Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated command and control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Coordination of multiple robot arms

Kinematic resolved-rate control from one robot arm is extended to the coordinated control of multiple robot arms in the movement of an object. The structure supports the general movement of one axis system (moving reference frame) with respect to another axis system (control reference frame) by one or more robot arms. The grippers of the robot arms do not have to be parallel or at any pre-disposed positions on the object. For multiarm control, the operator chooses the same moving and control reference frames for each of the robot arms. Consequently, each arm then moves as though it were carrying out the commanded motions by itself.

Barker, L. K.↗

Cross-Cultural Barriers to Effective Communication in Aviation

Recent research on communication and performance in airline flight crews has led to a concept of shared mental models that is associated with effective, efficient team coordination in problem solving and decision making situations. Elements that characterize efficient communication have been identified. This research, however, was based strictly on US crews. More recent studies supported by NASA have identified cultural factors that influence communication among team members who vary in their status and roles. Research is just beginning to identify commonalities and culturally distinct strategies for accomplishing joint tasks. ASRS incident reports have been analyzed to identify language barriers in flight that have safety consequences. Implications of these concepts and findings for multi-cultural command and control will be explored.

Orasanu, Judith↗

Control framework for hand-arm coordination

Coordination of multiple manipulators requires cooperation at several levels in the control hierarchy. A distributed processing environment with no hardware dependencies except at the motor servo level would provide a flexible architecture for coordination. A system on these lines is being built to control an articulated hand and an arm. The four levels of control envisaged include a task decomposition level, a planning level, a scheduling level, and a server level. The hand will carry both force and tactile sensors, feedback from these are used to provide adaptive control in grasping tasks. The processing of the sensory information is performed by independent processes, with analyzed information being sent to the relevant layer of the system. The manipulators are also controlled by individual processes. All process can open communications with an active process sending commands or data, or receiving them. The scope of the system and the current setup are described along with future lines of development.

Agrawal, Sanjay↗

Considerations for Isochronous Data Services over the Proximity-1 Space Link

Future mission concepts for robotic and human explorations will involve a high level of real time control/monitoring operations such as tele-operation for spacecraft rendezvous and surface mobile platforms carrying life-support equipments. The timely dissemination of voice, command, and real-time telemetry for monitoring and coordination purposes is critical for mission success. It is envisioned that future missions will require a network infrastructure capable of supporting isochronous data services. The CCSDS Proximity-1 Space Link Protocol1 could be used to carry isochronous traffic. This paper we will focus on the data link layer portion of the Proximity-1 protocol specification and analyze its jitter and performance for supporting isochronous applications. In particular we will focus on constrained scenarios where the protocol operates in full-duplex mode, carrying isochronous traffic in one direction and error-controlled traffic in the other direction. We analyze the impact of the strict priority scheme in Proximity-1 used to arbitrate channel access on the latency jitter of the isochronous traffic and the efficiency of the reliable data transfer. In general, jitter performance is driven by the loading of the acknowledgement traffic on the forward link. Under light loading condition, the upper-bound of the delay jitter is the transmission duration of an acknowledgement frame on the forward link; for higher loading scenarios, the maximum jitter is scaled up by the inverse of the residual bandwidth, i.e., the spare capacity available in the forward link after accounting for the acknowledgement traffic. We derive analytical expression on the maximum jitter and discuss its performance.

space link↗

Development of a safe ground to space laser propagation system for the optical communications telescope laboratory

Furthering pursuits in high bandwidth communications to future NASA deep space and neat-Earth probes, the Jet Propulsion Laboratory (JPL) is building the Optical communications Telescope Laboratory (OCTL) atop Table Mountain in Southern California. This R&D optical antenna will be used to develop optical communication strategies for future optical ground stations. Initial experiments to be conducted include propagating high-powered, Q-switched laser beams to retro-reflecting satellites. Yet laser beam propagation from the ground to space is under the cognizance of various government agencies, namely: the Occupational Safety and Health Administration (ISHA) that is responsible for protecting workforce personnel; the Federal Aviation Administration (FAA) responsible for protecting pilots and aircraft; and the Laser Clearinghouse of Space Command responsible for protecting space assets. To ensure that laser beam propagation from the OCTL and future autonomously operated ground stations comply with the guidelines of these organizations, JPL is developing a multi-tiered safety system that will meet the coordination, monitoring, and reporting functions required by the agencies. At Tier 0, laser operators will meet OSHA safety standards for protection and access to the high power lasers area will be restricted and interlocked. Tier 1, the area defined from the telescope dome out to a range of 3.4-km, will utilize long wave infrared camera sensors to alert operators of at risk aircraft in the FAA controlled airspace. Tier 2, defined to extend from 3.4-km out to the aircraft service ceiling in FAA airspace, will detect at risk aircraft by radar. Lastly, beam propagation into space, defined as Tier 3, will require coordination with the Laser Clearinghouse. A detailed description of the four tiers is presented along with the design of the integrated monitoring and beam transmission control system.

laser safety↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

42 ENGINEERING↗

Coordinated net-load management

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

Lundstrom, Blake Richard↗

Angular momentum desaturation for Skylab using gravity gradient torques

An angular momentum desaturation method for momentum exchange devices of orbiting spacecraft is described. The specific application of the method is to the Skylab which contains three double-gimbaled control moment gyros for precise attitude control and maneuvering. It is assumed that the attitude reference is inertially fixed and that two of the vehicle principal moments of inertia are much larger than the third. Gravity gradient torques and resultant angular momentum accumulation are developed for small deviations from the reference. The assumed moment-of-inertia distribution allows desaturation about all axes with only two attitude angles each for the two axes with large moments of inertia. The necessary desaturation maneuvers can be decoupled for a special set of orbital coordinates. All maneuvers are made during the night portion of the orbit, and the percentage utilized for desaturation is selectable. Expressions for the attitude angle commands are developed assuming infinite vehicle rates. The effect of finite rates introduces an efficiency into the desaturation. Expressions for this efficiency are developed and means for compensation are treated. Arbitrary misalignments between geometric vehicle axes and principal moment-of-inertia axes are permissible. An angle bias about the sun line minimizes the angular momentum accumulation about the sun line projection into the orbital plane. Adaptive desaturation maneuver limiting consistent with the available maneuver momentum is included.

Kennel, H. F.↗

Considerations for Isochronous Data Services over the Proximity-1 Space Link

Future mission concepts for robotic and human explorations will involve a high level of real time control/monitoring operations such as tele-operation for spacecraft rendezvous and surface mobile platforms carrying life-support equipments. The timely dissemination of voice, command, and real-time telemetry for monitoring and coordination purposes is critical for mission success. It is envisioned that future missions will require a network infrastructure capable of supporting isochronous data services. The CCSDS Proximity-1 Space Link Protocol1 could be used to provide isochronous service over the surface-to-Earth relay as well as "beyond-the-horizon" communications between distant Lunar or Mars surface elements. This paper will analyze the latency, jitter, and throughput performance of the Proximity-1 protocol for isochronous applications. In particular we will focus on constrained scenarios where the protocol operates in full-duplex mode, carrying isochronous traffic in one direction and error-controlled traffic in the other direction. We analyze the impact of the strict priority scheme in Proximity-1 on delay jitter and the impact of the isochronous traffic on the efficiency of the reliable data transfer in the other direction, and discuss methods for performance optimization. In general, jitter performance is driving by relative loading of isochronous traffic on the forward link compared to the acknowledgement traffic. Under light loading condition, the upper-bound of the delay jitter is the transmission duration of an acknowledgement frame on the forward link; for higher loading scenarios, the maximum jitter is scaled up by the inverse of the residual bandwidth, i.e., the spare capacity available in the forward link to carry isochronous traffic.

isochronous communications↗

Modeling the Scheduling of Eye Movements and Manual Responses in Performing a Sequence of Discrete Tasks

Common tasks in daily life are often accomplished by a sequence of actions that interleave information acquisition through the eyes and action execution by the hands. How are eye movements coordinated with the release of manual responses and how may their coordination be represented at the level of component mental operations? We have previously presented data from a typing-like task requiring separate choice responses to a series of five stimuli. We found a consistent pattern of results in both motor and ocular timing, and hypothesized possible relationships among underlying components. Here we report a model of that task, which demonstrates how the observed timing of eye movements to successive stimuli could be accounted for by assuming systems: an open-loop system generating saccades at a periodic rate, and a closed-loop system commanding a saccade based on stimulus processing. We relate this model to models of reading and discuss the motivation for dual control.

Wu, Shu-Chieh↗

Robonaut 2 and Watson: Cognitive Dexterity for Future Exploration

Future exploration missions will dictate a level of autonomy never before experienced in human spaceflight. Mission plans involving the uncrewed phases of complex human spacecraft in deep space will require a coordinated autonomous capability to be able to maintain the spacecraft when ground control is not available. One promising direction involves embedding intelligence into the system design both through the employment of state-of-the-art system engineering principles as well as through the creation of a cognitive network between a smart spacecraft or habitat and embodiments of cognitive agents. The work described here details efforts to integrate IBM's Watson and other cognitive computing services into NASA Johnson Space Center (JSC)'s Robonaut 2 (R2) anthropomorphic robot. This paper also discusses future directions this work will take. A cognitive spacecraft management system that is able to seamlessly collect data from subsystems, determine corrective actions, and provide commands to enable those actions is the end goal. These commands could be to embedded spacecraft systems or to a set of robotic assets that are tied into the cognitive system. An exciting collaboration with Woodside provides a promising Earth-bound testing analog, as controlling and maintaining not normally manned off-shore platforms have similar constraints to the space missions described.

Badger, Julia M.↗

Motivation and Design of the Sirocco Storage System Version 1.0.

Sirocco is a massively parallel, high performance storage system for the exascale era. It emphasizes client-to-client coordination, low server-side coupling, and free data movement to improve resilience and performance. Its architecture is inspired by peer-to-peer and victim- cache architectures. By leveraging these ideas, Sirocco natively supports several media types, including RAM, flash, disk, and archival storage, with automatic migration between levels. Sirocco also includes storage interfaces and support that are more advanced than typical block storage. Sirocco enables clients to efficiently use key-value storage or block-based storage with the same interface. It also provides several levels of transactional data updates within a single storage command, including full ACID-compliant updates. This transaction support extends to updating several objects within a single transaction. Further support is provided for con- currency control, enabling greater performance for workloads while providing safe concurrent modification. By pioneering these and other technologies and techniques in the storage system, Sirocco is poised to fulfill a need for a massively scalable, write-optimized storage system for exascale systems. This is version 1.0 of a document reflecting the current and planned state of Sirocco. Further versions of this document will be accessible at http://www.cs.sandia.gov/Scalable_IO/ sirocco .

97 MATHEMATICS AND COMPUTING↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Dual-arm manipulators with adaptive control

The described and improved multi-arm invention of this application presents three strategies for adaptive control of cooperative multi-arm robots which coordinate control over a common load. In the position-position control strategy, the adaptive controllers ensure that the end-effector positions of both arms track desired trajectories in Cartesian space despite unknown time-varying interaction forces exerted through a load. In the position-hybrid control strategy, the adaptive controller of one arm controls end-effector motions in the free directions and applied forces in the constraint directions; while the adaptive controller of the other arm ensures that the end-effector tracks desired position trajectories. In the hybrid-hybrid control strategy, the adaptive controllers ensure that both end-effectors track reference position trajectories while simultaneously applying desired forces on the load. In all three control strategies, the cross-coupling effects between the arms are treated as disturbances which are compensated for by the adaptive controllers while following desired commands in a common frame of reference. The adaptive controllers do not require the complex mathematical model of the arm dynamics or any knowledge of the arm dynamic parameters or the load parameters such as mass and stiffness. Circuits in the adaptive feedback and feedforward controllers are varied by novel adaptation laws.

Seraji, Homayoun↗

Method and apparatus for adaptive force and position control of manipulators

The described and improved multi-arm invention of this application presents three strategies for adaptive control of cooperative multi-arm robots which coordinate control over a common load. In the position-position control strategy, the adaptive controllers ensure that the end-effector positions of both arms track desired trajectories in Cartesian space despite unknown time-varying interaction forces exerted through a load. In the position-hybrid control strategy, the adaptive controller of one arm controls end-effector motions in the free directions and applied forces in the constraint directions; while the adaptive controller of the other arm ensures that the end-effector tracks desired position trajectories. In the hybrid-hybrid control strategy, the adaptive controllers ensure that both end-effectors track reference position trajectories while simultaneously applying desired forces on the load. In all three control strategies, the cross-coupling effects between the arms are treated as disturbances which are compensated for by the adaptive controllers while following desired commands in a common frame of reference. The adaptive controllers do not require the complex mathematical model of the arm dynamics or any knowledge of the arm dynamic parameters or the load parameters such as mass and stiffness. Circuits in the adaptive feedback and feedforward controllers are varied by novel adaptation laws.

Seraji, Homayoun↗

Advanced Diagnostic System on Earth Observing One

In this infusion experiment, the Livingstone 2 (L2) model-based diagnosis engine, developed by the Computational Sciences division at NASA Ames Research Center, has been uploaded to the Earth Observing One (EO-1) satellite. L2 is integrated with the Autonomous Sciencecraft Experiment (ASE) which provides an on-board planning capability and a software bridge to the spacecraft's 1773 data bus. Using a model of the spacecraft subsystems, L2 predicts nominal state transitions initiated by control commands, monitors the spacecraft sensors, and, in the case of failure, isolates the fault based on the discrepant observations. Fault detection and isolation is done by determining a set of component modes, including most likely failures, which satisfy the current observations. All mode transitions and diagnoses are telemetered to the ground for analysis. The initial L2 model is scoped to EO-1's imaging instruments and solid state recorder. Diagnostic scenarios for EO-1's nominal imaging timeline are demonstrated by injecting simulated faults on-board the spacecraft. The solid state recorder stores the science images and also hosts: the experiment software. The main objective of the experiment is to mature the L2 technology to Technology Readiness Level (TRL) 7. Experiment results are presented, as well as a discussion of the challenging technical issues encountered. Future extensions may explore coordination with the planner, and model-based ground operations.

Hayden, Sandra C.↗

Power Grid Simulation Testbed for Transactive Energy Management Systems

To effectively engage demand-side and distributed energy resources (DERs) for dynamically maintaining the electric power balance, the challenges of controlling and coordinating building equipment and DERs on a large scale must be overcome. Although several control techniques have been proposed in the literature, a significant obstacle to applying these techniques in practice is having access to an effective testing platform. Performing tests at scale using real equipment is impractical, so simulation offers the only viable route to developmental testing at scales of practical interest. Existing power-grid testbeds are unable to model individual residential end-use devices for developing detailed control formulations for responsive loads and DERs. Furthermore, they cannot simulate the control and communications at subminute timescales. To address these issues, this paper presents a novel power-grid simulation testbed for transactive energy management systems. Detailed models of primary home appliances (e.g., heating and cooling systems, water heaters, photovoltaic panels, energy storage systems) are provided to simulate realistic load behaviors in response to environmental parameters and control commands. The proposed testbed incorporates software as it will be deployed, and enables deployable software to interact with various building equipment models for end-to-end performance evaluation at scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kinematic rate control of simulated robot hand at or near wrist singularity

A robot hand should obey movement commands from an operator on a computer program as closely as possible. However, when two of the three rotational axes of the robot wrist are colinear, the wrist loses a degree of freedom, and the usual resolved rate equations (used to move the hand in response to an operator's inputs) are indeterminant. Furthermore, rate limiting occurs in close vicinity to this singularity. An analysis shows that rate limiting occurs not only in the vicinity of this singularity but also substantially away from it, even when the operator commands rotational rates of the robot hand that are only a small percentage of the operational joint rate limits. Therefore, joint angle rates are scaled when they exceed operational limits in a real time simulation of a robot arm. Simulation results show that a small dead band avoids the wrist singularity in the resolved rate equations but can introduce a high frequency oscillation close to the singularity. However, when a coordinated wrist movement is used in conjunction with the resolved rate equations, the high frequency oscillation disappears.

Barker, K.↗