Low AC Loss YBCO Coated Conductor Geometry by Direct Inkjet Printing

The second generation (2G) high temperature superconductors (HTS) wire offers potential benefits for many electric power applications, including ones requiring filamentized conductors with low ac loss, such as transformers and fault current limiters. However, the use of 2G wire in these applications requires the development of both novel multi-filamentary conductor designs with lower ac losses and the development of advanced manufacturing technologies that enable the low-cost manufacturing of these filamentized architectures. This Phase I SBIR project focused on testing inkjet printing as a potential low-cost, roll-to-roll manufacturing technique to fabricate potential low ac loss filamentized architectures directly on the 2G template strips.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Protection of 100% Inverter-dominated Power Systems with Grid-Forming Inverters and Protection Relays – Gap Analysis and Expert Interviews

This report summarizes a gap analysis resulting from a literature review and expert interviews conducted by subject matter experts from Sandia National Laboratory, Siemens, and the Electric Power Research Institute (EPRI) in Spring 2023. The gap analysis consists of two main parts: The fault-ride through (FRT) behavior of grid-forming (GFM) inverter-based resources (IBR) and the response of state-of-the-art protection relays to the fault currents and voltages from GFM IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Experience with Inverter-Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. This report identifies various protection challenges due to IBRs that industry is facing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV-EVSE Fault Study: An Analysis of Thermal Events Caused by Electrical Faults during DC Charging

This report outlines multiple avenues of analysis of electrical faults associated with electric vehicles (EVs) during charging, focusing specifically on the interactions between EVs and EV supply equipment (EVSE). Key concerns include the identification and mitigation of overtemperature events that can result in fires, which are commonly initiated by localized heating of connectors, wiring, or high-impedance fault current paths.

42 - ENGINEERING↗

Study the Protection Improvements for a Weak Grid Area With High IBRs

NLR is collaborating with Florida Power & Light (FPL) and GE to investigate power system stability and protection reliability challenges in a weak-grid region with high penetration of inverter-based resources (IBRs). This presentation will primarily focus on the protection aspects of the study. We will share key insights from this real-world project, including best practices for developing high-fidelity fault study models, establishing a controller-hardware-in-the-loop (CHIL) platform for testing physical relays, identifying system-level protection challenges, and designing enhanced protection schemes to address those issues. Through this discussion, the audience will gain practical understanding of protection studies in IBR-dominated systems, the emerging challenges associated with reduced fault current and altered transient behavior, and effective mitigation strategies. In particular, we will highlight the critical importance of IBR compliance with IEEE 2800-2022 to ensure dependable and secure protection relay operation in modern transmission systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design analysis and computer-aided performance evaluation of shuttle orbiter electrical power system. Volume 1: Summary

Studies were conducted to develop appropriate space shuttle electrical power distribution and control (EPDC) subsystem simulation models and to apply the computer simulations to systems analysis of the EPDC. A previously developed software program (SYSTID) was adapted for this purpose. The following objectives were attained: (1) significant enhancement of the SYSTID time domain simulation software, (2) generation of functionally useful shuttle EPDC element models, and (3) illustrative simulation results in the analysis of EPDC performance, under the conditions of fault, current pulse injection due to lightning, and circuit protection sizing and reaction times.

Source record↗

Floating frame grounding system

The development of a floating frame grounding system (FFGS) for the 40- by 80-foot low speed wind tunnel facility at the NASA Ames Research Center National Full Scale Aerodynamics Complex is addresssed. When electrical faults are detected, the FFGS ensures a ground path for the fault current. In addition, the FFGS alerts the tunnel operator when a mechanical foul occurs.

Forsyth, T. J.↗

Serial and parallel power equipment with high-temperature superconducting elements

One of the prospective, practical applications of high-temperature superconductors is the fault-current limitation in electrical energy networks. The development and testing of experimental HTSC serial current limiters have been reported in the literature. A Hungarian electric power company has proposed the development of a parallel equipment for arc suppressing both in the industrial and customers' networks. On the basis of the company's proposal the authors have outlined the scheme of a compound circuit that can be applied both for current limitation and arc suppressing. In this paper the design principles and methods of the shunt equipment are presented. These principles involve the electrical, mechanical and cryogenic aspects with the special view on the electrical and mechanical connection between the HTSC material and the current lead. Preliminary experiments and tests have been carried out to demonstrate the validity of the design principles developed. The results of the experiments and of the technological investigations are presented.

Bencze, Laszlo↗

Ultra-long-life spacecraft for long duration space exploration missions

The predominant failure mode in an ultra longlife system is the wear-out of components. In order to survive long duration missions, current fault tolerant design techniques would require excessive number of redundant components. This paper describes a more efficient fault tolerant avionics system architecture that requires much less redundant components. This architecture employs generic function blocks that can be programmed to replace a wide variety of components in-flight. Hence, each individual generic block is essentially equivalent to almost an entire redundant string of components in the conventional approach. In that way, the ultra long-life system can achieve much higher level of reliability while carrying much less components. On the other hand, due to the programmability of the generic redundant blocks, the physical location of a specific component might not be pre-determined. Therefore, wireless interconnection is employed to provide the necessary flexibility in connectivity. A testbed of this architecture is being developed at the Jet Propulsion Laboratory.

return missions↗

Space Shuttle Upgrades Advanced Hydraulic Power System

Three Auxiliary Power Units (APU) on the Space Shuttle Orbiter each provide 145 hp shaft power to a hydraulic pump which outputs 3000 psi hydraulic fluid to 41 hydraulic actuators. A hydrazine fuel powered APU utilized throughout the Shuttle program has undergone many improvements, but concerns remain with flight safety, operational cost, critical failure modes, and hydrazine related hazards. The advanced hydraulic power system (AHPS), also known as the electric APU, is being evaluated as an upgrade to replace the hydrazine APU. The AHPS replaces the high-speed turbine and hydrazine fuel supply system with a battery power supply and electric motor/pump that converts 300 volt electrical power to 3000 psi hydraulic power. AHPS upgrade benefits include elimination of toxic hydrazine propellant to improve flight safety, reduction in hazardous ground processing operations, and improved reliability. Development of this upgrade provides many interesting challenges and includes development of four hardware elements that comprise the AHPS system: Battery - The battery provides a high voltage supply of power using lithium ion cells. This is a large battery that must provide 28 kilowatt hours of energy over 99 minutes of operation at 300 volts with a peak power of 130 kilowatts for three seconds. High Voltage Power Distribution and Control (PD&C) - The PD&C distributes electric power from the battery to the EHDU. This 300 volt system includes wiring and components necessary to distribute power and provide fault current protection. Electro-Hydraulic Drive Unit (EHDU) - The EHDU converts electric input power to hydraulic output power. The EHDU must provide over 90 kilowatts of stable, output hydraulic power at 3000 psi with high efficiency and rapid response time. Cooling System - The cooling system provides thermal control of the Orbiter hydraulic fluid and EHDU electronic components. Symposium presentation will provide an overview of the AHPS upgrade, descriptions of the four hardware elements, and a summary of development results to date.

Source record↗

Splice Resistance Measurements in 2G YBCO Coated Conductor

Abstract The Oak Ridge National Laboratory has been investigating the electrical splice resistance of second-generation (2G) YBCO coated conductor. The purpose of the experimental investigation is to study the splice resistance of 2G YBCO coated conductor as a function of: a) operating temperature, b) magnetic field strength (B-field), and c) magnetic field orientation ( ). Understanding the splice resistance with its corresponding variation as a function of surface preparation and operating conditions is essential to the practical implementation of electric utility devices; e.g., motors, generators, transformers, cables, and fault-current limiters, etc. Preliminary test results indicate that the 2G YBCO splice resistance shows a weak temperature dependence and a significantly stronger dependence upon magnetic field strength and magnetic field orientation. Surface preparation conditions are also briefly discussed. Index Terms coated conductor, splice, critical current, YBCO

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Combining Partial Redundancy and Checkpointing for HPC

Today's largest High Performance Computing (HPC) systems exceed one Petaflops (10^15 floating point operations per second) and exascale systems are projected within seven years. But reliability is becoming one of the major challenges faced by exascale computing. With billion-core parallelism, the mean time to failure is projected to be in the range of minutes or hours instead of days. Failures are becoming the norm rather than the exception during execution of HPC applications. Current fault tolerance techniques in HPC focus on reactive ways to mitigate faults, namely via checkpoint and restart (C/R). Apart from storage overheads, C/R-based fault recovery comes at an additional cost in terms of application performance because normal execution is disrupted when checkpoints are taken. Studies have shown that applications running at a large scale spend more than 50\% of their total time saving checkpoints, restarting and redoing lost work. Redundancy is another fault tolerance technique, which employs redundant processes performing the same task. If a process fails, a replica of it can take over its execution. Thus, redundant copies can decrease the overall failure rate. The downside of redundancy is that extra resources are required and there is an additional overhead on communication and synchronization. This work contributes a model and analyzes the benefit of C/R in coordination with redundancy at different degrees to minimize the total wallclock time and resources utilization of HPC applications. We further conduct experiments with an implementation of redundancy within the MPI layer on a cluster. Our experimental results confirm the benefit of dual and triple redundancy - but not for partial redundancy - and show a close fit to the model. At 80,000 processes, dual redundancy requires twice the number of processing resources for an application but allows two jobs of 128 hours wallclock time to finish within the time of just one job without redundancy. For narrow ranges of processor counts, partial redundancy results in the lowest time. Once the count exceeds 770, 000, triple redundancy has the lowest overall cost. Thus, redundancy allows one to trade-off additional resource requirements against wallclock time, which provides a tuning knob for users to adapt to resource availabilities.

Elliott, James↗

Traveling Wave Relays for Distribution Feeder Protection with High Penetrations of Distributed Energy Resources: Preprint

Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Traveling Wave Relays for Distribution Feeder Protection with High Penetrations of Distributed Energy Resources

Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

SIW21-95: Hybridizing Synchronous Condensers with Grid-Forming Battery Energy Storage Systems

One of the main challenges associated with deployment of high shares of inverter-based resources (IBRs) in power grid is not only reduced system inertia but also degrading system strength that may cause severe stability impacts. A minimum level of system strength is needed for the power system to remain stable under normal conditions and to return to a steady state condition following a system disturbance. Significant system strength reduction is expected in almost all planned areas for solar and wind generation deployment. Synchronous condensers (SC) have been considered as one main technology to address the system strength issues for the areas with high levels of IBRs. SCs can help improving reliability and resiliency of power system but they do not provide the full range of services needed by power systems for reliable and economic integration of high shares of inverter-coupled variable generation such as PV generation. Services related to active power controls cannot be provided by SCs due to lack of prime mover. Even for provision of reactive power SCs have certain constraints based on their thermal and stability limits. NREL has been conducting research on a hybridized concept that combines SCs with grid forming (GFM) battery energy storage systems (BESS). This super flexible AC transmission system (SuperFACTS) that combines these two technologies in a single plant under the same controller offers a unique scalable set of services to the power system at all levels (transmission, sub-transmission, distribution, islands and isolated microgrids). Depending on use cases, SuperFACTS can be controlled to provide fully dispatchable and flexible operation using energy storage component, provide a full range of existing and future ancillary and reliability services to the grid (similar or better than conventional sources), maintain adequate levels of grid strength and inertia, and provide fault current for proper operation of protection systems. Therefore, this economic and easy to commercialize solution has potential for significant impacts on certain segments of global energy sector. All types of gird services (market based, reliability and resiliency) can be provided by SuperFACTS plants. GFM BESS can act as a self-black start source for each SuperFACTS module, which in turn can act a black start resource for co-located PV and wind power plants, segments of transmission and distribution networks, for conventional power plants, etc. The issue of in-rush currents during black start is addressed by overcurrent capability of SCs. In this paper we describe the results of modeling for SuperFACTS concept.

grid forming↗

FLISR in the Presence of DERs ADMS Test Bed Use Case

Fault location, isolation, and restoration (FLISR) is one of the distribution automation applications that utilities are most interested in. It operates groups of switches on distribution feeders to improve the reliability of power delivery after localizing outages. FLISR is an essential function for enabling a self-healing grid, and it directly affects grid reliability and resilience. The presence of DERs brings both new opportunities and challenges for FLISR applications. For instance, some DERs can work as backup generation sources and help energize local networks so more switching options can be achieved with the coordination of FLISR operations; however, the existence of DERs also brings new challenges. The bidirectional power flow resulting from DERs might require dynamic changes to protective devices' fault current settings, and thus the FLISR application will need to dynamically adjust its operations in coordination with the dynamic protection settings. Also, some FLISR applications make their service restoration decisions and close tie-switches based on predefined rules; however, the presence of DERs and their impact on altering net loads on the local feeder network are not considered. For this use case, the project team is using the FLISR application of the Survalent ADMS operating on a real-time simulation of a feeder from Central Georgia EMC, a cooperative electric utility. The performance of the FLISR application is being evaluated for different locations and combinations of DERs, including grid-forming battery energy storage systems.

ADMS↗

The overvoltage protection module for the power supply system for the pixel detector at Belle II experiment at KEK

In this paper the overvoltage protection modules (OVP) for the power supply (PS) system of the Belle II pixel detector (PXD) are described. The aim of the OVP is to protect the detector and associated electronics against overvoltage conditions. Most critical in the system are voltages supplying the front-end ASICs. The PXD detector consists of the DEPFET sensor modules with integrated chips like the Drain Current Digitizer, the Switcher and the Data Handling Processor. These chips, implemented in modern sub-micron technologies, are quite vulnerable to variations in the supply voltages. The PXD will be placed in the Belle II experiment as close as possible to the interaction point, where access during experiment is very limited or even impossible, thus the PS and OVP systems exploit the remote-sensing method. Overvoltage conditions are due to failures of the PS itself, wrong setting of the output voltages or transient voltages coming out of hard noisy environment of the experiment. The OVP modules are parts of the PS modules. For powering the PXD 40 PS modules are placed 15 m outside the Belle II spectrometer. Each one is equipped with the OVP board. All voltages (22) are grouped in 4 domains: Analog, Digital, Steering and Gate which have independent grounds. The OVP boards are designed from integrated circuits from Linear Technology. All configurations were simulated with the Spice program. The control electronics is designed in a Xilinx CPLD. Two types of integrated circuits were used. LT4356 surge stopper protects loads from high voltage transients. The output voltages are limited to a safe value and also protect loads against over current faults. For less critical voltages, the LTC2912 voltage monitors are used that detect under-voltage and overvoltage events. It has to be noted that the OVP system is working independently of any other protection of the PS system, which increases its overall reliability. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CERTS Microgrid Laboratory Test Bed

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1 a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2 an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3 a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources.