Search NASA⌕ Search

SEARCH · Search NASA

Results for “component reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Improved detection of rough defects for ultrasonic NDE inspections based on finite element modeling of elastic wave scattering

Defects which posses rough surfaces greatly affect ultrasonic wave scattering behaviour, often reducing the magnitude of reflected signals. Ultrasonic inspections rely upon this response for detecting and sizing flaws. For safety critical components reliable characterisation is crucial. Therefore, providing an accurate means to predict reductions in signal amplitude is essential. An extension of Kirchhoff theory has formed the basis for the UK power industry inspection justifications. However, it is widely recognised that these predictions are pessimistic owing to analytical approximations. A numerical full field modelling approach does not fall victim to such limitations. Here, a Finite Element model is used to aid in setting a non-conservative reporting threshold during the inspection of a large pressure vessel forging that might contain embedded rough defects. The ultrasonic response from multiple rough surfaces defined by the same statistical class is calculated for normal incident compression waves. The approach is validated by comparing coherent scattering with predictions made by Kirchhoff theory. At lower levels of roughness excellent agreement is observed, whilst higher values confirm the pessimism of Kirchhoff theory. Furthermore, the mean amplitude in the specular direction is calculated. This represents the information obtained during an inspection, indicating that reductions due to increasing roughness are significantly less than the coherent component currently being used.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2024

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • High-demand MOV SO failure rate • Low-demand MOV frequency of FTOC events (failures per reactor year) • High-demand MOV frequency of SO events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2020

This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are failure-to-open/close (FTOC), failure to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following trends were identified for the most recent 10-year period: o Extremely statistically significant increasing trend for the frequency of FTOC demands (demands per reactor year) for low-demand (= 20 demands per year) AOVs o Extremely statistically significant increasing trend for the frequency of FTOC demands for high-demand (> 20 demands per year) AOVs o Highly statistically significant decreasing trend for the failure rate of FTOP for low-demand AOVs o Highly statistically significant decreasing trend for the frequency of FTOP events (failures per reactor year) for low-demand AOVs o Statistically significant decreasing trend for the failure rate of SO for low-demand AOVs o Statistically significant decreasing trend for the frequency of SO events (failures per reactor year) for low-demand AOVs.

99 GENERAL AND MISCELLANEOUS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Main bearing response in a waked 15-MW floating wind turbine in below-rated conditions

Increased wind turbine size raises unknowns related to structural flexibility. Moreover, moving to deeper waters, component reliability becomes more critical. This work investigates main bearing response dependence on drivetrain flexibility and wake impingement in a two-turbine wind farm. A 15-MW floating direct-drive turbine is considered. Large eddy simulations (LES) are employed to model neutral, stable and unstable atmospheric conditions at below-rated mean wind speed, while the engineering codes OpenFAST and FAST.Farm simulate turbine and wake behavior. Results indicate significant sensitivities in fatigue estimates to lateral distance between the upstream and downstream turbine. The trends are most substantial in stable conditions, where the waked downwind main bearing sees twice the fatigue damage estimates of the upstream turbine for one position and 50% for another. Main bearing fatigue sensitivity to drivetrain flexibility is minor, while properly including generator rotor inertia loads is important for the axial forces of the locating (axially fixed) bearing, especially in stable conditions.

17 WIND ENERGY↗

Resilience and economics of microgrids with PV, battery storage, and networked diesel generators

Current designs and assessments of microgrids have ignored component reliability, leading to significant errors in predicting a microgrid’s performance while islanded. Existing life cycle cost studies on hybrid microgrids—which combine photovoltaics (PV), battery storage and networked emergency diesel generators—also have not identified all the potential economic opportunities. Reducing the number of emergency diesel generators through reliance on PV and battery, retail bill savings, and demand response and wholesale market revenue streams are all important. This paper provides a new statistical methodology that calculates the impact of distributed energy reliability and variability on a microgrid’s performance and a novel use of the optimization platform REopt to explore multiple cost savings and revenue streams. We examine the impacts for microgrids in California, Maryland, and New Mexico and show that a hybrid microgrid is a more resilient and cost-effective solution than a diesel-only system. Under realistic conditions, a hybrid microgrid can provide higher system reliability when islanded and have a lower life cycle cost under multiple market conditions than a traditional diesel generator-based system. The improved performance of the hybrid system is resilient to conditions experienced over the last 20 years in solar irradiance and sees little degradation in performance immediately after a hurricane. The cost savings to provide this more resilient backup power system as compared to a diesel-only microgrid are significant. The net present cost for a hybrid microgrid is 19% lower in New Mexico and 35% lower in Maryland than a diesel-only microgrid. In California, the net present cost of the hybrid microgrid is negative because, unlike a diesel-only microgrid, a hybrid microgrid has lower life cycle costs than the power costs without a microgrid.

25 ENERGY STORAGE↗

The Trajectory of Additively Manufactured Titanium Alloys with Superior Mechanical Properties and Engineered Microstructures

Additive manufacturing (AM) plays a crucial role in the manufacturing and development of advanced materials including titanium alloys for engineering applications. During the last two decades, a great deal of effort has been devoted to print titanium parts with desired properties. However, due to presence of non-equilibrium/metastable phases, anisotropic microstructure, and various porosities in the printed titanium alloys, achieving an excellent combination of mechanical properties has been challenging. Here this review paper aims to provide a comprehensive overview of multiple post-process and in-process approaches to achieve enhanced strength-ductility combinations by microstructure engineering. Approaches such as addition of alloying elements/nucleants, multi-step post heat treatment, in-situ heat treatment, forced inter-pass cooling, in situ peening/rolling, hybridizing microstructure, high-intensity acoustic vibration, thermo-hydrogen refinement of microstructure, deliberately introducing lack of fusion defects with subsequent hot isostatic pressing are discussed in detail. Finally, we conclude by highlighting the challenges associated with each method and potential areas of improvement that can pave the way to develop reliable components with enhanced performance.

36 MATERIALS SCIENCE↗

Navigating the obstacles of carbon-negative technologies

Nine years after the Paris Agreement was adopted, it is clear that negative-emission technologies are required to keep 1.5°C, or even 2°C, of global warming in reach. Yet carbon dioxide removal (CDR) strategies remain rife with political, technical, economic, environmental, and geographic challenges. Here, this Voices surveys the pitfalls of incorporating carbon-negative technologies into climate mitigation plans and asks: how can we navigate around the challenges to make CDR a reliable component of climate mitigation?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing wind power operating costs in the United States: Results from a survey of wind industry experts

This paper draws on a survey of wind industry professionals to clarify trends in the operational expenditures (OpEx) of U.S. land-based wind power plants. We find that average all-in lifetime OpEx has declined from approximately $80/kW-yr (~$35/MWh) for projects built in the late 1990s to a level approaching $40/kW-yr (~$11/MWh) for projects built in 2018. Turbine operations and maintenance costs represent the single largest component of overall OpEx and the primary source of cost reductions. We observe wide ranges of OpEx over time; respondents cite a range in average expected costs for recently commissioned projects from $33/kW-yr to $59/kW-yr. We also use historical OpEx learning rates, showing a 9% OpEx reduction for each doubling of global wind capacity, to project a further $5-$8/kW-yr reduction from 2018 to 2040. These findings suggest that continued OpEx reductions may contribute 10% or more of the expected reductions in land-based wind's levelized cost of energy. Moreover, these estimates understate the importance of OpEx owing to the multiplicative effects through which operational advancements influence not only operations and maintenance costs but also component reliability, performance, and plant-level availability - thereby also affecting levelized costs by enhancing annual energy production and plant lifetimes. Given the limited quantity and comparability of previously available OpEx data, the trends reported here may inform OpEx assumptions used by electric planners, analysts, and modelers. The results may also provide useful benchmarks to the wind industry, helping developers and asset owners compare their expectations with historical experience and other industry projections.

17 WIND ENERGY↗

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

DESIGN AND COMMISSIONING OF A THREE-BARREL SHATTERED PELLET INJECTOR FOR DIII-D DISRUPTION MITIGATION STUDIES

Disruptions are sudden unplanned terminations of tokamak plasmas that can lead to high thermal loads and runaway electrons (RE). Unmitigated disruptions in ITER are predicted to dissipate hundreds of MJ of thermal energy and generate multi-MeV runaway electrons. This intense heat and energetic particle beams can cause localized melting of the plasma facing components. Reliable and fast acting disruption mitigation (DM) techniques are therefore a critical requirement for ITER to safeguard the machine from damage. The proven method for DM centers on injecting a large quantity of impurity particles into the plasma to quickly increase density and radiate the thermal energy to mitigate thermal effects. Additionally, if the particle injection can achieve a critical density, it can create collisional drag which suppresses the formation of REs. The particle injection methods attempted have been shell pellet injection, massive gas injection, and shattered pellet injection (SPI). The SPI technique has been successfully used on DIII-D [1] to study thermal mitigation using a single-barrel SPI system that can more efficiently reach the critical density required for successful disruption mitigation than the other injection approaches. Recently, a new three-barrel second SPI (SPI-II) system has been developed for use on DIII-D to study injection effects from multiple toroidal locations and pellet timing. The SPI-II system is a liquid helium cooled pipe gun that has two 7 mm and one 8.5 mm pellet sizes. The pellet sizes are determined by the inner diameter of the pipe gun barrels which can easily be changed for different pellet sizes. The three pellets can be formed and fired individually or simultaneously. The SPI-II has provisions for making and firing pure species pellets with deuterium, neon, or argon and also deuterium layered pellets with a core of neon. The pellets are fired into a bent tube near the plasma edge which shatters them from the impact. This paper will describe the design and commissioning of the SPI-II system. Measured pellet speeds and shattered pellet fragment sizes will be reported.

Meitner, Steven↗

ON THE EXISTENCE OF 'RADIO THERMALLY ACTIVE' GALACTIC SUPERNOVA REMNANTS

In this paper, we investigate the possibility of significant production of thermal bremsstrahlung radiation at radio continuum frequencies that could be linked to some Galactic supernova remnants (SNRs). The main targets for this investigation are SNRs expanding in high-density environments. There are several indicators of radio thermal bremsstrahlung radiation from SNRs, such as a flattening at higher frequencies and thermal absorption at lower frequencies intrinsic to an SNR. In this work, we discuss the radio continuum properties of three SNRs that are the best candidates for testing our hypothesis of significant thermal emission. In the case of SNRs IC 443 and 3C 391, thermal absorption has been previously detected. For IC 443, the contribution of thermal emission at 1 GHz, from our model fit is 3%-57%. It is similar to the estimate obtained from the thermal absorption properties (10%-40% at 1 GHz). In the case of the 3C 391 the conclusions are not so clear. The results from our model fit (thermal emission contribution of 10%-25% at 1 GHz) and results obtained from the low-frequency absorption (thermal contribution of 0.15%-7% at 1 GHz) do not overlap. For the SNR 3C 396 we suggest that if previously detected thermal absorption could be intrinsic to the SNR then the thermal emission (<47% at 1 GHz from our model fit) could be significant enough to shape the radio continuum spectrum at high frequencies. Polarization observations for these SNRs can constrain the strength of a thermal component. Reliable observations at low frequencies (<100 MHz) are needed as well as more data at high radio frequencies (>1 GHz), in order to make stronger conclusions about the existence of 'radio thermally active' SNRs.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrated plan for LArTPC neutrino detectors in the US

We present an integrated R&D plan aimed at demonstrating the ability to build a very large Liquid Argon Time Projection Chamber (LArTPC), on a scale suitable for use as a Far Detector for the LBNE neutrino oscillation experiment. This plan adopts current LArTPC R&D-related activities and proposes new ones to address questions that go beyond those being answered by the current efforts. We have employed a risk evaluation strategy to identify questions that can be answered (or risks that can be mitigated) through one or more R&D steps. In summary form, the plan consists of the following pre-existing components: (1) The Materials Test Stand program, now in operation at Fermilab, addressing questions pertaining to maintenance of argon purity; (2) Existing electronics test stands at FNAL and BNL; (3) The Liquid Argon Purity Demonstrator (LAPD) now being assembled at Fermilab; (4) The ArgoNeuT prototype LArTPC, now running in the NuMI beam; (5) The MicroBooNE experiment, proposed as a physics experiment that will advance our understanding of the LArTPC technology, now completing its conceptual design phase; (6) A software development effort that is well integrated across present and planned LArTPC detectors. We are proposing to add to these efforts the following: (1) A membrane cryostat mechanical prototype to evaluate and gain expertise with this technology; (2) An installation and integration prototype, to understand issues pertaining to detector assembly, particularly in an underground environment; (3) A {approx} 5% scale electronics systems test to understand system-wide issues as well as individual component reliability. (4) A calibration test stand that would consist of a small TPC to be exposed to a test beam for calibration studies, relevant for evaluation of physics sensitivities. We have developed a timeline and milestones for achieving these goals as discussed in Section 4. The proposed activities necessary for the final design of LAr20 are complete by CD3 in 2014.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗