Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical metering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Opportunities for Industry to Provide Flexibility While Increasing Profitability

Supply and demand flexibility will both be needed to ensure the electricity system functions properly as the share from variable renewable generation continues to grow. Industrial manufacturing currently consumes about a third of primary energy worldwide, and electricity is projected to supply an increasing share of this demand as the global economy decarbonizes. Therefore, the ability for industry to flex demand poses an enticing opportunity to enable grid flexibility. However, large capital outlays prevent industry from voluntarily altering demand. Here we show that as battery costs continue to fall, industry will soon be able to profitably alter demand in accordance with electricity price variations. Focusing on two established industries– chlor-alkali and electric arc furnaces – and two industries with large future potential – methane pyrolysis and atmospheric CO 2 capture, we use a linear program (LP) optimization to assess the technoeconomic feasibility of flexible industrial demand across both historical and future-looking wholesale day-ahead marginal prices for the Electricity Reliability Council of Texas (ERCOT). We find positive net present values (NPV) from $\$$400K to $\$$50M using projected 2050 battery prices for industrial purchase of behind-the-meter batteries, using only arbitrage as a source of value. These results indicate that, with projected battery prices, profit-seeking industrial players could voluntarily play a future role in stabilizing a high-renewables grid where electricity prices act as accurate signals of grid needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Behind-the-Meter Solar Accounting in Renewable Portfolio Standards

If a behind-the-meter solar photovoltaic (BTM PV) system is adopted, how does that influence the total amount of renewable electricity in its state in the long run (i.e., after the existence of the generator is reflected in the relevant utility's generation mix)? Would we expect the total amount of renewable generation to increase on a 1:1 basis with the BTM PV's generation? Or could it be something more, or something less? We show in this paper that the answer can depend on two key elements of how BTM PV is accounted for in a state’s renewable portfolio standard (RPS): (1) whether renewable energy certificates (RECs) from BTM PV can be used for RPS compliance, and (2) whether load served by generation from BTM PV counts as load covered by the RPS. These two elements combine into four possible accounting options, and we characterize the implications of each under the simplifying assumptions that the RPS is binding and the BTM PV RECs are used for compliance when allowed. For example, if load served by BTM PV generation counts toward the RPS load and BTM PV RECs cannot be used for compliance, the presence of BTM does not change the amount of RECs that the utility is required to retire, and yet additional RECs will be retired by the BTM PV owner - therefore, the total amount of renewable generation would increase on a 1:1 basis with the BTM PV generation. In contrast, under a common RPS design in which BTM PV RECs can be used for compliance and the load served by BTM PV generation is not covered by the RPS, the presence of BTM PV and transfer of RECs for compliance can actually decrease the total amount of renewable generation in the state, relative to a situation in which there is no BTM PV.

14 SOLAR ENERGY↗

Are better combinations of DERs more profitable?: Combinatorial optimization for aggregation of DERs in wholesale electricity markets

Recently, regulatory changes in various countries have enabled the participation of small-scale distributed energy resources (DERs) aggregated in virtual power plants (VPPs) in wholesale electricity markets. The inherent uncertainty and variability of resources comprising VPPs can lead to imbalances between forecasted and metered outputs, potentially resulting in the deficient settlement of generation under imbalance settlement rules. To address this challenge, it is essential to manage variability in the planning phase and uncertainty in the operation phase. Most current research focuses on managing forecasting errors in the operational phase, with insufficient attention given to the planning phase. Here, to bridge this gap, this paper proposes an optimal combination strategy for DERs to maximize the market participation revenue of VPPs by proactively managing variability in the planning phase. To estimate the expected revenue, we conducted analyses for homogeneous and heterogeneous DERs using Monte Carlo simulations and genetic algorithms. Remarkably, the proposed method demonstrated approximately 8 % higher revenue compared to the neighboring group case when considering diversity in DER set configuration with equal proportions of photovoltaics and wind.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RF Sources for Electron Accelerators With a focus on high-duty-factor, low-to-moderate energy architectures

A charged particle, such as an electron or a proton, is accelerated through its interaction with either a static (DC) or time-varying (RF) electric field. The magnitude of the accelerating field, or gradient, is typically given in units of volts per meter; in charged-particle accelerators, fields are usually expressed as kV/m or MV/m. The energy of the accelerated particle is usually expressed in terms of electron volts, or eV. An electron starting at rest at ground potential, and accelerated to an electrode with a potential of 1 kV, will have an energy of 1 keV.

43 PARTICLE ACCELERATORS↗

Smart Outlets: Wireless Meter and Control Systems for Plug and Process Loads

Smart outlets control the flow of power to devices plugged into them and measure their energy use. The energy use data can be accessed via an online dashboard or smartphone application, allowing the user to turn power to plug-in devices on or off based on a schedule established in the dashboard or application. This four-page resource is a fact sheet meant to educate commercial building owners on smart outlets: what they are, why we use them, and how to use them in a way that will achieve energy savings while maintaining occupant comfort. The resource also describe how to procure a smart outlet system and how to fully capture their benefits over time. This resource was developed to support the Better Buildings Alliance Plug and Process Loads Technology Research Team.

30 DIRECT ENERGY CONVERSION↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Experimental investigation of the small-scale prototype of the dew point water recovery system

The article presents experimental investigation of the Dew Point Water Recovery (DPWR) system designed for clean water recovery using the dew point cooling phenomenon. The technology is a novel distillation process which allows for highly efficient water recovery. It is a first distillation technology which allows for water distillation through direct contact with atmospheric air. The authors designed, built, and tested an original prototype of a laboratory-scale DPWR system to verify its basic operating principles and perform performance analysis. It was shown that on average 10 × 10 −6 m 3 of clean water could be recovered from each cubic meter of the supply air with an average GOR of 1.9. Although the operation of the DPWR system requires electricity to drive fans, pumps and other associated equipment, the actual driving force of the system is thermal energy. The average thermal energy demand of the DPWR system was 370 kWh/m 3 , and more than half of this energy was based on the thermodynamic potential of the supply air. Based on experimental data, the mathematical model of the DPWR system was verified and it was found that the average relative discrepancy in predicting air temperature did not exceed 8%, and in predicting air humidity: 5%. In conclusion, the conducted experiments confirmed that the proposed DPWR system is feasible and has the potential to fill the technological gap in terms of a low-energy and easily accessible water recovery method.

42 ENGINEERING↗

Self-potential tomography preconditioned by particle swarm optimization—Self-potential monitoring and streamflow data acquired March 26–September 14, 2023 at East Fork Poplar Creek near Oak Ridge Tennessee

This data release contains self-potential (SP) monitoring data measured on the flood plain of East Fork Poplar Creek (East Fork) in Oak Ridge, Tennessee and streamflow data measured at streamgage EFK5.4 about 310 meters upstream from the SP monitoring site. Additionally, forward and inverse numerical modeling scripts used to model the electrical-potential field on the East Fork flood plain are provided. SP monitoring data included in this data release were measured at 39 different data-collection points on the east flood plain; 30 points were spaced 3-m apart along an 87-m profile parallel to the edge of the streambank, and 9 points were spaced 5-m apart along a 40-m profile approximately perpendicular to the streambank. The two profiles of SP data-collection points intersected at the approximate midpoint of the profile parallel to the streambank. Transient voltages were measured at each data-collection point every 60 seconds between 16:13 Eastern Standard Time (EST) on March 26, 2023, and 11:41 EST on September 14, 2023. Streamflow data included in this data release overlap the time-period of self-potential monitoring and were measured every 900 seconds between 16:23 on March 26, 2023, and 23:53 on September 14, 2023.

54 ENVIRONMENTAL SCIENCES↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data

Many distribution network monitoring and control applications - including state estimation, volt/VAR optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data: Preprint

Many distribution network monitoring and control applications - including state estimation, volt/VAR optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data

Many distribution network monitoring and control applications - including state estimation, Volt/VAr optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder-head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure (AMI)↗

Institutional and Policy Landscape for Solar-Plus-Storage Deployment by Electric Cooperatives

As co-location with battery storage has become a significant solar project-design trend across the United States, policies at all levels have started to adjust. Generally, these policies address battery storage development in major, urban markets, served by large investor-owned utilities (IOUs). Yet all kinds of utilities nationwide are seeking ways to tap into the fast-growing battery storage market, and they are all stakeholders in the federal, state, and local policies that impact the storage market's development. The electric cooperative sector, which includes some 830 distribution utilities and 63 generating and transmission (G&T) utilities across a mostly rural landscape, is no exception. It is impacted by federal, state, and local government policy requirements and incentives, as well as by policies that are controlled by the sector's own institutions. The objective of this paper is to identify and discuss the various policy and institutional factors that are relevant to the electric cooperative sector, and especially to local, distribution-level electric cooperatives (co-ops) that may be interested in procuring energy storage. Given this, the paper is largely written from the local co-op perspective. It also may be useful to wholesale G&T cooperatives. Other parties that may find the paper useful include storage developers, who are often unfamiliar with co-ops; local and state policymakers addressing policy options for this sector, and local renewable or storage stakeholders, who wish to understand the policy landscape affecting their local utility. Although co-op energy storage programs may tap customer-side batteries, this examination is focused on utility-side "front of the meter" projects and the policy issues they raise.

14 SOLAR ENERGY↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Potential bill impacts of dynamic electricity pricing on California utility customers

The rapid growth of renewable generation is creating challenges for the California grid in the form of the “duck curve,” with increasingly steep ramping required for conventional generation resources in the morning and evening, and growing curtailment of solar resources in midday periods. Time-varying electricity tariffs have received considerable attention as a tool to address these challenges, with a renewed recent focus on the potential for dynamic tariffs that vary to reflect conditions on the grid in near-real time. Consideration of dynamic tariffs may raise concerns about the financial impact on utility customers, especially for those who have limited flexibility to modify their electricity consumption in response. Specific areas of concern include electricity bills, bill volatility, and equity implications related to cost shifting among customer groups. In this paper we leverage smart meter data for more than 400,000 California utility customers, spanning residential, commercial, industrial, and agricultural customers, to assess potential customer bill impacts arising from a multi-component dynamic tariff . Specifically, we compute impacts on customer bills and bill volatility under the assumption of fully inelastic demand, i.e., where customers do not change their consumption patterns in response to the tariff. We also assess various approaches designing subscription load shapes that customers can pre-purchase as a hedge that may provide a measure of protection against large negative impacts, while still incentivizing the modification of loads on the margin. We compare and contrast the relative impacts on different customer classes and discuss benefits and pitfalls of different dynamic tariff structures and subscription load shapes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Deep Generative Model for Non-Intrusive Identification of EV Charging Profiles

The proliferation of electric vehicles (EVs) brings environmental benefits and technical challenges to power grids. An identification algorithm which can accurately extract individual EV charging profiles out of widely available smart meter measurements has attracted great interests. This paper proposes a non-intrusive identification framework for EV charging profile extraction, which is driven by deep generative models (DGM). First, the proposed DGM is designed as a representation layer embedded into the Markov process and used to model the joint probability distribution of available time-series data. A novel contribution is to approximate posterior distributions by neural networks whose parameters are obtained by variational inference and supervised learning. Second, the EV charging status is inferred from the DGM via dynamic programming. Lastly, the desired EV charging profile can be reconstructed by the rated power of EV models and inferred status. Compared with the benchmark Hidden Markov Models, the proposed framework can better handle noise in data with less computational complexity and better overall accuracy performances with smaller recall. The proposed framework is validated by numerical experiments on the Pecan Street dataset.

33 ADVANCED PROPULSION SYSTEMS↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗