Measure Guideline: Combined Space and Water Heating Installation and Optimization

Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Combined Space and Water Heating Installation and Optimization

Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hot Cell Installation and Demonstration of the Severe Accident Test Station

A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examine postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Factors that Influence Residential Solar Panel Installations

Though rooftop photovoltaic (PV) systems are the fastest growing source of distributed generation, detailed information about where they are located and who their owners are is often known only to installers and utility companies. This lack of detailed information is a barrier to policy and financial assessment of solar energy generation and use. To bridge the described data gap, Oak Ridge National Laboratory (ORNL) was sponsored by the Department of Energy (DOE) Office of Energy Policy and Systems Analysis (EPSA) to create an automated approach for detecting and characterizing buildings with installed solar panels using high-resolution overhead imagery. Additionally, ORNL was tasked with using machine learning techniques to classify parcels on which solar panels were automatically detected in the Washington, DC, and Boston areas as commercial or residential, and then providing a list of recommended variables and modeling techniques that could be combined with these results to identify attributes that motivate the installation of residential solar panels. This technical report describes the methodology, results, and recommendations in greater detail, including lessons learned and future work.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Design Installation and Operation of the Vortex ART Platform

ATS platforms are some of the largest, most complex, and most expensive computer systems installed in the United States at just a few major national laboratories. This milestone describes our recent efforts to procure, install, and test a machine called Vortex at Sandia National Laboratories that is compatible with the larger ATS platform Sierra at LLNL. In this milestone, we have 1) configured and procured a machine with similar hardware characteristics as Sierra ATS, 2) installed the machine, verified its physical hardware, and measured its baseline performance, and 3) demonstrated the machine's compatibility with Sierra ATS, and capacity for useful development and testing of Sandia computer codes (such as SPARC), including uses such as nightly regression testing workloads.

97 MATHEMATICS AND COMPUTING↗

Emergency Diesel Generator Reliability and Installation Energy Security

The U.S. Department of Defense’s (DoD’s) fixed installations - or military bases - are a critical element of national security. Military bases support the maintenance and deployment of weapons systems, training and mobilization of combat forces, and provide direct support to combat operations. Fixed installations do not operate without energy and they rely largely on electricity to support critical missions and functions. Installations are dependent on a commercial grid that is vulnerable to disruption due to severe weather, physical attacks, and cyberattacks. This report looks at the impact on the highest priority critical loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

VERA Installation Guide

This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in 'Standard VERA Dev Env Directory Structure' and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

97 MATHEMATICS AND COMPUTING↗

Options For Large-Scale Installation of Individual Heat Substations Based on International Best Practices

The purpose of this report is to provide recommendations for actions Ukraine could take to implement large-scale installation of IHSs as part of comprehensive district heating reform. The report discusses the importance of IHS in the district heating sector, then presents several case studies of approaches that European countries have taken to facilitate large-scale IHS installation in multi-apartment buildings. These case studies focus on the ownership and financing of IHS, as there are different models for how this can be done (the DH company can make the investments and recover the costs through the tariff, or building residents can make the investments themselves). They also include details on the approval process and technical specifications, as these can add additional barriers and time to the installation process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sources of price dispersion in U.S. residential solar installations

Prices of solar PV have dropped dramatically, by half in just the past 6 years. But looking simply at prices paid today, there is considerable heterogeneity. For systems installed in 2014, the 10-90 percentile range for the observed $/W spans nearly a factor of 2. This apparent price dispersion raises policy relevant questions, such as: why are consumers paying more than they need to? And would better-informed consumers increase the social benefits of solar PV? This paper analyzes price dispersion in U.S. residential PV installations between 2008 and 2014. Focusing on the most commonly used metric in previous studies of price dispersion, we use the quarterly coefficient of variation (CV) as our measure of price dispersion. We find higher levels of price dispersion in our data (0.22) than the average of 55 previous studies we reviewed (0.16). We also find that price dispersion has been persistent; it has remained above 0.15 since 2000 with no trend over that period. If anything, price dispersion has been increasing recently during the period for which we have complete data, 2008-14. Econometric analysis of the factors affecting price dispersion supports theories from the economic literature focusing on access to information and the costs and benefits of consumer search. Factors that increase the consumer payoffs of investing time in searching for information—system size and the value of solar— are associated with lower levels of price dispersion. Factors that reduce the costs of search—neighbors who have recently installed solar and having third-party quotes available—are also associated with less price dispersion. These results provide support for the importance of public efforts to enhance access to price information, e.g. by supporting private sector price quote providers. The results also point to the particular need for information in nascent markets for PV in which access to the experience of neighbors is not available.

14 SOLAR ENERGY↗

Installing MCNP6.2 on Microsoft Windows

This video shows how to install the MCNP code, version 6.2, on a Microsoft Windows 10 computer. After installation, the Xming software is installed, a quick calculation is performed, and geometry is plotted. At this point, this setup is ready for use in an MCNP classroom setting and/or for performing calculations of the viewer’s own creation.

97 MATHEMATICS AND COMPUTING↗

An Environmental Approach for Construction, Operation, and Maintenance of Floating Solar Array Renewable Energy Projects on Army Installations

The U.S. Army Office of Energy Initiatives (OEI) has primary responsibility over renewable projects to help achieve the Army’s renewable energy goals. The OEI serves as the central management office for partnering with U.S. Army installations to implement cost-effective, renewable energy projects, leveraging private sector financing. Siting, construction, and operation of solar power systems on U.S. Army installations help to achieve renewable energy goals. This report provides a general framework for environmental analysis for the siting, construction, and operation of floating solar renewable energy projects on U.S. Army installations, to include joint bases managed by the Department of the Army. This report includes specific information by resource area regarding the potential environmental impacts and probable best management practices or minimization approaches that afford environmental protection. This report provides analyses and suggestions that could support a programmatic analysis or site-specific action.

14 SOLAR ENERGY↗

FAST-1.0.1 User Installation and Verification Guide

The purpose of this document is to provide the user information about the installation of FAST-1.0.1 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0.1. Self-service oriented FAST-1.0.1 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.0.1 and described in Section 3.0. A convenience script for converting FRAPCON to FAST inputs is discussed in Section 4.0. FAST-1.0.1 was developed and released under a software quality assurance program based upon NQA-1-2017. FAST-1.0.1 is the latest baseline code and the result of a bug fixes to FAST-1.0 with other software and methodology developments. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs). Capability to model accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss Of Coolant Accidents (LOCAs), are targeted for a later release of FAST. FRAPTRAN-2.0 will continue to be used for accident conditions until the release of FAST with accident condition modeling capabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FAST-1.2 User Installation and Verification Guide: Developed Under NQA-1-2017

The purpose of this document is to provide the user information about the installation of Fuel Analysis for Steady state and Transient (FAST)-1.2 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0. Self-service oriented FAST-1.2 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.2 and described in Section 3.0. A convenience script for converting Fuel Rod Analysis Program – Constant (FRAPCON) to FAST inputs is discussed in Section 4.0. FAST-1.2 was developed and released under a software quality assurance program based upon NQA-1-2017 at Pacific Northwest National Laboratory (PNNL). FAST-1.2 is the latest baseline code. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs), accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss of Coolant Accidents (LOCAs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HBET V3.0 Installation Manual

The Hydropower Biological Evaluation Toolset (HBET) V3.0 now requires Python v3.11.0 to be installed, following the addition of the absolute fish injury rate prediction feature. This version introduces two new strike metrics—based on velocity and pressure—to provide a more precise understanding of the biological effects of fish collisions with rigid structures within the fish passage system. Additionally, SQL Server 2019 is the supported database for this release. This installation guide will walk users through the process of installing HBET V3.0 along with all necessary dependencies.

13 HYDRO ENERGY↗

VERA Installation Guide

This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

97 MATHEMATICS AND COMPUTING↗

Fermilab 2025 Summer Internship: Repairing Pre-Amplifiers with Mu2e Electronics Installation Team

The author spent nine weeks over summer 2025 working on the tracker electronics installation team for the Mu2e experiment. One of her main responsibilities was repairing high voltage (HV) and calibration (Cal) pre-amplifiers (pre-amps). During installation, the fragile wires connecting the two sockets to the pre-amp board must be bent, often leading to breakage. During production, the sockets and wires were initially soldered to the board at UC Berkely, then the whole pre-amp was coated in parylene before transport to Fermilab. The interns were able to expedite the repairs, and thus whole installation process, by using an alternative method on-site with epoxy. Another task they were responsible for, not included in the original project specifications, was attaching copper clips to specific vias on the Cals to reduce noise. The talk will give listeners insight into the daily problem-solving required by the novel technologies in the Mu2e project. The author would like to acknowledge her fellow Monmouth College undergraduate interns, Lizzie Durfee and Gianna Maughan, advisor and PI of the DOE RENEW Grant Dr. Christopher G. Fasano, and the Mu2e team lead by co-spokesperson Dr. Bob Bernstein and tracker L2 manager Dr. Brendan Kiburg.

de Zwart, Bronte [Monmouth Coll.]↗

Property Tax Assessments as a Finance Vehicle for Residential PV Installations: Opportunities and Potential Limitations

Readily accessible credit has often been cited as a necessary ingredient to open up the market for residential photovoltaic (PV) systems. Though financing does not reduce the high up-front cost of PV, by spreading that cost over some portion of the system's life, financing can certainly make PV systems more affordable. As a result, a number of states have, in the past, set up special residential loan programs targeting the installation of renewable energy systems and/or energy efficiency improvements, and often featuring low interest rates, longer terms, and no-hassle application requirements. Historically, these loan programs have met with mixed success (particularly for PV), for a variety of reasons, including: (1) historical lack of homeowner interest in PV, (2) lack of program awareness, (3) reduced appeal in a low-interest-rate environment, and (4) a tendency for early PV adopters to be wealthy, and not in need of financing. Although some of these barriers have begun to fade--most notably, homeowner interest in PV has grown in some states, particularly those that offer solar rebates--the passage of the Energy Policy Act of 2005 (EPAct 2005) introduced one additional roadblock to the success of low-interest PV loan programs: a residential solar investment tax credit (ITC), subject to the Federal government's 'anti-double-dipping' rules. Specifically, the residential solar ITC--equal to 30% of the system's tax basis, capped at $2000--will be reduced or offset if the system also benefits from what is known as 'subsidized energy financing', which is likely to include most government-sponsored low-interest loan programs. Within this context, it has been interesting to note the recent flurry of announcements from several U.S cities concerning a new type of PV financing program. Led by the City of Berkeley, California, these cities propose to offer their residents the ability to finance the installation of a PV system using increased property tax assessments, rather than a more-traditional credit vehicle, to recover both system and administrative costs. As discussed in more detail later, this seemingly innovative approach has a number of features that should appeal to PV owners, including: long-term, fixed-cost, attractive financing; loans that are tied to the tax capacity of the property rather than to the owner's credit standing; a repayment obligation that transfers along with the sale of the property; and a potential ability to deduct the repayment obligation from Federal taxable income, as part of the local property tax deduction. For these reasons, Berkeley's program--which was first announced on October 23, 2007--has received considerable nationwide attention in both the trade and general press. Since the announcement, cities from throughout California and the broader U.S. have expressed keen interest in the possibility of replicating this type of program. In California alone, the cities of Santa Cruz, Santa Monica, and Palm Desert are all reportedly considering similar programs, while the city of San Francisco has recently announced its own program, portions of which closely parallel Berkeley's approach. Berkeley's Proposed PV Program In addition, a bill (AB 811) that would authorize all cities (not just 'charter cities' like Berkeley) in California to create this type of program was approved by the California General Assembly on January 29, 2008 and passed on to the State Senate for consideration. That local governments from across California and the broader US are so genuinely excited about the prospect of supporting the installation of residential PV in their communities through this type of program is no doubt an interesting development. Given, however, the potential for such programs to negatively interact with the residential solar ITC, it is important to evaluate the financial attractiveness of this specific type of loan program, particularly in advance of any broader state- or nation-wide 'rollout'. This case study presents such an evaluation. Because Berkeley appears to have the most-well-developed proposal at the moment, this case study begins by describing Berkeley's program, as currently planned, in more detail. It then discusses subsidized energy financing and the potential negative tax implications of this type of program. Next, taking Berkeley's proposed program as a case study, it uses a simple pro forma financial model to first assess the potential financial benefit of the program relative to other commercially available financing options, and then to assess how much of that relative benefit might be eroded by the possible loss of the Federal ITC. Finally, it concludes by discussing potential actions that cities contemplating this sort of program might take to clarify the issues and optimize the value provided to participating residents.