Search NASA⌕ Search

SEARCH · Search NASA

Results for “final”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Research in Neutrino Physics (Final Technical Report)

The goal of the experimental neutrino efforts at Louisiana State University is to measure the properties of neutrinos and to improve our understanding of neutrino interactions. In pursuit of this goal, the group will continue its Intensity Frontier work on the DUNE experiment at Fermilab and the T2K experiment at J-PARC, Japan. The current work is focused on understanding how neutrinos change flavor and on the possibility for asymmetry between neutrinos and anti-neutrinos. The effort on T2K includes physics measurements using the collected T2K data and preparation for the second phase T2K-II data with an increased beam power and the newly upgraded ND280 detector, featuring a novel 3D fine grained scintillation tracker with 4π acceptance and 3D readout. T2K is in a position to improve our understanding of neutrino nucleus interactions which continue to be one of the largest systematic uncertainties for neutrino oscillation measurements. On DUNE, the effort is on analyzing the data collected by the ProtoDUNE-SP prototype at CERN and on the design, installation, and commissioning of ProtoDUNE-II and later the DUNE Far Detector cold electronics. The final DUNE Module-1 components will be fully characterized by ProtoDUNE-II and the collected data will be used to improve and tune simulation and reconstruction algorithms, and to measure hadron scattering cross section, used to improve the modeling of neutrino final state interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Deliverable 6.7-Final Technical Report: Development Summary and Evaluation of the Solar Uncertainty Integrator (SUNI) Software

The Data Quality and Uncertainty Integration Project was a three-year effort to address stakeholder needs for assessing solar radiation resource data quality based on existing tools for estimating radiometer measurement uncertainties and assessing post-measurement data quality. The annual research objectives for the project addressed a logical progression of effort needed to achieve the ultimate project goal of developing the Solar Uncertainty Integrator (SUNI) software. This final technical report summarizes the development process for achieving these key research objectives and addresses the outreach and code development efforts in the final year of the project to develop a new solar irradiance data uncertainty integration software package.

14 SOLAR ENERGY↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

COnfirmation using Gamma-ray Non-Imaging Zero-knowledge ANti-mask Time-encoding (COGNIZANT) Final Summary Report

In potential future arms reduction treaties in which the numbers of nuclear warheads may approach small numbers, using delivery systems as a proxy for the warheads themselves may be insufficient. Therefore, a technical means of verifying the presence of a nuclear warhead may become necessary. Verifying that a declared item actually is a warhead is technically challenging within a verification regime: providing assurance to the monitoring party that a presented item is a warhead while protecting sensitive information about that warhead may be required. It is generally believed that strong assurance will require the confirmation of key attributes that may reveal closely-guarded critical design information. This provides high confidence to the monitoring party, but presents a risk of information loss to the host. A verification system must overcome this hurdle. Over the last several decades, systems have been developed that balance host and monitoring partner needs by using sensitive information to confirm treaty accountable items (TAI) as warheads while sequestering that information behind an information barrier (1). These are designed to meet the needs of the host but places the onus on the monitor to authenticate the hardware, firmware, and software. Authentication requires that the monitor confirm that all components of the system have not been modified and work as intended. In 2014, Glaser et al. proposed applying the concept of “zero knowledge protocols” (ZKP) from the field of cryptography to the problem of warhead verification (2). In mathematical cryptography, ZKP is accomplished by challenging one party to solve a problem that is only possible if that party possesses the information being authenticated. After repeated challenges, the party provides confidence that it possesses this information without revealing any details about the information itself. Systems have been in development based on this idea at both Princeton and MIT (2) (3) (4). The final measurement results produced by these systems can be viewed by both the host and the monitoring party without the worry of revealing sensitive information. However, in both of these physical implementations, there remains an information barrier within the system. The need for a digital information barrier to protect a measurement result is eliminated, but it has been replaced with the need to sequester physical components of the system, potentially obfuscating the measurement process itself. Both implementations physically insert information into the system that requires protection to prevent undesired disclosure of sensitive information: in the Princeton method, one must physically load the complement of the expected image of a true warhead into the system, and in the MIT technique, one loads a collection of spectator foils whose thicknesses physically encrypt a measured spectrum. This complicates authentication of the hardware and measurement process. The CONFIDANTE/COGNIZANT concept developed in this project do not load sensitive information into the system at any time, and could therefore open the possibility of allowing the inspector to not only view the final data but also the measurement as it is being performed and all associated equipment.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines (Final Report)

This is the final report for project DE-FE0031924 titled “High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines.” The report provides a summary of the entire project efforts from October 2020 through December 2024 including the high-temperature commercial dry gas seal (DGS) tests and thermal modeling of Task 2, as well as the high-temperature, large-diameter seal design and high-temperature tests of large-diameter seals in Task 3. A key outcome of Task 2 was the testing completion of specially instrumented commercial DGS in the GE-SwRI Apollo sCO 2 compressor (27,000 rpm). Test data from the DGS showed elevated temperatures upwards of 350 o F, which are close to the higher operating temperature limit of the DGS. The temperature measurements provide insight into the expected thermal loads on DGS operating in high-speed sCO 2 compressor and provided test data for validation of an in-house thermal model of the compressor/seal. Under Task 2.0, this report also presents the development of a steady-state conjugate heat-transfer model of the DGS operating in the sCO 2 compressor – a first of its kind model for modeling heat transfer of sCO 2 in an actual operating compressor. The findings of the thermal model show a reasonable match between temperature predictions of the model and the measured temperature data, also pointing out the validity of the approach and assumptions made in modeling the flows, heat transfer coefficients and windage modeling in the rig. Under Task 3.0, this report presents the preliminary design of a large-diameter hybrid face seal (14 inch and 26-inch diameter) for field testing in a land-based GE turbine. The preliminary seal design effort presented in this report under project DE-FE0031924 builds on the development and successful laboratory testing for such large diameter hybrid face seal under the prior DE-FE0024007 project. Key aspects of seal fluid analyses with CFD, mechanical design considerations and assembly considerations in a land-based turbine are presented. Finally, under Task 3.0, this report also presents the continued high-temperature testing of the 14-inch diameter hybrid face seal developed previously under the DE-FE0024007 program. Specifically, test data demonstrating successful non-contact seal operation and seal effective leakage of 0.001-inch with seal inlet temperatures above 700 o F are presented in this report. Successful hybrid seal operation in a laboratory environment for a large diameter (14-inch) seal at temperatures above 700 o F is a major technological milestone for this technology.

01 COAL, LIGNITE, AND PEAT↗

Atomic Layer Deposition (ALD) of Metal and Metal Oxide Films: A Surface Science Study (Final Report)

This is the final report for this project. The long-term objective of our project is to develop a general molecular-level picture of the surface chemistry associated with ALD processes. Our central hypothesis is that the chemistry of ALD precursors can differ significantly from that seen in solution. Awareness of such differences should provide general guidelines on what to watch for when synthesizing new ALD precursors and designing and optimizing new ALD processes, especially in terms of minimizing the incorporation of impurities in the growing films and of carrying out depositions under mild pressure and temperature conditions. The main objective of our research project has been to advance the fundamental knowledge of the surface chemistry of ALD precursors needed for the design and optimization of film deposition processes. A modern surface-science approach has been implemented to both elucidate the mechanism of the reactions of the precursors on the surface and characterize the composition and morphology of the growing films. In general, emphasis is being placed on: • Identifying the primary reactions that may lead to the deposition of clean films; •Identifying the secondary reactions that may help the ALD process, by, for instance, helping with the reduction (or oxidation) of the metal atom; • Identifying the secondary reactions that may lead to the deposition of undesirable impurities in the growing films; • Determining the kinetic parameters of the relevant surface reactions in order to define the optimum conditions for film deposition and to minimize impurity deposition. • Characterizing the nature of the resulting films, with focus on their stoichiometry and on the final oxidation states of the constituent elements; and • Using the information obtained to propose better precursors for given ALD processes.

36 MATERIALS SCIENCE↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin (Final Technical Report)

This is the Final Technical Report for the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." Over the course of six years of collaboration between Battelle and project partners, all stated objectives of the program have been completed, including full geological characterization of the TBR trend (See companion report for Task2), laboratory and modeling experiments to determine the optimum composition and design of CO 2 -EOR operations in the TBR trend, execution of a field test of chemically-enhanced CO 2 in a TBR well, and integration of the data and learnings gathered during these efforts into a full-trend development plan. Detailed reporting on these activities, their outcomes, and implications for trend-wide development is provided in the report. This report and encompassed data will provide TBR field operators with detailed information on what worked, what did not work, and how to proceed with production optimization of their TBR assets using chemically-enhanced CO 2 -EOR. CO 2 -EOR is a relatively well understood and broadly implemented strategy for increasing incremental production across the oil and gas industry, but its application has been primarily focused on reservoirs with limited heterogeneity. The intention of this project was show first that the same physical mechanisms that improve recovery factors in homogeneous reservoirs (namely wettability alteration, viscosity alteration, oil swelling, and mobility control) are at play in heterogeneous reservoirs. This was proven by the project’s laboratory studies and dynamic simulations, with the potential exception of mobility control, which needs further study. The second intention was to demonstrate via direct field testing that CO 2 -EOR can work in a strongly heterogeneous reservoir. While the field test strategy implemented during this project did not succeed in producing oil, data gathered during the test sheds light on what may work for field operators who try chemically-enhanced CO 2 -EOR within their own reservoirs, significantly reducing the level of uncertainty carried by first-of-a-kind commercial efforts that could (and should) follow this test. Simultaneously, the project has identified several large-volume ethanol plants and other sources of CO 2 emissions in the region and provided a handrail that CO 2 emitters and field operators can leverage to capture, transport, and inject that CO 2 into their fields. This project has also shown that, in many cases, the economics of CO 2 -EOR in the TBR are attractive. And finally, by completing a project of this scope in the southern Michigan Basin, the project has contributed to the knowledge base and operational experience of field operators, state regulatory agencies, local service companies, and state universities, with CO 2 -EOR projects which should allow follow-on projects to proceed safely and efficiently.

02 PETROLEUM↗

Shower Reconstruction for Cross-Section Measurements with Photon(s) in the Final State at SBND

The Short-Baseline Near Detector (SBND) is a 112-ton liquid argon time projection chamber operating in the Booster Neutrino Beam at Fermilab as part of the Short-Baseline Neutrino Program. Precise reconstruction of electromagnetic showers from photons and electrons is essential for searches for neutrino oscillations, cross-section measurements, and rare-process studies in liquid argon. In this poster, we present a unified set of SBND analyses enabled by the SPINE (Scalable Particle Imaging with Neural Embeddings) end-to-end machine-learning–based reconstruction framework, highlighting charged-current neutral pion (CC π⁰) production and neutral-current (NC) Δ radiative decay as complementary physics cases. Charged-current π⁰ interactions provide a high-statistics benchmark for validating photon reconstruction, constraining the electromagnetic energy scale, and modeling backgrounds to other cross-section measurements and BSM searches with one or more photons in the final state. We summarize progress toward the ongoing development of a CC π⁰ selection in SBND and, report on the current status of a search for NC resonant Δ production followed by radiative decay (Δ→Nγ) in SBND. This rare process, previously investigated in MicroBooNE, provides a stringent test of photon-only final-state reconstruction and is of interest in the context of the MiniBooNE low-energy excess. Together, these analyses demonstrate how modern machine-learning–based shower reconstruction enables a diverse and scalable physics program at SBND.

Chung, Seokju [Nevis Labs, Columbia U.]↗

CRADA JWS02 (Final Report)

Final report for CRADA 2023-01U-JWS02 with UNLV. Final report is required to be provided to OSTI per DOE O 483.1B to close out this joint work statement.

36 MATERIALS SCIENCE↗

Charged and neutral Higgs bosons in final states with 6 bottom quarks

In extensions of two Higgs doublet models with vectorlike quarks, the decays of vectorlike quarks may be easily dominated by cascade decays through charged or neutral Higgs bosons leading to signatures with 6 top or bottom quarks. Since top quark decays also contain bottom quarks, the 6 bottom quarks in final states is a common signature to a large class of possible decay chains. We present a search strategy focusing on this final state and find the mass ranges of vectorlike quarks and Higgs bosons that can be explored at the Large Hadron Collider. Among other results the sensitivity to the charged Higgs boson, extending above 2 TeV, stands out when compared to models without vectorlike matter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development of One and Two Current Transition Amplitudes with Two Body Final States

One of the biggest challenges facing modern day nuclear physics is understanding the structure of states within the hadronic spectrum of Quantum Chromodynamics (QCD). We have shown this spectrum to be quite rich with hundreds of allowed states; however, if we wish to better grasp the dynamics of QCD, then it is necessary that we start investigating the internal structure of these states. This may be done by probing these states with external currents, but this requires a description of the intersection of QCD with the electroweak sector. This work acts as a stepping stone in this direction. Working to all orders in the strong interaction and to leading order in electroweak effects we present novel formalisms for transition amplitudes with one and two currents with two hadrons in the final state, namely the 2 + J ? 2 and 1 + J ? 2 + J amplitudes. Our results are valid for spinless hadrons with any number of open channels between two- and three-particle threshold, place no restrictions on the Lorentz structure or quantum numbers of the current, and are independent of any underlying model. We also show how this formalism may be used to rigorously access elastic form factors of resonances which has proven challenging to do experimentally. Finally, we present a toy calculation of elastic resonance form factors using the 2 + J ? 2 formalism in which we stress the importance of treating resonances rigorously as poles in the complex plane.

Sherman, Keegan↗

The DESI Bright Galaxy Survey: Final Target Selection, Design, and Validation

Over the next 5 yr, the Dark Energy Spectroscopic Instrument (DESI) will use 10 spectrographs with 5000 fibers on the 4 m Mayall Telescope at Kitt Peak National Observatory to conduct the first Stage IV dark energy galaxy survey. At z < 0.6, the DESI Bright Galaxy Survey (BGS) will produce the most detailed map of the universe during the dark-energy-dominated epoch with redshifts of >10 million galaxies spanning 14,000 deg 2 . In this work, we present and validate the final BGS target selection and survey design. From the Legacy Surveys, BGS will target an r < 19.5 mag limited sample (BGS Bright), a fainter 19.5 < r < 20.175 color-selected sample (BGS Faint), and a smaller low-z quasar sample. BGS will observe these targets using exposure times scaled to achieve homogeneous completeness and cover the footprint three times. We use observations from the Survey Validation programs conducted prior to the main survey along with simulations to show that BGS can complete its strategy and make optimal use of "bright" time. BGS targets have stellar contamination <1%, and their densities do not depend strongly on imaging properties. BGS Bright will achieve >80% fiber assignment efficiency. Finally, BGS Bright and BGS Faint will achieve >95% redshift success over any observing condition. BGS meets the requirements for an extensive range of scientific applications. BGS will yield the most precise baryon acoustic oscillation and redshift-space distortion measurements at z < 0.4. It presents opportunities for new methods that require highly complete and dense samples (e.g., N-point statistics, multitracers). BGS further provides a powerful tool to study galaxy populations and the relations between galaxies and dark matter.

79 ASTRONOMY AND ASTROPHYSICS↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Panel Session 46: Final Closure of Unlined LLW Disposal Facilities Worldwide (R3.5)

This panel discussed the on-going and emerging issues with the design and construction of final cover system of unlined disposal facilities (e.g., material disposal areas (MDAs), subsurface disposal areas (SDAs), burial grounds, and similar historical waste trenches, pits and vaults). The discussion focused on key technical and regulatory issues as well as lessons learned from years of engineering and construction in US and non-US locations. Panelists with presentations: Closure of Unlined LLW Disposal Sites (Craig Benson); Closure of LLW Facilities (Paul Pointon); Final Closure of Unlined LLW Disposal Facilities - Lessons Learned (Kevin Foye)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measuring Muon Antineutrino Charged-Current Interactions without Mesons in the Final State, in the NOvA Near Detector

NOvA is a long-baseline neutrino experiment based at Fermilab in the US, with the primary aim of measuring neutrino and antineutrino oscillations. This will enhance our understanding of electroweak interactions by measuring the neutrino mixing angles, CP-violating phase and neutrino mass ordering. To measure these oscillations, we first need to have a deep understanding of how neutrinos and antineutrinos interact with matter. Antineutrino interaction cross sections are, at present, particularly poorly constrained, and processes such as meson exchange currents are not well understood in the antineutrino sector. This analysis will develop a cross-section measurement of muon antineutrino interactions without mesons (e.g. pions or kaons) in the final state, in the NOvA near detector. A high-statistics, high-purity sample is obtained through a cut-based selection process implementing machine learning techniques. The sample is dominated by quasi-elastic and meson exchange current interactions which are sensitive to nuclear effects such as Final-State Interactions. The cross section will be extracted as a function of the incoming neutrino energy and the kinematics of the outgoing particles. This presentation will give an overview of the analysis and discuss progress towards obtaining the cross-section measurement.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of Multi-Proton Zero Pion Final States with the NuMI Neutrino Beam at ICARUS

Evidence suggests that charge-parity (CP) symmetry, or the principle that matter and antimatter must obey the same physics, might be violated in neutrino flavor mixing. The next-generation long-baseline experiment DUNE is designed to confirm whether or not neutrinos oscillate differently from antineutrinos. The magnitude of systematic uncertainties contributing to current long-baseline oscillation measurements, if left unimproved, is enough to jeopardize DUNE's ability to measure CP violation. Neutrino cross section measurements on argon targets are an essential input for improving neutrino interaction modelling and reducing the systematic uncertainties before DUNE turns on. The ICARUS experiment at Fermilab is well suited perform such measurements due to the NuMI neutrino beam providing neutrinos at the same energy as DUNE's first oscillation maximum. This work presents a measurement of muon neutrino charged-current interactions with multiple energetic protons and zero final state mesons in ICARUS. Multi-proton topologies are sensitive to contributions from two-particle two hole effects as well as resonant pion production and subsequent absorption via final state interactions (FSI) within the argon nucleus. Single-differential cross sections are measured in lab-frame opening angles and transverse kinematic imbalance variables, characterizing the initial sate momentum sharing between correlated nucleons and strength of FSI in argon.

Smedley, John [Rochester U.] (ORCID:00000002848611↗

Measurement of Charged-current Muon Neutrino–argon Interactions Without Final-state Pions Using the MicroBooNE Detector

This thesis presents a new high-statistics measurement of flux-integrated single- and double-differential cross sections for charged-current muon neutrino interactions on argon nuclei without final-state pions. The analysis utilizes the full 1.3 $\times$ $10^{21}$ protons-on-target dataset collected by the MicroBooNE liquid argon time projection chamber between 2015 and 2020 at Fermilab's Booster Neutrino Beam. The results of this study are reported with respect to final-state muon kinematic variables and compared with predictions from commonly used neutrino event generators. In one-dimensional distributions, all generators perform reasonably well. However, in two dimensions, only a few demonstrate good agreement with the data. These findings provide valuable insight into characterizing neutrino-nucleon interactions. Such advancements are vital for future long-baseline neutrino experiments, which aim to accurately measure neutrino oscillation and investigate beyond-the-Standard-Model physics with high sensitivity.

Englezos, Panagiotis [Rutgers U., Piscataway (main↗