Search NASA⌕ Search

SEARCH · Search NASA

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

LANL Meteorological Program Self-Assessment 2023 Update

The DOE Meteorological Coordinating Council (DMCC) conducted an initial LANL Meteorological (Met) Program Assist Visit in August 2006, and several observations and recommendations were shared with LANL management (DMCC 2006). In August 2015, a follow-up Met Program Assist Visit was conducted to determine progress in meeting all the observations and recommendations from the prior Assist Visit (DMCC 2015). During the 9 years between these two Assist Visits, DMCC noted that significant program improvements were made, and these were documented in the 2015 Assist Visit observations and recommendations. Based on current discussions with the Met Program, additional significant improvements have been made and will be discussed as part of this self-assessment.

54 ENVIRONMENTAL SCIENCES↗

CICE Consortium Progress Report, June 2018 - December 2019

The CICE Consortium accomplished a number of major upgrades to our sea ice model code, scripts and testing infrastructure, while strengthening our visibility in the international modeling community. We released CICE versions 6.0.0, 6.0.1, 6.0.2 and 6.1.0, all of which include updated releases of Icepack. Major new capabilities include a floe size distribution, new coupling infrastructure, improvements to all of CICE’s dynamics options, a new atmospheric data set for historical simulations, overhauled documentation, and more robust and flexible scripts for running and testing the code. Several key testing processes were automated this year. In addition, the team is actively engaged in planning our first user workshop and tutorial in February 2020. In addition to overseeing modifications to the Consortium’s resources and code releases, management tasks included meeting with and updating the Consortium’s Sponsors group in October 2018, prioritizing tasks by mapping them onto potential release targets, and rescuing early CICE releases (version 1 through 3.14) from a disappearing LANL archive.

54 ENVIRONMENTAL SCIENCES↗

LANL Meteorology Program Self-Assessment 2025 Update

The LANL Meteorological (Met) Program has been subject to several external reviews over the past 19 years. The DOE Meteorological Coordinating Council (DMCC) conducted an initial Met Program Site Assist Visit (SAV) in August 2006 (DMCC 2006). A follow-up SAV in August 2015 assessed progress (DMCC 2015), and in June 2023, the DOE Meteorological Subcommittee (DMSC), successor to the DMCC, conducted a second follow-up SAV (DMSC 2023), in which the Met Program was evaluated relative to the following 8 high-level questions: • What is the state of the meteorological services provided to its customers? • What is the quality of meteorological data provided to its customers and is it adequate and available to meet all customer needs? • What is the quality of atmospheric transport and diffusion modeling provided to its customers and is it applicable to complex wind flow patterns at LANL? • Are the current and future meteorological service customers being serviced appropriately? • Are there adequate human resources to meet present and future program customer needs and are they being appropriately leveraged? • Are existing instrumentation, facilities, and systems adequate to meet present and future customer needs? • Are LANL meteorological services conducted in an efficient, cost-effective manner? • Is meteorological data used to ensure safety & health of LANL personnel? More specific evaluations were performed relative to 23 performance objectives extracted from the ANSI/ANS-3.11- 2024 national standard and 14 separate performance objectives associated with consequence assessment and atmospheric transport and diffusion modeling in the consequence assessment element of DOE G 151.1-1B. In 2023, the DMSC SAV Team also reviewed the status of each of the 18 remaining recommendations from its 2015 SAV. Based on this review, DMSC stated in its Exit Briefing that the LANL meteorological program has gotten much stronger and more robust since 2015 and now represents one of the better managed programs within the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

The persistent nonperturbative charm enigma

The question of the existence and possible magnitude of nonperturbative (often called “intrinsic”) charm in the proton has long confounded attempts to cleanly isolate such a contribution in global analyses of high-energy experiments. In this letter, we show that the available (non)perturbative QCD theory and hadronic data have still not developed to a sufficient level to clearly resolve this problem. We highlight a number of challenging aspects that must be confronted in extracting nonperturbative charm in PDF fits, and in so doing, present an updated next-to-next-to-leading order CT analysis of fitted charm, CT18 FC, which we also compare to recent studies. We outline the theory developments and future data needed to make progress on this subject.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Advanced Reactor Regulatory Framework Development Activities for Fiscal Year 2023

This report provides an end-of-year summary that reflects the progress and status of Idaho National Laboratory’s (INL) activities concerning the development of advanced reactor (AR) regulatory framework and its implementation in the United States (U.S.). The report also summarizes some general updates on important topics in regulatory development. This work was completed in Fiscal Year 2023 (FY-23) and was supported by the U.S. Department of Energy (DOE) Regulatory Development sub-program. These activities are managed by INL on behalf of DOE.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Model Energy Codes End-Use Opportunity Analysis

Model energy codes (ASHRAE Standard 90.1 and IECC) has significantly impacted programs and policies aimed at improving energy efficiency both in United States and across the globe. Standard 90.1, first published in 1975 (originally referred to as Standard 90) provides minimum energy efficiency guidelines for designing, constructing, operating, and maintaining new construction and renovated buildings. It is updated continuously, with new editions published every 3 years. Pacific Northwest National Laboratory (PNNL) conducts simulated energy and cost savings analysis of model energy codes to determine their expected impact and to track progress toward net-zero goals and efficiency targets. Additionally, the simulation outputs are examined to assess how energy is used across primary systems within prominent U.S. commercial building types to understand how energy is used in each building type at the end-use level and to identify areas for improvements in future code cycles. This end-use opportunity analysis of model energy codes provides ASHRAE technical committees and other interested parties a better understanding of how the Standard affects various building systems and end uses, specifically, those in the Standard that most prominently influence energy efficiency. Additionally, findings provide industry stakeholders guidance in identifying building types and end-uses with the most potential for energy efficiency improvements through energy codes and those that may require beyond code measures to meet energy use reduction targets. This paper summarizes features and functionalities of a webtool created by PNNL to explore and visualize the End-Use opportunity analysis.

ASHRAE 90.1, Energy Codes, Tableau↗

A novel technique for minimizing energy functional using neural networks

An energy functional describes the equilibrium state of a system. In this work, we present a novel technique, Functional Optimization using Neural Networks (FONN), for minimizing the system’s energy. FONN utilizes neural networks to process information at discrete grid points, considering their interactions with neighboring grid points, to update the state of the system. The training process involves formulating a loss function based on the system’s energy, and with the help of multiple fine-tuning steps, the method employs a progressive energy reduction technique that decreases the energy in multiple steps. FONN’s effectiveness is demonstrated across various problems, including the minimization of the heat and Lyapunov energy. Furthermore, the paper explores the minimization of the elastic bending energy with an area constraint.

97 MATHEMATICS AND COMPUTING↗

LANL Meteorological Program Self-Assessment 2020 Update

The DOE Meteorological Coordinating Council (DMCC) conducted an initial Los Alamos National Laboratory (LANL) meteorological program Assist Visit in August 2006 and several observations and recommendations were shared with LANL management (DMCC 2006). In August 2015, a follow-up meteorological program Assist Visit was conducted to determine progress in meeting all the observations and recommendations from the prior Assist Visit (DMCC 2015). During the 9 years between these two Assist Visits, DMCC noted that significant program improvements were made, and these were noted in the 2015 Assist Visit observations and recommendations

54 ENVIRONMENTAL SCIENCES↗

Status Update: Deposition Modeling For SNF Canister CISCC

This report fulfills the M3 milestones M3SF-21PN010207025 & M3SF-20PN0102070412. During fiscal year (FY) 2020, Pacific Northwest National Laboratory (PNNL) worked to further develop the FY 2019 deposition and particle tracking models. This status report outlines these efforts and presents the progress made so far. Model development work is ongoing and is planned to continue in FY 2021. The FY 2020 model development included work on: Wind Effects. Model development and sensitivity studies, investigated how wind direction and speed affect deposition; Brownian Motion. Implementing Brownian Motion into existing models; Particle Size Variability. Depending on the particle composition, the diameter of the particle may vary with changes in relative humidity. Models were developed to analyze this; Multiphase and Fluid Film Modeling. Investigating canister surface wetting and drying, and how this effects overall deposition. Models were developed to analyze this; Difusophoresis. Performing initial work to implement diffusiophoresis into the existing models; Turbophoresis. Performing initial work to implement turbophoresis into the existing models. Much of this work will continue into FY21. The authors present initial results and discus current and future work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis, March 2020 (Progress Report for FRD-17-002)

In the month of March, we planned to have the Site License Agreement with SPI signed and fully executed, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and hoped to have the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC. We also hoped to have the updated budget from Iowa State in order to send both updated sub-recipient budget sheets to the CAM for approval.

09 BIOMASS FUELS↗

Front-of-Meter Model Results

These files contains aggregations of key variables from the NREL Distributed Wind Futures Study using full parcel level data. These variables describe total technical and economic potential for distributed wind turbine deployment. Aggregations are available at the (1) county, (2) zipcode (zip code tabulation area or zcta), and (3) US Census block group level. Each scenario is coded with the scenario name (e.g., baseline) and year (e.g., 2022). Those files postfixed with 'econpot' contain results for only those parcels that are economically viable while the files postfixed with 'techpot' include results for all parcels that are technically feasible. Hence these correspond to technoeconomic and technical potential respectively. The data are available as CSV or Geopackage. Columns in the files are as follows: * geoid: geographic identifier (FIPS code or similar) * min_techpot_sum_kw: technical potential for all parcels in kW using turbines downsized to demand when appropriate * max_techpot_sum_kw: technical potential for all parcels in kW without downsizing turbines * aep_sum_kwh: annual energy production estimate in kWh * cf_mean_ratio: mean capacity factor * lcoe_mean_cents_per_kwh: mean levelized cost of energy for parcels in geography in cents per kWh * lcoe_std_cents_per_kwh: standard deviation of the above * parcel_area_sum_acres: total area of viable parcels in acres * n_turbines: number of cited turbines (one per viable parcel currently) Note: These are preliminary results from the full-parcel 2024 update of the Distributed Wind Energy Futures study. Please take care when making use of the data, and feel free to contact the team with any questions. Full documentation in support of these data is in progress and will follow.

17 WIND ENERGY↗

Important Human Actions for Advanced Reactors: Implications for Human Factors

As advanced reactor platforms continue to develop and gain traction in the energy sector there is a need for risk-informed, scalable regulations that match that progress. This is a core component of the U.S. Nuclear Regulatory Commission’s proposed Part 53 Rule Making; the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy (ADVANCE) Act; and other efforts that seek to update nuclear power regulations. This paper covers one key aspect of that regulatory evolution: Important Human Actions (IHA). In this paper, we discuss how the understanding and definitions of IHAs have changed and what that means for human factors engagement through the process of developing these technologies. Instead of a narrow focus on control actions that led to an increase in core damage risk, the new focus is on IHAs is “wherever they occur.” What this means is that having a highly automated or passive safety system does not eliminate IHAs. Rather, it shifts the focus point to all the actions that enable these systems. Everything from maintenance, to design, to training can be considered an IHA and that dramatically shifts the efforts and level of engagement necessary for human factors to enable these technologies. We discuss the notions of risk-informed human factors that underpin these efforts, give several examples, and briefly describe the risk assessment methodologies that will be needed. In the past, IHAs were identified and then became a focus point of human factors engineering (HFE) activities to ensure a robust evaluation of the task was completed. The future is less clear. HFE for nuclear energy will need to evolve and become more integrated in technology development than ever before.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Trends and 2025 Insights on the Rise of Electric Vehicles in the USA

Plug-in electric vehicles (EVs) are reshaping the transportation energy landscape, providing a practical alternative to petroleum fuels for a growing number of applications. EV sales grew 55x in the past decade (2014-2024) and 6x since 2020, driven by technological progress enabled by policies to reduce transportation emissions as well as industrial plans motivated by strategic value of EVs for global competitiveness, jobs and geopolitics. In 2024, 22% of passenger cars sold globally were EVs and opportunities for EVs beyond on-road applications are growing, including solutions to electrify off-road vehicles, maritime and aviation. This Review updates and expands our 2020 assessment of the scientific literature and describes the current status and future projections of EV markets, charging infrastructures, vehicle-grid integration and supply chains in the USA. EV is the lowest-emission motorized on-road transportation option, with life-cycle emissions decreasing as electricity emissions continue to decrease. Charging infrastructure grew in line with EV adoption but providing ubiquitous reliable and convenient charging remains a challenge. EVs are reducing electricity costs in several US markets and coordinated EV charging can improve grid resilience and reduce electricity costs for all consumers. The current trajectory of technology improvement and industrial investments points to continued acceleration of EVs.

33 ADVANCED PROPULSION SYSTEMS↗

Detonation Wave Profile (update of LA-UR-15-29498-rev1)

The Zel’dovich-von Neumann-Doering (ZND) profile of a detonation wave is derived. Two basic material properties are required: i. An equation of state (EOS) for a partly burned explosive; P(V, e, λ). ii. A burn rate for the reaction progress variable; d/dtλ = R(V, e, λ). For a steady planar detonation wave the reactive flow PDEs can be reduced to ODEs. The detonation wave profile can be determined from an ODE plus algebraic equations for points on the partly burned detonation loci with a specified wave speed. Furthermore, for the CJ detonation speed, the end of the reaction zone is sonic. A solution to the reactive flow equations can be constructed with a rarefaction wave following the detonation wave profile. This corresponds to an underdriven detonation wave, and the rarefaction is know as a Taylor wave.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development of a Pre-Combustion CO 2 Capture Process Using High-Temperature PBI Hollow-Fiber Membranes

The overall objective of this project was to evaluate the advantages of transformational polybenzimidazole (PBI) polymer hollow-fiber membrane (HFM)-based, carbon dioxide (CO 2 ) capture and purification technology at bench-scale using an actual coal-derived syngas stream from a coal gasification facility. The project was carried out over two budget periods. The technical objectives in Budget Period 1 (BP1) included preparing HFs and modules and upgrading the available skid for field testing. The technical objectives for BP2 were to field-test the skid unit with actual coal-derived syngas from an oxygen-blown gasifier to obtain performance data, update the Techno-Economic Analysis (TEA) that would assist with future process scale-up, and provide information on the design of a small pilot-scale test unit. The goal was to advance the PBI-HFM CO 2 capture and gas separation system for pre-combustion applications beyond second-generation economic performance predictions and make progress toward meeting overall fossil energy performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) 30% less than baseline capture approaches. The research program was designed with progressive technical tasks leading to both dynamic and steady-state testing of the PBI-HFM skid with actual coal-derived syngas. The work plan was to: (1) fabricate sufficient Generation-2 (GEN-2) fibers for module fabrication; (2) upgrade the fiber skid to accommodate large fiber modules for bench-scale field testing; (3) conduct dynamic and steady-state testing with coal-derived syngas from an oxygen-blown gasifier and obtain system performance data; (4) perform a TEA and environmental, health, and safety (EH&S) assessment; (5) update the State-Point Data Table, Technology Gap Analysis (TGA), and Technology Maturation Plan (TMP); (6) uninstall and return the test skid to the Recipient’s facilities; and (7) submit a Final Report that describes the results and analysis of the project research effort.

03 NATURAL GAS↗

Transition Core Planning and Safety Analyses in Support of LEU Fuel Conversion of the University of Missouri Research Reactor (MURR)

The University of Missouri Research Reactor (MURR®) is one of six U.S. High Performance Research Reactors (USHPRR), including one critical facility, that is working with the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization (M3) Reactor Conversion Program to convert from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. The M3 Reactor Conversion USHPRR Project objectives include the development of LEU fuel element designs that will ensure safe reactor operations and to maintain the existing experimental performance of each facility. The work is being conducted through many inter-related activities being completed by four Project Pillars: Fuel Qualification (FQ), Fuel Fabrication (FF), Reactor Conversion (RC), and Cross Cutting (CC). A new type of LEU fuel based on an alloy of uranium-10 wt% molybdenum (U-10Mo) is expected to allow the conversion of those USHPRR, like MURR, requiring higher density fuels. The very-high-density LEU U-10Mo monolithic fuel is currently undergoing irradiation testing and post-irradiation examination under a planned and documented fuel qualification effort. The FQ Pillar will document fuel property and fuel performance data and qualify the fuel for use in these reactors. The FF Pillar is fabricating fuel for ongoing and future irradiation tests, as well as conducting fabrication demonstrations to validate or update preliminary fabrication assumptions. The FF Pillar is also working to develop and install commercial manufacturing capacity with the U-10Mo monolithic fuel to produce prototypic fuel. Working with the RC Pillar at Argonne, MURR has progressed through a preliminary fuel element design using preliminary data for the proposed monolithic alloy of U-10Mo. Analyses were completed in previous work that found for typical equilibrium operations with the preliminary LEU fuel element design, in conjunction with a power uprate to 12 MW and appropriate changes to the MURR Limiting safety system settings (LSSS), MURR will have adequate margins to safety for steady-state operations and postulated transient accidents and will have experimental performance in key locations that meets or exceeds current operations with HEU fuel. The purpose of this work is to develop a sequence of transition cycles that will enable MURR to transition from operation with the reactor core loaded with fresh LEU fuel elements only to typical equilibrium operations with mixed-burnup cores following conversion while meeting operational requirements on safety and experimental performance. It is expected that the use of fresh LEU fuel at conversion and subsequent low burnup of the LEU fuel elements that will initially be available for use following conversion will result in critical control blade positions that will substantially change the axial power distribution in the core and the neutron flux available in key experimental locations relative to equilibrium LEU operations. Given the constraints of MURR safety margins, operational practices, and production and research, a novel method has been developed to identify a transition sequence that minimizes the time MURR operates atypically compared to the current prototypic cycles using HEU fuel. The proposed transition sequence moves quickly to the same sort of equilibrium cycles for the LEU fuel that have already been evaluated in documented preliminary safety analyses. Although shifting the neutron flux peak to the lower half of the core during initial cycles with LEU at 12 MW reduces the experiment performance in some key locations relative to current HEU operations at 10 MW, all LEU cores provide an average performance that meets or exceeds that of HEU. An LEU cycle is reached that meets or exceeds the level of experimental performance predicted for current HEU and equilibrium LEU operations in more than 450 key locations identified by a reactor specialist at MURR by the 23rd cycle following conversion and that afterwards will enable MURR to consistently meet its experimental performance requirements. The proposed transition sequence only requires the fabrication of 34 fresh LEU elements in the first year of operation and does not exceed the anticipated availability of fresh elements that can be produced by the fuel fabricator. By the third year after conversion, 22 fresh LEU elements will be required each year, which is the same as expected for equilibrium LEU operations and the same as current operations with HEU fuel. The proposed transition sequence thus combines a relatively short time period before equilibrium burnup is achieved, a temporary increase of fuel elements needed annually relative to typical operations that are within the production capabilities of the fuel fabricator, and demonstrates comparable experimental performance of the LEU cores relative to current HEU operations. Further measures may be taken to reduce any initial experimental performance penalty even further, where possible, by repositioning certain experiments to leverage the increased performance in the lower axial experimental positions in the initial cycles following conversion or leaving the experiments in the irradiation facilities longer in order to achieve the required neutron fluence. This analysis may require refinement depending on the experimental facilities in use at the time of conversion. Nonetheless, the results presented here, including the experimental performance, core burnup, and critical control blade positions throughout the transition cycles, show that the proposed transition cycle fuel management patterns are consistent with what is expected and desired for MURR operation with LEU U-10Mo fuel. Detailed core power distributions from the neutronics models were also used to evaluate safety margins during steady-state operations for the selected transition cycles and the equilibrium LEU core. It is shown that there are adequate safety margins for both steady-state operations and postulated accident scenarios. For the steady-state operations with the preliminary LEU fuel element design the analysis predicts at least 2.49 MW margin to the onset of flow instability at the LSSS power of 15 MW. Considering the LSSS power is 125% of full license power, the margin to OFI is sufficient. In addition, the critical heat flux ratio at LSSS power is well above the requirement of CHFR > 2.0 from NUREG-1537 for all considered cases. For postulated transient accidents, the minimum margin to the fuel temperature safety limit is at least 109 °C. In summary, the proposed sequence of core loadings for MURR operations following conversion to LEU fuel and a power uprate to 12 MW provides sufficient safety margins for both steady-state operations and postulated transient accidents during a proposed sequence of transition cycles to equilibrium operations. Analysis has shown that there are some local experimental performance penalties during the initial cycles. Although there are local shifts in the experimental performance, on average all LEU cores at 12 MW have equal or higher performance than HEU at 10 MW. Temporary adjustments are being planned that will produce suitable experimental performance during these cycles. The results indicate that for the equilibrium LEU core the experimental performance exceeds that of current HEU operations in all key locations while also demonstrating sufficient safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on the High Precision Titration Method for Uranium Assay Supported by NBL Program Office

The NBL Program Office (NBL PO) has coordinated with Oak Ridge National Laboratory (ORNL) to implement the High Precision Titration (HPT) method for uranium assay measurements. The measurement method has been successfully developed and qualified, therefore ORNL has progressed to performing analyzes critical to the mission of the NBL PO. The HPT method is vital to producing the next generation of certified reference materials for uranium assay and isotopic abundance. The work described here focused on establishing traceability of the method to the NIST SRM 136 potassium dichromate series, and focused on investigating small differences between SRM 136e and 136f. The NBL PO evaluated the history of all of its primary uranium reference materials, including CRM 112A natural uranium metal, and worked with NIST in investigating the small differences in the dichromate SRM’s. ORNL performed comparative experiments on SRM 136e and 136f using CRM 112A. The results of the experiment will be presented here, along with NBL PO’s plans to re-evaluate the CRM 112A certified uncertainty to comply with JCGM 100, “Guide to the expression of uncertainty in measurement.”

Rogers, Kayron↗