Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Assessing the Value of Regulation Resources Based on Their Time Response Characteristics

Fast responsive regulation resources are potentially more valuable as a power system regulation resource (more efficient) because they allow applying controls at the exact moment and in the exact amount as needed. Faster control is desirable because it facilitates more reliable compliance with the NERC Control Performance Standards at relatively lesser regulation capacity procurements. The current California ISO practices and markets do not provide a differentiation among the regulation resources based on their speed of response (with the exception of some minimum ramping capabilities). Some demand response technologies, including some generation and energy storage resources, can provide quicker control actions. California ISO practices and markets could be updated to welcome more fast regulation resources into the California ISO service area. The project work reported in this work was pursuing the following objectives: • Develop methodology to assess the relative value of generation resources used for regulation and load following California ISO functions • This assessment should be done based on physical characteristics including the ability to quickly change their output following California ISO signals • Evaluate what power is worth on different time scales • Analyze the benefits of new regulation resources to provide effective compliance with the mandatory NERC Control Performance Standards • Evaluate impacts of the newly proposed BAAL and FRR standards on the potential value of fast regulation and distributed regulation resources • Develop a scope for the follow-up projects to pave a road for the new efficient types of balancing resources in California. The work included the following studies: • Analysis of California ISO regulating units characteristics • California ISO automatic generation system (AGC) analysis • California ISO regulation procurement and market analysis • Fast regulation efficiency analysis • Projection of the California ISO load following and regulation requirements into the future • Value of fast responsive resources depending on their ramping capability • Potential impacts of the balancing authority area control error limit (BAAL), which is a part of the newly proposed NERC standard “Balancing Resources and Demand” • Potential impacts of the Western Electricity Coordinating Council (WECC) frequency responsive reserve (FRR) standard • Recommendations for the next phase of the project. The following main conclusions and suggestions for the future have been made: • The analysis of regulation ramping requirements shows that the regulation system should be able to provide ramps of at least 40-60 MW per minute for a period up to 6 minutes. • Evaluate if changes are needed in the California ISO AGC system to effectively accommodate new types of fast regulation resources and minimize the California ISO regulation procurement. • California ISO may consider creating better market opportunities for and incentives for fast responsive resources. • An additional study of low probability high ramp events can be recommended to the California ISO. • The California ISO may be willing to consider establishing a more relaxed target CPS2 compliance level. • A BAAL-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the BAAL standard and its numerical values for the California ISO. The study may involve an assessment of advantages of the distributed frequency-based control for the California ISO system. The market-related issues that arise in this connection can be also investigated. • A FRR-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the FRR standard and its numerical values for the California ISO.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optics Supply Planning System

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

42 ENGINEERING↗

Price Projections of Feedstocks for Biofuels and Biopower in the U.S.

The economic availability of biomass resources is a critical component in evaluating the commercial viability of biofuels. To evaluate projected farmgate prices and grower payments needed to procure 295 million dry Mg (325 million dry tons) of biomass in the U.S. by 2022, this research employs POLYSYS, an economic model of the U.S. agriculture sector. A price-run simulation suggests that a farmgate price of $58.42 Mg{sup -1} ($53.00 dry ton{sup -1}) is needed to procure this supply, while a demand-run simulation suggests that prices of $34.56 and $71.61 Mg{sup -1} ($30.00 and $62.00 dry ton{sup -1}) in are needed in 2012 and 2022, respectively, to procure the same supply, under baseline yield assumptions. Grower payments are reported as farmgate price minus resource-specific harvest costs.

09 BIOMASS FUELS↗

Demonstration of particle exhaust control during ELM suppression by resonant magnetic perturbations in DIII-D

A 20 MW/5 GHz lower hybrid current drive (LHCD) system was initially due to be commissioned and used for the second mission of ITER, i.e. the Q = 5 steady state target. Though not part of the currently planned procurement phase, it is now under consideration for an earlier delivery. In this paper, both physics and technology conceptual designs are reviewed. Furthermore, an appropriate work plan is also developed. This work plan for design, R&D, procurement and installation of a 20 MW LHCD system on ITER follows the ITER Scientific and Technical Advisory Committee (STAC) T13-05 task instructions. It gives more details on the various scientific and technical implications of the system, without presuming on any work or procurement sharing amongst the possible ITER partners(b). This document does not commit the Institutions or Domestic Agencies of the various authors in that respect.

Hoang, G T↗

A Privacy Preserving Model-Free Optimization and Control Framework for Demand Response from Residential Thermal Loads

We consider the problem of optimizing the cost of procuring electricity for a large collection of homes managed by a load serving entity, by pre-cooling or pre-heating the thermal inertial loads in the homes to avoid procuring power during periods of peak electricity pricing. We would like to accomplish this objective in a completely privacy-preserving and model-free manner, that is, without direct access to the state variables (temperatures or power consumption) or the dynamical models (thermal characteristics) of individual homes, while guaranteeing personal comfort constraints of the consumers. We propose a two-stage optimization and control framework to address this problem. In the first stage, we use a long short-term memory (LSTM) network to predict hourly electricity prices, based on historical pricing data and weather forecasts. Given the hourly price forecast and thermal models of the homes, the problem of designing an optimal power consumption trajectory that minimizes the total electricity procurement cost for the collection of thermal loads can be formulated as a large-scale integer program (with millions of variables) due to the on-off cyclical dynamics of such loads. We provide a simple heuristic relaxation to make this large-scale optimization problem model-free and computationally tractable. In the second stage, we translate the results of this optimization problem into distributed open-loop control laws that can be implemented at individual homes without measuring or estimating their state variables, while simultaneously ensuring consumer comfort constraints. We demonstrate the performance of this approach on a large-scale test case comprising of 500 homes in the Houston area and benchmark its performance against a direct model-based optimization and control solution.

Sivaranjani, S.↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India

Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALA light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Choice Aggregation: Challenges, Opportunities, and Impacts on Renewable Energy Markets

Community choice aggregations (CCAs) are local governmental entities that procure electricity on behalf of retail electricity customers within some geographic area. CCAs are expanding in seven states that allow CCAs through enabling legislation. In 2017, we estimate that about 750 CCAs procured about 42 million MWh of electricity on behalf of about 5 million customers in 2017. In this report, we seek to summarize the current status of CCAs in the United States. We quantify CCA sales and customer bases in terms of both renewable and non-renewable energy. We summarize trends in CCA renewable energy power procurement. Based on 12 interviews with CCAs and other stakeholders, we identify key factors that could improve or reduce the potential of CCAs to support renewable energy markets. Last, we identify the challenges created and faced by the expansion of CCAs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Infrastructure Investments in LAMDA: SEM Mill and Vault (NSUF 2019 Milestone Report)

This document summarizes the procurement, installation, and commissioning of a scanning electron microscope (SEM) mill produced by Fischione Instruments and a lead-shielded vault for specimen storage in support of Nuclear Science User Facility (NSUF) awards for use in Oak Ridge National Laboratory’s (ORNL) Low Activation Materials Development and Analysis (LAMDA) laboratory. The Model 1061 SEM mill is a tabletop ion milling system for advanced sample preparation of high-quality SEM samples. This device was chosen for its broad range of ion energies allowing for both rapid milling and final polishing of the sample surface. The purchase order with Fischione Instruments was released and awarded by ORNL procurement on September 11, 2018. The instrument was shipped in December of 2018 and was installed in the LAMDA laboratory in March of 2019. During the commissioning of this equipment, electron backscatter diffraction (EBSD) was performed on specimens before and after milling to show the enhanced surface quality. With the purchase of a lead vault dedicated to NSUF library materials co-located in the LAMDA laboratory, the NSUF program will be able to maintain a significant sample library in LAMDA. These specimens will be easily accessible for rapid turnaround experiment (RTE) awards and will reduce the overall cost of year-over-year storage and shipments to and from ORNL hot cell facilities. The contract to fabricate a fourth lead vault dedicated to NSUF specimen storage was awarded by ORNL procurement on August 10, 2018. Installation of the new vault was completed in January of 2019.

47 OTHER INSTRUMENTATION↗

B341 MoMs Hydraulic System Design & Installation

This Statement of Work Document outlines the program equipment siting requirements for Building 341 to be installed at Lawrence Livermore National Laboratory (LLNL). The Subcontractor, who will be designing and installing B341 programmatic equipment hydraulic system, will be expected to provide engineering and construction support from procurement through installation. This scope of work includes the following: a) Walkdown and survey existing condition of Mechanics of Material (MoMs) programmatic equipment at B231. b) Engineering design, procurement, and installation of hydraulic system for MOMs programmatic equipment. c) Engineering design, procurement, and installation of indoor and outdoor hydraulic pumps. d) Engineering design of program equipment pits. e) Engineering design of new trenches to match existing B341 trenches.

42 ENGINEERING↗

Thermal Hydraulic Experimental Test Article: Status Report for FY2019

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in an SFR. High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, the secondary system in the 18-inch Test Vessel #6, and its sodium-to-air heat exchanger will occupy the location for 18-inch Test Vessel #5 (Test Vessel #5 will not be installed), Figure 2. The design work for the facility has been completed and is currently in the procurement, manufacturing and initial testing stage. The THETA primary system, including the redan, inlet and outlet plenum, 38 kW electric core simulant heater, submerged flowmeter, pump, and all instrumentation has either been procured or is currently being tested at Argonne. The secondary sodium system for cooling the tube-side sodium of the intermediate heat exchanger has all been analyzed according to ASME code and is in the final development stages before procurement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Thermal Hydraulic Experimental Test Article - Status Report for FY2019 (Rev. 1)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in an SFR. High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. The design work for the facility has been completed and is currently in the procurement, manufacturing and initial testing stage. The THETA primary system, including the redan, inlet and outlet plenum, 38 kW electric core simulant heater, submerged flowmeter, pump, and all instrumentation has either been procured or is currently being tested at Argonne. The secondary sodium system for cooling the tube-side sodium of the intermediate heat exchanger has all been analyzed according to ASME code and is in the final development stages before procurement.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Financing Federal Microgrids [Slides]

A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. When components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs, implementation by one of several privately financed federal procurement mechanisms is possible. However, it is typically difficult to achieve enough savings and avoided costs to cover the design, equipment, and installation of certain microgrid components that are required to integrate the system. This presentation explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Certified Green Building Materials: Policy Impact Assessment

Chinese building construction is rapidly expanding, making it critical to focus on energy efficiency to curb the increase of energy consumption and emissions over a building’s lifetime. A key mechanism to do so is through building material certification systems and programs. These establish how building materials will perform and can be used to promote energy and resource efficiency, which help create a more sustainable and healthy building industry. This report begins by identifying characteristics of a strong certification system and ways to improve existing systems. To curb building energy demand, the Chinese government began developing a building material certification program to encourage energy and resource efficiency in the building sector. A timeline is provided of their program’s development and provides analysis. China’s building material database is highlighted and analyzed for their significance and opportunities for improvement. The report then continues to analyze the importance of policies such as procurement programs, and the Chinese government is developing their procurement programs for certified green building materials. To understand the potential large-scale impacts of green building material certifications, we conducted an analysis of the environmental and market impact of a nationwide green building procurement policy for all new residential and commercial construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Design for Thermal/Epithermal eXperiments (TEX) with Lithium Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

One of the main goals of the Thermal/Epithermal eXperiments (TEX) project is to use existing Nuclear Criticality Safety Program (NCSP) assets to create critical experiment plutonium and uranium test beds for materials important to criticality safety that have insufficient benchmark evaluations. The plutonium test bed experiments were completed in 2018 and are published in the 2020 edition of the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook. The uranium test bed assemblies were completed in 2023 and accepted in the 2024 edition of the ICSBEP Handbook. The Nuclear Criticality Safety (NCS) group at Y-12 National Security Complex has identified programmatic need for validation cases for uranium electrorefining operations at Y-12. The electrorefining operation credits lithium enriched in 6 Li in addition to 35 Cl as absorbers in the design criticality safety evaluation for precluding criticality under upset conditions in the large and geometrically unfavorable electro-refiner. There is, however, inadequate experimental validation for the 6 Li absorbers. As an extension of the TEX uranium test bed, TEX-Cl critical experiments were performed with sodium chloride salt to address the 35 Cl thermal absorption as well as other validation needs at Los Alamos National Laboratory (LANL). These experiments were completed in 2024 and accepted into the 2025 ICSBEP Handbook. To continue the methodology used in TEX-Cl, TEX-Li aims to accomplish the same. The overall design of both experiments was to use commercially available, high purity, salts with polyethylene moderator and HEU plates to configure a critical assembly. Three experiments are planned for TEX-Li using encapsulated lithium carbonate (Li 2 CO 3 ), with natural 6 Li abundance. For all experiments, the highly enriched uranium (HEU) Jemima plates will be used as fissile material. Multiple layers will be stacked together with encapsulated Li 2 CO 3 alternated with polyethylene in standard configurations. Standard stacking was found to be optimal in matching the different sensitivity profiles provided by the Y-12 models. Three configurations are proposed with varying polyethylene moderation and a constant 1/4” absorber thickness. The first uses 11 layers of 5/4” polyethylene, the second uses 9 layers of 3/4” polyethylene, and the third uses 10 layers of 1/2” polyethylene. Calculations showed that some alternative forms of lithium-based materials provided slightly less-optimal sensitivity profiles when compared to lithium carbonate but come with other drawbacks. These alternatives included lithium aluminate (LiAlO 2 ), Aluminum-2050 alloy, Aluminum-8090, Aluminum-2095, lithium hydride (LiH), and lithium fluoride (LiF). Lithium aluminate and aluminum-2050 provided comparable sensitivity profiles when compared to lithium carbonate and can be used instead if lithium carbonate cannot be readily procured. After a broad material study, lithium carbonate outperformed any alternative material with a balance in affordability and workability. The assessment of experimental uncertainties of the non-absorber and absorber components was predicted to be 0.00089 and 0.00093 Δk eff , respectively. The largest uncertainties may be reduced with precision dimensional inspection of the components. Many of the parts and equipment for IER 575 have already been fabricated or procured for previous projects and therefore do not contribute significantly to the overall cost of this experiment. This includes the Jemima plates and Comet critical assembly machine, which are existing NCSP assets, as well as the aluminum platen and polyethylene reflector rings, which were fabricated and authorized for the TEX experiment involving HEU with polyethylene. Lithium carbonate containers will be procured by LANL and will be filled by LLNL. The total material costs for TEX-Li experiments are estimated to be on the order of $\$$47,400. Precision inspection, including dimensional, mass, density, and impurity, is recommended for all components for an estimated cost of $\$$12,000.

35Cl↗