Field Verification of Grid-Forming Inverter-Based Power Plant Performance for Transmission System Reliability

This report describes some examples of the operation of two grid-forming (GFM) inverter-based photovoltaic-battery hybrid power plants connected to the electric system of the island of Kauai in Hawaii. Both plants are photovoltaic power plants with battery energy storage and are connected to the networked transmission system operated by Kauai Island Utility Cooperative (KIUC), along with several other power plants including an oil-fired plant, diesel generators, small hydroelectric plants, a biofuel plant, and several other photovoltaic plants.

14 SOLAR ENERGY↗

Distributed Transient Safety Verification via Robust Control Invariant Sets: A Microgrid Application

Modern safety-critical energy infrastructures are increasingly operated in a hierarchical and modular control framework which allows for limited data exchange between the modules. In this context, it is important for each module to synthesize and communicate constraints on the values of exchanged information in order to assure system-wide safety. To ensure transient safety in inverter-based microgrids, we develop a set invariance-based distributed safety verification algorithm for each inverter module. Applying Nagumo's invariance condition, we construct a robust polynomial optimization problem to jointly search for safety-admissible set of control set-points and design parameters, under allowable disturbances from neighbors. We use sum-of-squares (SOS) programming to solve the verification problem and we perform numerical simulations using grid-forming inverters to illustrate the algorithm.

Bouvier, Jean-Baptiste H.↗

Urban weather modeling using WRF: linking physical assumptions, code implementation, and observational needs

The Weather Research and Forecasting (WRF) model includes urban schemes that simulate the influence of urban surfaces on the atmosphere using parameterizations for flux, and radiative exchanges. Three core schemes – the Bulk urban parameterization, Single-Layer Urban Canopy Model (SLUCM), and Multi-Layer Urban Canopy Model (MLUCM) – represent increasing levels of complexity. Although the parameterizations within these urban schemes are described in the literature, their specific implementation remains poorly documented, thus slowing down model development efforts. This manuscript provides a roadmap to the three urban schemes in WRF version 4.5.2, presenting equations using the same symbols as in the model code, along with references to code lines, and including graphics and explanations that connect the code to its physical foundations. Our thorough review of the urban parameterizations implemented in WRF version 4.5.2 highlighted a handful of parameters that may introduce discontinuities in simulations: (i) in the SLUCM, a 1 mm h −1 rain rate threshold is employed to switch between two minimum moisture availability parameterizations, thus impacting latent heat flux calculations; (ii) in the SLUCM a threshold is used to partition shortwave radiation into direct and diffuse components; (iii) in all three urban schemes, the bulk Richardson number is employed to select the similarity function, which influences the vertical distribution of heat and momentum. We also identified a highly simplified treatment of the radiative balance on roof surfaces. The implications of these simplifications can be assessed through targeted observations across relevant conditions, including varying precipitation rates, cloud cover, and transitions between stability regimes. Furthermore, the widespread application of the Monin-Obukhov similarity theory in these urban schemes warrants model evaluation under highly stable and unstable conditions and in heterogeneous urban settings with variable land cover and building heights on scales finer than model resolution. To address these challenges, we offer guidance on observational strategies, emphasizing the need for multi-parametric measurements to capture potential compensating biases and multi-height measurements that align with the levels where quantities are diagnostic and prognosed in the model (i.e., the lowest atmospheric level of the WRF model). Finally, our inspection of the code revealed implementation bugs that have now been corrected in WRF versions 4.6.0 and 4.6.1. Sensitivity tests over the Atlanta urban area show that these corrections affect surface temperatures, underscoring the importance of performing rigorous documentation and verification of the implementation of parameterizations in model code.

54 ENVIRONMENTAL SCIENCES↗

The NREL Sensor Laboratory: Hydrogen Leak Detection for Large Scale Deployments: Preprint

The NREL Hydrogen Sensor Laboratory was commissioned in 2010 as a resource for sensor developers, end-users, and regulatory agencies within the national and international hydrogen community. The Laboratory continues to provide as its core capability the unbiased verification of hydrogen sensor performance to assure sensor availability and their proper use. However, the mission and strategy of the NREL Sensor Laboratory has evolved to meet the needs of the growing hydrogen market. The Sensor Laboratory program has expanded to support research in conventional and alternative detection methods as hydrogen use expands to large-scale markets as envisioned by the DOE National Clean Hydrogen Strategy and Roadmap. Current research encompasses advanced methods of hydrogen leak detection including stand-off and wide area monitoring approaches for large scale and distributed applications. In addition to safety applications, low-level detection strategies to support the potential environmental impacts of hydrogen and hydrogen product losses along the value chain are being explored. Many of these applications utilize detection strategies that supplement and may supplant the use of traditional point sensors. The latest results of the hydrogen detection strategy research at NREL will be presented.

detection↗

Best Practices for Smart Grid-Interactive Efficient Building Ready Performance Contracts

Grid-interactive efficient building (GEB) measures reduce costs and optimize energy use for additional grid services by coordinating building energy loads and providing continuous demand management. Incorporating GEB energy conservation measures (ECMs) in performance contracts is reliant upon multiple factors. These factors include site selection with utility tariffs and incentives favorable to GEB, the identification of GEB as a priority in the initial stages of the contracting process, integration of GEB within comprehensive performance contracts with multiple other ECMs, and careful consideration of GEB measurement and verification (M&V) for energy savings performance contracts (ESPCs) and performance assurance for utility energy service contracts (UESCs).

building energy loads↗

Studying visual search without an eye tracker: an assessment of artificial foveation

Abstract Eye tracking is a useful tool for studying human cognition, both in the laboratory and in real-world applications. However, there are cases in which eye tracking is not possible, such as in high-security environments where recording devices cannot be introduced. After facing this challenge in our own work, we sought to test the effectiveness of using artificial foveation as an alternative to eye tracking for studying visual search performance. Two groups of participants completed the same list comparison task, which was a computer-based task designed to mimic an inventory verification process that is commonly performed by international nuclear safeguards inspectors. We manipulated the way in which the items on the inventory list were ordered and color coded. For the eye tracking group, an eye tracker was used to assess the order in which participants viewed the items and the number of fixations per trial in each list condition. For the artificial foveation group, the items were covered with a blurry mask except when participants moused over them. We tracked the order in which participants viewed the items by moving their mouse and the number of items viewed per trial in each list condition. We observed the same overall pattern of performance for the various list display conditions, regardless of the method. However, participants were much slower to complete the task when using artificial foveation and had more variability in their accuracy. Our results indicate that the artificial foveation method can reveal the same pattern of differences across conditions as eye tracking, but it can also impact participants’ task performance.

47 OTHER INSTRUMENTATION↗

Engineering Methanogenic Microbiomes to Redirect Flux to Biomass

In this study, we present a method for acquiring and characterizing novel microbial consortia that regulates methanogens and methanotrophs through selective cultivation and metagenomic analysis of indigenous microorganisms in the environment. In addition, we present the work performed as part of this project to model the pathways that act as limiting factors in microbial methane metabolism based on a carbon cycle model. In this report, we describe the methods for selective cultivation of methane-metabolism-related microorganisms from environmental samples, the method for monitoring their methane consumption performance, and the method and results for verifying their functions using quantitative PCR and metagenomics techniques. The microbial consortia containing methanotrophs were obtained through selective cultivation and molecular biological verification, and their methane consumption performance was evaluated. In addition, the potential of the existence of bacteriophages interacting with methane metabolism-related microorganisms was identified through metagenomic sequencing.

09 BIOMASS FUELS↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MPACT Verification and Validation Manual (V.4.3)

As the VERA SQA plan requires, it is the responsibility of the University of Michigan (UM) and Oak Ridge National Laboratory (ORNL), as co-owners of MPACT, to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be provided for reference and distribution within VERA. This document provides the current revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the plans for future MPACT V&V activities. The following sections provide an overview of the V&V process used in MPACT, as well as a summary of the status of each component of V&V in the code.

97 MATHEMATICS AND COMPUTING↗

MPACT Verification and Validation Manual Version 4.4

As the VERA SQA plan requires, it is the responsibility of the University of Michigan (UM) and Oak Ridge National Laboratory (ORNL), as co-owners of MPACT, to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be provided for reference and distribution within VERA. This document provides the current revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the plans for future MPACT V&V activities. The following sections provide an overview of the V&V process used in MPACT, as well as a summary of the status of each component of V&V in the code.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Establishing model credibility for process-microstructure-property relationships in additive manufacturing using exascale computing

Additive Manufacturing (AM) of alloys holds significant promise as a disruptive technology in various industries, yet its adoption is often hindered by challenges in achieving consistent part quality. These issues are primarily due to the complex process-microstructure-property (PSP) relationships inherent to AM. Computational models can greatly aid in understanding these relationships, but their widespread impact and adoption has been limited by a lack of validated, open-source, and computationally efficient PSP modeling frameworks and hardware limitations. Here, this study leverages the ExaAM software suite and data from the AMBench-2018 series of laser powder bed fusion (LPBF) benchmark experiments to perform a comprehensive model assessment, including verification, validation, sensitivity analysis, and uncertainty quantification. The RADICAL-EnTK workflow manager was used to perform an ensemble of heat transport, solidification, and mechanical response simulations on the exascale computer Frontier, considering uncertainties in critical model inputs such as laser spot size and nucleation parameters, and consisting of 125 explicit grain structure simulations and 7875 crystal plasticity simulations. For a selected location within the Inconel 625 AMBench-2018 test artifact, sensitivity analysis and uncertainty quantification were performed using the predicted distributions of grain structure and mechanical properties. Qualitative agreement was found between the predicted grain size and texture and the observed AMBench-2018 microstructure, the mean predicted yield stress was within 5% of the experimental measurement mean, and the mean predicted engineering stress at 5% strain was within 10% of the experimental measurement mean. The insights gained from development and validation of the ExaAM PSP modeling framework will help guide future directions for enhancing the credibility and reliability of PSP models in AM, thereby accelerating the adoption of AM technologies in various industries.

Additive manufacturing↗

Optimization Methodology of Pebble Bed HTGR Start-Up and Running-in Strategy

In recent years interest in advanced reactor technologies has increased significantly. However, the methods used for analysis of traditional nuclear reactors are insufficient to consider all the different and varied advanced reactor designs without further development. One promising advanced reactor design is the pebble bed reactor (PBR). PBRs possess unique operational and fuel cycle features that require the development of specific analysis methodologies to adequately design and analyze the systems. There is a need in PBR research for a capability to analyze and optimize the process of transitioning from the start-up reactor core to the equilibrium core (known as the “running-in” of the reactor). The start-up of a PBR and the transition to the equilibrium core is a complex, multi-physics challenge that has not yet been well researched and has many opportunities for design, analysis, and optimization of the process. In this research, a methodology is defined to consider the potential strategies in PBR start-up and run-in to the equilibrium core. Multiple candidate software are considered, and their pros and cons are discussed for the PBR-specific application in the methodology. A preliminary software selection for the physics engine is made, and initial verification of key modules is performed. Software to support optimization of the reactor run-in strategies through reduced order modeling (ROM) and machine learning are considered. Challenges for a full implementation of the methodology are discussed. Additional code selections and verification of models relevant to the application are needed before full demonstration of the methodology can be achieved and an optimal strategy determined.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance and wake flow characterization of a 1:8.7-scale reference USDOE MHKF1 hydrokinetic turbine to establish a verification and validation test database

As hydrokinetic turbine technologies continue to advance towards commercialization, public datasets on the performance characteristics for these devices and their flow field effects are invaluable to advance our understanding of these technologies and to validate analytical and numerical models. The Applied Research Laboratory at The Pennsylvania State University (ARL Penn State) collaborated with Sandia National Laboratories and the University of California at Davis to design, fabricate (at a 1:8.7 scale), and experimentally test a novel hydrokinetic turbine rotor design to provide an open platform and dataset for further study and development. The water tunnel test of this three-bladed, horizontal-axis rotor recorded power production, blade loading, the near-wake flow, cavitation effects, and noise generation. These state-of-the-art measurements demonstrate much of the complex physics associated with the flow through an unducted, horizontal-axis turbine, and they elucidate the performance characteristics and flow field effects at an unprecedented fidelity, accuracy and resolution. Measurements of powering coefficients (power, torque and thrust) as a function of tip-speed-ratio were performed. The dataset also includes unsteady measurements of driveshaft loading, blade strain, tower pressures, and radiated noise. Detailed flow mapping using laser Doppler velocimetry, and planar and stereo particle image velocimetry includes measurements of mean velocity and Reynolds stresses. Although the wake measurements are limited to less than half a diameter, they reveal the complex flow patterns in the near-wake structure of the rotor. The full database, available at the United States Department of Energy’s marine and hydrokinetic data repository, includes tunnel and model Computer Aided Design geometry files and inflow data sufficient for a “Model-the-Test” computational Verification and Validation study.

13 HYDRO ENERGY↗

Multi-Rigor Agile Verification and Rapid Prototyping for Formally Verified Software

We propose a novel approach to developing formally verified systems through Multi-rigor Agile Verification. Multi-rigor Agile Verification is rooted in the hypothesis of Rigor Independence, that a system’s specification and verification architecture depend primarily on the system requirements to be verified, and they depend very little on the rigor level of the methods used to verify those requirements. Due to its iterative nature, Multi-rigor Agile Verification promises to mitigate many of the high upfront design costs experienced by formally verified systems and to deliver a better-architected, and thus better-trusted, system in the end. We then discuss the tooling needed to perform Multi-rigor Agile Verification and go in depth to build one of those tools, which directly generates executable prototype code from declarative formal specifications using the Maude rewrite-logic framework.

97 MATHEMATICS AND COMPUTING↗

SAS4A/SASSYS-1 Lead Verification Test Suite

SAS4A/SASSYS-1 is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over forty-five years and represents a critical investment in safety analysis capabilities for the U.S. Department of Energy. Although SAS4A/SASSYS-1 was developed to support the analysis of any liquid-metal-cooled nuclear reactor, it has primarily been utilized to design and analyze Sodium Fast Reactors (SFRs). As a result, most of the verification basis for SAS4A/SASSYS-1 utilizes sodium as a coolant and geometry descriptions that are typical of a SFR facility. In this work, new verification problems are defined to extend the applicability of the SAS4A/SASSYS-1 verification basis into Lead Fast Reactor (LFR) design space. A review of the existing SAS4A/SASSYS-1 SFR verification test suite is performed to determine the number of test cases that are SFR specific. SFR specific test cases are replicated using lead as a coolant and system layouts that are representative of LFRs. This report provides definitions and reference solutions for seven new test cases that scope lead-specific features and capabilities of the software. For a verification test to be considered acceptable, comparisons of analytical solutions to SAS4A/SASSYS-1 predictions must produce negligible or justifiable errors. All LFR specific test cases are found to be acceptable.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A multi-dimensional parametric study of variability in multi-phase flow dynamics during geologic CO 2 sequestration accelerated with machine learning

Successful geologic CO 2 storage projects depend on numerical simulations to predict reservoir performance during site selection, injection verification, and post-injection monitoring phases of the project. These numerical simulations solve non-linear sets of coupled partial differential equations, while accounting for multi-phase fluid dynamics on the basis of constitutive equations that are embedded into the solution scheme. As a consequence, individual simulations often require tens to hundreds of hours to complete on high-performance computing clusters. Moreover, laboratory experiments reveal that parametric functions for capillary pressure and relative permeability exhibit substantial variability, even within the same rock type. This combination of computational expense and wide-ranging parametric variability means that there remains substantial uncertainty in the behavior of multi-phase CO 2 -water systems, particularly in the context of feedbacks between relative permeability and capillary pressure. To bridge this knowledge gap, here we develop a novel workflow that utilizes physics-based numerical simulation to train an artificial neural network (ANN) emulator for interrogating the multivariate parameter space that governs both capillary pressure and relative permeability. With this approach, the ANN is trained to emulate both fluid pressure distribution and CO 2 saturation, which are then interrogated quantitatively to generate parametric response surface mappings with high-fidelity resolution. Results from this study initially show that capillary entry pressure is the dominant control on both CO 2 plume geometry and fluid pressure propagation when considering the combined effects of capillary pressure and relative permeability, particularly when phase interference is low and residual CO 2 saturation is high. Moreover, the ANN emulator provides tremendous computational speed-up by computing 2691 individual simulations in several minutes; whereas, the same simulation ensemble would have required ~3 years of simulation time using only physics-based simulation methods (25,000 times speed up).

58 GEOSCIENCES↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗