Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric thrusters”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Sensitivity of Hybrid NEP-Chemical Vehicle Mass to Assumptions for Crewed Opposition-Class Mars Missions

This research illustrates the impact of different technology choices and their associated performance on overall sizing for a hybrid Nuclear Electric Propulsion (NEP) and chemical crewed Mars transportation vehicle. A set of models for the trajectory and vehicle mass, power system specific mass(α), and power conversion performance enable the analysis. Vehicle mass required to close the mission is calculated as a function of α and specific impulse (Isp) for multiple choices of high-level assumptions including system alpha vs. power scaling and electric thruster type. System alpha is built up and compared for multiple cases of technology assumptions. A Brayton cycle model is used to illustrate the alpha sensitivities to assumptions in cycle design such as peak operating temperature and component performance. The analysis illustrates how technology performance sensitivities affect the alpha and thus vehicle sizing for a range of mission and technology assumptions.

Matthew Duchek↗

Plume Impingement Studies in Space Environments for NASA Deep Space Logistics

NASA’s Artemis program is preparing to return Americans to the moon, in preparation for future deep space missions to Mars and beyond. The Lunar Gateway – a space station to be placed in orbit around the moon – serves as a critical component of the Artemis program, and will be the launchpad for future astronauts to visit the lunar surface and for humanity to learn how to live in a deep space environment. Much like the ISS, during operations and visiting vehicles approaches, the Lunar Gateway structures will be impinged upon from various plume sources: reaction control system rocket engine plumes, wastewater venting plumes, and plasma plumes from electric thrusters for station keeping. This presentation will describe the engineering challenges associated with each of these plume impingement scenarios and will detail the physical models and simulation approaches to predict the thermomechanical loading, contamination accretion, and erosion of station components due to plume impingement in space environments.

computational fluid dynamics↗

Plume Impingement Studies in Space Environments for NASA Deep Space Logistics

NASA’s Artemis program is preparing to return Americans to the moon, in preparation for future deep space missions to Mars and beyond. The Lunar Gateway – a space station to be placed in orbit around the moon – serves as a critical component of the Artemis program, and will be the launchpad for future astronauts to visit the lunar surface and for humanity to learn how to live in a deep space environment. Much like the ISS, during operations and visiting vehicles approaches, the Lunar Gateway structures will be impinged upon from various plume sources: reaction control system rocket engine plumes, wastewater venting plumes, and plasma plumes from electric thrusters for station keeping. This presentation will describe the engineering challenges associated with each of these plume impingement scenarios and will detail the physical models and simulation approaches to predict the thermomechanical loading, contamination accretion, and erosion of station components due to plume impingement in space environments.

Plume Impingement↗

Gateway Induced Environments Overview

Gateway will be a long duration space station orbiting the Moon in support of NASA’s Artemis campaign. Over its lifetime, Gateway will be exposed to a variety of induced environments, including materials outgassing, chemical and electric thruster plumes, vacuum vents, and lunar dust transport (from the Human Lander System, HLS). Induced Environments can impact vehicle performance and mission success. The multidisciplinary Gateway Induced Environments Team has developed requirements and methodologies to address the complex challenge of integrating multiple elements and visiting vehicles while maintaining the Gateway induced environments within prescribed limits. The Gateway Induced Environments requirements are summarized along with the integration / verification process and preliminary system analysis results.

Gateway↗

Gateway Induced Environments Overview

Gateway will be a long duration space station orbiting the Moon in support of NASA’s Artemis campaign. Over its lifetime, Gateway will be exposed to a variety of induced environments, including materials outgassing, chemical and electric thruster plumes, vacuum vents, and lunar dust transport (from the Human Lander System, HLS). Induced Environments can impact vehicle performance and mission success. The multidisciplinary Gateway Induced Environments Team has developed requirements and methodologies to address the complex challenge of integrating multiple elements and visiting vehicles while maintaining the Gateway induced environments within prescribed limits. The Gateway Induced Environments requirements are summarized along with the integration / verification process and preliminary system analysis results.

Gateway↗

Overview of the Lunar Gateway External Contamination Environment

As a part of the Artemis mission, Gateway will be a long duration space station in a near rectilinear halo orbit around the Moon. Gateway will be exposed to a variety of external contamination sources, which can degrade external hardware / surfaces and impact science utilization objectives. Requirements and methodologies addressing material outgassing, chemical and electric thruster plumes, vacuum venting, and visiting vehicle interactions have been developed by the Gateway Induced Environments team to ensure vehicle performance and mission success. The external contamination requirements and integration process are described along with required data deliverables. Integrated external contamination analyses are conducted by the Gateway Environments Team to assess compliance with external contamination requirements. This paper provides a current status of integration activities and analysis results, as well as future plans to improve external contamination characterization.

Crystal A. Quiroz↗

12-kW Advanced Electric Propulsion System Hall Current Thruster Qualification and Production Status

The AEPS contract was awarded to AR in May of 2016 with the goal of developing a 12.5kW Hall Thruster System, including the Hall Current Thruster (HCT), Power Processor Unit (PPU) and Xenon Flow Controller (XFC). It was originally targeted to support the Asteroid Redirect Mission, which was cancelled early in the project. The project was subsequently restructured to support the Gateway PPE propulsion mission, with modified scope that consisted of the development, qualification and delivery of three 12kW flight thrusters. The PPU and XFC components were designed and development hardware fabricated with initial testing performed prior to being de-scoped from the contract. System level testing was performed by AR using these engineering components in early 2022 at the Aerospace Corporation’s EP-3 test facility.

Hall thruster↗

Nuclear Electric Propulsion for Outer Planet Science Missions

Nuclear electric propulsion (NEP) combines the high specific impulse of electric thrusters with a constant power source that can operate anywhere in the solar system. Current investments in fission surface power offer a starting point for development of an NEP capability for deep space science missions, with a mission to the Saturn system illustrating the potential of such a system. Minimum time of flight transits, maximum payload delivery, and a sample return from Enceladus are considered. The NEP system can deliver payloads to the Saturn system with similar transit times to the Cassini spacecraft without requiring the planetary flyby maneuvers, and when coupled with a heavy-lift launch vehicle an NEP-powered spacecraft can complete a Saturn transit significantly faster than Cassini. High payload masses can be delivered on a longer trajectory at the expense of transit time. Replacing a portion of the payload with propellant allows for a high degree of maneuverability upon reaching the Saturn system. An Enceladus sample return mission closes when utilizing the NEP system for the Saturn departure and Earth return burns.

Matthew E Duchek↗

Overview of the Lunar Gateway External Contamination Environment

As a part of the Artemis mission, Gateway will be a long duration space station in a near rectilinear halo orbit around the Moon. Gateway will be exposed to a variety of external contamination sources, which can degrade external hardware / surfaces and impact science utilization objectives. Requirements and methodologies addressing material outgassing, chemical and electric thruster plumes, vacuum venting, and visiting vehicle interactions have been developed by the Gateway Induced Environments team to ensure vehicle performance and mission success. The external contamination requirements and integration process are described along with required data deliverables. Integrated external contamination analyses are conducted by the Gateway Environments Team to assess compliance with external contamination requirements. This paper provides a current status of integration activities and analysis results, as well as future plans to improve external contamination characterization.

Crystal A Quiroz↗

Overview of the Lunar Gateway External Contamination Environment

As a part of the Artemis mission, Gateway will be a long duration space station in a near rectilinear halo orbit around the Moon. Gateway will be exposed to a variety of external contamination sources, which can degrade external hardware / surfaces and impact science utilization objectives. Requirements and methodologies addressing material outgassing, chemical and electric thruster plumes, vacuum venting, and visiting vehicle interactions have been developed by the Gateway Induced Environments team to ensure vehicle performance and mission success. The external contamination requirements and integration process are described along with required data deliverables. Integrated external contamination analyses are conducted by the Gateway Environments Team to assess compliance with external contamination requirements. This paper provides a current status of integration activities and analysis results, as well as future plans to improve external contamination characterization.

thruster plumes↗

Gateway Element and Payload Materials Outgassing Analyses: HALO, HERMES, and ERSA

Gateway was intended to be humanity’s first space station around the Moon, but its development has been paused as the National Aeronautics and Space Administration (NASA) shifts focus to achieving the United States’ National Space Policy goals. Instead of an orbiting lunar outpost, NASA will now pursue the development of a lunar surface base to support a sustained human presence on the Moon. Before the program’s pause, Gateway’s Induced Environments team worked to ensure payloads and elements (i.e., modules) complied with induced environment requirements. Methods developed and insights gained from this work will have applicability to NASA’s Moon Base and the potential repurposing of Gateway elements and payloads, as well as to induced environments modeling for future space stations. The Gateway program’s induced environment included molecular contamination, electric thruster plume sputter and redeposition, and lunar dust transfer from the Human Landing System (HLS). Primary sources of external molecular contamination included materials outgassing, chemical thruster plume contamination, and vacuum venting. The focus of this paper will be on element- and payload-level materials outgassing analyses performed for Gateway Configuration 1, extending the previously-developed framework for Gateway system-level external molecular contamination modeling. Gateway Configuration 1 consisted of the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). It also included payloads like the European Radiation Sensor Array (ERSA) attached to PPE and the Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES) attached to HALO. The element- and payload-level analyses to be introduced in this paper for HALO, HERMES, and ERSA enabled high-fidelity descriptions of Gateway’s external molecular contamination environment. Approaches to geometric modeling, meshing, outgassing rate assignment, molecular transport modeling, and analysis methodology will be presented. Element and payload contaminant deposition onto sensitive Gateway receiver surfaces will be summarized and results compared to induced environment requirements. While these results incorporate refinements made over the course of the program, they were not intended to be final. Therefore, modeling assumptions and inputs, potential improvements, and lessons-learned will be documented to inform future work on Moon Base, repurposed elements and payloads, and other space stations.

Gateway↗

Brayton-Cycle Power-Conversion Unit Tested With Ion Thruster

Nuclear electric propulsion has been identified as an enabling technology for future NASA space science missions, such as the Jupiter Icy Moons Orbiter (JIMO) now under study. An important element of the nuclear electric propulsion spacecraft is the power conversion system, which converts the reactor heat to electrical power for use by the ion propulsion system and other spacecraft loads. The electrical integration of the power converter and ion thruster represents a key technical challenge in making nuclear electric propulsion technology possible. This technical hurdle was addressed extensively on December 1, 2003, when a closed- Brayton-cycle power-conversion unit was tested with a gridded ion thruster at the NASA Glenn Research Center. The test demonstrated end-to-end power throughput and marked the first-ever coupling of a Brayton turbo alternator and a gridded ion thruster, both of which are candidates for use on JIMO-type missions. The testing was conducted at Glenn's Vacuum Facility 6, where the Brayton unit was installed in the 3-m-diameter vacuum test port and the ion thruster was installed in the 7.6-m-diameter main chamber.

Hervol, David S.↗

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. Programmatic lessons learned associated with risk management, contract oversight, and requirement definition during the fabrication and assembly are discussed. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Electric Propulsion↗

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. A brief overview of three of SEP’s programmatic lessons learned are discussed: risk management, contract oversight, and requirement definition. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Mars Exploration↗

A thruster sub-system module /TSSM/ for solar electric propulsion

The thruster subsystem module (TSSM) considered for solar electric propulsion (SEP) missions is to consist of a 30-cm ion thruster, a thruster gimbal system, a propellant storage and feed system, a power processing unit, a modular thermal control system, and a modular support structure. TSSM design requirements are considered along with a TSSM general design approach. It is pointed out that a TSSM for SEP missions can be designed and built based on existing technology.

Sharp, G. R.↗

SERT D spacecraft study

The SERT D (Space Electric Rocket Test - D) study defines a possible spacecraft project that would demonstrate the use of electric ion thrusters for long-term (5 yr) station keeping and attitude control of a synchronous orbit satellite. Other mission objectives included in the study were: station walking to satellite rendezvous and inspection, use of low cost attitude sensing system, use of an advanced solar array orientation and slip ring system, and an ion thruster integrated directly with a solar array power source. The SERT D spacecraft, if launched, will become SERT 3 the third space electric thruster test.

Source record↗