Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource favorability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

187 records · Page 11

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Shallow Geothermal Resources for Cooling Applications at the University of Hawai'i

Drilling activities account for 30% to 57% of the cost to develop and install a geothermal plant. Therefore, an accurate representation of the cost to drill a well is paramount in techno-economic analysis to determine the feasibility of a geothermal power project. In 2022, the National Renewable Energy Laboratory (NREL) endeavored to revise the U.S. Department of Energy (DOE) GeoVision baseline drilling cost curves due to extensive improvement in drilling rates at the Utah Frontier Observatory Research in Geothermal Energy (FORGE) demonstration site. That effort did not culminate in the recommendation of new curves because the actual project costs did not match the reported performance improvements and were at or above the GeoVision baseline. The need for another iteration of this analysis has arisen from industry record drilling performance reported by recent commercial field-scale and demonstration projects, including Fervo Energy's Cape Station, the Utah FORGE 16B(78)-32 demonstration and the Geysers Power Company's GDC-36 demonstration. Therefore, in this work, we have estimated the resulting industry average rate of penetration (ROP) and bit life and applied these parameters as inputs to the Well Cost Simplified model used in the GeoVision analysis. The resulting revised cost curves show a significant decline from the GeoVision baseline. For vertical wells, the magnitude of cost decline ranges between 12% and 24% while for deviated wells, cost reductions between 18% and 26% are estimated. The revised cost curves are in good agreement with actual cost data and therefore, quantify the economic impact of the utilization of (and advances in) polycrystalline diamond compact (PDC) bit technology and the application of physics-based methodologies that optimize mechanical specific energy.

building cooling↗

Low soil phosphorus availability triggers maize growth stage specific rhizosphere processes leading to mineralization of organic P

Phosphorus (P) is one of the essential nutrients for all living organisms. High-quality mineral P fertilizer is a finite resource with only an estimated 80-100 years of reserves remaining globally. Both plants and microbes have developed several mechanisms such as secretion of organic acids, acidification of the rhizosphere, and production of extracellular enzymes to enhance the acquisition of P from soils. Increased activity of phosphatase occurs in response to P deficiency as part of P starvation responses which catalyze the hydrolysis of P o from soil organic matter (SOM) and release inorganic P (P i ). However, the specific interactions between plants and microbial communities in the rhizosphere soil triggered by P deficiency are largely unknown. In a greenhouse study we grew maize plants in low and high P containing soils and examined the role of rhizosphere processes on mineralization of organic P (P o ) in soils with low and high P availability and different P speciation 23 (Po dominated versus P i dominated) and determine its effect on plant growth. Plant biomass was determined and rhizosphere soils, and soil samples from pots with and without plants were collected at key vegetative growth stages (VGS). A variety of biogeochemical parameters (e.g. microbial biomass C and P, potential phosphatase activities, plant biomass P, soil P species etc.) were determined using both conventional (sequential chemical extraction) and advanced (e.g. high resolution mass spectrometry (FTICR-MS) and 3129 P solution NMR) techniques. Here, we used phospholipid fatty acid (PLFA) and DNA based microbial community analysis to track changes in microbial community structure and diversity. Low P availability induced changes in biogeochemical processes and microbial community composition in the rhizosphere soils of plants grown in low P containing soil. At early VGS, the plants in low P soil were visually struggling which correlated with greater rhizosphere potential acid phosphatase activity and a reduction in P o fractions. At late VGS, the plants appeared to recover which correlated with a decrease in Meh (III) extractable P, an increase in microbial biomass C and P and greater total P in the plant biomass (roots, shoots and leaves). In high P containing soil, on the other hand, greater P availability masked these rhizosphere processes. Our results confirmed the degradation of SOM and Po mineralization in rhizosphere soils driven by microbe and plant need for P. P deficiency may have favored the abundance of fungi which utilized easily degradable root exudates for the production of extracellular enzymes responsible for the mineralize of SOM P o . This study highlights the intertwined mechanisms involved, and emphasizes the importance of, P o sources for plant nutrition and survival in marginal soils.

59 BASIC BIOLOGICAL SCIENCES↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

GeoThermalCloud: Cloud Fusion of Big Data and Multi-Physics Models using Machine Learning for Discovery, Exploration, and Development of Hidden Geothermal Resources

The primary goals of this project are exploring hidden geothermal resources in the U.S.A. and designing profitable enhanced geothermal systems (EGS). Many processes and parameters control geothermal exploration and energy production from geothermal fields. Diverse datasets (e.g., geology, geochemistry, geophysics, satellite, airborne geophysics) are available to help characterize subsurface geothermal conditions. Sparse and multi-scale characteristics of these datasets prohibit properly leveraging these datasets for geothermal exploration and profitable EGS design. Recent advancements in machine learning (ML) promise to resolve these issues. The tremendous challenges and risks of geothermal exploration and production bring the demand for novel ML methods and tools that can (1) analyze large field datasets, (2) assimilate model simulations (large inputs and outputs), (3) process sparse datasets, (4) perform transfer learning (between sites with different exploratory levels), (5) extract hidden geothermal signatures in the field and simulation data, (6) label geothermal resources and processes, (7) identify high-value data acquisition targets, and (8) guide geothermal exploration and production by selecting optimal exploration, production, and drilling strategies. To address these necessities, ML-based geothermal resources exploration and enhanced geothermal systems (EGS) design tools have been developed. The exploration tool is called GeoThermalCloud and EGS design tool is called GeoDT-ML. GeoThermalCloud (https://github.com/SmartTensors/GeoThermalCloud.jl) utilizes a LANL unsupervised ML platform called SmartTensors (https://tensors.lanl.gov/) to automate data analyses and interpretations by extracting hidden signatures to identify geothermal prospects. Also, it enables the identification of critical measurements needed to identify geothermal resource signatures. Alternatively, GeoDT-ML (https://github.com/SmartTensors/GeoThermalCloud.jl/tree/master/EGS) is an ML-based alternative to GeoDT (https://github.com/GeoDesignTool/GeoDT.git), a fast, simplified multi-physics solver to evaluate EGS project designs in uncertain geologic systems. GeoDT-ML leverages recent advances in deep learning and high-performance computing. It is a faster and simpler version of GeoDT. To make this project a success, we used capabilities of LANL, PNNL, Google, Stanford, and Julia Computing. We analyzed eight datasets of the U.S.A. using GeothermalCloud and demonstrated potential highly prospective geothermal resources and identified key factors defining highly prospective sites. The first data set includes 44 locations in southwest New Mexico and 18 geological, hydrogeological, geophysical, geothermal, geochemical attributes. We defined low- and medium-temperature hydrothermal systems and discovered a new highly prospective site. The second data set analyzed 18 shallow water chemistry attributes at 14,342 locations in the Great Basin. It demarcated modestly, moderately, and highly prospective sites including key attributes for each type of prospectivity. The third data set analyzed Utah FORGE data including satellite (InSAR), geophysical (gravity, seismic), geochemical, and geothermal attributes. Here, we performed prospectivity analysis to identify future drilling locations using geological, geochemical, and geophysical attributes. Maps of temperature at depth and heat flow are constructed based on the available data. Prospectivity maps were generated, and drilling locations were proposed for future geothermal field exploration. The fourth data set analyzed 21 attributes at 120 locations in Tularosa Basin, New Mexico; data comes from past play fairway analyses in this region. ML analyses identified geothermal signatures associated with modestly, moderately, and highly hydrothermal systems. We also defined dominant attributes and spatial distribution of the geothermal signatures. The fifth, sixth, seventh, and eighth datasets include Tohatchi Springs, New Mexico, Hawaii, Brady site, Nevada, and EGS Collab, respectively. Moreover, we coupled GeothermalCloud and magnetotellurics data to pinpoint drilling locations for developing geothermal projects in the Tularosa Basin, New Mexico. GeothermalCloud found potential prospective locations for geothermal resources near White Sands Missile Range and McGregor Range at Fort Bliss. Magnetotellurics data determined the potential depth (~1800m) of geothermal prospects at McGregor Range based on apparent resistivity structures/layers in the subsurface. The McGregor Range consists of three resistivity layers and two resistivity structures. Magnetotellurics data also helps identify that the western portion of the McGregor Range has thick and low-resistivity earth materials. The low resistivity to the west is most likely for a fault system. Assuming temperature is consistent with a geothermal reservoir, the west-central part of the McGregor Range has the highest geothermal potential because of the increase in porosity and associated permeability attributed to the interpreted fault system. Also, we devised a coupling strategy between a process model and GeothermalCloud to characterize hydrogeological conditions and geothermal conditions, respectively. The process model characterizes hydrogeological and geothermal conditions on highly prospective geothermal sites provided by GeothermalCloud. We developed a physics-informed neural network (PINN) version of the Burns equation that can be easily coupled with GeothermalCloud. Furthermore, we performed an optimal design decision maximizing the economic value of an EGS power plant. This study optimized the range of well spacing between injection and production wells maximizing net present value in dollars (NPV). For this task, we used the GeoDT to simulate the Utah FORGE EGS development cycle from the initial well design to the end of production. Next, we accomplished another crucial task, which is predicting permeability of geothermal reservoirs. Predicting permeability of geothermal reservoirs is a non-trivial task because of huge computational runtime of simulation and lack of measurements. To avoid these limitations, we used easy-to-measure chemical concentrations in the subsurface as measurement data and convolutional neural network based ML model of a high-fidelity model. Next, we predicted permeability using Markov chain Monte Carlo simulation. We found that Markov chain Monte Carlo simulation predicts permeability with a high certainty if the prediction zone in the simulation area has chemical concentration data. Finally, we analyzed the DOE funded INGENIOUS and GeoDAWN projects data. For discovering hidden geothermal systems in the Great Basin, the INGENIOUS project accumulated old data, collected new data, and released them in 2022. The dataset includes a total of 24 geological, geophysical, and geochemical attributes. Data resolution and scale significantly vary prohibiting an appropriate usage. To avoid such limitations, we brought all data in the same resolution and scale by applying the inverse distance weighting interpolation technique for predicting data in unsampled locations. Subsequently, we analyzed LiDAR data of the GeoDAWN project. We received data in tiles format. The DOE’s overarching goal is to use ML on LiDAR data for finding favorable geological structures (e.g., step up faults in Brady, Nevada). To serve the purpose, we need to label favorable geologic structures that correspond to LiDAR data. We wrote an algorithm to label the LiDAR data with the favorable geologic structures.

15 GEOTHERMAL ENERGY↗

The Short Life of Upvalley Wind in a High‐Altitude Valley in the Colorado Rocky Mountains

Thermally driven upvalley (UV) wind in the upper East River Valley in the Colorado Rocky Mountains often unexpectedly stops in midmorning and reverses back to downvalley (DV) wind. We use a comprehensive observational data set for a nearly two‐year long period to analyze the wind system and boundary layer evolution in this high‐altitude valley and determine the reason for this early wind reversal. Days with short UV wind predominantly occur during the warm season when the valley floor is free of snow and the convective boundary layer (CBL) grows well above the height of the surrounding ridges. UV wind persists throughout the day only on a few days during the warm season. We link differences in valley wind evolution to wind direction at upper levels at and above ridge height and propose forced channeling mechanisms to describe coupling between valley and upper‐level wind when the CBL grows above ridge height. The frequency distribution of upper‐level wind direction is such that channeling in the DV direction is favored, which explains the predominance of days with short UV wind. The deep CBL is supported by the presence of a deep weakly stably stratified residual layer with high aerosol content, which is regularly present over the mountain range during the warm season. On days when the CBL does not grow above ridge height, for example, when the valley floor is covered by snow, thermally driven UV wind is able to persist throughout the day independent of upper‐level wind direction.

54 ENVIRONMENTAL SCIENCES↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗