Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Pyrochemical Glovebox Line Replacement (Stage I) Design Evaluation

The Pyrochemical Glovebox Line Replacement project at Los Alamos National Lab (LANL) will replace the aging infrastructure utilized for pure plutonium metal production. This new ElectroRefining (ER) line is also designed to accommodate programmatic goals of increased pit manufacturing. The line consists of various modules that execute the needed functions of ER work. Compared to previous operations, the new design incorporates a number of automated features and other improvements that modernize processing and reduce the operational burden on the glovebox worker. The update will occur in two stages, the first is the topic of this evaluation. We will first give an overview of the new design then evaluate it in regard to the goals and functional and operational requirements established to guide the redesign. We will also present alternative design concepts that are consistent with design objectives and in some cases address issues/deficiencies in the new design.

Engineering(42)↗

Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary

Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing, and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Replacement of Wooden Wing Walls and Deteriorated Concrete Pad at Manhattan Project Era Magazine TA-16-58

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to replace missing and broken asbestos shingles, reconstruct deteriorated wooden wing walls, and remove and replace a concrete pad on Building 58 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL). Building TA-16-58 is a Manhattan Project Era magazine that was evaluated and determined eligible, in consultation with the State Historic Preservation Office (June 5, 2003 and June 22, 2003, respectively), for listing in the National Register of Historic Places (Register) in ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16 and in Sentinels of the Atomic Dawn: A Multiple -Property Evaluation of the Remaining Manhattan Project Properties at Los Alamos (1942–1946) (McGehee et al. 2003a, 2003b). The building is a LANL candidate for preservation as identified in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL 2017a ). It is also eligible for inclusion in the Manhattan Project National Historical Park (i.e., identified in the Park legislation), and is located within the TA-16 potential Cold War historic district (McGeh ee 1995a, 1995b; LANL 2012,).

99 GENERAL AND MISCELLANEOUS↗

Material replacement in quadrupoles of LANSCE DTL tank 1

The fields of short quadrupole magnets in the DTL tank 1 (T1) are calculated with CST EM Studio to evaluate effects of replacing their pole-tip and yoke material: high-purity iron by low-carbon steel. These quadrupoles, the strongest ones in the linac, are embedded into drift tubes, and their replacements may be required to have spare T1 drift tubes available.

43 PARTICLE ACCELERATORS↗

Replacing photomultiplier tubes with silicon photomultipliers for nuclear safeguards applications

Photomultiplier tubes (PMTs) have been used for decades as the default light detection technology for scintillator-based radiation monitors. PMTs come with a handful of disadvantages, however, including large volume usage, fragility, high-voltage requirements, and susceptibility to magnetic fields. Arrays of silicon photomultipliers (SiPMs) are a possible alternative to PMTs providing similar performance while offering improvements in the areas listed. We focus on straightforward “drop-in replacement” evaluations by imposing a single channel output of the SiPM signal and a backend electronics data acquisition and analysis routine identical to that used for PMTs. In the realm of nuclear safeguards, the primary performance metric for gamma spectroscopy is detector resolution, and for neutron detection it is pulse shape discrimination (PSD) to separate neutron and gamma signals. In this work we present the results of replacing a PMT with a 2” x 2” SiPM array mounted, in turn, to the same 2” x 2” cylindrical sodium iodide (NaI) crystal. The ultimate comparison for this gamma spectrometry is confirmation of uranium enrichment standards, ranging from depleted uranium to 93% highly enriched uranium (HEU), by analyzing the resulting spectra with both a simple integral scaling in key energy regions of the spectrum, as well as with the NaIGEM software package. In addition to the gamma spectroscopy work, we will present the latest results on comparing the PSD capabilities of a 4” x 4” SiPM array to a 5” PMT. As with the gamma spectroscopy evaluations, the light detectors are mounted in turn to the same liter-scale organic scintillators. This neutron-focused work includes evaluation of prototype SiPM readout boards with a single output signal summed over 256 individual SiPM pixels, and evident tradeoffs between PSD capability and fast response.

42 ENGINEERING↗

Storm Water Pollution Prevention Plan for C902 Data Center Replacement Facility

This Storm Water Pollution Prevention Plan (SWPPP) has been prepared for the C902 Data Center Replacement Facility in Livermore, California. C902 Data Center Replacement Facility is a proposed development consisting of the construction of an approximately 8,900 square foot new single-story building and an approximately 4,200 square foot equipment yard. The project also includes paved parking lot, hardscape and landscape consisting of 2-6" stone at retention ponds and wood mulch elsewhere. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC.

54 ENVIRONMENTAL SCIENCES↗

Development and Field Testing Novel Natural Gas Surface Process Equipment for Replacement of Water as Primary Hydraulic Fracturing Fluid (Final Report)

Southwest Research Institute® (SwRI ® ), Schlumberger Technology Corporation (SLB), and Chevron Corporation ® (Chevron) developed a novel, optimized, and lightweight process for natural gas (NG) to replace water as a low-cost fracturing medium with a low environmental impact. Hydraulic fracturing is used to increase oil and NG production by injecting high-pressure fluid, primarily water, into a rock formation, which fractures the rock and releases trapped oil and NG. This method was developed to increase yield and make feasible production areas that would not otherwise be viable for large-scale oil and NG extraction using traditional drilling technologies. Since the fracturing fluid is composed of approximately 90% water, one of the principal drawbacks to hydraulic fracturing is its excessive water use and associated large environmental footprint. According to recent data collected at fracture sites within the United States, fracturing applications in North America can consume as much as 9 million gallons of water per well. During the fracturing process, some of the fracturing fluid is permanently lost and the portion that is recovered is contaminated by both fracturing chemicals and dissolved solids from the formation. The recovered water or flow-back represents a significant environmental challenge, as it must be treated before it can be reintroduced into the natural water system. Although there is some recycling for future fracturing, the majority of the flow-back water is hauled from the well site to a treatment facility or to an injection well for permanent underground disposal. To mitigate these issues, an optimized, lightweight and modular surface process using NG to replace a majority of the water was developed as a cost-effective and environmentally clean fracturing fluid. Using NG will result in significantly less consumption since the gas that is injected as a fracturing fluid will be mixed with the formation gas and extracted as if it were from the formation itself. This process will minimize the collection, waste, and treatment of large amounts of water and will reduce the environmental impact of transporting and storing the fracturing fluid. There are two major steps involved in utilizing NG as the primary fracturing medium: (1) increasing the supply pressure of NG to wellhead pressures suitable for fracturing and (2) mixing the required chemicals and proppant needed for the fracturing process at these elevated pressures. The second step (NG-proppant mixing at elevated pressures) still requires demonstration; but very similar processes have been demonstrated in the field with other gases such as nitrogen (N 2 ) and carbon dioxide (CO 2 ). However, the first step (a compact, on-site unit for generating high-pressure NG at costs feasible for fracturing) has not been developed and is currently not commercially available. Due to the inherent compressibility of NG, more energy is required to compress the gas than what is required to pump water (or other incompressible liquids) to the very high pressure required for downhole injection. This project aimed to develop a novel, hybrid method to overcome this challenge. The project accomplishments and findings are discussed in this report. Ultimately, the research and development efforts described herein demonstrate that fracturing with NG foam is a feasible alternative to using water.

02 PETROLEUM↗

Replaceable Paddle Tip Fabrication and Testing for Saltstone Production Facility (SPF) Mixer (FY2020 Update)

Details of the operations and issues related to the paddles used in the Saltstone Production Facility (SPF) employing the 10-inch READCO ™ -Kurimoto co-rotating dual shaft continuous mixer are provided in SRNL-ST1-2019-00142, Based on a recent effort performed by the Savannah River National Laboratory (SRNL) and funded by Savannah River Remediation (SRR), eight different replaceable paddle designs were proposed and the angled notched design was selected for this study. This design was selected over the other designs due to its simplicity and its ability to meet the fitness of duty requirements. There are two types of angled notched replaceable tip designs, one being flat and the other helical. Either of these designs can be used for blending the premix with the salt solution. Stress calculations performed on this design (the use of the bolts and connections) are documented in M-CLC-Z-00137 showing it was suitable for use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring(RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650MHz SRF Linac, followed by a ~2-8 GeV pulsed Linac using 1300 MHz cryomodules. The Linac components incorporate recent improvements in SRF technology. The Linac configuration and beam dynamics requirements are presented. Injection options are discussed. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

42 ENGINEERING↗

Physics Opportunities for the Fermilab Booster Replacement

This white paper presents opportunities afforded by the Fermilab Booster Replacement and its various options. Its goal is to inform the design process of the Booster Replacement about the accelerator needs of the various options, allowing the design to be versatile and enable, or leave the door open to, as many options as possible. The physics themes covered by the paper include searches for dark sectors and new opportunities with muons.

43 PARTICLE ACCELERATORS↗

Renewable Solvents to Replace Water in the Synthesis of Battery Materials

Our lab has been engaged in using glycerol to replace water in the synthesis of metal oxides, especially those for use in Li-ion battery. Glycerol is a byproduct from biodiesel production. The U.S. biodiesel manufacturers generate about 1 billion pounds of glycerol yearly, which needs to be utilized for producing value added products. By using glycerol as a solvent, we found that it can replace water to prepare many metal oxide powders. The materials synthesis processes have the potential to significantly reduce manufacturing cost and alleviate the environmental issues with aqueous processes. In this talk, I will present some of our work in materials synthesis using glycerol as a solvent. In particular, I will introduce the work on making active cathode materials for the Li-ion battery.

36 MATERIALS SCIENCE↗

CHL1 2K COLD BOX REPLACEMENT

There is growing evidence showing that the cold compressors in the Modified Sub-atmospheric Cold Box (SC1/SCM) of the JLab Central Helium Liquefier (CHL) are approaching the end of their life. Their replacement parts are no longer available due to obsolescence, thus placing the Physics program at serious risk. A new sub-atmospheric cold box (SC1R), which hosts five technologically superior, water-cooled cold compressors and a similar 4K-2K refrigeration recovery heat exchanger, was funded in July 2017, to replace the existing 2K cold box. The design of the new 2K cold box and the external support system have been completed allowing the project to enter the fabrication and assembly phase, which will be completed here at JLab. We present the design, fabrication, installation and commissioning schedule of the new 2K cold box.

Yang, Shirley↗

Survey of Aging and Monitoring Concerns for Cables and Splices Due to Cable Repair and Replacement

The purpose of this report is to survey aging and monitoring concerns for electrical cable splices in nuclear power plants (NPPs) in long term operation. As portions of existing electrical cable runs in nuclear are replaced over time due to localized events, the total number of splices in NPPs is expected to increase. Relative to cables, the body of knowledge regarding aging of splices and splices in combination with aging cables in nuclear service environments in long-term operations is low. A few reports have considered the aging of cable system components other than cables (Jacobus 1990; Nelson 1998; Villaran and Lofaro 2002), but the nuclear industry has two decades of operating experience since these were published to further enlighten this issue. Herein we discuss electrical cables and splices commonly found in U.S. nuclear power plants, their qualification in safety-related application, and methods for monitoring their health condition. Common environmental stresses that can give rise to cable and splice failure are discussed. The Nuclear Regulatory Commission (NRC) Licensee Event Reports (LER) database was used to identify documented issues of cable and splice failure. The trend in the resultant data over time is considered to see if failures are increasing as plants age. Observations and conclusions of this work include: 1. Cables and splices are highly reliable components. Occurrence rates for events of interest were low and nearly constant over the last 20 years. 2. Common-cause failure for evaluated cable events of interest was observed to primarily be associated with loose connections, which may manifest associated with workmanship issues, thermal cycling, and/or vibration. 3. Replacement of cables is more common than repair, leading to an increase in proportion of new generation cables in the plant over time. 4. Splices on degraded cables have been observed to be problematic. Due to aging NPP infrastructure, including electrical cables, it is expected that such issues will continue to increase. 5. Condition monitoring approaches, while shown to be fruitful for cables, have been shown to be insensitive to degradation of splice sleeves, which are critical to the continued performance of splices. Additional condition monitoring (CM) work is needed to evaluate methods which are sensitive to the degradation of splice components. 6. Extended Material Degradation Assessment (EMDA) knowledge gaps for electrical cables (Bernstein et al. 2014) have not been investigated for splices but may represent similar concerns such as for the accelerated aging process historically used in environmental qualification.

42 ENGINEERING↗

Development Results on Replacement Materials for Current Scarce or High Supply Chain Risk Materials

In September 2020, the U.S. government issued an executive order to address the threat to the domestic supply chain from its reliance on critical minerals (CMs) from foreign competitors and to support the domestic mining and processing industry. The Advanced Materials and Manufacturing Technology (AMMT) program is addressing this executive order by evaluating advanced manufacturing (AM) and its impact on the demands of CMs for energy production in general and how the deployment of AM in nuclear energy will support the projected goals of the Paris Accord and further a net-zero carbon economy (NZE) by 2050. Three strategic reports were previously prepared by the AMMT program to date and identified two areas for more detailed exploration: (1) the replacement of high-risk CMs such as cobalt and niobium by more abundant minerals and (2) the minimization and utilization of CM waste streams. The design of nuclear materials without critical elements as alloying elements, is a part of the nuclear materials strategy to overcome the critical minerals scarcity. In this report, two approaches are evaluated namely (1) replacement of critical elements as alloying elements in nuclear materials, and (2) the design of a new alloys that does not contain critical minerals as an alloying element.

36 MATERIALS SCIENCE↗

Moving Beyond Drop-In Replacements: Performance-Advantaged Biobased Chemicals Workshop Summary Report

BETO held the Moving beyond Drop-In Replacements: Performance-Advantaged Biobased Chemicals Workshop on June 1, 2017, in Denver, Colorado. Approximately 90 stakeholders attended, representing companies, national laboratories, government agencies, and academic institutions. A list of workshop attendees who agreed to share their contact information can be found in Appendix A. The breakdown of stakeholders is shown in Figure 3 below. The day began with a keynote presentation from Nichole Fitzgerald of BETO to give participants an overview of the Office’s current work on functional replacements, as well as to outline the goals of the workshop. This was followed by two keynote presentations from industry representatives—Dale McIntyre (Behr Masco) and Michael Saltzberg (DuPont Industrial Biosciences)—on their current work with performance-enhanced biobased chemicals. Participants then attended two breakout sessions in smaller groups to provide feedback. In the afternoon, a third and final keynote—given by Dr. Brent Shanks (Center for Biorenewable Chemicals, Iowa State University)— covered potential strategies for targeting future research in this area, followed by a final breakout session on the same topic. A detailed agenda can be found in Appendix B.

09 BIOMASS FUELS↗