Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

System design of the Pioneer Venus spacecraft. Volume 12: International cooperation

A spectrum of plans has been prepared to illustrate the range of practical sharing possibilities available so as to assist Ames Research Center (ARC) and European Space Research Organization (ESRO) in selection of a program meeting mutual goals. Five plans are described showing increased participation by ESRO WITH ascending plan number. Each of these has sharing properties fulfilling particular requirements such as available ESRO budget level, extent of ESRO program responsibility, matching particular ESRO capability, and cost saving to ARC through sharing. All plans apply to orbiter sharing only. A sharing plan based on the model Plan 4 may offer the most attractive division of Pioneer Venus between ARC and ESRO. This plan allows ESRO to bear primary responsibility for the orbiter and to avoid an extensive financial burden. Savings to ARC are commensurate with ARC loss of program control. Duplication of effort is avoided by using orbiter subsystems that are common to the probe bus and orbiter.

Kelly, R. S.↗

Strategy for Mitigating Collision Between Landsat-5 and the Afternoon Constellation

The NASA Goddard Space Flight Center Earth Science Mission Operations project, the French space agency Centre National d tudes Spatiales, the Argentinian space agency Comisi n Nacional de Actividades Espaciales, and the United States Geological Survey all operate spacecraft in sun-synchronous frozen orbits. The orbits are planned to not place any of the spacecraft at risk of colliding with another. However, evolution of these orbits over time has com-promised the safe interaction between Landsat-5 and the Afternoon Constella-tion. This paper analyzes the interactions between the Landsat-5 spacecraft and the Afternoon Constellation members over a period of 6 years, describing the current risk and plan to mitigate collisions in the future.

Levi, Joshua A.↗

Execution of the Spitzer In-orbit Checkout and Science Verification Plan

The Spitzer Space Telescope is an 85-cm telescope with three cryogenically cooled instruments. Following launch, the observatory was initialized and commissioned for science operations during the in-orbit checkout (IOC) and science verification (SV) phases, carried out over a total of 98.3 days. The execution of the IOC/SV mission plan progressively established Spitzer capabilities taking into consideration thermal, cryogenic, optical, pointing, communications, and operational designs and constraints. The plan was carried out with high efficiency, making effective use of cryogen-limited flight time. One key component to the success of the plan was the pre-launch allocation of schedule reserve in the timeline of IOC/SV activities, and how it was used in flight both to cover activity redesign and growth due to continually improving spacecraft and instrument knowledge, and to recover from anomalies. This paper describes the adaptive system design and evolution, implementation, and lessons learned from IOC/SV operations. It is hoped that this information will provide guidance to future missions with similar engineering challenges

operations↗

Initial Jupiter Orbit Insertion and Period Reduction Maneuver Plans for Juno

This paper describes the initial plans for the New Frontiers Juno mission at Jupiter. It includes the considerable contingency planning for mission recovery if the Jupiter Orbit Insertion (JOI) burn to place Juno into a large capture orbit were interrupted or terminated on a burn timer setting, and the options for the mission if the Period Reduction Maneuver (PRM) burn to achieve the final orbit period were terminated early. The analyses were based on the assumption that 14-day orbits were the desired operational orbit period.

Bordi, John J.↗

Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans

The Solar Dynamics Observatory (SDO) was designed to understand the Sun and the Sun s influence on Earth. SDO was launched on February 11, 2010 carrying three scientific instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). Both AIA and HMI are sensitive to high frequency pointing perturbations and have sub-arcsecond level line-of-sight (LOS) jitter requirements. Extensive modeling and analysis efforts were directed in estimating the amount of jitter disturbing the science instruments. To verify the disturbance models and to validate the jitter performance prior to launch, many jitter-critical components and subassemblies were tested either by the mechanism vendors or at the NASA Goddard Space Flight Center (GSFC). Although detailed analysis and assembly level tests were performed to obtain good jitter predictions, there were still several sources of uncertainties in the system. The structural finite element model did not have all the modes correlated to test data at high frequencies (greater than 50 Hz). The performance of the instrument stabilization system was not known exactly but was expected to be close to the analytical model. A true disturbance-to-LOS observatory level test was not available due to the tight schedule of the flight spacecraft, the cost in time and manpower, difficulties in creating gravity negation systems, and risks of damaging flight hardware. To protect the observatory jitter performance against model uncertainties, the SDO jitter team devised several on-orbit jitter reduction plans in addition to reserve margins on analysis results. Since some of these plans severely restricted the capabilities of several spacecraft components (e.g. wheels and High Gain Antennas), the SDO team performed on-orbit jitter tests to determine which jitter reduction plans, if any, were necessary to satisfy science LOS jitter requirements. The SDO on-orbit jitter tests were designed to satisfy the following four objectives: 1. Determine the acceptable reaction wheel operational speed range during Science Mode. 2. Determine HGA algorithm jitter parameters (number of stagger steps and enable/disable no-steprequests). 3. Determine acceptable EVE instrument filter wheels spin rates. 4. Determine if AIA instrument filter wheels excite the first AIA telescope structural mode. This paper provides detailed information on the SDO wheel jitter test plan, shows on-orbit jitter measurements and how ground predictions compare to those measurements, and describes the final jitter mitigation plan executed on SDO.

Liu, Kuo-Chia (Alice)↗

A new methodology to integrate planetary quarantine requirements into mission planning, with application to a Jupiter orbiter

A new methodology is proposed for integrating planetary quarantine objectives into space exploration planning. This methodology is designed to remedy the major weaknesses inherent in the current formulation of planetary quarantine requirements. Application of the methodology is illustrated by a tutorial analysis of a proposed Jupiter Orbiter mission. The proposed methodology reformulates planetary quarantine planning as a sequential decision problem. Rather than concentrating on a nominal plan, all decision alternatives and possible consequences are laid out in a decision tree. Probabilities and values are associated with the outcomes, including the outcome of contamination. The process of allocating probabilities, which could not be made perfectly unambiguous and systematic, is replaced by decomposition and optimization techniques based on principles of dynamic programming. Thus, the new methodology provides logical integration of all available information and allows selection of the best strategy consistent with quarantine and other space exploration goals.

Howard, R. A.↗

Space station synergetic RAM-logistics analysis

NASA's Space Station Maintenance Planning and Analysis (MP&A) Study is a step in the overall Space Station Program to define optimum approaches for on-orbit maintenance planning and logistics support. The approach used in the MP&A study and the analysis process used are presented. Emphasis is on maintenance activities and processes that can be accomplished on orbit within the known design and support constraints of the Space Station. From these analyses, recommendations for maintainability/maintenance requirements are established. The ultimate goal of the study is to reduce on-orbit maintenance requirements to a practical and safe minimum, thereby conserving crew time for productive endeavors. The reliability, availability, and maintainability (RAM) and operations performance evaluation models used were assembled and developed as part of the MP&A study and are described. A representative space station system design is presented to illustrate the analysis process.

Dejulio, Edmund T.↗

The Space Shuttle Orbiter and aerodynamic testing

The concept of utilizing the Space Shuttle Orbiter as an aerodynamic flight research vehicle is discussed. The orbiter's planned flight frequency and its complex flight control system provide an unprecedented flight research potential. This paper defines the orbiter's flight environment and applicable baseline systems, their capabilities and limitations, as well as those instrument systems required to augment the baseline capability. These required systems, which are being developed under NASA's Orbiter Experiments Program (OEX) are the Aerodynamic Coefficient Identification Package (ACIP), Shuttle Entry Air Data System (SEADS), and the Shuttle Upper Atmosphere Mass Spectrometer (SUMS). Finally, the need for and capability of launching payloads from the orbiter to extend the research potential beyond the orbiter configuration and/or environment is defined.

Siemers, P. M., III↗

Telesat-G/Delta post launch report

The Canadiari Telesat-G (ANIK-D1) commercial communications satellite was launched successfully from the Eastern space and Missile Center (ESMC) at 7:10 p.m., EDT, on August 25, 1982, by a Delta 3920 Vehicle, Mission Number 164. Performance of the two stage Delta launch vehicle was nominal and placed the payload in a low circular orbit as planned. The Payload Assist Module (PAM-D), which is part of the payload, also performed nominally. The synchronous transfer orbital elements achieved by Delta/PAM, compared with the nominal expected, are provided. The satellite performed satisfactorily during the transfer orbit, and the ABM was fired successfully at 5:29 p.m., EDT, on August 29, 1982. The satellite was maneuvered to a position 104 degrees West Longitude above the equator. Satellite status is satisfactory and it has entered service.

Mahon, J. B.↗

Space Shuttle communications experiments

Experiments which are under consideration for possible flight on the Space Shuttle in the 1980's to aid in the development of new communications techniques are outlined. A millimeter wave communications experiment for the study of propagation above 10 GHz and an electromagnetic environment experiment for the characterization of fields in orbit are planned to provide information needed for effective spectrum conservation. An antenna range experiment is being studied to provide an in-orbit far-field RF signal source for measuring ground antenna patterns and gain over a wide frequency range. Additional experiments will be intended to test spacecraft technology developments, including such communications system components as large phased array antennas and solid state transmitters and receivers.

Wolff, E. A.↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

Copernicus: Lunar surface mapper

The Utah State University (USU) 1991-92 Space Systems Design Team has designed a Lunar Surface Mapper (LSM) to parallel the development of the NASA Office of Exploration lunar initiatives. USU students named the LSM 'Copernicus' after the 16th century Polish astronomer, for whom the large lunar crater on the face of the moon was also named. The top level requirements for the Copernicus LSM are to produce a digital map of the lunar surface with an overall resolution of 12 meters (39.4 ft). It will also identify specified local surface features/areas to be mapped at higher resolutions by follow-on missions. The mapping operation will be conducted from a 300 km (186 mi) lunar-polar orbit. Although the entire surface should be mapped within six months, the spacecraft design lifetime will exceed one year with sufficient propellant planned for orbit maintenance in the anomalous lunar gravity field. The Copernicus LSM is a small satellite capable of reaching lunar orbit following launch on a Conestoga launch vehicle which is capable of placing 410 kg (900 lb) into translunar orbit. Upon orbital insertion, the spacecraft will weigh approximately 233 kg (513 lb). This rather severe mass constraint has insured attention to component/subsystem size and mass, and prevented 'requirements creep.' Transmission of data will be via line-of-sight to an earth-based receiving system.

Redd, Frank J.↗

EOS Terra Terra Constellation Exit/Future Maneuver Plans Update

This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.

EOS Terra↗

Agent independent task planning

Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

Davis, William S.↗

Relay Telecommunications for the Coming Decade of Mars Exploration

Over the past decade, an evolving network of relay-equipped orbiters has advanced our capabilities for Mars exploration. NASA's Mars Global Surveyor, 2001 Mars Odyssey, and Mars Reconnaissance Orbiter (MRO), as well as ESA's Mars Express Orbiter, have provided telecommunications relay services to the 2003 Mars Exploration Rovers, Spirit and Opportunity, and to the 2007 Phoenix Lander. Based on these successes, a roadmap for continued Mars relay services is in place for the coming decade. MRO and Odyssey will provide key relay support to the 2011 Mars Science Laboratory (MSL) mission, including capture of critical event telemetry during entry, descent, and landing, as well as support for command and telemetry during surface operations, utilizing new capabilities of the Electra relay payload on MRO and the Electra-Lite payload on MSL to allow significant increase in data return relative to earlier missions. Over the remainder of the decade a number of additional orbiter and lander missions are planned, representing new orbital relay service providers and new landed relay users. In this paper we will outline this Mars relay roadmap, quantifying relay performance over time, illustrating planned support scenarios, and identifying key challenges and technology infusion opportunities.

Edwards, C.↗

Enhancing orbital servicing operations: Providing positive and effective management of spare and installed hardware - A case study of the Hubble Space Telescope

The Satellite Resources Management and Tracking System was developed specifically for the Hubble Space Telescope (HST) program, and now, NASA has the ability to immediately access the necessary data for planning successful orbital satellite servicing operations. This system is an online, real-time data base system that contains a plethora of data on each item identified to support the HST throughout its planned 15 year life. Some of the information provided includes the current status, location, quantity, and history of each asset, a separate record for each discrete serial numbered item, procurement lead times on items sensitive to technology obsolescence, and the maintenance and repair history of each asset. Finally, details are provided on organizational, operational and logistics requirements.

Randolph, Joseph L.↗