Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

An Experimental Approach to a Rapid Propulsion and Aeronautics Concepts Testbed

Modern aircraft design tools have limitations for predicting complex propulsion-airframe interactions. The demand for new tools and methods addressing these limitations is high based on the many recent Distributed Electric Propulsion (DEP) Vertical Take-Off and Landing (VTOL) concepts being developed for Urban Air Mobility (UAM) markets. We propose that low cost electronics and additive manufacturing can support the conceptual design of advanced autonomy-enabled concepts, by facilitating rapid prototyping for experimentally driven design cycles. This approach has the potential to reduce complex aircraft concept development costs, minimize unique risks associated with the conceptual design, and shorten development schedule by enabling the determination of many "unknown unknowns" earlier in the design process and providing verification of the results from aircraft design tools. A modular testbed was designed and built to evaluate this rapid design-build-test approach and to support aeronautics and autonomy research targeting UAM applications utilizing a complex, transitioning-VTOL aircraft configuration. The testbed is a modular wind tunnel and flight model. The testbed airframe is approximately 80% printed, with labor required for assembly. This paper describes the design process, fabrication process, ground testing, and initial wind tunnel structural and thermal loading of a proof-of-concept aircraft, the Langley Aerodrome 8 (LA-8).

McSwain, Robert G.↗

Analysis of Alternative Architectures for a 2024 Lunar Sortie

This study focused on performing a broad analysis of lunar architectures to identify key alternatives capable of performing a 2024 human lunar landing mission. The goal of the study was to identify architecture alternatives which exhibit robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The study consisted of up to three element architectures which perform the mission from cis-lunar aggregation, through the surface sortie, and return to cis-lunar space. More than 600,000 data points were evaluated utilizing a novel architecture synthesis framework currently being developed by NASA/MSFC. Key findings from the study indicate that architecture complexity can be reduced by minimizing the number of discrete, unique architecture elements, which in turn translates into reduced design, development, test, and evaluation (DDT&E) complexity. It was identified that heavy lift launch vehicles enable such architectures while also providing significant increases to launch vehicle margin over existing and near-term commercial launch vehicle (CLV) performance expected in the 2024 time frame. Additionally, the study identified storable propellant based lander architectures as leading alternatives in achieving a 2024 human lunar landing by providing reduced technology needs and development schedules.

Architecture Analysis↗

Surface Biology and Geology (SBG) Thermal Infrared (TIR) Free -Flyer Concept

Scientists and engineers from the United States and Italy are developing a thermal infrared (TIR) free-flyer concept that forms an essential element of the NASA Surface Biology & Geology (SBG) designated observable and the greater NASA Earth System Observatory (ESO), which also includes observations of aerosols, clouds, convection, and precipitation; mass change; and surface deformation & change.In response to the recommendations from the 2017 National Academies decadal survey for Earth science, NASA initiated the SBG designated observable with five key research and applications focus areas: ecosystems and natural resources, hydrology, weather, climate, and solid Earth. SBG includes spaceborne measurements of hyperspectral imagery in the visible to shortwave infrared (0.4-2.5 um) and multispectral imagery in the mid and thermal infrared (3-12 um) that provide the remote sensing data needed to inform each research and applications area. High-level TIR data products include Earth surface temperature & emissivity, evapotranspiration, substrate composition, volcanic plumes, and high-temperature features. While the science, applications, and technology build on prior mission studies conducted for more than a decade, it has only been recently that a joint team of scientists and engineers from the NASA Jet Propulsion Laboratory (JPL), Agenzia Spaziale Italiana (ASI), Istituto Nazionale Geofisica e Volcanologia (INGV), and the Istituto Nazionale Astrofisica (INAF) have developed a compelling concept for a TIR free-flyer. In this concept, the TIR instrument is an eight-band radiometer. Seven of the bands are between 3 and 12 um with an additional band at 1.65 um. The instrument’s 68.8 deg total viewing angle and the free-flyer’s 665 km operational altitude results in a ground sampling distance (GSD) of <60 m at nadir, produces a swath width of 935 km, and allows for a 2-3-day revisit time. A two-band visible and near infrared (VNIR) camera, with <30 m GSD at nadir and 935 km swath width, will complement the TIR instrument. VNIR high-level data products include top & bottom of atmosphere reflectance and normalized difference vegetation indices (NDVI). The TIR instrument and VNIR camera will be mounted on a PLATiNO+ spacecraft, a multi-application, reconfigurable, and scalable platform. The launcher selected for the TIR free-flyer is the VEGA-C. To maximize the science and applications benefits the SBG-TIR free-flyer team are collaborating with personnel from the ESA Land Surface Temperature Monitoring mission (LSTM) as well individuals from the Thermal Infrared Imaging Satellite for High-resolution Natural resource Assessment (TRISHNA), a joint mission by CNES and ISRO. Pre-Phase A concept studies for the SBG-TIR free-flyer commenced in the spring 2021. This allows for the concept to be refined; for technical risks to be identified and mitigated, as necessary; and strategies for reducing the development schedule to be defined and assessed before conducting a NASA-ASI Mission Concept Review (MCR) in the spring of 2022 and a NASA Key Decision Point-A (KDP-A) as early as the summer of 2022. These are key milestones in being able to launch and begin operating the SBG-TIR free-flyer in the second half of the decade, so that many of the questions posed by the National Academies in the 2017 decadal survey can be answered.

Fabrizia-Buongiorno, Maria↗

BioSentinel Avionics Design Approach with COTS Parts

This presentation focuses on ARC's avionics design approach using Commercial Off-The-Shelf (COTS) parts for high-risk, high-reward missions. Examples of ARC's past missions in small spacecraft, nano-satellites, and Class D payloads are highlighted, emphasizing the benefits of COTS, such as wider selections, faster development schedules, and lower costs. The challenges and limitations of traditional Qualified Parts List (QPL) approaches are discussed, along with observations from ARC missions, which show that design and workmanship issues are more significant than component failures. Mitigations for radiation risks associated with COTS are proposed, emphasizing risk awareness, proper software and hardware design, and careful parts selection. The success of ARC's 30+ projects using COTS over the past 17 years underscores its viability for high-risk missions.

BioSentinel↗

Cost and Schedule Analytical Techniques Development

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

Source record↗

Simulation/Emulation Techniques: Compressing Schedules With Parallel (HW/SW) Development

NASA has always been in the business of balancing new technologies and techniques to achieve human space travel objectives. NASA's Kedalion engineering analysis lab has been validating and using many contemporary avionics HW/SW development and integration techniques, which represent new paradigms to NASA's heritage culture. Kedalion has validated many of the Orion HW/SW engineering techniques borrowed from the adjacent commercial aircraft avionics solution space, inserting new techniques and skills into the Multi - Purpose Crew Vehicle (MPCV) Orion program. Using contemporary agile techniques, Commercial-off-the-shelf (COTS) products, early rapid prototyping, in-house expertise and tools, and extensive use of simulators and emulators, NASA has achieved cost effective paradigms that are currently serving the Orion program effectively. Elements of long lead custom hardware on the Orion program have necessitated early use of simulators and emulators in advance of deliverable hardware to achieve parallel design and development on a compressed schedule.

Mangieri, Mark L.↗

Cost and schedule analytical techniques development

This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

Source record↗

Cost and Schedule Analytical Techniques Development: Option 2 Year

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

Source record↗

Cost and Schedule Analytical Techniques Development

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

Source record↗

Cost and Schedule Analytical Techniques Development: Option 1

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

Source record↗

Low Cost Large Core Vehicle Structures Assessment

Boeing Information, Space, and Defense Systems executed a Low Cost Large Core Vehicle Structures Assessment (LCLCVSA) under contract to NASA Marshall Space Flight Center (MSFC) between November 1997 and March 1998. NASA is interested in a low-cost launch vehicle, code named Magnum, to place heavy payloads into low earth orbit for missions such as a manned mission to Mars, a Next Generation Space Telescope, a lunar-based telescope, the Air Force's proposed space based laser, and large commercial satellites. In this study, structural concepts with the potential to reduce fabrication costs were evaluated in application to the Magnum Launch Vehicle (MLV) and the Liquid Fly Back Booster (LFBB) shuttle upgrade program. Seventeen concepts were qualitatively evaluated to select four concepts for more in-depth study. The four structural concepts selected were: an aluminum-lithium monocoque structure, an aluminum-lithium machined isogrid structure, a unitized composite sandwich structure, and a unitized composite grid structure. These were compared against a baseline concept based on the Space Shuttle External Tank (ET) construction. It was found that unitized composite structures offer significant cost and weight benefits to MLV structures. The limited study of application to LFBB structures indicated lower, but still significant benefits. Technology and facilities development roadmaps to prepare the approaches studied for application to MLV and LFBB were constructed. It was found that the cost and schedule to develop these approaches were in line with both MLV and LFBB development schedules. Current Government and Boeing programs which address elements of the development of the technologies identified are underway. It is recommended that NASA devote resources in a timely fashion to address the specific elements related to MLV and LFBB structures.

Hahn, Steven E.↗

One for All: Maintaining a Single Schedule Database for Large Development Projects

Efficiently maintaining and controlling a single schedule database in an Integrated Product Team environment is a significant challenge. It's accomplished effectively with the right combination of tools, skills, strategy, creativity, and teamwork. We'll share our lessons learned maintaining a 20,000 plus task network on a 36 month project.

Hilscher, R.↗

Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS

The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.

Loganantharaj, Rasiah↗

A knowledge-based decision support system for payload scheduling

This paper presents the development of a prototype Knowledge-based Decision Support System, currently under development, for scheduling payloads/experiments on space station missions. The DSS is being built on Symbolics, a Lisp machine, using KEE, a commercial knowledge engineering tool.

Tyagi, Rajesh↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

Scheduling language and algorithm development study. Volume 1: Study summary and overview

A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

Source record↗