Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Plant Water Profiler: A Water Balance and True Cost of Water Calculator for Manufacturing Plants

As the uncertainty of a sustained water supply, regulatory constraints, competition among end users, and public scrutiny increases, a growing number of manufacturing sectors are adapting to current and emerging water-related risks by optimizing productivity and reducing waste. As a step toward increasing water use efficiency and making informed business decisions, corporations must make an effort to understand and track their water demands, losses, and costs associated with each subsystem within their facilities. Manufacturers are often unaware of the “true cost of water” (i.e., the total costs associated with procurement, treatment, and consumption of water, and wastewater disposal), which reduces the visibility of the actual impact of water-saving measures. To help manufacturers account for water procurement and use in manufacturing operations, quantify the true cost of water, and identify potential areas for water and associated energy cost savings, an open access tool—Plant Water Profiler (PWP)—was developed. The tool is based on water mass balance analysis and has been adopted as the core analysis tool for plant water use assessments, Water In-Plant Training (Water INPLT), as part of the US Department of Energy’s Better Plants program. During three pilot INPLTs conducted in 2019 at three manufacturing facilities, the PWP tool allowed users to understand water flows within the facilities and provided additional capabilities to analyze their water use. This paper describes the methodology behind the PWP tool and its implementation through pilot Water INPLT trainings delivered in three manufacturing facilities in the United States. The three case studies demonstrate opportunities to improve water efficiency and reduce associated costs and the challenges encountered in three different manufacturing sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Framework for Effective Science Communication and Outreach Strategies and Dissemination of Research Findings for Marine Energy Projects

Marine energy is an emerging renewable energy industry with the potential to produce 2300 terawatt-hours per year from resources within the United States. As development and testing of marine energy devices advance, regulatory and permitting decision-makers are concerned about the uncertainty surrounding the potential environmental effects resulting from the introduction of these novel devices in coastal and riverine environments. The Triton Initiative researches and provides recommendations for environmental monitoring technologies and methods to inform industry stakeholders with the data necessary to permit the testing of marine energy systems. Effective dissemination of the research findings is essential for improving the accessibility of data to stakeholders who may use the results to inform policy decisions, yet few frameworks for conducting science communications for marine energy projects exist. In this paper, we present tools, channels, and tactics for developing a science communication framework for marine energy projects, or similar areas of study, using the Triton Initiative’s pilot science communication program as a case study. By leveraging existing bodies of work in disciplines such as communications theory, marketing, public relations, and social science, the presented framework includes audience identification and analysis; channel development, including a website, blog, newsletter, social media, and webinars and presentations; and metrics for determining success. Outcomes from one year of Triton’s case study are presented, including the most effective tactics and lessons learned.

communication framework↗

Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated into the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-on Criticality Safety Training Courses

In 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

PracticeCALM: Coaching Anxiety Lessening Methods for Radiation Therapists: A Pilot Study of a Skills-Based Training Program in Radiation Oncology

PracticeCALM is an 8-week on-the-job training program to teach radiation therapists (RTs) techniques for assisting patients who are experiencing treatment-related anxiety. Twelve clinical RTs in a regional oncology program were recruited on a volunteer basis to participate in the training. A mixed-method approach was undertaken to evaluate perceived benefits to clinical practice. The quantitative findings from the Perceived Stress Scale (PSS) showed there were no changes before and after training. Qualitative findings showed significant benefits to RTs, including (1) ability to empathically attune more effectively and earlier to signs of anxiety in patients; (2) improved confidence and self-efficacy for effectively intervening in difficult treatment situations; and (3) enhanced creative problem solving in partnership with patients to assist the acutely anxious patient. The PSS results suggest that intrinsic and extrinsic stressors are a variable but consistent part of the everyday reality of RT practice. A training program focusing on the therapeutic presence dimension of RT practice has a direct impact on effectiveness in assisting anxious patients undergoing RT. When embedded in the clinical life of a radiation therapy department, such a training program has the potential to capture the lived practice wisdom and creative skills of RTs, and effectively mediate these skills across a team through group discussions and documentation on patient charts.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Energy Efficiency Finance Programs: Use Case Analysis to Define Data Needs and Guidelines

There are over 200 energy efficiency loan programs—across 49 U.S. states—administered by utilities, state/local government agencies, or private lenders.1 This distributed model has led to significant variation in program design and implementation practices including how data is collected and used. The challenge of consolidating and aggregating data across independently administered programs has been illustrated by a recent pilot of an open source database for energy efficiency financing program data. This project was led by the Environmental Defense Fund (EDF), the Investor Confidence Project, the Clean Energy Finance Center (CEFC), and the University of Chicago. This partnership discussed data collection practices with a number of existing energy efficiency loan programs and identified four programs that were suitable and willing to participate in the pilot database (Diamond 2014).2 The partnership collected information related to ~12,000 loans with an aggregate value of ~$100M across the four programs. Of the 95 data fields collected across the four programs, 30 fields were common between two or more programs and only seven data fields were common across all programs. The results of that pilot study illustrate the inconsistencies in current data definition and collection practices among energy efficiency finance programs and may contribute to certain barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

TASK 2: QUENCH ZONE SIMULATION

Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. A key feature of the AR gasifier design is the transition from the gasifier outlet into the quench zone, where the raw syngas is cooled to ~ 400°C by injection and vaporization of atomized water. Earlier pilot plant testing revealed a propensity for the original gasifier outlet design to accumulate slag in the outlet, leading to erratic syngas flow from the outlet. Subsequent design modifications successfully resolved this issue in the pilot plant gasifier. In order to gain greater insight into the physical phenomena occurring within this zone, AR developed a cold flow simulation apparatus with Coanda Research & Development with a high degree of similitude to hot fire conditions with the pilot scale gasifier design, and capable of accommodating a scaled-down quench zone for a demonstration-scale gasifier. The objective of this task was to validate similitude of the cold flow simulation model by comparison of pilot-scale outlet design performance, and to assess demonstration scale gasifier design feasibility from testing of a scaled-down outlet design. Test results did exhibit a strong correspondence with the two pilot scale outlet designs, indicating credible similitude for the cold flow simulation device. Testing of the scaled-down outlet revealed important considerations in the design and operation of the demonstration scale gasifier, in particular pertaining to the relative momentum between the downcoming raw syngas and the sprayed quench water and associated impacts on flow patterns within the quench zone. This report describes key findings from the test program, including assessment of pilot plant configuration simulations relative to actual results on the pilot plant gasifier and demonstration plant design recommendations, based on cold flow simulation results.

01 COAL, LIGNITE, AND PEAT↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy (DOE) Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high-performance buildings that push the boundaries of the industry. In the 2020 Design Challenge, DOE piloted the Design Partners Program, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Design Challenge, Design Partners receive a zero-energy design alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment. It also provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. This article summarizes the current policy, technology, health, and economic trends that make zero energy buildings desirable and feasible, and presents the value of the Solar Decathlon to industry. We highlight innovative solutions 2020 Design Partner pilot projects are bringing to the building industry.

30 DIRECT ENERGY CONVERSION↗

Technology Applicable to Remote Hazardous Constituents and Waste Stream Grouping

Originally, Rocky Flats transuranic (TRU) waste was managed from waste streams that were composed of similar chemical constituents and were generated from identical processes. Early waste processing at Idaho National Laboratory (INL) maintained the Rocky Flats record until INL began generating their own item description codes (IDCs). Ultimately TRU waste management at INL was driven to combine wastes from all IDCs that were assigned by Rocky Flats to a summary category group regardless of whether the chemical constituents in the waste were known or not. At this point, the Waste Isolation Pilot Plant (WIPP) certified program requirements to process the TRU waste according to waste streams was nearly eliminated. In April 2018, operations in the Sludge Repackage Project (SRP) area were halted by a radiological materials release accident in which drums containing waste experienced a loss of containment after over-pressurization occurred. Four SRP drums, repackaged in the Accelerated Retrieval Project (ARP) V area, had an adverse, delayed chemical reaction event occur when prohibited materials from one container were mixed with chemically-incompatible materials from other containers in the repackaging process. This incident was the direct result of processing unknowns under a protocol where the components of the waste were added to incompatible materials resulting in a run-away reaction. After a Difficult Waste Team (DWT) and Los Alamos National Laboratory – Carlsbad Operations (LANL-CO) subject matter expert (SME) visit in September 2019, it was determined by the team that all of the work observed on the September visit was performed upstream of the certified program and that the Visual Examination (VE) and other methods typically used by the certified program were being used for Acceptable Knowledge (AK) augmentation. This augmentation was needed in order to determine what the constituents in the waste might be, and is based primarily on collections of VE results. The waste at INL that is being processed in what is considered to be the Priority 2 (yellow) and Priority 3 (red) lists either needs AK to be completed before certified characterization can occur or is waiting to be processed because the waste has been mixed with unknown wastes resulting in a lack of information that could have impact of the ability to certify and ship the waste to the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstrating Load-Shaping Capabilities of Cost Minimizing Heat Pump Water Heater Controls with Varying Price Profiles

Increased penetration of photovoltaics and electrification of traditionally gas appliances are exacerbating existing challenges in cost-effectively balancing electricity grid supply and demand. Decarbonization without incurring expensive transmission and distribution system capacity increases requires shifting building loads from peak demand times to peak renewable production times. Grid operators are evaluating new ways of encouraging load shifting, including using time-varying price structures to provide a financial incentive. If devices incorporate price-responsive controls, a price profile could be designed to yield a wide variety of load curves as needed to optimize grid functionality. Heat pump water heaters (HPWHs) are an ideal device for price-responsive controls because the storage tank enables them to optimize the timing of electricity consumption without impacting hot water delivery service. This paper presents work demonstrating how price-responsive controls for HPWHs can provide different load profiles, as needed to stabilize the grid, in response to different price profiles. HPWH manufacturers now include web API and CTA-2045 communication capabilities which enable sending load shaping control signals. Pilot studies and preliminary programs have utilized these capabilities with uniform control strategies to reduce 4-9 PM electricity consumption. However, no studies have developed flexible controls capable of both a) responding to constantly varying price profiles and b) customizing logic to match the needs of each HPWH. Berkeley Lab's CalFlexHub project is pioneering price-driven load flexibility by developing and deploying cost-minimizing controls utilizing setpoint setting signals for fleets of HPWHs in response to varying price profiles. Control development is based on simulations using the Flexible Heat Pump Water Heater Performance Predictor which captures the control decisions of a residential, integrated HPWH manufacturer’s on-board controller. The proposed cost-reducing controls respond to constantly changing price profiles, providing the ability to change the price profile to generate load curves as needed to maintain grid stability. Preliminary simulations studying the load shaping capabilities of price-responsive controls on a fleet of 60 HPWHs have demonstrated an average of a) 135.4% increases in load during low-price periods, b) >36.8% reductions in electricity peak-price period, and c) 6.2% electricity cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of an Enhanced Payback Function for the Superior Energy Performance Program

The U.S. DOE Superior Energy Performance (SEP) program provides recognition to industrial and commercial facilities that achieve certification to the ISO 50001 energy management system standard and third party verification of energy performance improvements. Over 50 industrial facilities are participating and 28 facilities have been certified in the SEP program. These facilities find value in the robust, data driven energy performance improvement result that the SEP program delivers. Previous analysis of SEP certified facility data demonstrated the cost effectiveness of SEP and identified internal staff time to be the largest cost component related to SEP implementation and certification. This paper analyzes previously reported and newly collected data of costs and benefits associated with the implementation of an ISO 50001 and SEP certification. By disaggregating “sunk energy management system (EnMS) labor costs”, this analysis results in a more accurate and detailed understanding of the costs and benefits of SEP participation. SEP is shown to significantly improve and sustain energy performance and energy cost savings, resulting in a highly attractive return on investment. To illustrate these results, a payback function has been developed and is presented. On average facilities with annual energy spend greater than $2M can expect to implement SEP with a payback of less than 1.5 years. Finally, this paper also observes and details decreasing facility costs associated with implementing ISO 50001 and certifying to the SEP program, as the program has improved from pilot, to demonstration, to full launch.

Therkelsen, Peter↗

Retrieval of High Level Waste for the Cigeo Project - A Practical Retrieval Test Story - 16085

Since the passing of the June 28, 2006 Act, Andra has incorporated in its step-wise design development of the French high level waste (HLW) and intermediate level long lived waste (IL-LLW) deep geological repository (DGR, aka Cigeo) various requirements linked to 'reversibility' at different stages of the repository life cycle (from its construction phase to its final closure). Reversibility is based on a number of practical dispositions including the progressivity of the development and deployment of the facility, the flexibility of the nature of operations being carried out, the adaptability of the facility to future modifications and the possible retrieval of waste. The capacity to retrieve waste from Cigeo, also called 'retrievability', bears specific requirements. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible over at least 100 years. The current paper starts with two acceptations: retrievability and reversibility. It details how those two notions are defined and inter-linked. The 'Retrievability Scale' as proposed by OECD/NEA (and adopted by Andra) is also reminded. The needs for demonstration of retrieval operations are also exposed for the two categories of waste containers disposed of in Cigeo (IL-LLW and HLW) within the context of their respective emplacement configurations (in disposal horizontal vaults and micro-tunnels) at different stages of the repository life cycle. The technical part of the paper is then focused on a practical case story: a technological test campaign (still running) of HLW container retrieval out of a steel cased disposal micro-tunnel. On a test bench built on surface to simulate (create) the environmental conditions that may prevail inside a HLW micro-tunnel at time of retrieval, it was possible to check whether the mechanical means developed for the purpose were adequate and sufficient. The test case story is exposed, c/w the problems and challenges encountered (high temperature impairing the retrieval robot's proper functioning, presence of corrosion products...). The trouble-shooting solutions implemented and the results are commented. This article concludes with a critical analysis of the methods and equipment used, the results obtained and provides some perspectives of improvement. The positive outcomes of this technical test campaign pave the way for planning the in situ retrieval tests to be programmed in the 'industrial pilot phase' of Cigeo (to be implemented over the ten first years of operations, including the active and inactive test period and the first years of disposal activities): the industrial pilot phase is presently scheduled around 2026-2036 (provided the Cigeo construction is authorized in 2021, following the licensing request filing scheduled in 2018). The issues of IL-LLW containers retrieval (for which specific solutions are also studied and technical demonstrations engaged or planned) are also briefly presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current status of the DOE/NNSA nuclear criticality safety program hands-on criticality safety training courses

In 2011 the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager's course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student's clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager's course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings. (author)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plasma Synthesized Doped Boron Nanopowder for MgB 2 Superconductors

Under this program, a process to synthesize nano-sized doped boron powder by a plasma synthesis process was developed and scaled up from 20 gram batches at program start to over 200 grams by program end. Over 75 batches of boron nanopowder were made by RF plasma synthesis. Particle sizes were typically in the 20-200 nm range. The powder was synthesized by the reductive pyrolysis of BCl 3 in hydrogen in an RF plasma. A wide range of process parameters were investigated including plasma power, torch geometry, gas flow rates, and process pressure. The powder-in-tube technique was used to make monofilament and multifilament superconducting wires. MgB 2 wire made with Specialty Materials plasma synthesized boron nanopowder exhibited superconducting properties that significantly exceeded the program goals. Superconducting critical currents, J c , in excess of 10 5 A cm -2 at magnetic fields of 8 tesla were reproducibly achieved. The upper critical magnetic field in wires fabricated with program boron powder were H c2 (0) = 37 tesla, demonstrating the potential of these materials for high field magnet applications. T c in carbon-doped MgB 2 powder showed a systematic decrease with increasing carbon precursor gas flows, indicating the plasma synthesis process can give precise control over dopant concentrations. Synthesis rates increased by a factor of 400% over the course of the program, demonstrating the scalability of the powder synthesis process. The plasma synthesis equipment at Specialty Materials has successfully and reproducibly made high quality boron nanopowder for MgB 2 superconductors. Research and development from this program enabled Specialty Materials to successfully scale up the powder synthesis process by a factor of ten and to double the size of its powder pilot plant. Thus far the program has been a technical success. It is anticipated that continued systematic development of plasma processing parameters, dopant chemistry and concentration, wire processing technology, and collection technology will lead to the commercialization of boron nanopowder as a precursor for MgB 2 superconductors. Potential commercial applications include magnets for magnetic resonance imaging (MRI), fault current limiters, wind turbine generators.

08 HYDROGEN↗

Manufacturing of Protected Lithium Electrodes for Advanced Lithium-Air, Lithium-Water & Lithium-Sulfur Batteries

The global demand for rechargeable batteries is large and growing rapidly. Assuming the adoption of electric vehicles continues to increase, the need for smaller, lighter, and less expensive batteries will become even more pressing. In this vein, PolyPlus Battery Company has developed ultra-light high performance batteries based on its proprietary protected lithium electrode (PLE) technology. The Company’s Lithium-Air and Lithium-Seawater batteries have already demonstrated world record performance (verified by third party testing), and we are developing advanced lithium-sulfur batteries which have the potential deliver high performance at low cost. In this program PolyPlus Battery Company teamed with Corning Incorporated to transition the PLE technology from bench top fabrication using manual tooling to a pre- commercial semi-automated pilot line. At the inception of this program PolyPlus worked with a Tier 1 battery manufacturing engineering firm to design and build the first-of-its-kind pilot line for PLE production. The pilot line was shipped and installed in Berkeley, California several months after the start of the program. PolyPlus spent the next two years working with and optimizing the pilot line and now produces all of its PLEs on this line. The optimization process successfully increased the yield, throughput, and quality of PLEs produced on the pilot line. The Corning team focused on fabrication and scale-up of the ceramic membranes that are key to the PLE technology. PolyPlus next demonstrated that it could take Corning membranes through the pilot line process to produce state-of-the-art protected lithium electrodes. In the latter part of the program the Corning team developed alternative membranes targeted for the large rechargeable battery market. PolyPlus is now in discussions with several potential customers for its advanced PLE-enabled batteries, and is building relationships and infrastructure for the transition into manufacturing. It is likely that the next step will be accomplished through a combination of joint venture partnering and licensing of the technology.

25 ENERGY STORAGE↗