Search NASASearch

SEARCH · Search NASA

Results for “high-enthalpy testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,662 records · Page 11

Thermal Vacuum Testing of the Cryostat Heat Removal System for COSI SMEX

The Cryostat Heat Removal System (CHRS) of the Compton Spectrometer and Imager (COSI) consists of cryocooler, three transport aluminum ammonia Constant Conductance Heat Pipes (CCHP), three radiators with CCHP spreaders and Cryocooler Control Electronics (CCE) attached to a separate radiator. A Thermal Vacuum (TVAC) test was conducted at NASA Goddard Space Flight Center to characterize the integrated COSI CHRS in the flat configuration. This presentation summarizes the measured COSI CHRS performance along with lessons learned.

Pipes

Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities

Design, Testing and Evaluation of Latching End Effector

The Latching End Effector (LEE) forms part of the Space Station Remote Manipulator System (SSRMS) for which Spar Aerospace Ltd, Space Systems Division is the prime contractor. The design, testing and performance evaluation of the Latching End Effector mechanisms is the subject of this paper focusing on: (1) ambient, thermal and vibration testing; (2) snare/rigidize performance testing and interaction during payload acquisition; and (3) latch/umbilical test results and performance.

B Walker

Hubble Space Telescope nickel-hydrogen battery testing: An update

The Marshall Space Flight Center (MSFC) began testing the HST Ni-H2 Six Battery Test and the 'Flight Spare Battery' Tests approximately one year before the launch of the HST. These tests are operated and reported on by the MSFC, but are managed and funded by Goddard Space Flight Center in direct support of the HST program. The HST Ni-H2 batteries are built from Eagle Picher RNH-90-3 cells. The HST EPS (electrical power system) is a direct energy transfer power system. The HST Ni-H2 Six Battery Test is a breadboard of the HST EPS. The batteries in the test are composed of test module cells and packaged into three battery modules identical to the flight modules. This test is the HST EPS testbed. The 'Flight Spare Battery' Test is a simulation of one of the six battery channels on the HST. The cells in the test are from the flight spare lot of cells, which are the same lot of cells that three of the six HST flight batteries are made from. This test is the battery life test for the HST program.

Whitt, Thomas H.

Nickel-hydrogen battery testing for Hubble Space Telescope

The authors identify objectives and provide data from several nickel-hydrogen battery tests designed to evaluate the possibility of launching Ni-H2 batteries on the Hubble Space Telescope (HST). Test results from a 14-cell battery, a 12-cell battery, and a 4-cell pack are presented. Results of a thermal vacuum test to verify the battery-module/bay heat rejection capacity are reported. A 6-battery system simulation breadboard is described, and test results are presented.

Baggett, Randy M.

Parametric tests of a 40-Ah bipolar nickel-hydrogen battery

A series of tests were performed to characterize battery performance relating to certain operating parameters which include charge current, discharge current, temperature, and pressure. The parameters were varied to confirm battery design concepts and to determine optimal operating conditions.

Cataldo, R. L.

An Assessment of the Nevada Test Site for Low-Level Waste Management

This report presents a summary of description information, facilities, and operating practices at the Nevada Test Site. It is concluded that NTS is not only a feasible location for surface and near-surface storage of low-level wastes, but also a potential site for underground storage of higher level wastes.

052002* -- Nuclear Fuels-- Waste Disposal & Storag

Development of Hydrogen Burner for FT4000® Aeroderivative Engine - Final Report

This report details an effort to develop a retrofittable fuel/air injector for the FT4000® aeroderivative gas turbine that enables use of hydrogen as a carbon-free fuel for efficient power generation. The FT4000 engine’s low-NOx combustor was developed by Pratt & Whitney and RTX Technology Research Center with core technology from the Pratt & Whitney PW4000 turbofan aircraft engine. The current FT4000 production engine operates on either natural gas or No. 2 fuel oil with water injection to achieve high thermal efficiency and low emissions. This engine is fielded by Mitsubishi Power Aero and delivers 70 MW of power with a simple-cycle efficiency of over 41% when operating with wet compression. The work reported here advances the technology readiness level of the FT4000 combustor for operation with hydrogen, starting with an experimental assessment of the current production hardware with increasing hydrogen content mixed with natural gas and ending with improved nozzle concepts for fully robust operation with 100% hydrogen. High-pressure single-sector combustor rig tests have been completed, demonstrating the ability for the dual fuel nozzle to operate an FT4000 combustor on 100% hydrogen with low nitrogen oxide (NOx) emissions. Metal temperature measurements and video images of the flame structure from zero to 100% hydrogen highlight opportunities to improve the fuel nozzle robustness for high hydrogen conditions. The design of new fuel/air mixer concepts to improve durability and operability with high hydrogen levels was also completed. A total of eleven new concepts were developed and analyzed, ranging from modifications to the bill-of-materials nozzle to fully clean sheet designs. The concepts were evaluated with non-reacting and reacting flow evaluations to assess the performance of the new hardware designs. Non-reacting tests included Phase Doppler Particle Analysis (PDPA) for droplet size and velocity, mechanical patternation for liquid water flux, and planar laser induced fluorescence (PLIF) with acetone-seeding for gaseous fuel/air mixing characterization. Five scaled candidate fuel nozzle designs, in addition to a scaled bill-of-materials nozzle, were then successfully evaluated in an atmospheric pressure burner rig. The nozzles were evaluated for performance with natural gas, hydrogen/natural gas blends, and pure hydrogen. For 100% hydrogen, the nozzles were evaluated with and without water injection. Optical and infrared imaging of the flame and fuel nozzle was captured. NOx emissions were sampled from fixed emissions probes. The results show measurable differences between the various designs, and the data was used to down-select the two most promising designs to advance to future full pressure rig testing. Results from this study have cleared the current production FT4000 engines with dual fuel nozzles to operate at baseload power on blends of hydrogen mixed with natural gas and water. Two promising nozzle designs have been developed to enable fully robust operation with up to 100% hydrogen. These nozzles require validation at full baseload operating conditions before they can be introduced to the field.

03 NATURAL GAS