Search NASA⌕ Search

SEARCH · Search NASA

Results for “site operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Interactive orbital proximity operations planning system

An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

Grunwald, Arthur J.↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Hydrogen Generation Through Renewable Energy Sources at the NASA Glenn Research Center

An evaluation of the potential for generating high pressure, high purity hydrogen at the NASA Glenn Research Center (GRC) was performed. This evaluation was based on producing hydrogen utilizing a prototype Hamilton Standard electrolyzer that is capable of producing hydrogen at 3000 psi. The present state of the electrolyzer system was determined to identify the refurbishment requirements. The power for operating the electrolyzer would be produced through renewable power sources. Both wind and solar were considered in the analysis. The solar power production capability was based on the existing solar array field located at NASA GRC. The refurbishment and upgrade potential of the array field was determined and the array output was analyzed with various levels of upgrades throughout the year. The total available monthly and yearly energy from the array was determined. A wind turbine was also sized for operation. This sizing evaluated the wind potential at the site and produced an operational design point for the wind turbine. Commercially available wind turbines were evaluated to determine their applicability to this site. The system installation and power integration were also addressed. This included items such as housing the electrolyzer, power management, water supply, gas storage, cooling and hydrogen dispensing.

Colozza, Anthony↗

Practical Operational Readiness Gambits: Operations Training Simulations for the Curiosity Rover

The Mars Science Laboratory team had been puttingin effort to make a Training Venue to allow for parallel shadowtactical operations for trainees to actively work alongside theprime tactical operations personnel without affecting operations,since staffing constraints and shortened operations timelineswere straining the tactical process in supporting operationstrainees in the traditional way. The COVID- 19 Pandemic presentedfurther challenges in continuing on-console training forMSL operations trainees. The MSL operations team switched tofully remote operations, thus hampering the direct mentorshipa trainee would normally receive while on site at JPL. TheMars 2020 training team had developed a concept for roveroperations training simulations based on Johnson Space Center’sextensive simulations training program for astronauts andflight controllers. The MSL team borrowed this idea, and implementedthese training simulations which are called PracticalOperational Readiness Gambits (PORGs). The PORGs so farhave focused on the Science Planner and Rover Planner roles,which are two crucial roles in tactical operations that engagein key interactions throughout a shift. PORGs are based onactual sol scenarios that have occurred on Mars and follow thetactical operations process and timeline as closely as possible.However, unlike an operations shift, PORGs can slow down orpause to allow for more mentoring time. PORGs can focus onparticular skills to test the trainees on their understanding ofa concept. PORGs increase in complexity with each scenario toease the trainees into more typical tactical operations workloads.As more trainees join the MSL operations team, more roles arebeing incorporated into PORGs. There are plans to incorporatecertified operations personnel into PORGs to practice anomalyresponse situations. PORGs have become an essential part of theMSL operations training program and will continue even afterthe return to on-site operations at JPL.

Gajeway, Jocelyn↗

Synchronized computational architecture for generalized bilateral control of robot arms

A master six degree of freedom Force Reflecting Hand Controller (FRHC) is available at a master site where a received image displays, in essentially real time, a remote robotic manipulator which is being controlled in the corresponding six degree freedom by command signals which are transmitted to the remote site in accordance with the movement of the FRHC at the master site. Software is user-initiated at the master site in order to establish the basic system conditions, and then a physical movement of the FRHC in Cartesean space is reflected at the master site by six absolute numbers that are sensed, translated and computed as a difference signal relative to the earlier position. The change in position is then transmitted in that differential signal form over a high speed synchronized bilateral communication channel which simultaneously returns robot-sensed response information to the master site as forces applied to the FRHC so that the FRHC reflects the feel of what is taking place at the remote site. A system wide clock rate is selected at a sufficiently high rate that the operator at the master site experiences the Force Reflecting operation in real time.

Szakaly, Zoltan F.↗

Overview of GPM Missions's Ground Validation Program

An important element of the internationally structured Global Precipitation Measurement (GPM) mission will be its ground validation research program. Within the last year, the initial architecture of this program has taken shape. This talk will describe that architecture, both in terms of the international program and in terms of the separate regional programs of the principle participating space agencies, i.e., ESA, JAXA, and NASA. There are three overriding goals being addressed in the planning of this program; (1) establishing various new, challenging and important scientific research goals vis-a-vis current ground validation programs supporting satellite retrieval of precipitation; (2) designing the program as an international partnership which operates, out of necessity, heterogeneous sites in terms of their respective observational foci and science thrusts, but anneals itself in terms of achieving a few overarching scientific objectives; and (3) developing a well-designed protocol that allows specific sites or site networks, at their choosing, to operate in a 'supersite' mode - defined as the capability to routinely transmit GV information at low latency to GPM's Precipitation Processing System (PPS). (The PPS is being designed as GPM's data information system, a distributed data system with main centers at the Goddard Space Flight Center (GSFC) within NASA, the Earth Observation Research Center (EORC) within JAXA, and a TBD facility to be identified by the ESA s ESTEC facility in Noordwijk.)

Smith, Eric A.↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

Supervisory Control with Dual Tasking in Post G-Transition Vehicle Landings

BACKGROUND Landing during exploration spaceflight may consist of both planned automated supervisory control and unplanned crew override. Supervisory control, particularly when performed under cognitive load with additional monitoring tasks, is essential for ensuring overall mission success during landing contingencies. Evaluating performance in a relevant Human Landing System (HLS) supervisory landing task after long-duration microgravity exposure can help identify potential risks from human error and sensorimotor alterations. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. Although training and landing aids facilitate successful landings despite disorientation, these adaptive changes may heighten cognitive demand, which must be considered in the landing strategy. It is important to characterize these effects as soon as possible following the G-transition while the sensorimotor system remains in a state of adaptive flux to inform appropriate countermeasures. METHODS A Multi-attribute Lunar Table Battery (MALTB) task was developed for an iOS tablet device to provide flexible crew testing and training capabilities in-flight and on the ground. Elements of the tablet task were derived from the Multi-Attribute Task Battery (MATB, Cegarra et al. 2020). The task requires crew members to study a map of a planned landing site and memorizing the terrain and surface landmarks to inform potential divert maneuvers during landing. The user will oversee a series of approaches through touchdown simulations on the tablet with an external camera view of the Lunar surface. The primary responsibility of the crew member will be to execute a divert if the guidance recommended site is erroneous (e.g., the guidance projected landing target is not within 10m of the planned landing site center), or the projected landing site is no longer suitable due to surface obstacles. Considering vehicle maneuverability and fuel reserves, the divert capabilities will diminish as the task progresses. In cases where a divert is initiated, a new landing target will need to be designated by the user and will be evaluated for the proximity to the original pre-planned site. A secondary operational monitoring task will challenge the user's cognitive reserve by requiring the user to maintain several gauges within acceptable limits and respond to a visual indicator while completing the landing approach. Outcome measures include distance from the planned landing site to the user-initiate divert landing location, ground slope at the new landing site, time to divert, the ability to accomplish the secondary monitoring tasks, and perceived workload. The tablet task is being evaluated in a ground-based study to determine the learning effect of first-time users. The tablet task will be utilized in a flight study to test performance multiple times postflight. Future potential testing in-flight have been identified for capsules with iOS tablet devices. Multi-attribute Lunar Table Battery Task MALTB comprises video footage of thirty distinct landing conditions. The landing scenarios feature various landing sites (n = 3), hazardous object sizes (n = 6), sun azimuth degrees (n = 4), camera modes (i.e., fixed or gimbaled), and navigation bias (i.e., true or false). Each seventy second trial uses a sixty-degree constant glideslope trajectory. The application architecture and layout include user identification setup and data storing, a guided walkthrough of the task and interface components, practice mode for task familiarization, and a modified Bedford workload scale administered following task completion. The time-based dependent measures are saved locally to the iOS Files application and post-processing scripts have been developed to evaluate the remaining measures of performance. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the landing risks associated with sensorimotor alterations. ACKNOWLEDGEMENTS: This project is funded by NASA’s Human Research Program Human Health Countermeasures Element. REFERENCES Cegarra J, Valery B, Avril E, Calmettes C, Navarro J (2020) OpenMATB: A Multi-Attribute Task Battery promoting task customization, software extensibility and experiment replicability. Behav Res Methods 52:1980-1990 doi: 10.3758/s13428-020-01364-w

Matthew McDonnell↗

Evaluation of the feasibility of using the data collection system to operate a network of hydrological and climatological stations at sites remote from normal communication links

The author has identified the following significant results. The General Electric DCP has proven to be a versatile, rugged piece of hardware and has surpassed original expectation; it is very simple to use and does not require skilled staff for its use, installation, and operation. It is well suited for use in remote sites where no power is available. From this experience, it is concluded that the data collection system will be very useful in operating a network of hydrometeorological stations situated in sites remote from normal communication links.

Perrier, R.↗

Feasibility and Definition of a Lunar Polar Volatiles Prospecting Mission

The recent Lunar Crater Observing and Sensing Satellite (LCROSS) mission has provided evidence for significant amounts of cold trapped volatiles in Cabeus crater near the Moon's south pole. Moreover, LRO/Diviner measurements of extremely cold lunar polar surface temperatures imply that volatiles can be stable outside or areas of strict permanent shadows. These discoveries suggest that orbital neutron spectrometer data point to extensive deposits at both lunar poles. The physical state, composition and distribution of these volatiles are key scientific issues that relate to source and emplacement mechanisms. These issues are also important for enabling lunar in situ resource utilization (ISRU). An assessment of the feasibility of cold-trapped volatile ISRU requires a priori information regarding the location, form, quantity, and potential for extraction of available resources. A robotic mission to a mostly shadowed but briefly .unlit location with suitable environmental conditions (e.g. short periods of oblique sunlight and subsurface cryogenic temperatures which permit volatile trapping) can help answer these scientific and exploration questions. Key parameters must be defined in order to identify suitable landing sites, plan surface operations, and achieve mission success. To address this need, we have conducted an initial study for a lunar polar volatile prospecting mission, assuming the use of a solar-powered robotic lander and rover. Here we present the mission concept, goals and objectives, and landing site selection analysis for a short-duration, landed, solar-powered mission to a potential hydrogen volatile-rich site.

Heldmann, Jennifer↗

Pax: A permanent base for human habitation of Mars

The Advanced Design Program in Space Architecture at the University of Wisconsin-Milwaukee supported the synthesis report and two of its scenarios - 'Architecture 1' and 'Architecture 4' - and the Weaver ExPO report on near-term extraterrestrial explorations during the spring of 1992. The project investigated the implications of different mission scenarios, the Martian environment, supporting technologies, and especially human factors and environment-behavior considerations for the design of the first permanent Martian base. This paper presents the results of that investigation. The paper summarizes site selection, development of habitability design requirements based on environment-behavior research, construction sequencing, and a full concept design and design development for a first permanent Martian base and habitat. The proposed design is presented in terms of an integrative mission scenario and master plan phased through initial operational configuration, base site plan, and design development details of a complete Martian habitat for 18 crew members including all laboratory, mission control, and crew support spaces.

Moore, Gary T.↗

Flight Demonstration of Unmanned Aircraft System (UAS) Traffic Management (UTM) at Technical Capability Level 3

The goal of the Unmanned Aircraft System (UAS) Traffic Management (UTM) effort at NASA is to enable access to low-altitude airspace for small UAS. This goal is being achieved partly through partnerships that NASA has developed with the FAA, other government agencies, the UAS stakeholder community, and the designated FAA UAS Test Sites. This paper reports the technical and operational capabilities demonstrated during the UTM flight demonstration, March 6 through May 30, 2018. The demonstration featured geographically diverse operations, involving FAA UAS Test Sites in Alaska, Nevada, New York, North Dakota, Texas and Virginia. The demonstration leveraged the contributions of 30 partner organizations serving as UAS service suppliers, UAS operators, and/or providers of sensors, surveillance, connectivity, and management roles. Utilizing the UTM architecture developed at NASA, the demonstration explored 11 use cases for small UAS operations to highlight UTM capabilities at what NASA calls “Technical Capability Level (TCL) 3.” TCL 3 is characterized by multiple small UAS safely operating in moderately populated areas and beyond the visual line of sight of their operators. The TCL 3 flights demonstrated the basic feasibility of such operations in the UTM environment, including USS exchanges; communication, navigation and surveillance functions; sense and avoid capabilities; and technologies and procedures to enable them.

Aweiss, Arwa↗

Generic Propellants Transfer Unit (GPTU)

The Generic Propellants Transfer Unit (GPTU) is being designed to support spacecraft liquid propellant operations at the Kennedy Space Center (KSC) and Eastern Test Range (ETR). The GPTU will have a 500 gallon capacity and be Department Of Transportation (DOT) approved for over-the-road transportation of hypergolic propellants. The use of these containers will allow the users to increase efficiency and reduce the following costs: design/construction, transportation (to/from the launch site), propellant transfer operations, and decontamination operations. The user also acquires the flexibility of transporting to an offsite location for processing or storage without obtaining special exemptions or permits. These containers will incorporate their own quantity gaging and temperature sensing systems, and be integrated onto a transport trailer which contains work platforms and a fluid transfer system.

Cook, Christopher A.↗

Environmental projects, volume 10. Environmental assessment: New 34-meter antenna at Apollo site

The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.

Source record↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Monte Carlo Tree Search Approach

Numerous unmanned aircraft systems operating at low altitudes to deliver goods and services may one day become ubiquitous in our cities. In the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) framework, such a concept is envisioned, where aerial vehicles operate beyond visual line of sight (BVLOS) within specifically reserved and time stamped “corridors” in the airspace. For example, these corridors or operational intent volumes can connect an aerial vehicle’s origin site to its destination site for package delivery operations. There may also be more than one corridor available for an aerial vehicle to choose from and often different corridors may intersect with one another. Thus, it is imperative to ensure flight trajectories belonging to different aerial vehicles are not in conflict. Per the UTM CONOPs, we assume that a vehicle almost always stays inside its corridor or operational volume. This work provides a framework for strategic deconfliction of UTM or package delivery drones, where we schedule the departure time of all vehicles subject to various temporal constraints (including the corridor deconfliction at the intersections). We present the “multi-route weighted package delivery problem” which serves as an exemplifying model for strategic deconfliction in UTM. In the multi-route weighted package delivery problem, a graph network is given which consists of a set of depots (source) and drop-off (destination) nodes, with multiple routes (defined as a sequence of waypoints) connecting the depots to drop-off nodes. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is for a known set of aerial vehicles to depart from the depots, choose a route and take off time, while avoiding conflicts with other aerial vehicles, and minimizing both risk and distance traveled. We provide a mixed integer linear programming (MILP) formulation of the problem, as well as a heuristic solution based on Monte Carlo Tree Search (MCTS) – a method used in game theory and artificial intelligence – to overcome limitations inherent to optimal solvers. Computational results show the advantages of using MCTS over the MILP formulation; the former can provide a sub-optimal solution quickly, and may sometimes even reach an optimal solution, whereas the latter may not even produce a solution in reasonable time. Furthermore, results from both the MILP formulation and MCTS methods were validated using a preliminary agent-based simulator implementing the UTM concept of operations. Thus, the MCTS method can be seen as a scalable solution to the complex multi-route weighted package delivery problem and may possibly be extended to similar complex optimization problems.

Kenny Chour↗

Measuring surface fluxes in CAPE

Two stations (site 1612 and site 2008) were operated by the University of Georgia group from 6 July 1991 to 18 August 1991. The following data were collected continuously: surface energy fluxes (i.e., net radiation, soil heat fluxes, sensible heat flux and latent heat flux), air temperature, vapor pressure, soil temperature (at 1 cm depth), and precipitation. Canopy reflectance and light interception data were taken three times at each site between 6 July and 18 August. Soil moisture content was measured twice at each site.

Kanemasu, E. T.↗

Hot gas ingestion: From model results to full scale engine testing

An overview is presented of a joint NASA Lewis McDonnell Aircraft Co. Hot Gas Ingestion (HGI) test program in NASA Lewis' 9 x 15 foot Low Speed Wind Tunnel (LSWT). Advanced short takeoff vertical landing (ASTOVL) aircraft capable of operating from remote sites, damaged runways, aircraft carriers and small air-capable ships are being pursued for deployment around the turn of the century. To achieve this goal, it is important that technologies critical to this unique class of aircraft be developed. One of the ASTOVL concepts, the vectored thrust, has as its critical technology item, the potential of hot gas ingestion (which occurs during vertical flight operation while in ground effect) as a key development issue. Recognizing this need, NASA Lewis Powered Lift Section and McAir have defined a cooperative program for testing in the Lewis 9 x 15 foot LSWT. This program is described in detail.

Johns, Albert L.↗

Surface Operations: Two Case Studies of Simulated Lunar Operations

In September 2007, a team of scientists and engineers from several NASA centers participated in a field exercise at Meteor Crater, Arizona. The tests in this field exercise utilized recently developed robots of varying scales and capabilities and humans in pressurized space suits. Two examples of operations performed in the field are presented: a surface operations scenario involving suited crew supported by a number of mobile robots and setup operations for accessing a crater. The surface operations scenario simulated the end of a crew sortie and involved the following agents: 1) Suit subjects from Johnson Space Center s (JSC) advanced spacesuit laboratory 2) JSC's unpressurized crewed rover testbed, SCOUT 3) The Jet Propulsion Laboratory s (JPL) rough terrain, payload carrying robot, ATHLETE 4) JSC's Astronaut assist robot, Robonaut 5) Ames Research Center's (ARC) inspection robot, K-10. Operations began with ATHLETE positioning a pressurized rover compartment (PRC) as two crew members drove the SCOUT unpressurized rover from the field. The crew dismounted SCOUT, walked to the PRC for recharging. Robonaut then removed a sample box from the SCOUT equipment tray. K-10 then performed a drive around inspection of SCOUT, assembling a mosaic image. Lastly, the SCOUT vehicle was remotely driven to the next site. The setup operations for crater access scenario involved ATHLETE and Robonaut. This scenario began with Robonaut approaching ATHLETE and extracting a tether line. ATHLETE then extracted a drill and drilled an anchor into the surface. Robonaut then reconnected the tether to the anchor and backed away. ATHLETE is then ready to descend into the crater. This descending into the crater step is currently in the planning phase.

Bluethmann, William J.↗