Search NASA⌕ Search

SEARCH · Search NASA

Results for “missions operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

NBI optimization on SMART and implications for scenario development

Abstract The SMall Aspect Ratio Tokamak (SMART) under commissioning at the University of Seville, Spain, aims to explore confinement properties and possible advantages in confinement for compact/spherical tokamaks operating at negative vs. positive triangularity. This work explores the benefits of auxiliary heating through Neutral Beam Injection (NBI) for SMART scenarios beyond the initial Ohmic phase of operations, in support of the device’s mission. Expected values of electron and ion temperature achievable with NBI heating are first predicted for the current flat-top phase, including modeling to optimize the NBI injection geometry to maximize NBI absorption and minimize losses for a given equilibrium. Simulations are then extended for a selected case to cover the current ramp-up phase. Differences with results obtained for the flat-top phase indicate the importance of determining the plasma evolution over time, as well as self-consistently determining the edge plasma parameters for reliable time-dependent simulations. Initial simulation results indicate the advantage of auxiliary NBI heating to achieve nearly double values of pressure and stored energy compared to Ohmic discharges, thus significantly increasing the device’s performance. The scenarios developed in this work will also contribute to diagnostic development and optimization for SMART, as well as providing test cases for initial predictions of macro- and micro-instabilities.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Communications Plan for the Radiochemical Processing Laboratory Life Extension Plan

The Radiochemical Processing Laboratory Life Extension Plan (RPL-ELP) is a collection of independent projects that enable the life extensions of the Radiochemical Processing Laboratory to provide continuous, safe, and secure research operations in support of Department of Energy missions. The ELP includes facility infrastructure upgrades, laboratory and equipment upgrades, and increased research capacity through conversion of existing spaces to the current Pacific Northwest National Laboratory (PNNL) standards. This communications plan is a living document that outlines the goals, target audiences and objectives, key messages, communications opportunities, and tactics for those communications products. This plan will help to make sure communications are coordinated and consistent. Periodically, PNNL will review the communications plan to make sure it addresses current needs of the RPL-ELP.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

LaserNetUS: A Proposal to Advance North America’s First High Intensity Laser Research Network Final Report

LaserNetUS Collaborative Network established in 2018 is a network of high-power laser facilities supported by the Department of Energy (DOE) Office of Fusion Energy Sciences (FES) and operating effectively as a user facility. Its mission is to advance and promote intense laser science and applications by providing scientists and students with broad access to unique facilities and enabling technologies, advancing the frontiers of laser-science research, and fostering collaboration among researchers and networks from around the world. Users who submit proposals through an annual call are selected by an external and independent proposal review panel (PRP) not involving personnel from any of the facilities.

36 MATERIALS SCIENCE↗

Inventory Management Improvement Project

The Lawrence Livermore National Laboratory (LLNL) conducts research and development for the National Nuclear Security Agency (NNSA) and its affiliates. The Polymer AM team at LLNL conducts research and development in 3D printing, specifically direct-ink-write, in accordance with LLNL and NNSA missions. The team is composed of machine operators, chemists, testing engineers, and project engineers across multiple lab spaces with one shared storage area at LLNL. The operations use a variety of different consumables and hardware to conduct research applications for LLNL and NNSA. These items are critical to performing operation tasks; if an item is out of stock, operations associated with the respective item could be suspended for weeks. As such, the Polymer AM team manages an inventory of spare consumables and hardware to ensure these items are always available. However, the current management system, an excel sheet managed by the project engineer group, is not intuitive in providing inventory information despite the high labor utilization needed to maintain the system. As such, the team is looking to improve their inventory management that can send notifications regarding inventory needs, accessible to other team members, provide all relevant information to a specific item, and store historical information for budget and operation planning. The proposed solution is a Computer Maintenance Management System (CMMS): a web-based management software that stores inventory information and provides automated notifications. The system will store information on each item including quantity in stock, technical information, supplier information, costs, lead times, and expiration date. The system has a notifications function that can send notifications to the respective team member’s when an item needs to be counted, item inventory is low, or an item is approaching their expiration date. Information for each item can be tracked over time creating data to be used for budget planning and process improvement purposes. Due to its web-based source, the system can be accessed by the respective team member viewing technical information, quantity, and purchasing information.

42 ENGINEERING↗

Uncertainty-aware photovoltaic generation estimation through fusion of physics with harmonics information using Bayesian neural networks

We develop an aggregate photovoltaic generation estimation methodology that uses diverse inputs and can reason on its current input-dependent predictive uncertainty. Named PVPHEst, for PhotoVoltaic Physics- & Harmonics-driven Estimator, the resulting tool is intelligently weighing and fusing information carried by the output of physics models, harmonics, and line sensors, using Bayesian neural networks and related techniques aimed at solving machine learning problems with intrinsic uncertainty quantification. As each of the three input classes carries heterogeneous information that only sheds light on one facet of the estimation problem but its value can diminish in the face of diverse grid phenomena, PV-PHEst with its estimation and uncertainty reasoning capabilities perform a nontrivial and potentially mission-critical task of value to grid operators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The U.S. CMS HL-LHC R&D Strategic Plan

The HL-LHC run is anticipated to start at the end of this decade and will pose a significant challenge for the scale of the HEP software and computing infrastructure. The mission of the U.S. CMS Software & Computing Operations Program is to develop and operate the software and computing resources necessary to process CMS data expeditiously and to enable U.S. physicists to fully participate in the physics of CMS. We have developed a strategic plan to prioritize R&D efforts to reach this goal for the HL-LHC. This plan includes four grand challenges: modernizing physics software and improving algorithms, building infrastructure for exabyte-scale datasets, transforming the scientific data analysis process and transitioning from R&D to operations. We are involved in a variety of R&D projects that fall within these grand challenges. In this talk, we will introduce our four grand challenges and outline the R&D program of the U.S. CMS Software & Computing Operations Program.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Microgrids: A Primer for Facility Managers

A water microgrid is similar in concept to an energy microgrid, which the U.S. Department of Energy defines as “a local energy grid with control capability, which means it can disconnect from the traditional grid and operate autonomously.” Similarly, a water microgrid is a local water system that supplies, treats, and distributes water, with the primary objective to meet mission critical water demands during a disruption of the primary supply. A water microgrid has the capability to operate independently of an existing primary water system and includes a layer of sensing capability that provides the necessary monitoring and controls to operate the water microgrid. A water microgrid may offer a viable solution for a site to address resilience gaps identified through the resilience planning process. For example, a site may not have adequate and redundant water supply to meet mission critical demands with vulnerabilities in the operating systems. A water microgrid provides the ability to island the water system from the primary water supply to satisfy water demand requirements throughout an outage or disruption.

42 ENGINEERING↗

Dynamic thermal behavior of polycrystalline LaB 6 hollow cathodes

Lanthanum hexaboride (LaB6) hollow cathodes have demonstrated a capability for long life operation, which is critical to many space exploration missions. Thermal characterization of LaB6 hollow cathodes has revealed lower than expected electron emitter temperatures when the cathode reaches a steady state. This phenomenon is observed at discharge currents ranging from 5 to 35 A and xenon mass flow rates of 5–25 SCCM in cathodes with three different orifice diameters. Thus, the currently accepted value of the work function for polycrystalline LaB 6 , 2.67 eV, does not describe well the emission characteristics of LaB6 hollow cathodes operating with internal gas discharges at a steady state. We use empirically measured temperatures combined with a model of the hollow cathode emitter and xenon discharge to estimate the value of the work function, yielding a value ranging from 2.1 to 2.44 eV. This lower work function value implies that LaB6 hollow cathodes are expected to have even longer lifetimes than previously anticipated, further establishing them as a more suited alternative to other conventional cathode technologies for the task of long duration travel. Direct measurements of the work function as a function of depth on a hollow cathode emitter using x-ray photoelectron spectroscopy and ion beam milling indicate that the work function decreases with depth. We postulate several mechanisms that could explain the observed work function enhancement. Altogether, our results have important implications to the design, study approach, and operation of LaB 6 cathodes and potentially other cathodes with hollow configuration. Finally, our work opens the question of why the work function is reduced upon interaction with Xe plasma.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Vector Development for Verification and Validation of Heavy-Duty Autonomous Vehicle Operations

The current focus in the ongoing development of autonomous driving systems (ADS) for heavy duty vehicles is that of vehicle operational safety. To this end, developers and researchers alike are working towards a complete understanding of the operating environments and conditions that autonomous vehicles are subject to during their mission. This understanding is critical to the testing and validation phases of the development of autonomous vehicles and allows for the identification of both the nominal and edge case scenarios encountered by these systems. Previous work by the authors saw the development of a comprehensive scenario generation framework to identify an operating domain specification (ODS), or external and internal conditions an autonomous driving system can expect to encounter on its mission to form critical scenario groups for autonomous vehicle testing and validating using statistical patterns, clustering, and correlation. Continuing this prior work, this paper focuses on the generation of test cases based on the critical scenarios identified that can be used to prioritize either the most common nominal driving scenarios or the least common severe driving scenarios. These test cases can then be used validate, through simulation or real-world testing, the operating design domain (ODD) for a generalized driving mission and built upon to identify spatial and temporal impacts on the driving mission of an autonomous vehicle.

Siekmann, Adam↗

Hanford Site Raptor Nest Monitoring Report for Calendar Years 2024 and 2025

The focus of this report is to document the distribution and abundance of nesting raptors on the HFO-managed portion of the Hanford Site. Raptor nest surveys provide land managers with specific locations of nest sites so that the nests can be avoided and disturbances minimized during the nesting season. Long-term trends in nesting raptor populations also allow for the assessment of potential impacts from Hanford Site operations.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Dissolution of Fluoride Salts in Hanford Tank Waste

The Direct Feed High-Level Waste (DFHLW) strategy seeks to bypass the Hanford Waste Treatment and Immobilization Plant Pretreatment Facility while retaining some processing functions to maximize waste feed loading and minimize high-level waste (HLW) waste volume. The DFHLW flowsheet needs leaching, washing, and solids concentration operations either in new or existing tanks. The effectiveness and efficiency of sludge washing has a substantial impact on DST space, mission duration, and the evaporation and low-activity waste (LAW) treatment operations required by these large wash-water additions. One target species requiring washing is fluoride. The HLW glass composition limits for fluorine drive operations to dissolve fluoride-bearing salts into the LAW fraction and thereby maximize waste loading in HLW glass. The fluoride in many high-level wastes at Hanford is predominantly in the form of fluoride-salt precipitates: villiaumite (NaF), kogarkoite (Na 3 FSO 4 ), and natrophosphate (Na 7 F(PO 4 ) 2 ·19H 2 O). Fluoride produces melter off-gas that creates corrosion risk in the off-gas system piping, while the sulfate and phosphate in the fluoride double salts kogarkoite and natrophosphate can be detrimental to glass waste loading. Fluoride salts are sparingly soluble, with solubilities ranging from approximately 40 to 130 kg per kL of pure water, and the dissolution kinetics of the three fluoride salts are not well known. Unexpected delays in a tank dissolution process could be encountered as a result of the lack of information about dissolution rates. In addition, if the double salts show transient non-stoichiometric dissolution of fluoride versus phosphate or sulfate, unexpectedly high concentrations of one of these other constituents could be produced. Washington River Protection Solutions authorized Pacific Northwest National Laboratory to collect the available data for fluoride salt dissolution rate, provide a scoping estimate of dissolution time if possible, and identify gaps in the understanding and predictive capability for estimating dissolution time. Open literature and Hanford reports were reviewed to document, understand, and (where possible) evaluate limitations on fluoride salt equilibria and dissolution kinetics, including both mass transport and surface reaction rate. Scoping estimates of dissolution time were made for mass-transfer-controlled dissolution of spherical particles of fluoride salts suspended in liquid. This is not the only potential governing mechanism; dissolution could be substantially slower if the surface reaction rate (the rate of release of ions from the surface) is the controlling mechanism. When the minimum amount of water for complete dissolution is used and the slip velocity between the liquid and suspended particles is less than or equal to the terminal settling velocity, the estimated mass-transfer rates allow 0.1 mm particles of fluoride salt to dissolve in minutes at 25 °C in water containing no other dissolved salts. Much larger solids, such as the 6-mm chunks that have been seen in heels, could take a few hours to more than a week to dissolve. The actual dissolution times will depend strongly on the actual slip velocity, the extent of particle suspension, constraint by surface reaction rates, the ratio of solvent to solid, and the presence of common ions that shift the solubility equilibria to restrict dissolution of fluoride salts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2023 NSTTF Annual Report

The National Solar Thermal Test Facility (NSTTF) is a DOE Core Capability and Technology Deployment Center located in Albuquerque, NM. It is operated by Sandia National Laboratories (Sandia) for the U.S. Department of Energy (DOE). The NSTTF is the only multi-mission, multi-use, multi-story test facility of its type in the United States. The NSTTF was founded in 1978 and began testing with high heat flux that same year. Over the past 45 years, the NSTTF has been at the forefront of the research, design, fabrication, and testing of many of the critical Concentrating Solar Power (CSP) technologies. These technologies have allowed costs to be dramatically reduced from over $\$ $0.40 /kWh to $\$$0.12 /kWh since the conception of this renewable energy technology. The NSTTF has worked to make the Solar Energy Generating Systems (SEGS) parabolic trough plants successful, while also working with the Solar One and Solar Two facilities for successful implementation. Over the four decades since its founding, the mission of the NSTTF has grown to include new receiver technologies, like our generation 3 falling particle system (G3P3 Tower), optical metrology techniques like SOFAST, molten salt testing, thermal energy storage, solar thermal chemistry, and more. We continue to expand our capabilities in pursuit of the DOE SETO mission and the DOE SunShot 2030 goals: unsubsidized LCOE of $\$$0.05/kWh for CSP that includes 12 or more hours of thermal energy storage. To support both the DOE SETO mission and support the CSP sector as a whole, we are working to develop our operations and maintenance framework to provide a world class testing facility in support of our technological achievements. To accomplish both of these missions, the NSTTF draws on the decades of experience and expertise of our staff along with the world-class facilities at Sandia National Laboratories to further the science of concentrated solar thermal technologies in diverse applications. We remain a trusted partner for high-quality and impactful research in both fundamental and applied arenas. We are able to provide our partners with both one-of-a-kind testing platforms as well as world-class analytics.

14 SOLAR ENERGY↗

Consequence Management Cobalt Magnet 2022 Laboratory Analysis: After Action Report

On May 16-20, 2022, federal mission partners (e.g., DOE Consequence Management, CDC, FDA, FBI, DHS) as well as integrated state, local, tribal, and territorial governments took part in Cobalt Magnet 22 (CM22), a large-scale, week-long radiological incident exercise in Austin, Texas, that linked several important national assets (National Search Program, Radiological Assistance Program, and Consequence Management [CM] personnel) into a single response effort. The exercise had nine (9) overarching Objectives and an additional 162 associated Critical Tasks for all the participating organizations. In total, 13 National Core Capabilities spanning 5 Mission Areas were represented in the final exercise. This exercise enabled a full range of capabilities to be fielded together and examine the operational connection between major assets, discover any resource shortages associated with conducting multiple mission areas simultaneously or in close succession, and identify any challenges related to leadership. This report summarizes nearly 100 successes and observations provided from players and controllers supporting the LA Division, Fly Away Laboratory (FAL) and Gamma Spectroscopist operations. The observations were categorized to align with the FRMAC programmatic functional areas to consider for future improvements: Logistics, CBRN Responder, Laboratory Analysis, Sampling and Monitoring, Health and Safety, Gamma Spectroscopist Operations, Fly Away Laboratory, and the FRMAC Interdivision Interoperability Group (FIIG).

54 ENVIRONMENTAL SCIENCES↗

Getting things done onsite: Heat Source production never ramps down

The COVID-19 pandemic has changed many norms in the world and at LANL. During the rapid transition of sending many to work from home in March, some programs were deemed mission critical, with the expectation to continue driving their missions forward. One of those essential programs is Heat Source Technologies, a group within the Actinide Material Power & Processing (AMPP) Division at TA-55. Within the Associate Laboratory Directorate of Weapons Production (ALDWP), the group responsible for the Pu-238 heat sources continued their work nearly uninterrupted as many others made the mandatory transition to work remotely. This group, known as AMPP-1, Heat Source Technologies, works on the production line producing heat sources from Plutonium (Pu)-238, which is an essential mission for National Security. This group is comprised of nearly 90 employees and operates out of the TA-55 Plutonium Facility (PF-4 and PF-5) producing heat sources. Heat source production includes the operations that purify, process, and weld Pu-238 oxide into encapsulated heat sources that are essential for space and defense missions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Overview of the EUROfusion Tokamak Exploitation programme in support of ITER and DEMO

Within the 9th European Framework programme, since 2021 EUROfusion is operating five tokamaks under the auspices of a single Task Force called ‘Tokamak Exploitation’. The goal is to benefit from the complementary capabilities of each machine in a coordinated way and help in developing a scientific output scalable to future largre machines. The programme of this Task Force ensures that ASDEX Upgrade, MAST-U, TCV, WEST and JET (since 2022) work together to achieve the objectives of Missions 1 and 2 of the EUROfusion Roadmap: i) demonstrate plasma scenarios that increase the success margin of ITER and satisfy the requirements of DEMO and, ii) demonstrate an integrated approach that can handle the large power leaving ITER and DEMO plasmas. The Tokamak Exploitation task force has therefore organized experiments on these two missions with the goal to strengthen the physics and operational basis for the ITER baseline scenario and for exploiting the recent plasma exhaust enhancements in all four devices (PEX: Plasma EXhaust) for exploring the solution for handling heat and particle exhaust in ITER and develop the conceptual solutions for DEMO. The ITER Baseline scenario has been developed in a similar way in ASDEX Upgrade, TCV and JET. Key risks for ITER such as disruptions and run-aways have been also investigated in TCV, ASDEX Upgrade and JET. Experiments have explored successfully different divertor configurations (standard, super-X, snowflakes) in MAST-U and TCV and studied tungsten melting in WEST and ASDEX Upgrade. The input from the smaller devices to JET has also been proven successful to set-up novel control schemes on disruption avoidance and detachment.

ASDEX upgrade↗