Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Application of statistical distribution theory to launch-on-time for space construction logistic support

The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

Morgenthaler, George W.↗

Computer aided system engineering for space construction

This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

Racheli, Ugo↗

Preliminary design of a lunar construction utility vehicle

Construction of a lunar base, prior to manned occupancy, is one of the most demanding technological challenges facing space system designers today. A flexible lunar construction machine is needed that can be operated remotely and that can perform a variety of construction tasks over a wide range of lunar conditions. A preliminary lunar construction utility vehicle (LCUV) design has been developed as part of a capstone design course at Old Dominion University and is described in this summary report. The design requirements are taken from a 1988 USRA Summer Design Report entitled The Lunar Split Mission: A Robotic Constructed Lunar Base Scenario, and from the proceedings of a workshop hosted by United Technologies Corporation entitled Report of the In Situ Resources Utilization Workshop. The first report describes a bootstrap base concept in which a minimum of essential surface elements are delivered and configured such that minimum EVA is required to bring the initial base on-line. The base is to be built in three phases, the first of which will be unmanned, while the second and third will be manned. The key to these concepts is the development of a semiautonomous, telerobotic lunar construction utility vehicle (LCUV). The tasks required of this robotic vehicle during the phase 1 build-up are as follows: (1) surface element transportation, handling, and assembly; (2) soil excavation and movement for site preparation; (3) radiation protection and materials processing; and (4) repair and maintenance of surface elements. In order to meet the stated requirements, the LCUV must be: (1) transformable to perform a wide variety of tasks; (2) self supporting; (3) designed to allow for telerobotic control as well as autonomous operation; (4) able to transport one fully configured space station common module (SSCM); (5) upgradable to allow for future growth; and (6) easy to maintain.

Bryant, C. A.↗

Accelerated aging test results for aerospace wire insulation constructions

Several wire insulation constructions were evaluated with and without continuous glow discharges at low pressure and high temperature to determine the aging characteristics of acceptable wire insulation constructions. It was known at the beginning of the test program that insulation aging takes several years when operated at normal ambient temperature and pressure of 20 C and 760 torr. Likewise, it was known that the accelerated aging process decreases insulation life by approximately 50% for each 10 C temperature rise. Therefore, the first phases of the program, not reported in these test results, were to select wire insulation constructions that could operate at high temperature and low pressure for over 10,000 hours with negligible shrinkage and little materials' deterioration.The final phase of the program was to determine accelerated aging characteristics. When an insulation construction is subjected to partial discharges the insulation is locally heated by the bombardment of the discharges, the insulation is also subjected to ozone and other deteriorating gas particles that may significantly increase the aging process. Several insulation systems using either a single material or combinations of teflon, kapton, and glass insulation constructions were tested. All constructions were rated to be partial discharge and/or corona-free at 240 volts, 400 Hz and 260 C (500 F) for 50, 000 hours at altitudes equivalent to the Paschen law. Minimum partial discharge aging tests were preceded by screening tests lasting 20 hours at 260 C. The aging process was accelerated by subjecting the test articles to temperatures up to 370 C (700 F) with and without partial discharges. After one month operation with continuous glow discharges surrounding the test articles, most insulation systems were either destroyed or became brittle, cracked, and unsafe for use. Time with space radiation as with partial discharges is accumulative.

Dunbar, William G.↗

Perl Modules for Constructing Iterators

The Iterator Perl Module provides a general-purpose framework for constructing iterator objects within Perl, and a standard API for interacting with those objects. Iterators are an object-oriented design pattern where a description of a series of values is used in a constructor. Subsequent queries can request values in that series. These Perl modules build on the standard Iterator framework and provide iterators for some other types of values. Iterator::DateTime constructs iterators from DateTime objects or Date::Parse descriptions and ICal/RFC 2445 style re-currence descriptions. It supports a variety of input parameters, including a start to the sequence, an end to the sequence, an Ical/RFC 2445 recurrence describing the frequency of the values in the series, and a format description that can refine the presentation manner of the DateTime. Iterator::String constructs iterators from string representations. This module is useful in contexts where the API consists of supplying a string and getting back an iterator where the specific iteration desired is opaque to the caller. It is of particular value to the Iterator::Hash module which provides nested iterations. Iterator::Hash constructs iterators from Perl hashes that can include multiple iterators. The constructed iterators will return all the permutations of the iterations of the hash by nested iteration of embedded iterators. A hash simply includes a set of keys mapped to values. It is a very common data structure used throughout Perl programming. The Iterator:: Hash module allows a hash to include strings defining iterators (parsed and dispatched with Iterator::String) that are used to construct an overall series of hash values.

Tilmes, Curt↗

Constructing an Efficient Self-Tuning Aircraft Engine Model for Control and Health Management Applications

Self-tuning aircraft engine models can be applied for control and health management applications. The self-tuning feature of these models minimizes the mismatch between any given engine and the underlying engineering model describing an engine family. This paper provides details of the construction of a self-tuning engine model centered on a piecewise linear Kalman filter design. Starting from a nonlinear transient aerothermal model, a piecewise linear representation is first extracted. The linearization procedure creates a database of trim vectors and state-space matrices that are subsequently scheduled for interpolation based on engine operating point. A series of steady-state Kalman gains can next be constructed from a reduced-order form of the piecewise linear model. Reduction of the piecewise linear model to an observable dimension with respect to available sensed engine measurements can be achieved using either a subset or an optimal linear combination of "health" parameters, which describe engine performance. The resulting piecewise linear Kalman filter is then implemented for faster-than-real-time processing of sensed engine measurements, generating outputs appropriate for trending engine performance, estimating both measured and unmeasured parameters for control purposes, and performing on-board gas-path fault diagnostics. Computational efficiency is achieved by designing multidimensional interpolation algorithms that exploit the shared scheduling of multiple trim vectors and system matrices. An example application illustrates the accuracy of a self-tuning piecewise linear Kalman filter model when applied to a nonlinear turbofan engine simulation. Additional discussions focus on the issue of transient response accuracy and the advantages of a piecewise linear Kalman filter in the context of validation and verification. The techniques described provide a framework for constructing efficient self-tuning aircraft engine models from complex nonlinear simulations.Self-tuning aircraft engine models can be applied for control and health management applications. The self-tuning feature of these models minimizes the mismatch between any given engine and the underlying engineering model describing an engine family. This paper provides details of the construction of a self-tuning engine model centered on a piecewise linear Kalman filter design. Starting from a nonlinear transient aerothermal model, a piecewise linear representation is first extracted. The linearization procedure creates a database of trim vectors and state-space matrices that are subsequently scheduled for interpolation based on engine operating point. A series of steady-state Kalman gains can next be constructed from a reduced-order form of the piecewise linear model. Reduction of the piecewise linear model to an observable dimension with respect to available sensed engine measurements can be achieved using either a subset or an optimal linear combination of "health" parameters, which describe engine performance. The resulting piecewise linear Kalman filter is then implemented for faster-than-real-time processing of sensed engine measurements, generating outputs appropriate for trending engine performance, estimating both measured and unmeasured parameters for control purposes, and performing on-board gas-path fault diagnostics. Computational efficiency is achieved by designing multidimensional interpolation algorithms that exploit the shared scheduling of multiple trim vectors and system matrices. An example application illustrates the accuracy of a self-tuning piecewise linear Kalman filter model when applied to a nonlinear turbofan engine simulation. Additional discussions focus on the issue of transient response accuracy and the advantages of a piecewise linear Kalman filter in the context of validation and verification. The techniques described provide a framework for constructing efficient self-tuning aircraft engine models from complex nonlinear simulatns.

Armstrong, Jeffrey B.↗

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana↗

Life Cycle Assessment and Design of LignoBlock: A Lignin Bound Block on the Path Towards a Green Transition of the Construction Industry

Lignin-based biopolymer-bound soil composites (BSCs) are a new class of sustainable construction materials that utilize a bio-based biopolymer — lignin — as a binder. Prior use of lignin suggests that lignin is a promising candidate for the development of bio-based construction materials. Inspired by these applications, lignin-based BSCs were developed using lignoboost lignin, lignoforce lignin, alkali lignin, and hydrolysis lignin. Uni-axial compressive testing of lignin-based BSC shows that the compressive strength for these BSCs range from 1.6–8.1 MPa, which makes them appropriate for low compressive strength construction applications. We performed a life cycle assessment (LCA) of lignin-based BSC, with the functional unit being a CMU-sized block ( V =6423 cm -3 ). The major advantage of BSC lies in the elimination of ordinary portland cement, which is common to many construction materials, including many forms of concrete. Furthermore, the use of lignin in lignin-based BSC results in carbon sequestration (lignin ≈ 60 wt% carbon), potentially making construction materials made from lignin-based BSC carbon negative. Additionally, a design guide for estimating the life cycle carbon footprint of lignin-based BSC for a required compressive strength was developed. By utilizing the results from material tests and the LCA, designers are now able to use lignin effectively in construction applications, as they can now design lignin-based BSC for a target compressive strength with a full understanding of the life cycle carbon footprint implications.

Lignin↗

Fabrication and Characterization of A Lunar Simulant-Based Sintered Construction Material

In-situ resource utilization (ISRU) is critical to enable future efforts to have a long-term human presence on the Moon as well as Mars. ISRU technologies are being developed for radiation protection, dust mitigation, thermal insulation, and other applications. One such ISRU technology for creating construction materials out of lunar and Martian regolith is sintering, which is a thermal-based construction process that bonds finely grained material together at temperatures below the melting point. However, the conditions employed during the sintering, such as temperature, atmospheric composition, duration of the process, and pressure, can have a significant impact on the quality and strength of the resulting materials. In parallel, the development of methods for characterizing the quality, porosity, density, and other properties of these materials is critical. X-ray computed tomography (X-ray CT) can image large changes in density within a material, such as the presence of pores throughout an otherwise uniform medium, with relatively high spatial resolution. Similarly, Terahertz time-domain spectroscopic (THz-TDS) imaging is sensitive to density variations within samples, but is restricted to non-conducting materials. Specifically, previous work has shown that the refractive index (n eff ) values obtained through the analysis of THz-TDS images increases with increasing density within plastic samples. Even further, this work showed that it is possible to create a calibration curve for a given material from samples of different, but known density, which can enable one to directly convert n eff to density for samples having the same composition, but unknown density. Here, we report on the fabrication of a lunar simulant-based sintered construction material using vacuum hot pressed (VHP) sintering, then show X-ray CT and THz-TDS imaging results of the sample, which show spatial variations in the material. This has important implications for efforts to improve these types of lunar construction material processes and verify the quality of these materials in terms of consolidation. To the best of our knowledge, there is no previous work utilizing VHP sintering to make lunar simulant-based construction materials or exploring the feasibility of THz imaging to spatially map the density variation through a lunar simulant-based construction material.

Terahertz time-domain spectroscopic imaging↗

Illumina Unamplified Indexed Library Construction: An Automated Approach

Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.

59 BASIC BIOLOGICAL SCIENCES↗

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China

The construction and demolition waste generation rates (C and D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m{sup 2} and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C and D waste management in China.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How much have adverse occupational health outcomes among construction workers improved over time? Evidence from 25 years of medical screening

Background Construction workers have always had a high risk of occupational illnesses. We used 25 years of data from a medical screening program serving older construction workers to determine how much health outcomes have improved over the past 60 years. Methods We investigated changes in relative risk for chest radiographs consistent with pneumoconiosis, COPD by spirometry, lung cancer mortality, and audiometry-assessed hearing impairment among workers participating in a medical screening program. Results were stratified by decade of first construction employment: before 1960, 1960–1969, 1970–1979, 1980–1989, and after 1990. Poisson and Cox regression analyses assessed relative risk by decade adjusted for age, sex, smoking, and years of construction trade work. Results Subjects were 94% male and, on average, 60 years old with 25 years of construction work. When compared to workers employed before 1960, those first employed after 1990 experienced the following reductions in model-adjusted relative risks: chronic obstructive pulmonary disease, 32%; all pneumoconiosis, 68%; parenchymal abnormalities, 35%; pleural abnormalities, 71%; hearing impairment, 20%; and lung cancer mortality, 48%. Risks started to decline in the 1960s with greatest reductions among workers first employed after 1970. Conclusions This study demonstrates the positive impact that adoption of occupational health protections have had over the past 60 years. The greatest risk reductions were observed for outcomes with strong regulatory and legal incentives to reduce exposures and associated risks, such as those associated with inhalation hazards (asbestos and silica), while lowest improvement was for hearing impairment, for which little regulatory enforcement and few prevention incentives have been adopted.

60 APPLIED LIFE SCIENCES↗

Mortality of older construction and craft workers employed at Department of Energy (DOE) nuclear sites: Follow‐up through 2021

Background To determine if construction and trades workers formerly employed at US Department of Energy (DOE) nuclear weapons sites are at significant risk for occupational diseases, we studied the mortality experience of participants in the Building Trades National Medical Screening Program (BTMed). Methods The cohort included 26,922 participants enrolled between 1998 and 2021 and 8367 deaths. Standardized mortality ratios were calculated based on US death rates. Cox models compared construction workers (n = 22,747; 7487 deaths) to two nonconstruction subpopulations: administrative, scientific and security workers (n = 1894; 330 deaths), and all other nonconstruction workers (n = 2218; 550 deaths). Results Mortality was elevated for all causes, all cancers, cancers of the trachea, bronchus, lung, kidneys, and lymphatic and hematopoietic system, mesothelioma, chronic obstructive pulmonary disease (COPD), asbestosis, transportation injuries, and other injuries, particularly accidental poisonings. There were 167 deaths from coronavirus disease 2019 (COVID-19), which was lower than expected using US death rates. Overall cause-specific mortality was significantly higher among construction workers than for internal comparison groups. Conclusions Construction workers employed at DOE sites have a significantly increased risk for occupational illnesses. Apart from COVID-19 deaths, this update: (1) found that mortality among construction workers is significantly elevated compared to the US population and significantly higher than in the internal comparison populations, and (2) confirmed excess risk for these workers for first employment after 1990. Cancer mortality risks are similar to the cancers identified for DOE compensation from radiation exposures. In conclusion, the high lung cancer risk supports the value of early lung cancer detection. Continued medical surveillance is important.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Social cost in construction projects

Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

54 ENVIRONMENTAL SCIENCES↗

Architects' perspectives on construction waste reduction by design

The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

54 ENVIRONMENTAL SCIENCES↗