At least 199 records · Page 11

Review of Power System Support Functions for Inverter-Based Distributed Energy Resources - Standards, Control Algorithms, and Trends

Penetration of renewable energy in power systems has been increasing in the past decades in response to increased global electricity demand and concerns for the environment. Distributed energy resources (DERs) based on renewables have experienced rapid growth thanks to the incentive programs and broad-based participation. With the growing prevalence of DERs, the risk of grid instability and vulnerability increases due to the intermittent nature of renewable energy. At the same time, the voltage and frequency deviation problems emerge more often when the reverse power flow occurs under supply-demand imbalance in distributed power systems. Standards and grid codes have been issued for DER inverters to interconnect with the distribution grid. The updated standard and grid codes expect DERs to provide a variety of power system support functions in order to incorporate higher DER penetration and to maximize DER value to the grid. This paper provides an overview of the power system support functions from renewable DER inverters, which are categorized as: voltage regulation by active/reactive power control, frequency regulation by active power control, voltage ride-through, and frequency ride-through. The benefits and drawbacks of each algorithm are presented and compared with its predecessor, manifesting the logic in the evolution of the algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Country Review of Energy-Efficiency Financial Incentives in the Residential Sector

A large variety of energy-efficiency policy measures exist. Some are mandatory, some are informative, and some use financial incentives to promote diffusion of efficient equipment. From country to country, financial incentives vary considerably in scope and form, the type of framework used to implement them, and the actors that administer them. They range from rebate programs administered by utilities under an Energy-Efficiency Resource Standards (EERS) regulatory framework (California, USA) to the distribution of Eco-points rewarding customers for buying highly efficient appliances (Japan). All have the primary objective of transforming the current market to accelerate the diffusion of efficient technologies by addressing up-front cost barriers faced by consumers; in most instances, efficient technologies require a greater initial investment than conventional technologies. In this paper, we review the different market transformation measures involving the use of financial incentives in the countries belonging to the Major Economies Forum. We characterize the main types of measures, discuss their mechanisms, and provide information on program impacts to the extent that ex-ante or ex-post evaluations have been conducted. Finally, we identify best practices in financial incentive programs and opportunities for coordination between Major Economies Forum countries as envisioned under the Super Efficient Appliance Deployment (SEAD) initiative.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fault Detection in Distributed Climate Sensor Networks using Dynamic Bayesian Networks

The Atmospheric Radiation Measurement program operated by U.S. Department of Energy is one of the largest climate research programs dedicated to the collection of long-term continuous measurements of cloud properties and other key components of the earth’s climate system. Given the critical role that collected ARM data plays in the analysis of atmospheric processes and conditions and in the enhancement and evaluation of global climate models, the production and distribution of high-quality data is one of ARM’s primary mission objectives. Fault detection in ARM’s distributed sensor network is one critical ingredient towards maintaining high quality and useful data. We are modeling ARM’s distributed sensor network as a dynamic Bayesian network where key measurements are mapped to Bayesian network variables. We then define the conditional dependencies between variables by discovering highly correlated variable pairs from historical data. The resultant dynamic Bayesian network provides an automated approach to identifying whether certain sensors are malfunctioning or failing in the distributed sensor network. A potential fault or failure is detected when an observed measurement is not consistent with its expected measurement and the observed measurements of other related sensors in the Bayesian network. We present some of our experiences and promising results with the fault detection dynamic Bayesian network.

54 ENVIRONMENTAL SCIENCES↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incentivizing Distributed Solar: Best Practices (Presentation)

The presentation discussed findings of a recent NREL technical report on best practices for designing and implementing incentives for small and mid-sized residential and commercial distributed solar energy projects. Topics covered included: factors to consider in setting and modifying incentive levels over time, differentiating incentives to encourage various market segments, and administrative issues such as providing equitable access to incentives and customer protection. In addition, the presentation explored how incentive programs can be designed to respond to changing market conditions while attempting to provide a longer-term and stable environment for the solar industry. The findings of the report were based on interviews with program administrators, regulators, and industry representatives as well as data from numerous incentive programs nationally, particularly the largest and longest-running programs.

14 SOLAR ENERGY↗

Gluons and the Quark Sea at High Energies: Distributions, Polarization, Tomography

This report on the science case for an Electron-Ion Collider (EIC) is the result of a ten-week program at the Institute for Nuclear Theory (INT) in Seattle (from September 13-November 19, 2010), motivated by the need to develop a strong case for the continued study of the QCD description of hadron structure in the coming decades. Hadron structure in the valence quark region will be studied extensively with the Jefferson Lab 12 GeV science program, the subject of an INT program the previous year. The focus of the INT program was on understanding the role of gluons and sea quarks, the important dynamical degrees of freedom describing hadron structure at high energies. Experimentally, the most direct and precise way to access the dynamical structure of hadrons and nuclei at high energies is with a high luminosity lepton probe in collider mode. An EIC with optimized detectors offers enormous potential as the next generation accelerator to address many of the most important, open questions about the fundamental structure of matter. The goal of the INT program, as captured in the writeups in this report, was to articulate these questions and to identify golden experiments that have the greatest potential to provide definitive answers to these questions. At resolution scales where quarks and gluons become manifest as degrees of freedom, the structure of the nucleon and of nuclei is intimately connected with unique features of QCD dynamics, such as confinement and the self-coupling of gluons. Information on hadron sub-structure in DIS is obtained in the form of 'snapshots' by the 'lepton microscope' of the dynamical many-body hadron system, over different momentum resolutions and energy scales. These femtoscopic snapshots, at the simplest level, provide distribution functions which are extracted over the largest accessible kinematic range to assemble fundamental dynamical insight into hadron and nuclear sub-structure. For the proton, the EIC would be the brightest femtoscope scale lepton-collider ever, exceeding the intensity of the HERA collider a thousand fold. HERA, with its center-of-mass (CM) energy of 320 GeV, was built to search for quark substructure. An EIC, with its scientific focus on studying QCD in the regime where the sea quarks and gluons dominate, would have a lower CM energy. In a staged EIC design, the CM energy will range from 50-70 GeV in stage I to approximately twice that for the full design. In addition to being the first lepton collider exploring the structure of polarized protons, an EIC will also be the first electron-nucleus collider, probing the gluon and sea quark structure of nuclei for the first time. Following the same structure as the scientific discussions at the INT, this report is organized around the following four major themes: (1) The spin and flavor structure of the proton; (2) Three dimensional structure of nucleons and nuclei in momentum and configuration space; (3) QCD matter in nuclei; and (4) Electroweak physics and the search for physics beyond the Standard Model. In this executive summary, we will briefly outline the outstanding physics questions in these areas and the suite of measurements that are available with an EIC to address these. The status of accelerator and detector designs is addressed at the end of the summary. Tables of golden measurements for each of the key science areas outlined are presented on page 12. In addition, each chapter in the report contains a comprehensive overview of the science topic addressed. Interested readers are encouraged to read these and the individual contributions for more details on the present status of EIC science.

43 PARTICLE ACCELERATORS↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Developing a Regulatory Roadmap for Distributed Energy Resource (DER) Integration in Colombia

The USAID-NREL Partnership in Colombia, in conjunction with SURE and USEA, selected four action plan teams from the Young Professionals Leadership Program to receive tailored NREL technical assistance to support action plan implementation. The four plans selected represent various aspects associated with planning for the efficient integration of DERs, including electric mobility, residential and commercial energy applications, distributed generation modeling, and regulatory considerations. In response to national grid modernization, decentralization, digitalization, and electrification trends, CREG is looking to update Colombia's electric distribution code, with an emphasis on the integration of electric vehicles and charging stations, but also energy storage systems, non-conventional sources of renewable energy, and other distributed energy resources (DERs). CREG aims to establish the general steps that must be carried out to update the distribution code for the integration of DERs, with a view to the design and development of new markets. The objective of the TA provided to CREG was to support them in identifying and outlining the general processes and approaches to consider when updating Colombia's distribution code for the integration of electric vehicles, distributed renewable energy systems, and energy storage systems, with a view to the design and development of new markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Prefeasibility Analysis of Behind-the-Meter Distributed Energy Resources in Highland Park, MI: Highland Park Pathways to Power [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. NREL used the REopt platform to evaluate the techno-economic potential of adding solar PV, electric storage, and/or diesel generators at several locations in Highland Park, Michigan: a typical residential and commercial building in Highland Park, the Earnest T. Ford Recreation Center, and the Parker Village Microgrid. The analysis goals focused on the ability of solar PV, electric storage, and/or diesel generators to reduce electricity costs and improve site resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Embedded Energy Converters for Ocean Wave Energy Harvesting: Enabling a Domain of Transformative Technologies: Preprint

Distributed embedded energy conversion technology (DEEC-Tec) is a very promising - but underdeveloped - domain in marine renewable energy research. The technology utilizes small distributed embedded energy converters (DEECs) that, in aggregate, form a much larger energy harvesting-converting structure. Each DEEC is a small transducer - an individual mechanism that converts one form of energy into another. A transducer's specific mode of operation can be based upon any number of physical phenomena, including variable capacitance, variable magnetic fields, or piezoelectrics. It is the dynamic deformation of a structure made from such DEECs (a DEEC-Tec structure) that provides the needed physical phenomena (the external energy source) for the underlying transducers to intake and convert energy into another form, such as electricity. DEEC-Tec structures designed specifically to dynamically deform in the presence of ocean wave energy - for the purpose of harvesting and converting that energy - can be called flexWECs. A flexWEC's gross shape (topology) and its compliant characteristics (morphologies) are chiefly determined by how the DEECs making up its structure are arranged and implemented. In turn, those corresponding topologies and morphologies will largely determine how a flexWEC interacts with - and dynamically deforms within - the presence of ocean wave energy. FlexWECs appear to have many attractive features, including broad-banded ocean energy conversion, in situ energy conversion throughout an entire flexWEC structure, inherent redundancy, and appealing material and manufacturing costs. To this end, the design and development of any particular flexWEC or flexWEC feature is a revolutionary opportunity for how we conceptualize and envision the future of ocean wave energy conversion.

50 EE - Wind and Water Power Program - Water (EE-4↗

Chapter 10: Peak Demand and Time-Differentiated Energy Savings Cross-Cutting Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Savings from electric energy efficiency measures and programs are often expressed in terms of annual energy and presented as kilowatt-hours per year (kWh/year). However, for a full assessment of the value of these savings, it is usually necessary to consider the measure or program's impact on peak demand as well as time-differentiated energy savings. This cross-cutting protocol describes methods for estimating the peak demand and time-differentiated energy impacts of measures implemented through energy efficiency programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing Distributed Energy Resources and building retrofits with the strategic DER-CAModel

The pressuring need to reduce the import of fossil fuels as well as the need to dramatically reduce CO 2 emissions in Europe motivated the European Commission (EC) to implement several regulations directed to building owners. Most of these regulations focus on increasing the number of energy efficient buildings, both new and retrofitted, since retrofits play an important role in energy efficiency. Overall, this initiative results from the realization that buildings will have a significant impact in fulfilling the 20/20/20-goals of reducing the greenhouse gas emissions by 20%, increasing energy efficiency by 20%, and increasing the share of renewables to 20%, all by 2020. The Distributed Energy Resources Customer Adoption Model (DER-CAM) is an optimization tool used to support DER investment decisions, typically by minimizing total annual costs or CO 2 emissions while providing energy services to a given building or microgrid site. This document shows enhancements made to DER-CAM to consider building retrofit measures along with DER investment options. Specifically, building shell improvement options have been added to DER-CAM as alternative or complementary options to investments in other DER such as PV, solar thermal, combined heat and power, or energy storage. The extension of the mathematical formulation required by the new features introduced in DER-CAM is presented and the resulting model is demonstrated at an Austrian Campus building by comparing DER-CAM results with and without building shell improvement options. Strategic investment results are presented and compared to the observed investment decision at the test site. Results obtained considering building shell improvement options suggest an optimal weighted average U value of about 0.53 W/(m 2 K) for the test site. This result is approximately 25% higher than what is currently observed in the building, suggesting that the retrofits made in 2002 were not optimal. Furthermore, the results obtained with DER-CAM illustrate the complexity of interactions between DER and passive measure options, showcasing the need for a holistic optimization approach to effectively optimize energy costs and CO 2 emissions. Lastly, the simultaneous optimization of building shell improvements and DER investments enables building owners to take one step further towards nearly zero energy buildings (nZEB) or nearly zero carbon emission buildings (nZCEB), and therefore support the 20/20/20 goals.

25 ENERGY STORAGE↗

THE BRIGHTEST YOUNG STAR CLUSTERS IN NGC 5253

The nearby dwarf starburst galaxy NGC 5253 hosts a number of young, massive star clusters, the two youngest of which are centrally concentrated and surrounded by thermal radio emission (the “radio nebula”). To investigate the role of these clusters in the starburst energetics, we combine new and archival Hubble Space Telescope images of NGC 5253 with wavelength coverage from 1500 Å to 1.9 μm in 13 filters. These include Hα, Pβ, and Pα, and the imaging from the Hubble Treasury Program LEGUS (Legacy Extragalactic UV Survey). The extraordinarily well-sampled spectral energy distributions enable modeling with unprecedented accuracy the ages, masses, and extinctions of the nine optically brightest clusters (M{sub V} < −8.8) and the two young radio nebula clusters. The clusters have ages ∼1–15 Myr and masses ∼1 × 10{sup 4}–2.5 × 10{sup 5} M{sub ⊙}. The clusters’ spatial location and ages indicate that star formation has become more concentrated toward the radio nebula over the last ∼15 Myr. The most massive cluster is in the radio nebula; with a mass ∼2.5 × 10{sup 5} M{sub ⊙} and an age ∼1 Myr, it is 2–4 times less massive and younger than previously estimated. It is within a dust cloud with A{sub V} ∼ 50 mag, and shows a clear near-IR excess, likely from hot dust. The second radio nebula cluster is also ∼1 Myr old, confirming the extreme youth of the starburst region. These two clusters account for about half of the ionizing photon rate in the radio nebula, and will eventually supply about 2/3 of the mechanical energy in present-day shocks. Additional sources are required to supply the remaining ionizing radiation, and may include very massive stars.

79 ASTRONOMY AND ASTROPHYSICS↗

Community Microgrid Planning Considering Building Thermal Dynamics

In this paper, the building thermal dynamic characteristics are introduced in the community microgrid (MG) planning model. The proposed planning model is formulated as a mixed integer linear programming (MILP) which seeks to determine the optimal deployment strategy for various distributed energy resources (DER). The objective is to minimize the annualized cost of community MG, including investment cost in DER, operation cost for dispatchable fuel-generators (DFG), energy storage system (ESS) degradation cost, energy purchasing and peak demand charge at PCC, customer discomfort cost due to the room temperature deviation and load curtailment cost. Given the slow thermal dynamic characteristics of buildings, the heating, ventilation and air-conditioning (HVAC) system in the proposed model is treated as a demand side management (DSM) component, whose dispatch commands are provided by the central MG controller. Numerical results based on a community MG comprising of 20 residential buildings demonstrate the effectiveness of the proposed planning model and the benefits of introducing the building thermal dynamic model.

Zhang, Xiaohu↗

Pecan Street Grid Demonstration Program. Final technology performance report

This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol, is a 711-acre LEED Neighborhood Development mixed-use, urban infill redevelopment on the site of Austin’s former airport, currently under development through a public-private project between the City of Austin, and Catellus Austin LLC. Currently, Mueller is less than 50% complete and more than 3,500 people live or work at Mueller. At full build-out, the project will include more than 3 million square feet of commercial and institutional space, more than 13,000 residents from approximately 5,700 single-family and multi-family dwelling units. Figure 1 shows a Google Map image of the Mueller community, zoomed in on the residential streets participating in the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Electric Vehicle Benefits Connected to Smart Grids

Connecting electric storage technologies to smartgrids will have substantial implications in building energy systems. Local storage will enable demand response. Mobile storage devices in electric vehicles (EVs) are in direct competition with conventional stationary sources at the building. EVs will change the financial as well as environmental attractiveness of on-site generation (e.g. PV, or fuel cells). In order to examine the impact of EVs on building energy costs and CO2 emissions in 2020, a distributed-energy-resources adoption problem is formulated as a mixed-integer linear program with minimization of annual building energy costs or CO2 emissions. The mixed-integer linear program is applied to a set of 139 different commercial buildings in California and example results as well as the aggregated economic and environmental benefits are reported. The research shows that considering second life of EV batteries might be very beneficial for commercial buildings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗