Joined-Wing Gust Load Alleviation Wind-Tunnel Tests
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Because of the large numbers of satellite cells currently being tested and anticipated at the Naval Weapons Support Center (NAVWPNSUPPCEN) Crane, Indiana, satellite cell testing is being integrated into the Battery Test Automation Project (BTAP). The BTAP, designed to meet the growing needs for battery testing at the NAVWPNSUPPCEN Crane, will consist of several Automated Test Stations (ATSs) which monitor batteries under test. Each ATS will interface with an Automation Network Controller (ANC) which will collect test data for reduction.
Explore the source record for details and available documents.
The setup and testing of battery systems are described. Basic control mode, basic block diagrams and circuitry are given.
A test program was set up early in the Explorer XIII program to simulate as nearly as possible all expected environmental conditions to which the spacecraft would be subjected during the ascending phase of the trajectory and while in orbit. These tests included spin, acceleration, thermal-vacuum, vibration, and shock. Functional tests were performed on individual modules of the telemeter system. The test procedure started with breadboard construction of telemeter components. Circuits were evaluated in this phase, and components chosen for prototype construction. Prior to the prototype environmental tests, it was found desirable to construct a mock-up structure for preliminary evaluation of the spacecraft hardware.
Fabrication and testing of polyethylene battery separator material
The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.
The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.
Presentation of test process at the National Transonic Facility, Nasa Langley Research Center. The test showcased was part of a cooperative test effort between ARC, LaRC, GRC, and AEDC collecting aerodynamic and process data on the modified F-111 FAVOR model.
Explore the source record for details and available documents.
Life cycle tests being run on the 50 A lightweight nickel hydrogen flight battery are discussed and the preliminary results are presented.
It is considered by the Flight Mechanics Panel of AGARD as vitally important that the NATO flight test community meet regularly so that new techniques for flight test, instrumentation and data analysis and lessons learned from past and on-going programs be disseminated to ensure that safe efficient cost-effective and timely testing is accomplished. There are many new systems being tested or planned for testing in the near future. These include programmable signal processor radars, integrated flight, fire and propulsion control systems, thrust vectoring, low observable technologies, multifunction pilot displays and multisensor integration. Acquisition and processing of large quantities of avionics multiplex data are challenges that must be met. There is a need for greater use of simulators and other hardware-in-the-loop ground test facilities.
Explore the source record for details and available documents.
Pre-flight testing is critical to the success of any flight test program. Pre-flight tests are performed to measure and evaluate the characteristics of an aircraft in a non-flying environment and to verify that these characteristics are as desired. Since aircraft systems are becoming more and more complex, conducting proper pre-flight testing to help identify system characteristics and deficiencies prior to flight is more important now than ever before. Much flight test time has been lost fixing problems that should have been found and corrected prior to flight. Accidents have occurred because pre-flight tests and verification procedures were not conducted thoroughly enough to identify the aircraft's characteristics properly or to find system discrepancies. Proper pre-flight testing helps ensure that the aircraft is ready to fly and contributes toward an efficient, productive, and safe flight test program. The reader should be aware that this Section is dedicated to the testing that should take place prior to the first flight. There are other "pre-flight" tests that take place prior to each individual flight. These latter tests are not discussed in this Section. The following paragraphs of this Section describe significant tests that are usually accomplished prior to flying a new or highly modified aircraft. Test objectives, descriptions, products, and requirements are provided in the following subsections: 9.1 Wind tunnel tests 9.2 Simulation tests 9.3 Propulsion tests 9.4 Weight and balance tests 9.5 Ground vibration tests 9.6 Structural loads tests 9.7 Gain margin tests 9.8 Verification and calibration tests 9.9 Taxi tests The specific examples given and the test facilities mentioned in this Section will illustrate the approach taken and the techniques used by the US Air Force; however, they are typical of those used by other test organizations.
Quantitative ataxia test battery to assess psychomotor performance and postural equilibrium under rotating environments and other stresses
Developmental thermal vacuum (TVAC) testing is a critical step in maturing hardware designs and validating performance prior to flight qualification. Unlike qualification or acceptance testing, developmental testing provides flexibility to explore design margins, uncover integration challenges, and refine test approaches before formal verification activities begin. This presentation highlights the value of developmental testing while sharing common pitfalls encountered during developmental TVAC campaigns. Lessons learned from hands-on testing experience, including extensive developmental testing at cryogenic temperatures, will be shared in this presentation. Topics include test planning and preparation, instrumentation strategies, contamination control considerations, troubleshooting unexpected anomalies, and approaches for staying on schedule while meeting test objectives. The audience will gain practical insights and best practices that can improve test efficiency, reduce risk, and enhance the overall success of future developmental TVAC efforts.
Materials research - diffusion bonding methods, stress corrosion tests, nondestructive testing, material designs for electronic equipment, and nonmetallic material development.
A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.