Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

Deep Reinforcement Scheduling of Energy Storage Systems for Real-time Voltage Regulation in Unbalanced LV Networks with High PV Penetration

The ever-growing higher penetration of distributed energy resources (DERs) in low-voltage (LV) distribution systems brings both opportunities and challenges to voltage support and regulation. This paper proposes a deep reinforcement learning (DRL)-based scheduling scheme of energy storage systems (ESSs) to mitigate system voltage deviations in unbalanced LV distribution networks. The ESS-based voltage regulation problem is formulated as a multi-stage quadratic stochastic program, with the objective of minimizing the expected total daily voltage regulation cost while satisfying operational constraints. While existing voltage regulation methods are mostly focused on onetime- step control, this paper explores a day-horizon systemwide voltage regulation problem. In other words, the size of action and state spaces are extremely high-dimensional and need to be delicately handled. Furthermore, in order to overcome the difficulty of modeling uncertainties and develop a realtime solution, a learn-to-schedule feedback control framework is proposed by adapting the problem to a model-free DRL setting. The proposed algorithm is tested on a customized 6-bus system and a modified IEEE 34-bus system. Simulation results validate the effectiveness and near-optimality of voltage regulation by ESS in comparison with a deterministic quadratic program solution.

Wang, Shengyi↗

An Uncertainty Management Framework for Integrated Gas-Electric Energy Systems

In many parts of the world, electric power systems have seen a significant shift toward generation from renewable energy and natural gas. Because of their ability to flexibly adjust power generation in real time, gas-fired power plants are frequently seen as the perfect partner for variable renewable generation. However, this reliance on gas generation increases interdependence and propagates uncertainty between power grids and gas pipelines and brings coordination and uncertainty management challenges. To address these issues, we propose an uncertainty management framework for uncertain, but bounded gas consumption by gas-fired power plants. The admissible ranges are computed based on a joint optimization problem for the combined gas and electricity networks, which involves chance-constrained scheduling for the electric grid and a novel robust optimization formulation for the natural-gas network. This formulation ensures feasibility of the integrated system with a high probability, while providing a tractable numerical formulation. A key advance with respect to existing methods is that our method is based on a physically accurate, validated model for transient gas pipeline flows. Our case study benchmarks our proposed formulation against methods that ignore how reserve activation impacts the fuel use of gas power plants and only consider predetermined gas consumption. Here, the results demonstrate the importance of considering uncertainty to avoid operating constraint violations and curtailment of gas to the generators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method for interference mitigation in space communications scheduling

Increases in the number of user spacecraft and data rates supported by NASA's Tracking and Data Relay Satellite System (TDRSS) in the S and Ku bands could result in communications conflicts due to mutual interference. A method to mitigate interference while minimizing unnecessary scheduling restrictions on both TDRSS network and user resources, based on consideration of all relevant communications parameters, was developed. The steps of this method calculate required separation angles at TDRS and produce interference intervals, which can be used in the production of schedules free of unacceptable interference. The method can also be used as a basis for analysis, evaluation, and optimization of user schedules with respect to communications performance. Described here are the proposed method and its potential application to scheduling in space communications. Test cases relative to planned missions, including the Earth Observing System, the Space Station Manned Base, and the Space Shuttle are discussed.

Wong, Yen F.↗

A method for interference mitigation in space communications scheduling

Increases in the number of user spacecraft and data rates supported by NASA's Tracking and Data Relay Satellite System (TDRSS) in the S and Ku bands could result in communications conflicts due to mutual interference. A method to mitigate interference while minimizing unnecessary scheduling restrictions on both TDRSS network and user resources, based on consideration of all relevant communications parameters, was developed. The steps of this method calculate required separation angles at TDRSS and produce interference intervals, which can be used in the production of schedules free of unacceptable interference. The method also can be used as the basis for analysis, evaluation, and optimization of user schedules with respect to communications performance. Described here are the proposed method and its potential application to scheduling in space communications. Test cases relative to planned missions, including the Earth Observing System, the Space Station Manned Base, and the Space Shuttle are discussed.

Wong, Yen F.↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

Dautrechy, C. Lynne↗

Parallel plan execution with self-processing networks

A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.

D'Autrechy, C. Lynne↗

Software-Defined Network for End-to-end Networked Science at the Exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work we presen here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end-to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

97 MATHEMATICS AND COMPUTING↗

Software-defined network for end-to-end networked science at the exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work presented here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end- to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

47 OTHER INSTRUMENTATION↗

Tool for Merging Proposals Into DSN Schedules

A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

Khanampornpan, Teerapat↗

Visual task analysis /VISTA/

Computer system VISTA, automatically plots selective PERT networks in order to develop accurate, standardized scheduling documentation as an essential element to project planning. This automation of plotting networks generates standardized networks due to a priority scheme adopted for calculating paths between events.

Burkes, T.↗

Air compressor load forecasting using artificial neural network

Air compressor systems are responsible for approximately 10% of the electricity consumed in United States and European Union industry. As many researches have proven the effectiveness of using Artificial Neural Network inair compressor performance prediction, there is still a need to forecast the air compressor electrical load profile. The objective of this study is to predict compressed air systems’ electrical load profile, which is valuable to industry practitioners as well as software providers in developing better practice and tools for load managementand look-ahead scheduling programs. Two artificial neural networks, Two-Layer Feed-Forward Neural Networkand Long Short-Term Memory were used to predict an air compressors electrical load. Compressors with three different control mechanisms are evaluated with a total number of 11,874 observations. Here, the forecasts were validated using out-of-sample datasets with 5-fold cross-validation. Models produced average coefficient ofdetermination values from 0.24 to 0.94, average root-mean-square errors from 0.05 kW - 5.83 kW, and meanabsolute scaled errors from 0.20 to 1.33. The results indicate that both artificial neural networks yield goodresults for compressors using variable speed drive (average R 2 = 0.8 and no naïve forecasting), only the longshort-term memory model gives acceptable results for compressors using on/off control (average R 2 = 0.82 and no naïve forecasting), and no satisfactory results are obtained for load/unload type air compressors (models constituting active forecasting).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Steps Toward Optimal Competitive Scheduling

This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum of users preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a committee is usually in charge of deciding the priority of each mission competing for access to the DSN within a time period while scheduling. Instead, we can assume that the committee assigns a budget to each mission.This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum ofsers preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a committee is usually in charge of deciding the priority of each mission competing for access to the DSN within a time period while scheduling. Instead, we can assume that the committee assigns a budget to each mission.

Frank, Jeremy↗

Envisioning an Optimal Network of Space-Based Lasers for Orbital Debris Remediation

The rapid increase in resident space objects, including satellites and orbital debris, poses a significant threat to the safety and sustainability of space missions. This paper explores orbital debris remediation using a network of collaborative space-based lasers, leveraging laser ablation for momentum transfer on debris. A novel delta-v vector analysis framework quantifies the e↵ects of multiple simultaneous laser-to-debris (L2D) engagements by using vector composition of the imparted delta-v vectors. The paper introduces the Concurrent LocationScheduling Problem (CLSP), which optimizes the placement of laser platforms and the scheduling of L2D engagements to maximize debris remediation capacity. Due to the computational complexity of the CLSP, it is decomposed into two sequential subproblems: (1) optimal laser platform locations are determined using the Maximal Covering Location Problem, and (2) a novel integer linear programming-based approach schedules L2D engagements within the network configuration to maximize remediation capacity. Computational experiments are conducted to evaluate the proposed framework’s e↵ectiveness under various mission scenarios, demonstrating key network functions such as collaborative nudging, deorbiting, and just-in-time collision avoidance. A sensitivity analysis further examines how varying the number and distribution of laser platforms a↵ects debris remediation capacity, providing insights into optimizing the performance of space-based laser networks.

David O Williams Rogers↗

Optimal charging scheduling and management for a fast-charging battery electric bus system

Herein we discuss how battery electric buses (BEBs) are rapidly being embraced by public transit agencies because of their environmental and economic benefits. To address the problems of limited driving range and time-consuming charging for BEBs, manufacturers have developed rapid on-route charging technology that utilizes typical layovers at terminals to charge buses in operation using high power. With on-route fast-charging, BEBs are as capable as their diesel counterparts in terms of range and operating time. However, on-route fast-charging makes it more challenging to schedule and manage charging events for a BEB system. First, on-route fast-charging may lead to high electricity power demand charges. Second, it may increase electricity energy charges because of charging that occurs during on-peak hours. Without careful charging scheduling and management, on-route fast-charging may significantly increase fuel costs and reduce the economic attractiveness of BEBs. The present study proposes a network modeling framework to optimize the charging scheduling and management for a fast-charging BEB system, effectively minimizing total charging costs. The charging schedule determines when to charge a BEB, while the charging management strategically controls the actual charging power. Charging costs include both electricity demand charges and energy charges. The charging scheduling and management problem is first formulated as a nonlinear nonconvex program with time-continuous variables. A discretizing method and a linear reformulation technique are then adopted to reformulate the model as a linear program, which can be easily solved using off-the-shelf solvers, even for large-scale problems. Finally, the model is demonstrated with extensive numerical studies based on two real-world bus networks. The results demonstrate that the proposed model can effectively determine the optimal charging scheduling and management for a fast-charging BEB system, which carries the potential for use in large-scale real-world bus networks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The International Space Station, Optical Communications, and Delay Tolerant Networking: Towards A Solar System Internet Architecture

As Delay Tolerant Networking (DTN) matures as a software product its use cases have extended to infrastructural and architectural studies, bringing DTN closer to a widespread, operational technology. While it is known that a DTN can be configured, given complete information about a system of nodes, to provision a system with a complete network capability, what remains is to tackle practical considerations such as scalability, networking best practices, and how to establish service providers. In this paper, we document progress towards a scalable DTN architecture that was tested across multiple organizational and project boundaries; our approach was tested across nodes flying on the International Space Station (ISS) connected to a ground network. The network consists of four main network areas: the ISS, the White Sands Complex (WSC), the Mission Cloud Platform (MCP), and NASA’s Huntsville Operations Support Center (HOSC). The connections on the ground (WSC, MCP, and HOSC) are straightforward technically, but represent administrative and non-technical challenges that had to be overcome. The connection from the ISS to WSC was realized through a hybrid optical/RF means. In particular, NASA’s Integrated Laser Communications Relay Demonstration (LCRD) can form a relay from lowEarth-orbit (LEO) to the Earth, and was used in conjunction with the LCRD LEO User Modem and Amplifier Terminal (ILLUMA-T) on the ISS to form a link to one of three geographically diverse ground stations. A major goal was to achieve communications while keeping the ISS nodes unaware of ground station choices and scheduling. These disparate links were networked using High-rate DTN (HDTN), which enabled the desired architecture. The network architecture, tests, HDTN performance metrics, and general observations made are all discussed in detail, including a discussion on the successful utilization of the DTN security standard known as DTN Bundle Protocol Security (BPSec). We conclude with suggestions for next steps, and in particular focus on extending this architecture to the Near Space Network (NSN) and the upcoming LunaNet.

Alan Hylton↗

A method for interference mitigation in space communications scheduling

Increases in the number of user spacecraft and data rates supported by NASA's Tracking and Data Relay Satellite System (TDRSS) in the S and Ku bands could result in communications conflicts due to mutual interference. More attention must be paid to this problem in terms of communications scheduling. A method based on consideration of all relevant communications parameters has been developed to mitigate interference while minimizing unnecessary scheduling restrictions on both the TDRSS network and user resources. This method calculates required separation angles at TDRS and produces potential interference intervals, which can be used in the production of schedules free of unacceptable interference. The method also can be used as the basis for analysis, evaluation, and optimization of user schedules with respect to communications performance. This paper describes the method and its proposed application to scheduling in space communications. Test cases relative to missions operating at Ku-band, including Space Shuttle, are discussed.

Wong, Yen F.↗