Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Evaluating the Impacts of the Bipartisan Budget Act of 2018 45Q Tax Credit on CCS Network Costs

This study evaluates the impact of the Bipartisan Budget Act of 2018 (BBA)-amended 45Q tax credit on integrated carbon capture and storage (CCS) networks for source types and geologic storage reservoirs common to the north-central U.S. The integrated CCS networks evaluated were chosen to closely replicate those in the forthcoming National Energy Technology Laboratory (NETL) central U.S. CCS cost options study’s Northwest CCS Network Regional Impact Area (Northwest Impact Area).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗

Updated Oregon Floating Offshore Wind Cost Modeling [Slides]

The study provides heat maps showing updated estimates of the levelized cost of energy (LCOE) for floating offshore wind energy off the coast of Oregon. This project builds on a 2019 National Renewable Energy Laboratory (NREL) floating offshore wind power cost study in Oregon (Musial et al. 2019) and a recent NREL California cost analysis (Beiter et al. 2020). Floating wind power cost data, modeling methodology, and resource data are updated and LCOE is estimated through 2032 using 2019 as a reference year. Comparisons are made to the previous offshore wind energy cost studies (Musial et al. 2019; Beiter et al. 2020). The study does not prioritize specific sites or make judgments about marine spatial planning viability.

17 WIND ENERGY↗

Cost and schedule estimation study report

This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

Condon, Steve↗

EXPERIMENTAL STUDY ON COST-EFFECTIVE ADDITIVE MANUFACTURING OF SILICA AEROGEL

The conventional aerogel insulation material manufacturing from supercritical drying suffers from issues of massive energy consumption and prolonged processing time. With the consideration of large market demand of the aerogel insulation material in the next decade, a low-cost and scalable fabrication technique is highly desired. In this paper, a direct ink writing (DIW) method is used to three-dimensionally fabricate the silica aerogel insulation material, followed by ambient pressure drying. Compared to the supercritical drying and freeze drying, the reported method significantly reduces the fabrication time and costs. The cost-effective DIW technique offers the capability to print complex hollow internal structure, coupled with the porous structure, is found to be beneficial to the thermal insulation property. The addition of fiber to the ink assures the durability of the fabricated product. The foam ink preparation methods and the printability are demonstrated in this paper, along with the printed samples for characterizing thermal insulation properties and mechanical properties.

42 ENGINEERING↗

Space tug economic analysis study. Volume 3: Cost estimates

Cost estimates for the space tug operation are presented. The subjects discussed are: (1) research and development costs, (2) investment costs, (3) operations costs, and (4) funding requirements. The emphasis is placed on the single stage tug configuration using various types of liquid propellants.

Source record↗

Study of the costs and benefits of composite materials in advanced turbofan engines

Composite component designs were developed for a number of applicable engine parts and functions. The cost and weight of each detail component was determined and its effect on the total engine cost to the aircraft manufacturer was ascertained. The economic benefits of engine or nacelle composite or eutectic turbine alloy substitutions was then calculated. Two time periods of engine certification were considered for this investigation, namely 1979 and 1985. Two methods of applying composites to these engines were employed. The first method just considered replacing an existing metal part with a composite part with no other change to the engine. The other method involved major engine redesign so that more efficient composite designs could be employed. Utilization of polymeric composites wherever payoffs were available indicated that a total improvement in Direct Operating Cost (DOC) of 2.82 to 4.64 percent, depending on the engine considered, could be attained. In addition, the percent fuel saving ranged from 1.91 to 3.53 percent. The advantages of using advanced materials in the turbine are more difficult to quantify but could go as high as an improvement in DOC of 2.33 percent and a fuel savings of 2.62 percent. Typically, based on a fleet of one hundred aircraft, a percent savings in DOC represents a savings of four million dollars per year and a percent of fuel savings equals 23,000 cu m (7,000,000 gallons) per year.

Steinhagen, C. A.↗

IUS/TUG orbital operations and mission support study. Volume 5: Cost estimates

The costing approach, methodology, and rationale utilized for generating cost data for composite IUS and space tug orbital operations are discussed. Summary cost estimates are given along with cost data initially derived for the IUS program and space tug program individually, and cost estimates for each work breakdown structure element.

Source record↗

Space Tug Avionics Definition Study. Volume 5: Cost and Programmatics

The baseline avionics system features a central digital computer that integrates the functions of all the space tug subsystems by means of a redundant digital data bus. The central computer consists of dual central processor units, dual input/output processors, and a fault tolerant memory, utilizing internal redundancy and error checking. Three electronically steerable phased arrays provide downlink transmission from any tug attitude directly to ground or via TDRS. Six laser gyros and six accelerometers in a dodecahedron configuration make up the inertial measurement unit. Both a scanning laser radar and a TV system, employing strobe lamps, are required as acquisition and docking sensors. Primary dc power at a nominal 28 volts is supplied from dual lightweight, thermally integrated fuel cells which operate from propellant grade reactants out of the main tanks.

Source record↗

Spacelab cost reduction alternatives study. Volume 3: Crew training task analysis

The on-orbit phase of flight was analyzed to identify the functions that had to be performed to meet flight objectives. The functions identified were combined into a top-level functional flow diagram (3.0 On-Orbit Operations). Each function, in turn, was analyzed to determine the major activities necessary to perform the function. The activities and activity sequences were presented in second level functional flow diagrams. Each major activity was further analyzed to define the operator tasks that are performed to accomplish that activity. Training analysis worksheets were used to document the analysis of each function down to the task level and provide training requirements data for each task. For Vol. 1, see N76-24315.

Source record↗

Low energy stage study. Volume 4: Cost benefits analysis and recommendations

The costs and benefits of existing/planned systems, new propulsion concepts, and adaptations of existing/planned systems (as supported by Orbiter interface requirements and operations requirements) were quantified. Scenarios of these propulsion approaches were established which accommodate the low energy regime as defined by the new low energy payload mission model. These scenarios were screened on a cost and then a benefits basis. A propulsion approach comprising existing/planned systems and a new propulsion concept were selected as the most cost effective approach to accommodate the model payloads and the low energy regime they represent. Key cost drivers and sensitivity trends were identified. All costs were derived in 1977 dollars.

Source record↗

Commerical (terrestrial) and modified solar array design studies for low cost, low power space applications

The suitability of commercial (terrestrial) solar arrays for use in low Earth orbit is examined. It is shown that commercial solar arrays degrade under thermal cycling because of material flexure, and that certain types of silicones used in the construction of these arrays outgas severely. Based on the results, modifications were made. The modified array retains the essential features of typical commercial arrays and can be easily built by commercial fabrication techniques at low cost. The modified array uses a metal tray for containment, but eliminates the high outgassing potting materials and glass cover sheets. Cells are individually mounted with an adhesive and individually covered with glass cover slips, or clear plastic tape. The modified array is found to withstand severe thermal cycling for long intervals of time.

Kolecki, J. C.↗