Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Guaranteeing Failsafe Operation of Extended-Scene Shack-Hartmann Wavefront Sensor Algorithm

A Shack-Hartmann sensor (SHS) is an optical instrument consisting of a lenslet array and a camera. It is widely used for wavefront sensing in optical testing and astronomical adaptive optics. The camera is placed at the focal point of the lenslet array and points at a star or any other point source. The image captured is an array of spot images. When the wavefront error at the lenslet array changes, the position of each spot measurably shifts from its original position. Determining the shifts of the spot images from their reference points shows the extent of the wavefront error. An adaptive cross-correlation (ACC) algorithm has been developed to use scenes as well as point sources for wavefront error detection. Qualifying an extended scene image is often not an easy task due to changing conditions in scene content, illumination level, background, Poisson noise, read-out noise, dark current, sampling format, and field of view. The proposed new technique based on ACC algorithm analyzes the effects of these conditions on the performance of the ACC algorithm and determines the viability of an extended scene image. If it is viable, then it can be used for error correction; if it is not, the image fails and will not be further processed. By potentially testing for a wide variety of conditions, the algorithm s accuracy can be virtually guaranteed. In a typical application, the ACC algorithm finds image shifts of more than 500 Shack-Hartmann camera sub-images relative to a reference sub -image or cell when performing one wavefront sensing iteration. In the proposed new technique, a pair of test and reference cells is selected from the same frame, preferably from two well-separated locations. The test cell is shifted by an integer number of pixels, say, for example, from m= -5 to 5 along the x-direction by choosing a different area on the same sub-image, and the shifts are estimated using the ACC algorithm. The same is done in the y-direction. If the resulting shift estimate errors are less than a pre-determined threshold (e.g., 0.03 pixel), the image is accepted. Otherwise, it is rejected.

Sidick, Erikin↗

A north-south stationkeeping ion thruster system for ATS-F

A one millipound cesium ion thruster system experiment designed for the ATS-F satellite will be used to demonstrate north-south stationkeeping for synchronous satellites. Development effort leading to the present design will be described and test data for qualification and flight acceptance tests will be presented. These include a review of EMI evaluations tests made with the power conditioning subsystem and the thruster simulator, and an extended system operational test. During the extended test, 90 on-off cycles simulated thruster operation in orbit. A planned 18,000 hour ground test of a flight qualified thruster will be discussed.

James, E.↗

The utility of surface magnetic field measurements in the MAGSAT program

To take full advantage of the global, vector, survey by the Magsat satellite, and international program of augmented surface measurements was proposed. For secular variation and upper mantle conductivity the proposed measurements are global. The repeat station measurements for secular variation should be occupied at 2-3 year intervals. A special observing period in November and December of 1979 is proposed during which simultaneous, continuous, global measurements for upper mantle conductivity studies are to be gathered. Finally, it is recommended that the networks in operation during the IMS extend their operation through the Fall of 1980 to provide correlative data useful for high latitude disturbance studies and for crustal conductivity studies.

Langel, R. A.↗

The Impact of Back-Sputtered Carbon on the Accelerator Grid Wear Rates of the NEXT and NSTAR Ion Thrusters

A study was conducted to quantify the impact of back-sputtered carbon on the downstream accelerator grid erosion rates of the NEXT (NASA's Evolutionary Xenon Thruster) Long Duration Test (LDT1). A similar analysis that was conducted for the NSTAR (NASA's Solar Electric Propulsion Technology Applications Readiness Program) Life Demonstration Test (LDT2) was used as a foundation for the analysis developed herein. A new carbon surface coverage model was developed that accounted for multiple carbon adlayers before complete surface coverage is achieved. The resulting model requires knowledge of more model inputs, so they were conservatively estimated using the results of past thin film sputtering studies and particle reflection predictions. In addition, accelerator current densities across the grid were rigorously determined using an ion optics code to determine accelerator current distributions and an algorithm to determine beam current densities along a grid using downstream measurements. The improved analysis was applied to the NSTAR test results for evaluation. The improved analysis demonstrated that the impact of back-sputtered carbon on pit and groove wear rate for the NSTAR LDT2 was negligible throughout most of eroded grid radius. The improved analysis also predicted the accelerator current density for transition from net erosion to net deposition considerably more accurately than the original analysis. The improved analysis was used to estimate the impact of back-sputtered carbon on the accelerator grid pit and groove wear rate of the NEXT Long Duration Test (LDT1). Unlike the NSTAR analysis, the NEXT analysis was more challenging because the thruster was operated for extended durations at various operating conditions and was unavailable for measurements because the test is ongoing. As a result, the NEXT LDT1 estimates presented herein are considered preliminary until the results of future posttest analyses are incorporated. The worst-case impact of carbon back-sputtering was determined to be the full power operating condition, but the maximum impact of back-sputtered carbon was only a four percent reduction in wear rate. As a result, back-sputtered carbon is estimated to have an insignificant impact on the first failure mode of the NEXT LDT at all operating conditions.

Soulas, George C.↗

The Impact of Back-Sputtered Carbon on the Accelerator Grid Wear Rates of the NEXT and NSTAR Ion Thrusters

A study was conducted to quantify the impact of back-sputtered carbon on the downstream accelerator grid erosion rates of the NASA's Evolutionary Xenon Thruster (NEXT) Long Duration Test (LDT1). A similar analysis that was conducted for the NASA's Solar Electric Propulsion Technology Applications Readiness Program (NSTAR) Life Demonstration Test (LDT2) was used as a foundation for the analysis developed herein. A new carbon surface coverage model was developed that accounted for multiple carbon adlayers before complete surface coverage is achieved. The resulting model requires knowledge of more model inputs, so they were conservatively estimated using the results of past thin film sputtering studies and particle reflection predictions. In addition, accelerator current densities across the grid were rigorously determined using an ion optics code to determine accelerator current distributions and an algorithm to determine beam current densities along a grid using downstream measurements. The improved analysis was applied to the NSTAR test results for evaluation. The improved analysis demonstrated that the impact of back-sputtered carbon on pit and groove wear rate for the NSTAR LDT2 was negligible throughout most of eroded grid radius. The improved analysis also predicted the accelerator current density for transition from net erosion to net deposition considerably more accurately than the original analysis. The improved analysis was used to estimate the impact of back-sputtered carbon on the accelerator grid pit and groove wear rate of the NEXT Long Duration Test (LDT1). Unlike the NSTAR analysis, the NEXT analysis was more challenging because the thruster was operated for extended durations at various operating conditions and was unavailable for measurements because the test is ongoing. As a result, the NEXT LDT1 estimates presented herein are considered preliminary until the results of future post-test analyses are incorporated. The worst-case impact of carbon back-sputtering was determined to be the full power operating condition, but the maximum impact of back-sputtered carbon was only a 4 percent reduction in wear rate. As a result, back-sputtered carbon is estimated to have an insignificant impact on the first failure mode of the NEXT LDT1 at all operating conditions.

Soulas, George C.↗

Dawn's Second and Final Extended Mission: A New Operational Campaign at Ceres

Dawn has been in orbit around Ceres since March 2015. In 2016, Dawn completed its prime mission of exploring Vesta and Ceres, and it completed an extended mission at the dwarf planet in 2017. The spacecraft has lost all reaction wheel control, making attitude control dependent on a dwindling supply of hydrazine. Nevertheless, in 2017 the project was approved for a second and final extended mission at Ceres. Starting in April 2018, Dawn used its ion propulsion system to maneuver to two new orbits. These highly elliptical orbits provided hydrazine-efficient opportunities for the acquisition of valuable new data. Now in the second of these orbits, Dawn's lowest altitude is only 9% of the lowest altitude previously in the mission, enabling significant improvements in the spatial resolution of the data. We describe Dawn operations in its second extended mission, the nature of the orbits, and the observation campaigns. We also summarize expectations for the end of the mission.

Rayman, Marc D.↗

Extending ISS Life Beyond 2030

The United States On-orbit Segment (USOS) of the International Space Station (ISS) was designed to meet a 15-year on-orbit life. Since the first hardware was launched in late 1998, the ISS would have reached its end of life in 2013. With the realization that the ISS would be needed well into the next decade, and beyond, a multi-disciplinary effort was undertaken to extend the ISS’ life through 2028 and to show that further extension to 2040 and beyond is not only feasible but achievable. Currently, NASA and the ISS international partners have agreed to extend its operations through 2030. This collaborative effort ensures that the ISS will continue to serve as a hub for scientific research, international cooperation, and educational endeavors for the next decade. Maintaining a continuous human presence in Low Earth Orbit (LEO) is desirable for testing new LEO, lunar, and deep-space technologies; conducting scientific research in micro-gravity for the benefit of life on Earth; and enabling a seamless transition of capabilities to one or more commercially owned and operated destinations. This paper provides an overview of the ISS life extension project with a particular focus on the analytical approach used to assess the primary structure. This analytical approach includes future operations planning, critical location screening, on-orbit dynamic load simulation, on-orbit optical property degradation studies, on-orbit thermal analyses, spectra generation, crack model idealization, fracture analyses, and post processing. Structural life results and identification of the most critical on-orbit events are presented. Also addressed are life extension approaches for other affected sub-systems, including: 1. Secondary Structure. 2. Materials. Evaluations consider environmental exposure to atomic oxygen, ionizing and gamma radiation, fluids, etc. Life limited materials, wear, and usage effects are also considered. 3. Environmental Control and Life Support Systems, including oxygen supply and generation, water recovery and management, and regenerative hardware. Evaluations are performed to determine which hardware can be run to failure and which are assessed for life extension. 4. Electrical power system. ISS is powered by eight channels of solar arrays and an electrical energy storage system providing 357 kWh power. Power generation and balance analyses are performed considering hardware degradation and increasing power demand. 5. Logistics and maintenance. Analyses are performed to determine critical spares required to maintain functionality. Consideration is given to supply chain health, obsolescence issues, onboard stowage availability, and up-mass capability. The successful life extension results have built confidence to safely operate, maintain and enhance the ISS well beyond the current decade. Extending the operational life of the ISS maintains an international presence in LEO and serves to avoid a gap in capability necessary to fulfill the exploration and research needs of NASA, international partners, and industry without interruption until a commercial space station is operational.

design life↗

Using Model-Based Reasoning for Autonomous Instrument Operation

Multiprobe missions are an important part of NASA's future: Cluster, Magnetospheric Multi Scale, Global Electrodynamics and Magnetospheric Constellation are representatives from the Sun-Earth Connections Theme. To make such missions robust, reliable, and affordable, ideally the many spacecraft of a constellation must be at least as easy to operate as one spacecraft is today. To support this need for scalability, science instrumentation must become increasingly easy to operate, even as this same instrumentation becomes more capable and advanced. Communication and control resources will be at a premium for future instruments. Many missions will be out of contact with ground operators for extended periods either to reduce operations cost or because of orbits that limit communication to weekly perigee transits. Autonomous capability is necessary if such missions are to effectively achieve their operational objectives. An autonomous system is one that acts given its situation in a mission appropriate manner without external direction to achieve mission goals. To achieve this capability autonomy must be built into the system through judicious design or through a built-in intelligence that recognizes system state and manages system response. To recognize desired or undesired system states, the system must have an implicit or explicit understanding of its expected states given its history and self observations. The systems we are concerned with, science instruments, can have stringent requirements for system state knowledge in addition to requirements driven by health and safety concerns. Without accurate knowledge of the system state, the usefulness of the science instrument may be severely limited. At the same time, health and safety concerns often lead to overly conservative instrument operations further reducing the effectiveness of the instrument. These requirements, coupled with overall mission requirements including lack of communication opportunities and tolerance of environmental hazards, frame the problem of constructing autonomous science instruments. we are developing a model of the Low Energy Neutral Atom instrument (LENA) that is currently flying on board the Imager for Magnetosphere-to-Aurora Global Exploration (IMAGE) spacecraft. LENA is a particle detector that uses high voltage electrostatic optics and time-of-flight mass spectrometry to image neutral atom emissions from the denser regions of the Earth's magnetosphere. As with most spacecraft borne science instruments, phenomena in addition to neutral atoms are detected by LENA. Solar radiation and energetic particles from Earth's radiation belts are of particular concern because they may help generate currents that may compromise LENA's long term performance. An explicit model of the instrument response has been constructed and is currently in use on board IMAGE to dynamically adapt LENA to the presence or absence of energetic background radiations. The components of LENA are common in space science instrumentation, and lessons learned by modelling this system may be applied to other instruments. This work demonstrates that a model-based approach can be used to enhance science instrument effectiveness. Our future work involves the extension of these methods to cover more aspects of LENA operation and the generalization to other space science instrumentation.

Johnson, Mike↗

Extended-performance 8-cm ion thruster operation

The performance of an 8-cm ion thruster has been extended to 32-mN thrust, 4062-s specific impulse, and 0.033-mN/W thrust-to-power ratio. The design of this thruster is similar to the IAPS (Ion Auxiliary Propulsion System), which has a performance of 5-mN thrust, 3500-s specific impulse, and 0.036-mN/W thrust-to-power ratio. The above level of extended performance has been achieved by increasing the discharge power, ion-beam accelerating voltage, and propellant flowrate, and by modifying the propellant-vapor injection, discharge-chamber magnetic-field strength, high-voltage insulators, and electron baffle. This paper describes results obtained in characterizing the extended-performance operation of both the unmodified thruster (i.e., in an IAPS-like configuration) and the modified thruster. Lifetime-estimating measurements for the modified thruster at extended-performance conditions are also presented.

Wessel, F. J.↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Autonomy and the human element in space

NASA is contemplating the next logical step in the U.S. space program - the permanent presence of humans in space. As currently envisioned, the initial system, planned for the early 1990's, will consist of manned and unmanned platforms situated primarily in low Earth orbit. The manned component will most likely be inhabited by 6-8 crew members performing a variety of tasks such as materials processing, satellite servicing, and life science experiments. The station thus has utility in scientific and commercial enterprises, in national security, and in the development of advanced space technology. The technical foundations for this next step have been firmly established as a result of unmanned spacecraft missions to other planets, the Apollo program, and Skylab. With the shuttle, NASA inaugurates a new era of frequent flights and more routine space operations supporting a larger variety of missions. A permanently manned space system will enable NASA to expand the scope of its activities still further. Since NASA' s inception there has been an intense debate over the relative merits of manned and unmanned space systems. Despite the generally higher costs associated with manned components, astronauts have accomplished numerous essential, complex tasks in space. The unique human talent to evaluate and respond inventively to unanticipated events has been crucial in many missions, and the presence of crews has helped arouse and sustain public interest in the space program. On the other hand, the hostile orbital environment affects astronaut physiology and productivity, is dangerous, and mandates extensive support systems. Safety and cost factors require the entire station complex, both space and ground components, to be highly automated to free people from mundane operational chores. Recent advances in computer technology, artificial intelligence (AI), and robotics have the potential to greatly extend space station operations, offering lower costs and superior productivity. Extended operations can in turn enhance critical technologies and contribute to the competitive economic abilities of the United States. A high degree of automation and autonomy may be required to reduce dependence on ground systems, reduce mission costs, diminish complexity as perceived by the crew, increase mission lifetime and expand mission versatility. However, technologies dealing with heavily automated, long duration habitable spacecraft have not yet been thoroughly investigated by NASA. A highly automated station must amalgamate the diverse capabilities of people, machines, and computers to yield an efficient system which capitalizes on unique human characteristics. The station also must have an initial design which allows evolution to a larger and more sophisticated space presence. In the early years it is likely that AI-based subsystems will be used primarily in an advisory or planning capacity. As human confidence in automated systems grows and as technology advances, machines will take on more critical and interdependent roles. The question is whether, and how much, system autonomy will lead to improved station effectiveness.

Source record↗

Engineering and operational characteristics of the extended duration orbiter

A program is being pursued to lengthen the mission duration of the Space Shuttle from 10 days to 16 days, with future plans to increase the on-orbit stay time to 28 days. Presently, the length of the mission is limited by fuel cell reactants, stowage constraints, and life-support system consumables. In December 1988, NASA gained approval to begin the design and development of the extensive modifications to OV-102 Columbia required to extend its mission duration to 16 days. Additionally, OV-105 Endeavour is now being manufactured so as not to preclude its transformation to a 28-day vehicle in the future, should that program gain subsequent approval and funding. The first extended duration orbiter (EDO) launch of Columbia is slated for March 1992 with the US microgravity laboratory (USML) as its payload. Scientific payloads such as the USML and Spacelab, which require longer periods of zero gravity or the vacuum of space, will greatly benefit from the EDO program.

Cerna, Peter J.↗