Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Planning for the Evolution of the Electric Grid with a Long-Run Marginal Emission Rate [Slides]

NREL Webinar slide deck that summarizes the findings of a recent article published in iScience, "Planning for the evolution of the grid with a long-run marginal emission rate". The webinar focuses on a study of how well three different types of emissions factors can anticipate the electric-sector carbon emissions induced by different types of interventions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploratory analysis of high-resolution power interruption data reveals spatial and temporal heterogeneity in electric grid reliability

Modern grid monitoring equipment enables utilities to collect detailed records of power interruptions. Here, these data are aggregated to compute publicly reported metrics describing high-level characteristics of grid performance. The current work explores the depth of insights that can be gained from public data, and the implications of losing visibility into heterogeneity in grid performance through aggregation. We present an exploratory analysis examining three years of high-resolution power interruption data collected by archiving information posted in real-time on the public-facing website of a utility in the Western United States. We report on the size, frequency and duration of individual power interruptions, and on spatio-temporal variability in aggregate reliability metrics. Our results show that metrics of grid performance can vary spatially and temporally by orders of magnitude, revealing heterogeneity that is not evidenced in publicly reported metrics. We show that limited access to granular information presents a substantive barrier to conducting detailed policy analysis, and discuss how more widespread data access could help to answer questions that remain unanswered in the literature to date. Lastly, given open questions about whether grid performance is adequate to support societal needs, we recommend establishing pathways to make high-resolution power interruption data available to support policy research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and Prototyping of Advanced Control Systems for Advanced Reactors Operating in the Future Electric Grid (Final Report)

Despite its significant advantages as a baseload, low-carbon energy source, the U.S. nuclear power industry has faced increasing difficulties in maintaining economic competitiveness in a rapidly evolving energy market. The economic conditions faced by the current fleet of nuclear power plants (NPPs) in the U.S. deregulated electricity market require a concerted effort to mitigate specific cost factors. Many units are struggling to stay competitive, and some premature shutdowns have occurred. Besides, in response to the large penetration of renewable energy sources, the role of nuclear power plants as pure baseload units needs to be reconsidered. Based on these experiences, operational flexibility is considered a fundamental requirement for the next generation of nuclear reactors to be competitive in the future energy market. The deployment of advanced reactors capable of operating within a new power grid paradigm, known as the Integrated Energy System (IES) was investigated. This approach combines new reactor designs with Thermal Energy Storage (TES) technologies, allowing the nuclear reactor to maintain a steady power output without the need for constant adjustments in response to load demand fluctuations. With this configuration, the reactor operates as a baseload unit, experiencing only very gradual power transients, while the energy storage facility within the power conversion cycle acts as a peaking unit.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Valuing Maintenance Strategies for Fusion Plants as Part of a Future Electricity Grid

Scheduled maintenance is likely to be lengthy and therefore consequential for the economics of fusion power plants. The maintenance strategy that maximizes the economic value of a plant depends on internal factors such as the cost and durability of the replaceable components, the frequency and duration of the maintenance blocks, and the external factors of the electricity system in which the plant operates. Here, this paper examines the value of fusion power plants with various maintenance properties in a decarbonized United States Eastern Interconnection circa 2050. Seasonal variations in electricity supply and demand mean that certain times of year, particularly spring to early summer, are best for scheduled maintenance. Seasonality has two important consequences. First, the value of a plant can be 15% higher than what one would naively expect if value were directly proportional to its availability. Second, in some cases, replacing fractions of a component in shorter maintenance blocks spread over multiple years is better than replacing it all at once during a longer outage, even through the overall availability of the plant is lower in the former scenario.

power plant, maintenance, seasonality, electricity↗

Electric Grid Supply Chain Review: Large Power Transformers and High Voltage Direct Current Systems

The report “America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition” lays out the challenges and opportunities faced by the United States in the energy supply chain as well as the federal government plans to address these challenges and opportunities. It is accompanied by several issue-specific deep dive assessments, including this one, in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. The need to modernize and increase the capacity of the U.S. power grid is increasing due to growing population, aging infrastructure, grid resilience requirements, operational flexibility needs, and a growing portfolio of renewable energy. As part of the Paris Climate Agreement the United States has committed to reducing its net greenhouse gas emissions by 50 to 52 percent below 2005 levels in 2030 and has set a goal of 100 percent carbon pollution free electricity by 2035 (The United States of America Nationally Determined Contribution, 2021). Meeting these targets will require a significant expansion of the power system to integrate a large amount of new renewable resources (United States Department of State & United States Executive Office of the President, 2021). However, many critical components supporting the power grid have limited to no domestic manufacturing capacity and face complex challenges in supporting a rapid expansion of the grid to meet multiple objectives, including decarbonization goals. This report focuses on two key grid components: large power transformers (LPTs) and high-voltage direct current (HVDC) transmission.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating High Levels of Renewables in to the Lanai Electric Grid

The Hawaii Clean Energy Initiative (HCEI) is working with a team led by the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) and Sandia National Laboratory (Sandia) to assess the economic and technical feasibility of increasing the contribution of renewable energy sources on the island of Lanai with a stated goal of reaching 100% renewable energy. NREL and Sandiapartnered with Castle & Cooke, Maui Electric Company (MECO), and SRA International to perform the assessment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Electricity Grid Integration Roadmap for Mexico. Supplement to the IEA Expert Group Report on Recommended Practices for Wind Integration Studies

As a recognized leader in efforts to mitigate global climate change, the Government of Mexico (GOM) works proactively to reduce emissions, demonstrating strong political will and capacity to comprehensively address climate change. Since 2010, the U.S. government (USG) has supported these efforts by partnering with Mexico under the Enhancing Capacity for Low Emission Development Strategies (EC-LEDS) program. Through the program, the USG has partnered with Mexico’s Ministry of Energy (SENER), as well as other government agencies, to support GOM in reaching its clean energy and climate change goals. Specifically, the EC-LEDS program is supporting GOM’s clean energy goal of generating 35% of its electricity from renewable energy (RE) by 2024. EC-LEDS, through the U.S. Agency for International Development (USAID) and the U.S Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL), has been collaborating with SENER and GOM interagency working group—the Consejo Consultivo para las Energías Renovables (Consultative Council on Renewable Energy)—to create a grid integration roadmap for variable RE. 1 A key objective in creating a grid integration roadmap is assessing likely impacts of wind and solar energy on the power system and modifying planning and operations accordingly. This paper applies best practices in conducting a grid integration study to the Mexican context.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How the Availability and Cost of Water Could Influence the Future Buildout of the Electric Grid in the U.S.

The power sector is the largest water withdrawer in the U.S., and water availability can drive both its investment and operating decisions. Given a range of uncertain trends in the power sector, it's important to consider how water demands might evolve from both generation and load change and how the cost and availability of water might impact water source decisions. Doing so requires a detailed consideration of technology-specific water needs, water availability characterization, and scenario exploration. This presentation describes capabilities to do so in unprecedented detail and some preliminary findings about how water constraints could influence power sector expansion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Grid Expansion Planning with High Levels of Variable Generation

Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance in the EI system. Incorporating more details of renewables in expansion planning will inevitably increase the computational burden. Therefore, high performance computing (HPC) techniques are urgently needed for power system operation and planning optimization. As a scoping study task, this project tested some preliminary parallel computation techniques such as breaking down the simulation task into several sub-tasks based on chronology splitting or sample splitting, and then assigning these sub-tasks to different cores. Testing results show significant time reduction when a simulation task is split into several sub-tasks for parallel execution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗