Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous improvement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Upscaling of Bio-mediated Soil Improvement

As demand for soil improvement continues to increase, new, sustainable, and innocuous methods are needed to alter the mechanical properties of soils. Recent research has demonstrated the potential of bio-mediated soil improvement for geotechnical applications (DeJong et al. 2006, Whiffin et al. 2007). Upscaling the bio-mediated treatment process for in situ implementation presents a number of challenges to be addressed, including soil and pore fluid interactions, bioaugmentation versus biostimulation of microbial communities, controlled distribution of mediated calcite precipitation, and permanence of the cementation. Current studies are utilizing large-scale laboratory experiments, non-destructive geophysical measurements, and modeling, to develop an optimized and predictable bio-mediated treatment method.

54 ENVIRONMENTAL SCIENCES↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

Microscopy Studies of the Catalyst Inks for PEM Fuel Cells

The microstructure of the catalyst layer in proton exchange membrane fuel cells (PEMFC) is one of the key factors that determine fuel cell performance. The ink preparation, including dispersion solvent, mixing time, and mixing power, are among the less reported parameters that would influence the ionomer distribution on the catalyst surface and the continuity of the carbon network. In this work, novel characterization approaches have been used to investigate the effect of the Pt/C catalyst ink preparation conditions on the morphology and structures of the catalyst layer. Microscopy analysis revealed that longer mixing time led to better performing electrode structures than shorter mixing time. The longer mixing time enabled improved continuity of the ionomer network and high porosity in the cathode layer that contributes to improved proton conductivity and mass transport. This has been reflected in performance and durability tests, where the electrode made from a 5-day catalyst ink displayed improved performance compared to the one made from a 3-day ink. Durability studies showed 26% and 43% loss of the initial mass activity for 5 days and 3 days mixing, respectively. Finally, in addition, the catalyst layer prepared with ethylene glycol as the dispersion solvent showed better durability than water/1-propanol based solution.

25 ENERGY STORAGE↗

ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

42 ENGINEERING↗

The MCNP ® 6 code: A decade of progress

After several years of effort involved in merging the Los Alamos National Laboratory MCNP5 and MCNPX codes, in 2013 the first production release of version 6 of the Monte Carlo N-Particle ® , or MCNP ® , code MCNP6.1 was distributed publicly. Since then, three significant releases have been issued: MCNP6.1.1beta in 2014, MCNP6.2 in 2018, and MCNP6.3 in 2023. While each release always contains new features, code enhancements, and bug fixes, each version has had a different primary focus, ranging from improved calculational efficiency to new powerful utilities and tools, to software modernization of the code base. With all that has been learned over the first decade of the MCNP6 code, continuous progress is being made toward a modernized, general-purpose Monte Carlo radiation transport code that remains a trusted resource for the global community of practitioners. This paper describes these first 10+ years of the MCNP6 code and its continually improving data libraries, and gives some insight into how the next decade is expected to unfold.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

5-year Infrastructure plan at FNAL

Fermilab's 5-year infrastructure plan aims to create a sustainable, safe, and long-lasting pavement network by prioritizing lower-rated pavements first for regular maintenance. FNAL should address the most distressed areas promptly, to extend sitewide pavement longevity and reduce overall maintenance costs. This approach compounds improvements by freeing future year’s capital for more routine pavement maintenance. This allows greater surface areas to be addressed each year, until a sustainable cycle can be achieved. The continually improvements enhance safety, benefit employees, visitors, and equipment transportation while aligning with Fermilab's commitment to environmental responsibility.

Washington, Davion↗

Survey of Advanced Booster Options for Potential Shuttle Derivative Vehicles

A never-ending major goal for the Space Shuttle program is to continually improve flight safety, as long as this launch system remains in operational service. One of the options to improve system safety and to enhance vehicle performance as well, that has been seriously studied over the past several decades, is to replace the existing strap-on four segment solid rocket boosters (SRB's) with more capable units. A number of booster upgrade options have been studied in some detail, ranging from five segment solids through hybrids and a wide variety of liquid strap-ons (both pressure and pump fed with various propellants); all the way to a completely reusable liquid fly back booster (complete with air breathing engines for controlled landing and return). All of these possibilities appear to offer improvements in varying degrees; and each has their strengths and weaknesses from both programmatic and technical points of view. The most beneficial booster upgrade/design, if the shuttle program were to continue long enough to justify the required investment, would be an approach that greatly increased both vehicle and crew safety. This would be accomplished by increasing the minimum range/minimum altitude envelope that would readily allow abort to orbit (ATO), possibly even to zero/zero, and possibly reduce or eliminate the Return to Launch Site (RTLS) and even the Trans Atlantic Landing (TAL) abort mode requirements. This paper will briefly survey and discuss all of the various booster'upgrade options studied previously, and compare their relative attributes. The survey will explicitly discuss, in summary comparative form, options that include: five segment solids; several hybrid possibilities; pressure and/or pump-fed liquids using either LO2/kerosene, H2O/kerosene and LO2/J2, any of which could be either fully expendable, partly or fully reusable; and finally a fully reusable liquid fly back booster system, with a number of propellant and propulsion system options. Performance and configuration comparison illustrations and tables will be included to provide a comprehensive survey for the paper.

Sackheim, Robert L.↗

Reduction in Dynamic Visual Acuity Reveals Gaze Control Changes Following Spaceflight

INTRODUCTION: Exposure to microgravity causes adaptive changes in eye-head coordination that can lead to altered gaze control. This could affect postflight visual acuity during head and body motion. The goal of this study was to characterize changes in dynamic visual acuity after long-duration spaceflight. METHODS: Dynamic Visual Acuity (DVA) data from 14 astro/cosmonauts were collected after long-duration (~6 months) spaceflight. The difference in acuity between seated and walking conditions provided a metric of change in the subjects ability to maintain gaze fixation during self-motion. In each condition, a psychophysical threshold detection algorithm was used to display Landolt ring optotypes at a size that was near each subject s acuity threshold. Verbal responses regarding the orientation of the gap were recorded as the optotypes appeared sequentially on a computer display 4 meters away. During the walking trials, subjects walked at 6.4 km/h on a motorized treadmill. RESULTS: A decrement in mean postflight DVA was found, with mean values returning to baseline within 1 week. The population mean showed a consistent improvement in DVA performance, but it was accompanied by high variability. A closer examination of the individual subject s recovery curves revealed that many did not follow a pattern of continuous improvement with each passing day. When adjusted on the basis of previous long-duration flight experience, the population mean shows a "bounce" in the re-adaptation curve. CONCLUSION: Gaze control during self-motion is altered following long-duration spaceflight and changes in postflight DVA performance indicate that vestibular re-adaptation may be more complex than a gradual return to normal.

Peters, Brian T.↗

H-Canyon Ventilation System Exhaust Tunnel Inspection at the Savannah River Site - 18052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program (SIP) performs periodic visual inspections to confirm the component is capable of performing its safety function. This Program provides the process to document the conditions of safety related structural systems and components, their damage mechanisms, and recommend repairs if required before there is impact on the safety envelope. The H-Canyon Exhaust Tunnel is part of the H-Canyon Exhaust Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel. Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras prior to CY2003. Since CY2003, five camera equipped crawlers have been used with varying levels of inspection success. With each successive crawler inspection, expectations have increased to perform tasks beyond visual examinations. The 2017 crawler performed the visual inspection but also included improvements on crawler performance, such as testing the use of wireless capability and remediation of crawler travel route, to the addition of stationary cameras and lighting at key locations. The latest 2017 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System for the second time since development, thus providing key visual data for the integrity program [2]. In addition, several access ports were installed in 2017 following the removal of concrete core samples that allow for new visual inspection of the Canyon Crossover tunnel, thus providing information for an area that was generally inaccessible for monitoring. Planning for the 2019 crawler inspection is underway with the expectations to improve upon inspection cameras and also introduce mapping technologies such as LIDAR. The challenge to obtain meaningful data from the remote inspections of a 60+ year operating Canyon Exhaust tunnel continues to be a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the continuing improvements in inspection techniques and the challenges associated these inspections. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Getting back to the grass roots: harnessing specialized metabolites for improved crop stress resilience

Roots remain understudied as the site of complex and important biological interactions mediating plant productivity. In grain and bioenergy crops, grass root specialized metabolites (GRSM) are central to key interactions, yet our basic knowledge of the chemical language remains fragmentary. Continued improvements in plant genome assembly and metabolomics are enabling large-scale advances in the discovery of specialized metabolic pathways as a means of regulating root-biotic interactions. Metabolomics, transcript coexpression analyses, forward genetic studies, gene synthesis and heterologous expression assays drive efficient pathway discoveries. Functional genetic variants identified through genome wide analyses, targeted CRISPR/Cas9 approaches, and both native and non-native overexpression studies critically inform novel strategies for bioengineering metabolic pathways to improve plant traits.

59 BASIC BIOLOGICAL SCIENCES↗

BATSE Solar Flare Spectroscopy

This final report describes the progress originally proposed: (1) the continued improvement of a software and database environment capable of supporting all users of BATSE solar data as well as providing scientific expertise and effort to the BATSE solar community; (2) the continued participation with the PI team and other guest investigators in the detailed analysis of the BATSE detectors' response at low energies; (3) using spectroscopic techniques to fully exploit the potential of electron time-of-flight studies; and, (4) a full search for flare gamma-ray line emission at 2.2 MeV from all GOES X-class flares observed with BATSE.

Schwartz, R. A.↗

Workshop on Discovery Lessons-Learned

As part of the Discovery Program's continuous improvement effort, a Discovery Program Lessons-Learned workshop was designed to review how well the Discovery Program is moving toward its goal of providing low-cost research opportunities to the planetary science community while ensuring continued U.S. leadership in solar system exploration. The principal focus of the workshop was on the recently completed Announcement of Opportunity (AO) cycle, but the program direction and program management were also open to comment. The objective of the workshop was to identify both the strengths and weaknesses of the process up to this point, with the goal of improving the process for the next AO cycle. The process for initializing the workshop was to solicit comments from the communities involved in the program and to use the feedback as the basis for establishing the workshop agenda. The following four sessions were developed after reviewing and synthesizing both the formal feedback received and informal feedback obtained during discussions with various participants: (1) Science and Return on Investment; (2) Technology vs. Risk; Mission Success and Other Factors; (3) Cost; and (4) AO.AO Process Changes and Program Management.

Saunders, M.↗

Tracking the Short Term Planning (STP) Development Process

Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

Price, Melanie↗

SRR's 'Next Step' in the Lean Journey -Taking Lean to the Workforce - 17247

The Savannah River Site, a U.S. Department of Energy (DOE) facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. At SRR, the Lean business management system has been adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. The first step of the SRR Lean Journey was to formally identify areas of improvement and initiate Value Stream Analysis (VSAs) and Rapid Improvement Events (RIEs). SRR has achieved improvements in procedure implementation, work planning and control, project schedule compression, and engineering requirements. SRR is now phasing in the next phase of Lean through Managing for Daily Improvement (MDI), Visual Management and 5S (sort, set in order, shine, standardize, and sustain). MDI is a fundamental Lean principle in that we use our most valuable asset, our employees, to drive continuous improvement versus a smaller population through formal events. Part of MDI includes visual management where the workforce can go to a 'dashboard' to see and understand the company mission and status. 5S is a process where a work group improves performance in an area by addressing physical organization, efficiency, uniformity, standardization, and mechanisms to sustain improvements. 5S stands for: Sort, Set in Order, Shine, Standardize, and Sustain. This paper will focus on the 'Next Step' in SRR's Lean journey by address how SRR is implementing MDI and 5S to improve CONOPs, Project efficiencies, and worker engagement in day to day operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory, Performance Improvement Strategy, Fiscal Years 2012-2016

This document presents the Los Alamos National Laboratory (LANL) Multiyear Strategy for Performance Improvement for FY12-FY16 in accordance with Clause H-3 Contractor Multiyear Strategy for Performance Improvement of the National Nuclear Security Administration (NNSA) Contract No. DE-AC52-06NA2S396. "The Contractor shall develop a multiyear strategy that details (1) its planned efforts and expected accomplishments by year, to continuously improve its management and performance at the Laboratory, and (2) the planned efforts and contributions of its Parent Organization. The multiyear strategy shall also address planned efforts to (1) enhance Contractor communications, cooperation and integration with the NNSA Weapon Complex, with emphasis on Lawrence Livermore National Laboratory (LLNL); and, (2) contribute to overall NNSA Weapon Complex improvements in performance. The listing of the Contractor's planned efforts and expected accomplishments from its Offer in response to Solicitation No. DE-RP52-05NA25396 for FY06 (June 1, 2006 - September 30, 2006, partial year) and FY07 shall be addressed in the initial multiyear strategy. Subsequent annual updates shall be submitted to the Contracting Officer no later than May 15th of each year. Performance measures for these planned efforts and expected accomplishments may be considered for inclusion in the Contract's Performance Evaluation Plan."

99 GENERAL AND MISCELLANEOUS↗

Performance Improvement Strategy FY14-18: Create Our Future Strengthen the Core

This document presents the Los Alamos National Laboratory (LANL) Multiyear Strategy for Performance Improvement for FY14–FY18 in accordance with Clause H-3 Contractor Multiyear Strategy for Performance Improvement of the National Nuclear Security Administration (NNSA) Contract No. DE-AC52-06NA25396. “The Contractor shall develop a multiyear strategy that details (1) its planned efforts and expected accomplishments by year, to continuously improve its management and performance at the Laboratory, and (2) the planned efforts and contributions of its Parent Organization. “The multiyear strategy shall also address planned efforts to (1) enhance Contractor communications, cooperation and integration with the NNSA Weapons Complex, with emphasis on Lawrence Livermore National Laboratory; and, (2) contribute to overall NNSA Weapons Complex improvements in performance. The listing of the Contractor’s planned efforts and expected accomplishments from its offer in response to Solicitation No. DE-RP52-05NA25396 for FY2006 (June 1, 2006 – September 30, 2006, partial year) and FY2007 shall be addressed in the initial multiyear strategy. Subsequent annual updates shall be submitted to the Contracting Officer no later than May 15th of each year. Performance measures for these planned efforts and expected accomplishments may be considered for inclusion in the Contract’s Performance Evaluation Plan.”

99 GENERAL AND MISCELLANEOUS↗

An Indicator-based Approach to Sustainable Management of Natural Resources (Chapter 12)

Assessing the sustainability of natural resource management choices for agricultural and forest lands requires quantification of potential changes to a set of environmental and socioeconomic indicators selected to characterize reference scenarios relative to projected future scenarios. Correctly framing the questions with local stakeholders is a critical first step in the sustainability assessment, and the questions that can be addressed are often limited by data availability. Selecting and prioritizing indicators with stakeholders to address their needs and concerns improves the likelihood of investment in monitoring and evaluation of those indicators over time. Computational techniques for analyzing interactions between the selected indicators are inherently affected by the scales and formats of the assembled indicator datasets. Data analytics have the potential to improve understanding of the potential synergies and tradeoffs involved with meeting multiple environmental and socioeconomic goals simultaneously, but timely and appropriate indicator datasets are not always available—even in this new era of “big data.” Continued improvements in data science and data analytics are needed to broaden understanding and acceptance of problems and to provide valuable information for natural resource management. Advances in these areas will enable society to design future landscapes that meet multiple objectives, including the provisioning of agricultural and forest resources along with a variety of ecosystem services (e.g., clean water and healthy soils).

Parish, Esther↗