Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

A Comparative Analysis of Infrastructure-Based Perception Sensors for Intelligent Transportation Systems

The rise of privatized and public investment in smart city infrastructure and intelligent transportation systems has generated a heightened demand for perception sensors that effectively track and detect objects while being reliable in diverse weather and lighting conditions. This growing demand for perception sensors has accelerated their development and enhanced their capabilities. With these new capabilities, it is challenging to determine the most suitable sensing unit to use in each situation. Therefore, it is essential to have a comprehensive understanding of the benefits and limitations of each sensing unit to effectively leverage their capabilities. The purpose of this paper is to provide a detailed evaluation of various perception sensors. Additionally, this paper will demonstrate the benefits of combining multiple perception sensors, which complement each other by addressing data gaps inherent to single-sensor systems, to facilitate the creation of a digital twin that models the real world. The Infrastructure, Perception, and Control (IPC) team will conduct data analysis using data collected through field testing at traffic intersections in Colorado Springs, Colorado, to make comparisons between sensors. This research aims to provide clear and concise information about modern perception systems, which will support the development of intelligent transportation systems.

33 ADVANCED PROPULSION SYSTEMS↗

Energy Storage Impacts in Resilience Hubs and Other Critical Infrastructure: An Assessment Guide for Developers and Practitioners

Battery energy storage systems (BESS) deployed behind the meter at resilience hubs and other critical infrastructure can provide economic and operational value during normal operations—such as lower and more predictable energy costs—as well as resilience and security benefits during power disruptions by maintaining essential services. However, existing evaluation approaches tend to focus narrowly on engineering performance or rely on broad socio-economic frameworks that are not well suited to behind-the-meter storage. As a result, developers, utilities, and funders often lack consistent methods for defining success, quantifying benefits, and comparing outcomes across projects. This report presents a practitioner-oriented impact assessment framework for evaluating behind-the-meter BESS at resilience hubs and critical infrastructure facilities. The framework is organized into five iterative components—developing an action plan, defining project goals, identifying metrics, collecting data and measuring outcomes, and reporting and using results—and includes a structured metric architecture spanning six impact categories. Designed for real-world constraints such as limited staffing and uneven data availability, the framework was developed, applied, and refined through real projects, and is illustrated with case studies across diverse deployment contexts.

Impact Assessment↗

Accelerating discoveries at DIII-D with the Integrated Research Infrastructure

DIII-D research is being accelerated by leveraging high performance computing (HPC) and data resources available through the National Energy Research Scientific Computing Center (NERSC) Superfacility initiative. As part of this initiative, a high-resolution, fully automated, whole discharge kinetic equilibrium reconstruction workflow was developed that runs at the NERSC for most DIII-D shots in under 20 min. This has eliminated a long-standing research barrier and opened the door to more sophisticated analyses, including plasma transport and stability. These capabilities would benefit from being automated and executed within the larger Department of Energy Advanced Scientific Computing Research program’s Integrated Research Infrastructure (IRI) framework. The goal of IRI is to empower researchers to meld DOE’s world-class research tools, infrastructure, and user facilities seamlessly and securely in novel ways to radically accelerate discovery and innovation. For transport, we are looking at producing flux matched profiles and also using particle tracing to predict fast ion heat deposition from neutral beam injection before a shot takes place. Our starting point for evaluating plasma stability focuses on the pedestal limits that must be navigated to achieve better confinement. This information is meant to help operators run more effective experiments, so it needs to be available rapidly inside the DIII-D control room. So far this has been achieved by ensuring the data is available with existing tools, but as more novel results are produced new visualization tools must be developed. In addition, all of the high-quality data we have generated has been collected into databases that can unlock even deeper insights. This has already been leveraged for model and code validation studies as well as for developing AI/ML surrogates. The workflows developed for this project are intended to serve as prototypes that can be replicated on other experiments and can be run to provide timely and essential information for ITER, as well as next stage fusion power plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Comparison of Sub-Ppm Instrument Response Suggests Higher Detection Limits Could Be Used to Quantify Methane Emissions from Oil and Gas Infrastructure

Quantifying and controlling fugitive methane emissions from oil and gas facilities remains essential for addressing climate goals, but the costs associated with monitoring millions of production sites remain prohibitively expensive. Current thinking, supported by measurement and simple dispersion modelling, assumes single-digit parts-per-million instrumentation is required. To investigate instrument response, the inlets of three trace-methane (sub-ppm) analyzers were collocated on a facility designed to release gas of known composition at known flow rates between 0.4 and 5.2 kg CH 4 h –1 from simulated oil and gas infrastructure. Methane mixing ratios were measured by each instrument at 1 Hertz resolution over nine hours. While mixing ratios reported by a cavity ring-down spectrometer (CRDS)-based instrument were on average 10.0 ppm (range 1.8 to 83 ppm), a mid-infrared laser absorption spectroscopy (MIRA)-based instrument reported short-lived mixing ratios far larger than expected (range 1.8 to 779 ppm) with a similar nine-hour average to the CRDS (10.1 ppm). We suggest the peaks detected by the MIRA are likely caused by a micrometeorological phenomenon, where vortex shedding has resulted in heterogeneous methane plumes which only the MIRA can observe. Further analysis suggests an instrument like the MIRA (an optical-cavity-based instrument with cavity size ≤10 cm3 measuring at ≥2 Hz with air flow rates in the order of ≤0.3 slpm at distances of ≤20 m from the source) but with a higher detection limit (25 ppm) could detect enough of the high-concentration events to generate representative 20 min-average methane mixing ratios. Even though development of a lower-cost, high-precision, high-accuracy instrument with a 25 ppm detection threshold remains a significant problem, this has implications for the use of instrumentation with higher detection thresholds, resulting in the reduction in cost to measure methane emissions and providing a mechanism for the widespread deployment of effective leak detection and repair programs for all oil and gas infrastructure.

03 NATURAL GAS↗

bhartendupandey/Urban-Infrastructure-Inequalities: Urban Infrastructure Inequalities Analysis Code

This code release contains the final scripts used in the multi-scale analysis of infrastructure inequalities, as reported in the manuscript (Pandey et al. 2025). Reference: Pandey, B., Brelsford, C., & Seto, K. C. (2025). Rising infrastructure inequalities accompany urbanization and economic development. Nature Communications, 16(1), 1193.

Pandey, Bhartendu [ORNL] (ORCID:0000000237125961)↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

Infrastructure dynamics: A selected bibliography

The term infrastructure is used to denote the set of life support and public service systems which is necessary for the development of growth of human settlements. Included are some basic references in the field of dynamic simulation, as well as a number of relevant applications in the area of infrastructure planning. The intent is to enable the student or researcher to quickly identify such applications to the extent necessary for initiating further work in the field.

Dajani, J. S.↗

The 1990 direct support infrastructure

The airport and cargo terminal were individually analyzed in depth as the principal direct infrastructure components having cross impacts with aircraft carrying cargo. Containerization was also addressed in depth as an infrastructure component since it categorically is linked with and cross impacted by the aircraft, the cargo terminal, the surface transport system, the shipper and consignee, and the actual cargo being moved.

Source record↗

Architectural options for space stations in the context of the space infrastructure

The role of space stations in the space element infrastructure anticipated for the end of the 20th century is discussed. Various architectures for space stations designed to function as part of the infrastructure are examined with respect to a set of potential objectives for the stations. Architectural options are described that range from a minimum station of low capability and cost to an expensive station with a full operations capability and high growth potential. The capabilities, growth potentials, and likely costs of the options are compared, and the association between functional capabilities and likely cost is considered. It is concluded that the cost of a space station is intimately related to its architecture and that a larger initial investment must be made to satisfy more ambitious objectives.

Bekey, I.↗

Evolutionary Space Station infrastructure

This paper discusses the approach to Space Station evolution planning and the preliminary analysis of options for the evolution of the infrastructure. The approach emphasizes the analysis of evolution paths, driven by specific user requirements, and evolution modes, i.e., the infrastructure required to support the evolution paths. The objective is to determine the near-term actions that must be taken to protect the future options. These include the identification of evolution 'hooks and scars' on the baseline Space Station and the establishment of an evolution advanced development program. The near term emphasis of the evolution planning is on methods of increasing the efficiency and productivity of the Space Station and on requirements to support new initiatives currently being studied by NASA.

Diaz, Alphonso V.↗

Development of a lunar infrastructure

The problem of building an infrastructure on the moon is discussed, assuming that earth-to-moon and moon-to-earth transport will be available. The sequence of events which would occur in the process of building an infrastructure is examined. The human needs which must be met on a lunar base are discussed, including minimal life support, quality of life, and growth stages. The technology available to meet these needs is reviewed and further research in fields related to a lunar base, such as the study of the moon's polar regions and the limits of lunar agriculture, is recommended.

Burke, J. D.↗

Infrastructure for deployment of power systems

A preliminary effort in characterizing the types of stationary lunar power systems which may be considered for emplacement on the lunar surface from the proposed initial 100-kW unit in 2003 to later units ranging in power from 25 to 825 kW is presented. Associated with these power systems are their related infrastructure hardware including: (1) electrical cable, wiring, switchgear, and converters; (2) deployable radiator panels; (3) deployable photovoltaic (PV) panels; (4) heat transfer fluid piping and connection joints; (5) power system instrumentation and control equipment; and (6) interface hardware between lunar surface construction/maintenance equipment and power system. This report: (1) presents estimates of the mass and volumes associated with these power systems and their related infrastructure hardware; (2) provides task breakdown description for emplacing this equipment; (3) gives estimated heat, forces, torques, and alignment tolerances for equipment assembly; and (4) provides other important equipment/machinery requirements where applicable. Packaging options for this equipment will be discussed along with necessary site preparation requirements. Design and analysis issues associated with the final emplacement of this power system hardware are also described.

Sprouse, Kenneth M.↗

Low earth orbit infrastructure to accommodate manned lunar missions

In order to establish bases on the lunar and Mars surfaces, a significant amount of orbital infrastructure including assembly platforms, cryogenic fluids depots, and Space Station Freedom, will be required in LEO. These facilities will be required to perform a myriad of functions ranging from orbital demonstration of advanced technology systems and establishment of life science capabilities to servicing and refurbishment of reusable lunar transfer vehicles. This paper addresses the requirements levied on these facilities and provides an overview of potetial LEO infrastructure elements that satisfy various advanced manned missions. Of key importance to the success of the manned lunar mission are (1) the evolutionary growth of Space Station Freedom to serve as a transportation node and (2) the development of a Shuttle-derived launch vehicle to deliver mission elements to LEO.

Cirillo, William M.↗

Design of a minimum level lunar base infrastructure

The minimum necessary planet infrastructure required to support a lunar base is discussed. Various mission architectures are studied to illustrate the strategy of the minimum service level infrastructure (MSLI). These architectures encompass a standard suite of lunar surface elements (habitats, rovers, and power and communications systems), which are absolutely required to create and support the lunar base. Scientists are considered to be the most probable initial customers of a lunar base, and the initial lunar base is envisioned to provide the level of services required to support the scope of scientific activities. MSLI is considered to represent various additional services which cannot be justified by private investment or parochial interests and thereby must be provided by NASA or the government to encourage outside participation.

Connolly, John F.↗

Building an intellectual infrastructure for space commerce

Competition in commerce requires an 'intellectual infrastructure', that is, a work force with extensive scientific and technical knowledge and a thorough understanding of the business world. This paper focuses on the development of such intellectual infrastructure for space commerce. Special consideration is given to the contributions to this development by the 17 Centers for the Commercial Development of Space Program conducting commercially oriented research in eight specialized areas: automation and robotics, remote sensing, life sciences, materials processing in space, space power, space propulsion, space structures and materials, and advanced satellite communications. Attention is also given to the Space Business Development Center concept aimed at addressing a variety of barriers common to the development of space commerce.

Stone, Barbara A.↗

Intelligent systems technology infrastructure for integrated systems

A system infrastructure must be properly designed and integrated from the conceptual development phase to accommodate evolutionary intelligent technologies. Several technology development activities were identified that may have application to rendezvous and capture systems. Optical correlators in conjunction with fuzzy logic control might be used for the identification, tracking, and capture of either cooperative or non-cooperative targets without the intensive computational requirements associated with vision processing. A hybrid digital/analog system was developed and tested with a robotic arm. An aircraft refueling application demonstration is planned within two years. Initially this demonstration will be ground based with a follow-on air based demonstration. System dependability measurement and modeling techniques are being developed for fault management applications. This involves usage of incremental solution/evaluation techniques and modularized systems to facilitate reuse and to take advantage of natural partitions in system models. Though not yet commercially available and currently subject to accuracy limitations, technology is being developed to perform optical matrix operations to enhance computational speed. Optical terrain recognition using camera image sequencing processed with optical correlators is being developed to determine position and velocity in support of lander guidance. The system is planned for testing in conjunction with Dryden Flight Research Facility. Advanced architecture technology is defining open architecture design constraints, test bed concepts (processors, multiple hardware/software and multi-dimensional user support, knowledge/tool sharing infrastructure), and software engineering interface issues.

Lum, Henry↗

Intelligent systems technology infrastructure for integrated systems

Significant advances have occurred during the last decade in intelligent systems technologies (a.k.a. knowledge-based systems, KBS) including research, feasibility demonstrations, and technology implementations in operational environments. Evaluation and simulation data obtained to date in real-time operational environments suggest that cost-effective utilization of intelligent systems technologies can be realized for Automated Rendezvous and Capture applications. The successful implementation of these technologies involve a complex system infrastructure integrating the requirements of transportation, vehicle checkout and health management, and communication systems without compromise to systems reliability and performance. The resources that must be invoked to accomplish these tasks include remote ground operations and control, built-in system fault management and control, and intelligent robotics. To ensure long-term evolution and integration of new validated technologies over the lifetime of the vehicle, system interfaces must also be addressed and integrated into the overall system interface requirements. An approach for defining and evaluating the system infrastructures including the testbed currently being used to support the on-going evaluations for the evolutionary Space Station Freedom Data Management System is presented and discussed. Intelligent system technologies discussed include artificial intelligence (real-time replanning and scheduling), high performance computational elements (parallel processors, photonic processors, and neural networks), real-time fault management and control, and system software development tools for rapid prototyping capabilities.

Lum, Henry, Jr.↗

Overview of NASA communications infrastructure

The infrastructure of NASA communications systems for effecting coordination across NASA offices and with the national and international research and technological communities is discussed. The offices and networks of the communication system include the Office of Space Science and Applications (OSSA), which manages all NASA missions, and the Office of Space Operations, which furnishes communication support through the NASCOM, the mission critical communications support network, and the Program Support Communications network. The NASA Science Internet was established by OSSA to centrally manage, develop, and operate an integrated computer network service dedicated to NASA's space science and application research. Planned for the future is the National Research and Education Network, which will provide communications infrastructure to enhance science resources at a national level.

Arnold, Ray J.↗