced by a factor of about 12. This one-beam version would still allow evaluation of the efficacy of our design concept for implementing two stages, including prevention of radiation loss at the HV gap, and for demonstrating the predicted 90% electronic efficiency and the absence of reflected electrons from the collector reaching the cathodes. But the absence of the expected industrial partner in further development of this novel RF source made it impractical for advancing the project into Phase II.

43 PARTICLE ACCELERATORS↗

2022 Site Environmental Report: Idaho National Laboratory

The INL Site’s operations, as well as the ongoing cleanup mission involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for U.S. Department of Energy, Idaho Operations Office (DOE-ID) in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” The purpose of the report is to provide the following: (1) Present the INL Site, mission, and programs, (2) Report compliance status with applicable federal, state, and local regulations, (3) Describe the INL Site environmental programs and activities, (4) Summarize results of environmental monitoring, (5) Discuss potential radiation doses to the public residing in the vicinity of the INL Site, (6) Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park, (7) Describe quality assurance methods used to ensure confidence in monitoring data, and (8) Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

54 ENVIRONMENTAL SCIENCES↗

Wearable robotics could save the day (and your back)

How can a lightweight back-assisted exosuit help material handlers decrease back strain from repetitive lifting tasks? What are the benefits of a passive robotic shoulder support in reducing fatigue and injury for environmental cleanup workers? How can mechanical devices reduce joint and muscle injuries in a manufacturing environment? These are some of the questions a group of Laboratory engineers are asking in their ongoing quest to identify and evaluate specially designed wearable advanced technologies to assist workers and help keep them safe.

42 ENGINEERING↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Summary Report - FY 23)

Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2023, extending from October 1, 2022, through September 30, 2023), approximately 9.37E+04 metric tons (1.03E+05 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2023, approximately 17.1 million metric tons (18.8 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 89.1% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Biofuels and Biomass Feedstocks for Decarbonizing the U.S. Economy by 2050 - (DECARB) Decarbonizing Energy Through Collaborative Analysis of Routes and Benefits

Utilizing biomass resources, such as cellulosic biomass and waste, can greatly contribute to decarbonization efforts in the U.S. economy. The U.S. bioenergy sector includes corn ethanol production, biodiesel, renewable diesel production, and the utilization of biomass wastes for electricity generation being the primary applications. Within the electricity sector, biopower can play a crucial role as a stable low-carbon resource. Enhancing the electricity mix's diversity could enhance grid reliability. If the issues regarding hot gas cleanup can be resolved, flexible biopower resources like biomass gasification facilities could complement the integration of variable renewable energy sources due to their quick ramp-up and ramp-down times. The criticality of bioenergy deployment lies in its ability to decarbonize hard-to-electrify sectors, such as aviation, where alternative decarbonization options may not be viable in the short term. Moreover, bioenergy has the potential to be converted into process heating, building materials, and plastics, which are not considered in this study. A set of pathways was carefully chosen to represent viable options for converting ample herbaceous and woody cellulosic feedstocks into fuels, chemicals, and electricity in this study. In conclusion, biomass pathways provide flexibility by generating various types of bioenergy and bioproducts, including electricity, hydrogen, liquid fuels, biochemicals, and bioplastics. When paired with carbon dioxide capture and storage (CCS), specific bioenergy approaches can effectively extract carbon dioxide from the atmosphere, thus providing an effective decarbonization option for the transportation sector.

09 BIOMASS FUELS↗

Results of Speciation Determination Measurements of Insulating Sulfur Hexafluoride Gas

Under the direction of the NNSA NA-231 Mo-99 Program, SRNL has provided technical assistance to U.S. companies under cooperative agreements. One such area of technical assistance has been for the recommendation for contamination management methods in the eventuality that tritium contaminates the insulating gas of a high-voltage ion source used in the accelerator-based process developed by SHINE Medical Technologies to produce Mo-99. The SHINE accelerator process uses tritium as the target of a deuterium ion beam, where the ion beam is produced within a high-voltage ion source insulated with sulfur hexafluoride (SF 6 ), and is separated from the tritium target by an extensive pump train. Normal operating conditions preclude the conditions necessary for contamination of the insulating gas, however certain atypical conditions could result in a tritium contamination event. Accelerator based processes for medical isotope production represent an anomalous tritium contamination challenge due to the presence of SF 6 . SF 6 decomposes through normal use as an insulator gas, and the exact speciation of the decomposition byproducts depends on a variety of factors. This creates a scenario where the anticipation of species present in the insulating gas mixture is difficult. In turn, the fate of tritium within such a chemical system is unclear. This document discusses the results of measurements made in-situ of the SF 6 insulating gas in use within a SHINE Medical Technology’s high-voltage ion source. This was done in an effort to determine the chemical speciation of the gas, allowing for the recommendation of management strategies in the event that tritium contaminates the insulating gas. The results of the measurements reported in this work suggest that tritium contamination in the insulating gas may result in two chemical forms of tritium in the system, tritiated water and molecular tritium. These two forms of tritium would be captured by two methods. Tritiated water may be captured and removed from the SF 6 by an adsorbent canister already present within the pressure vessel that houses the insulating gas while in use. It may also be separated from the SF 6 during routine purification of the SF 6 , which is performed by SHINE personnel routinely. The purification cart will perform all non-embedded systems cleanup necessary to remediate tritiated species in the system. The purification cart passes the insulating gas through several filters, followed by the liquefication of the SF 6 . The filters will separate tritiated water from the SF 6 at this stage. It is expected that molecular tritium will accumulate in the gas-phase during the liquification step, which is separated and stored. Tritium may be recovered from this mixture through more conventional hydrogen purification methods such as a palladium diffuser.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aerosol Envelope Sealing of Existing Residences

This report explores the best methods for aerosol envelope sealing of unoccupied, existing residences and documents typical leakage reductions. The project consisted of three distinct efforts: (1) scaled field demonstrations of the sealing process, tracking from setup to sealing and cleanup, (2) laboratory testing of new sealants that dry clear, making them more appropriate for retrofit applications, and (3) BEopt™ (Building Energy Optimization Tool) modeling of the energy implications of the measured reductions in leakage. Overall, aerosol sealing performance in existing homes was effective, with an average leakage reduction of 47% across all 34 sites. Conventional approaches typically only produce leakage reductions of 25%–30%. The aerosol sealing technology could provide a process for existing homes and multifamily units to gain the benefits of a well-sealed home at a reasonable cost with minimal disruption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Management of the Three Mile Island Unit 2 Accident Corium and Severely Damaged Fuel Debris (Rev. 2)

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core underwent a significant meltdown in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. Primary coolant discharging through a malfunctioning valve represented what was analyzed as a “small-break” loss-of-coolant accident (LOCA) and ultimately became a full core meltdown. The melted core recovery process required the development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with fuel rods intact. The core to be recovered was composed of loose, gravel-like and granular particulate material and a central solidified mass of formerly molten fuel. Molten fuel had also penetrated some of the pressure vessel internals and resolidified below the main core support structure. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of the Three Mile Island Unit 2 Accident Corium and Severely Damaged Fuel Debris (Rev. 2)

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core underwent a significant meltdown in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. Primary coolant discharging through a malfunctioning valve represented what was analyzed as a “small-break” loss-of-coolant accident (LOCA) and ultimately became a full core meltdown. The melted core recovery process required the development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with fuel rods intact. The core to be recovered was composed of loose, gravel-like and granular particulate material and a central solidified mass of formerly molten fuel. Molten fuel had also penetrated some of the pressure vessel internals and resolidified below the main core support structure. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive and integrated assessment of technology needs related to executing the River Protection Project (RPP) baseline, reducing risk, and providing opportunity for improvement in executing efficiencies, worker safety and environmental protection. As such, some of the proposed activities herein are pending final decision in the form of an upcoming Tri-party Holistic Agreement. Addressing the identified technology needs will contribute to achieving successful completion of the Hanford Site tank waste cleanup mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Specifications and a Prototype Software to Demonstrate a Data Catalog for Hanford Datasets

Environmental management activities at the Hanford Site produce extensive data about site conditions, contaminants, and cleanup activities. Managing, archiving, and accessing that data requires a high degree of collaboration among site contractors and a high level of awareness by project managers and staff. The Hanford Site has a range of databases (e.g., Hanford Environmental Information System [HEIS]) and their associated user interfaces (e.g., Environmental Dashboard Application [EDA], Virtual Library [VL]), as well as other document management systems (e.g., Integrated Document Management System [IDMS]). However, Hanford lacks a single unified resource to find data (which itself comes in multiple formats) amongst the multiple disparate systems, not to mention ad hoc data not contained in an official repository/database.

54 ENVIRONMENTAL SCIENCES↗

Identifying Controlling Variables for Mercury Vapors in Alpha-4 at Y-12: Two Year Data Collection Update

Multiple sensor packages were deployed at Alpha-4 by SRNL, in collaboration with United Cleanup Oak Ridge LLC (UCOR), to monitor mercury vapor concentrations and meteorological parameters. These sensors collected data, inside and outside of the legacy-use facility, for approximately two years. Though data gaps still exist, particularly in colder months, several controlling variables were identified that govern mercury vapor concentrations within Alpha-4. Temperature, barometric pressure gradients, humidity, and wind speed have been identified as controlling variables. A strong positive correlation was seen between mercury vapor concentrations and temperature which generally followed diurnal fluctuations. Temperatures below approximately 10 degrees Celsius did not show any spikes above the PEL, indicating more work can be performed at any time during the winter months – more data should be collected to confirm consistency in this finding. Additionally, spikes in mercury vapor concentrations above that of the permissible exposure limit (PEL; 100 µg/m 3 ) occurred primarily in late afternoon or evening/overnight hours (between 3 PM and 6 AM), which suggests D&D operations might be best scheduled during morning or daytime hours prior to the late afternoon. However, a limited number of spikes did occur outside of the identified window, although this may be attributed to disturbances in air flow and mercury vapor release from work activities performed inside of the Alpha-4 building. The analysis conducted allows for a strong predictive capability for estimating mercury vapor concentrations based upon accurate meteorological parameters. Still, additional data collection, particularly in the winter months, could help to strengthen the predictive power and validate the identified data trends. Further, increased temporal resolution could also help to better characterize the incipient stages of the increases and decreases in the mercury vapor concentration. Continued monitoring support by SRNL at Y-12 is underway at Alpha-4 to further close remaining data gaps and support deactivation and decommissioning work. Within a collaborative effort with UCOR, the SRNL team is collecting mercury vapor data to study the efficacy of a novel mercury suppressant, FerroBlack® which was recently deployed at Alpha-4. In addition, modifications to the current monitoring setup to increase measurement resolution is also being investigated.

54 ENVIRONMENTAL SCIENCES↗

Comparison of RESRAD-ONSITE and PRG/DCC Calculators and Application to Navy Environmental Media

The purpose of this project is to develop an improved Navy-wide approach for estimating risk and calculating cleanup goals for radiologically impacted environmental media (e.g., soils). This comparative analysis focused on the new features added (or improved) to the PRG/DCC Calculators since the 2015 comparison study (Yu et al. 2015a). RESRAD-ONSITE code Version 7.2 and the PRG/DCC Calculators available on the USEPA website between January and June of 2024 were used.

54 ENVIRONMENTAL SCIENCES↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of the Three Mile Island, Unit 2, Accident Corium and Severely Damaged Fuel Debris

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core melted down in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. The melted core recovery process required development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with a majority of rods intact. The core to be recovered was composed of loose debris and a solidified mass of formerly molten fuel. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases. Over a period of several years, the central melt was broken up, primarily by use of a core-boring drill originally designed to acquire samples through the depth of the debris field. The broken pieces were loaded into specially designed debris canisters by use of long-handled pick-and-place tools and suctioned into baffled knockout canisters using an airlift vacuum system. A remotely operable underwater plasma arc torch was developed for removal of the lower core support structure to be able to retrieve the fuel pieces and secondary melt that had accumulated on the bottom reactor vessel head. Canister design played a central role in defining the initial retrieval process and later affected transportation, interim wet and its current interim dry storage. Due to concerns about the potential for radiolysis of residual water in the debris and other canister material, the canisters were fitted with hydrogen recombiner catalyst units to prevent a buildup of flammable gas and potential pressurization. To confirm the effectiveness of the recombiners during shipping, eight dewatered canisters were kept sealed for up to 205 days with periodic sampling of the headspace gas. The highest hydrogen value (9 vol%) was observed in a canister held for 147 days while the longest stored canister resulted in a 5% hydrogen concentration. The oxygen concentration never exceeded 0.5 %, and the primary backfill was >80% argon, meaning there was no flammability risk. Radiolytic hydrogen was also observed in wet pool storage, where the vented canisters discharged a portion of the water backfill as a result of gas production. The 344 canisters (268 fuel debris, 62 filter, and 12 knockout type) were dewatered, loaded in groups of seven into a double barrier shipping cask, and transported to the U.S. Department of Energy site in Idaho for 10 years of pool storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗