Search NASA⌕ Search

SEARCH · Search NASA

Results for “early building design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Development of first generation aerospace NiMH cells

Gates Aerospace Batteries in conjunction with Gates Energy Products (GEP) has been developing NiMH technology for aerospace use since 1990. GEP undertook the development of NiMH technology for commercial cell applications in 1987. This program focused on wound cell technology for replacement of current NiCd technology. As an off shoot of this program small, wound cells were used to evaluate initial design options for aerospace prismatic cell designs. Early in 1991, the first aerospace prismatic cell designs were built in a 6 Ah cell configuration. These cells were used to initially characterize performance in prismatic configurations and begin early life cycle testing. Soon after the 6 Ah cells were on test, several 22 Ah cells were built to test other options. The results of testing of these cells were used to identify potential problem areas for long lived cells and develop solutions to those problems. Following these two cell builds, a set of 7 Ah cells was built to evaluate improvements to the technology. To date results from these tests are very promising. Cycle lives in excess of 2,200 LEO cycles at 50 percent DoD were achieved with cells continuing on test. Results from these cell tests are discussed and data presented to demonstrate feasibility of this technology for aerospace programs.

Tinker, Lawrence↗

Advanced Stirling Convertor (ASC)--From Technology Development to Future Flight Product

The Advanced Stirling Convertor (ASC) is being developed by Sunpower Inc. under contract to NASA s Glenn Research Center (GRC) with critical technology support tasks led by GRC. The ASC development, funded by NASA s Science Mission Directorate, started in 2003 as one of 10 competitively awarded contracts that were intended to address the power conversion needs of future Radioisotope Power Systems (RPS). The ASC technology has since evolved through progressive convertor builds and successful testing to demonstrate high conversion efficiency (38 percent), low mass (1.3 kg), hermetic sealing, launch vibration simulation, EMI characterization, and is undergoing extended operation. The GRC and Sunpower team recently delivered two ASC-E convertors to the Department of Energy (DOE) and Lockheed Martin Space Systems Company for integration onto the Advanced Stirling Radioisotope Generator Engineering Unit (ASRG EU) plus one spare. The design of the next build, called the ASC-E2, has recently been initiated and is based on the heritage ASC-E with design refinements to increase reliability margin and offer higher temperature operation and improve performance. The ASC enables RPS system specific power of about 7 to 8 W/kg. This paper provides a chronology of ASC development to date and summarizes technical achievements including advancements toward flight implementation of the technology on ASRG by as early as 2013.

Wong, Wayne A.↗

Launch Vehicle Demonstrator Using Shuttle Assets

The Advanced Concepts Office at NASA's George C. Marshall Space Flight Center undertook a study to define candidate early heavy lift demonstration launch vehicle concepts derived from existing space shuttle assets. The objective was to determine the performance capabilities of these vehicles and characterize potential early demonstration test flights. Given the anticipated budgetary constraints that may affect America's civil space program, and a lapse in U.S. heavy launch capability with the retirement of the space shuttle, an early heavy lift launch vehicle demonstration flight would not only demonstrate capabilities that could be utilized for future space exploration missions, but also serve as a building block for the development of our nation s next heavy lift launch system. An early heavy lift demonstration could be utilized as a test platform, demonstrating capabilities of future space exploration systems such as the Multi Purpose Crew Vehicle. By using existing shuttle assets, including the RS-25D engine inventory, the shuttle equipment manufacturing and tooling base, and the segmented solid rocket booster industry, a demonstrator concept could expedite the design-to-flight schedule while retaining critical human skills and capital. In this study two types of vehicle designs are examined. The first utilizes a high margin/safety factor battleship structural design in order to minimize development time as well as monetary investment. Structural design optimization is performed on the second, as if an operational vehicle. Results indicate low earth orbit payload capability is more than sufficient to support various vehicle and vehicle systems test programs including Multi-Purpose Crew Vehicle articles. Furthermore, a shuttle-derived, hydrogen core vehicle configuration offers performance benefits when trading evolutionary paths to maximum capability.

Creech, Dennis M.↗

Simulation of Image Performance Characteristics of the Landsat Data Continuity Mission (LDCM) Thermal Infrared Sensor (TIRS)

The next Landsat satellite, which is scheduled for launch in early 2013, will carry two instruments: the Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS). Significant design changes over previous Landsat instruments have been made to these sensors to potentially enhance the quality of Landsat image data. TIRS, which is the focus of this study, is a dual-band instrument that uses a push-broom style architecture to collect data. To help understand the impact of design trades during instrument build, an effort was initiated to model TIRS imagery. The Digital Imaging and Remote Sensing Image Generation (DIRSIG) tool was used to produce synthetic "on-orbit" TIRS data with detailed radiometric, geometric, and digital image characteristics. This work presents several studies that used DIRSIG simulated TIRS data to test the impact of engineering performance data on image quality in an effort to determine if the image data meet specifications or, in the event that they do not, to determine if the resulting image data are still acceptable.

Landsat↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Lessons Learned in Systems Engineering Availability and Recommendations for Mission Technical Leaders

In spaceflight missions at Goddard Space Flight Center (GSFC), the Mission System Engineer (MSE) is the technical leader of the overall engineering team and also is the Independent Engineering Technical Authority. The responsibility of this role includes the definition of the mission design architecture, concept of operations, and mission requirements, management of risk throughout the development, and verification and validation of the final system performance and function amongst other duties. This responsibility inherently requires time management, enabling focus on a balanced development with appropriate risk. Time is the most valuable resource of the MSE. The system engineer’s availability to interact with the development team (often product or component design leads and technicians, often in different worksites) to discover and mitigate mission risks during development is key to mission success. This paper presents examples from Lunar Reconnaissance Orbiter, Landsat 9, and Neutron star Interior Composition ExploreR (NICER) which represent in-house and out-of-house hardware builds. These examples demonstrate how interactions between the Mission Systems Engineers and other project and partner engineers result in discovery of critical risks, leading to early mitigation with significant cost and performance savings. These three missions would have suffered test failures or on-orbit failures had their MSEs not set aside time to visit engineers and technicians that were working on key pieces of space flight hardware. Availability is more than just time; it is openness to listen to concerns and questions. It begins by building a level of trust in the team that it is safe to ask questions or share concerns without the fear of blame or additional workload. It also requires enabling informal conversations (over lunch, coffee, in the clean room, or at the team members desk, etc.) where key information can be exchanged, and team members may even provide an easy-to-implement mitigation idea for another subsystem. Availability is a highly valuable commodity and completely non-obvious to protect and optimize. The natural tendency of engineers is to keep themselves busy with solving problems that they know about. This paper is encouraging MSEs to resist this tendency to try and solve all the complex problems themselves and actively devote daily time to learning and solving problems that are found with informal communications with other team members.

Lessons Learned↗

Operations influence on Space Station Freedom

The Space Station Freedom is the first experience for NASA and its international partners in building a spacecraft that will be operated and maintained over a multi-year lifetime and that will be permanently manned. To ensure it functions safely and effectively, the operations community has become involved much earlier than in previous U.S. programs. This involvement has taken the form of defining requirements and analyzing the configuration, systems, and elements in terms of operations suitability and supportability. This early participation has had many effects on the definition and design of the Freedom Station. Examples of operations participation include the development of various operations concepts, design reference missions, contingency operations scenarios, and assembly operations assessments.

Accola, Anne L.↗

The Numerical Propulsion System Simulation: An Overview

Advances in computational technology and in physics-based modeling are making large-scale, detailed simulations of complex systems possible within the design environment. For example, the integration of computing, communications, and aerodynamics has reduced the time required to analyze major propulsion system components from days and weeks to minutes and hours. This breakthrough has enabled the detailed simulation of major propulsion system components to become a routine part of designing systems, providing the designer with critical information about the components early in the design process. This paper describes the development of the numerical propulsion system simulation (NPSS), a modular and extensible framework for the integration of multicomponent and multidisciplinary analysis tools using geographically distributed resources such as computing platforms, data bases, and people. The analysis is currently focused on large-scale modeling of complete aircraft engines. This will provide the product developer with a "virtual wind tunnel" that will reduce the number of hardware builds and tests required during the development of advanced aerospace propulsion systems.

Lytle, John K.↗

NASA's Space Launch System Progress Report

Exploration beyond Earth will be an enduring legacy for future generations, confirming America's commitment to explore, learn, and progress. NASA's Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program's Saturn V that sent Americans to the Moon. The SLS offers a flexible design that may be configured for the MultiPurpose Crew Vehicle and associated equipment, or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Both options support a national capability that will pay dividends for future generations. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 metric tons (mT) and will be evolvable to 130 mT. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of asteroids and Mars. With its superior lift capability, the SLS can expand the interplanetary highway to many possible destinations, conducting revolutionary missions that will change the way we view ourselves, our planet and its place in the cosmos. To perform missions such as these, the SLS will be the largest launch vehicle ever built. It is being designed for safety and affordability - to sustain our journey into the space age. Current plans include launching the first flight, without crew, later this decade, with crewed flights beginning early next decade. Development work now in progress is based on heritage space systems and working knowledge, allowing for a relatively quick start and for maturing the SLS rocket as future technologies become available. Together, NASA and the U.S. aerospace industry are partnering to develop this one-of-a-kind asset. Many of NASA's space centers across the country will provide their unique expertise to the Space Launch System endeavor. Unique infrastructure to be used includes the Michoud Assembly Facility for tank manufacturing, Stennis Space Center for engine testing, and Kennedy Space Center for processing and launch. As this panel will discuss, the SLS team is dedicated to doing things differently-from applying lean oversight/insight models to smartly using legacy hardware and existing facilities. Building on the foundation laid by over 50 years of human and scientific space flight--and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs-the SLS team has delivered both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable.

Singer, Joan A.↗

Low cost miniature data collection platform

The development of the RF elements of a telecommunications package involved detailed study and analysis of concepts and techniques followed by laboratory testing and evaluation of designs. The design goals for a complete telecommunications package excluding antenna were a total weight of 300 grams, in a total volume of 400 cu cm with a capability of unattended operation for a period of six months. Of utmost importance is extremely low cost when produced in lots of 10,000. Early in the program it became apparent that a single Miniature Data Collection Platform would not satisfy all users. A single high efficiency system would not satisfy a user who had available a large battery capacity but required a low cost system. Conversely, the low cost system would not satisfy the end user who had a very limited battery capacity. A system design to satisfy these varied requirements was implemented by designing several versions of the system building blocks and then constructing three systems from these building blocks.

Source record↗

Direct-DC Power in Buildings: Identifying the Best Applications Today for Tomorrow’s Building Sector

Driven by the increased use of direct current (DC) sources (photovoltaics, battery storage) and DC end-use devices (electronics, solid-state lighting, efficient motors), DC power distribution in buildings and DC microgrids have been proposed as a way to achieve greater efficiency, cost savings, and resiliency in a transitioning building sector.Despite these important benefits, several market and technological barriers inhibit the development of DC distribution, and the market for DC in buildings is still largely in the demonstration phase. Therefore, to jumpstart this technology, a clear path forward must emerge at this early stage of deployment. The goal of this paper is to define specific end-use cases for which DC distribution in buildings is a value proposition today by defining clear efficiency and resiliency benefits while addressing barriers to implementation.The paper begins with a technology and market assessment of DC distribution equipment, end uses, and technology standards. That is followed by results from an expert elicitation of DC power and building end-use professionals (e.g., electrical designers, building operators, engineers) and reports on-site visits and lessons learned from successful (and less successful) field deployments of DC distribution projects in North America. We present specific adoption pathways at the community and building level that can be implemented today, and evaluate them using qualitative and quantitative metrics, such as technology and market readiness, energy savings, and resiliency.

Vossos, Evangelos↗

Direct-DC Power in Buildings: Identifying the Best Applications Today for Tomorrow’s Building Sector

Driven by the increased use of direct current (DC) sources (photovoltaics, battery storage) and DC end-use devices (electronics, solid-state lighting, efficient motors), DC power distribution in buildings and DC microgrids have been proposed as a way to achieve greater efficiency, cost savings, and resiliency in a transitioning building sector. Despite these important benefits, several market and technological barriers inhibit the development of DC distribution, and the market for DC in buildings is still largely in the demonstration phase. Therefore, to jumpstart this technology, a clear path forward must emerge at this early stage of deployment. The goal of this paper is to define specific end-use cases for which DC distribution in buildings is a value proposition today by defining clear efficiency and resiliency benefits while addressing barriers to implementation. The paper begins with a technology and market assessment of DC distribution equipment, end uses, and technology standards. That is followed by results from an expert elicitation of DC power and building end-use professionals (e.g., electrical designers, building operators, engineers) and reports on-site visits and lessons learned from successful (and less successful) field deployments of DC distribution projects in North America. We present specific adoption pathways at the community and building level that can be implemented today, and evaluate them using qualitative and quantitative metrics, such as technology and market readiness, energy savings, and resiliency.

building-level electrical distribution↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clementine: An inexpensive mission to the Moon and Geographos

The Clementine Mission, a joint project of the Strategic Defense Initiative Organization (SDIO) and NASA, has been planned primarily to test and demonstrate a suite of lightweight sensors and other lightweight spacecraft components under extended exposure to the space environment. Although the primary objective of the mission is to space-qualify sensors for Department of Defense applications, it was recognized in 1990 that such a mission might also be designed to acquire scientific observations of the Moon and of Apollo asteroid (1620) Geographos. This possibility was explored jointly by SDIO and NASA, including representatives from NASA's Discovery Program Science Working Group, in early 1991. Besides the direct return of scientific information, one of the benefits envisioned from a joint venture was the development of lightweight components for possible future use in NASA's Discovery-class spacecraft. In Jan. 1992, SDIO informed NASA of its intent to fly a 'Deep Space Program Science Experiment,' now popularly called Clementine; NASA then formed an advisory science working group to assist in the early development of the mission. The Clementine spacecraft is being assembled at the Naval Research Laboratory, which is also in charge of the overall mission design and mission operations. Support for mission design is being provided by GSFC and by JPL. NASA's Deep Space Network will be utilized in tracking and communicating with the spacecraft. Following a recommendation of the COMPLEX committee of the Space Science Board, NASA will issue an NRA and appoint a formal science team in early 1993. Clementine is a 3-axis stabilized, 200 kg (dry weight) spacecraft that will be launched on a refurbished Titan-2G. One of the goals has been to build two spacecraft, including the sensors, for $100M. Total time elapsed from the decision to proceed to the launch will be two years.

Shoemaker, Eugene M.↗

Precision in Assembled Discrete Lattice Space Structures for Next-Generation ISAM Applications

Robust autonomous robotic assembly of large-scale space structures has been a long-term and challenging goal to enable higher quality in-space communication and science instrumentation. For optical observatory support structures and antenna structures, the challenge is the strict dimensional precision requirements (generally RMS surface error) driven by the operational radiation wavelength. Early theoretical work in the area linked RMS surface error of a reflector support truss plate to the natural passive dynamic mode frequencies of the structure, as well as to the error distribution in dimensions of constituent structural elements. Prior robotic truss assembly demonstrations focused on designing ultra-high precision structural elements, joints, and robotic actuators. Recently, an alternative space structure assembly strategy based on a programmable matter approach (NASA ARMADAS) was demonstrated. This approach uses lattice building blocks (voxels) that are reversibly, mechanically joined into a bulk lattice structure by robots that locomote in and on the structure itself. Such a system can achieve high-level autonomy with low computation, robustly assemble utilizing inexpensive and imprecise robots, and efficiently build structures several orders of magnitude larger than the assembly robots. However, for instrumentation support structure applications, the resulting precision of these building block-based lattice structures is not well studied. Since they are demonstrated with many more assembly units than prior art trusses, it is unclear whether the same precision design approaches apply. In this work, we study in simulation the effects of voxel geometry, error in distribution, assembly resolution (module size), and assembly geometry on the error of both beam and plate lattice structures. While average RMS error of a plate increases with plate size, increasing plate thickness quickly collapses RMS error towards a limit that is on the order of the error of the constituent parts. We validate our models against previously published precision measurements of built systems. Results from this study will guide manufacturing precision requirements, as well as designs, for future robotically assembled structural applications and establish feasibility for different applications.

Christine E Gregg↗

Harnessing the Digital Transformation for Development of Electrified Aircraft Propulsion Control Systems

Hybrid electric aircraft propulsion is an emerging technology that presents a variety of potential benefits along with technical integration challenges. Developing these new propulsion architectures with their complex control systems, and ultimately proving their benefit, is a multistep process. This process includes concept development and analysis, dynamic simulation, hardware-in-the-loop testing, full-scale testing, and so on. This effort is being revolutionized and indeed enabled by new digital tools that support increasing the technology readiness level throughout the maturation process. As part of this Digital Transformation, NASA has developed a suite of publicly available digital tools that facilitate the path from concept to implementation. This paper describes the NASA-developed tools and puts them in the context of control system development for hybrid electric aircraft propulsion. The three MATLAB®-based software packages are the Toolbox for the Modeling and Analysis of Thermodynamic Systems (T-MATS), the Electrical Modeling and Thermal Analysis Toolbox (EMTAT), and the Thermal Systems Analysis Toolbox (TSAT). These tools are interactive, complementary, and compatible with each other. T-MATS is a modular thermodynamic modeling framework designed for creating custom component level models of jet engines. EMTAT is a modeling framework used to simulate a variety of power electronic devices, using both physics-based and power flow calculations. TSAT is a framework for modeling and analysis of dynamic heat transfer. These packages all consist of graphical, drag-and-drop, parameterizable building blocks representing various components of the system to be modeled, e.g., compressors, turbines, motors, energy storage devices, etc. They are designed to enable the user to model and simulate the end-to-end dynamic operation of a hybrid electric gas turbine engine powertrain at the timescale of the turbomachinery, capturing mechanical, electrical, and thermal interactions. This paper demonstrates through multiple examples how these tools have been used successfully in a variety of applications, including several of the early stages of hybrid electric gas turbine engine propulsion system development, from the initial system modeling to real-time interactive pilot-in-the-loop simulation to physical hardware-in-the-loop testing, each step bringing the technology closer to fruition.

hybrid electric propulsion↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Orion Heat Shield Manufacturing Producibility Improvements for the EM-1 Flight Test Program

This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.

Producibility↗