Search NASA⌕ Search

SEARCH · Search NASA

Results for “software sustainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 60,000 cases during its parametric sweeps; these system iterations produced valuable insight into the optimal LADI geometry for minimizing energy demands, estimating carbothermal reactor and radiator mass relationships, and calculated the power dynamics of the electrolysis unit. Advanced efforts with advanced models will include examining multiple production targets to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy, and increase the MAIT software capability to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

Develop advanced nonlinear signal analysis topographical mapping system

The Space Shuttle Main Engine (SSME) has been undergoing extensive flight certification and developmental testing, which involves some 250 health monitoring measurements. Under the severe temperature, pressure, and dynamic environments sustained during operation, numerous major component failures have occurred, resulting in extensive engine hardware damage and scheduling losses. To enhance SSME safety and reliability, detailed analysis and evaluation of the measurements signal are mandatory to assess its dynamic characteristics and operational condition. Efficient and reliable signal detection techniques will reduce catastrophic system failure risks and expedite the evaluation of both flight and ground test data, and thereby reduce launch turn-around time. The basic objective of this contract are threefold: (1) develop and validate a hierarchy of innovative signal analysis techniques for nonlinear and nonstationary time-frequency analysis. Performance evaluation will be carried out through detailed analysis of extensive SSME static firing and flight data. These techniques will be incorporated into a fully automated system; (2) develop an advanced nonlinear signal analysis topographical mapping system (ATMS) to generate a Compressed SSME TOPO Data Base (CSTDB). This ATMS system will convert tremendous amount of complex vibration signals from the entire SSME test history into a bank of succinct image-like patterns while retaining all respective phase information. High compression ratio can be achieved to allow minimal storage requirement, while providing fast signature retrieval, pattern comparison, and identification capabilities; and (3) integrate the nonlinear correlation techniques into the CSTDB data base with compatible TOPO input data format. Such integrated ATMS system will provide the large test archives necessary for quick signature comparison. This study will provide timely assessment of SSME component operational status, identify probable causes of malfunction, and indicate feasible engineering solutions. The final result of this program will yield an ATMS system of nonlinear and nonstationary spectral analysis software package integrated with the Compressed SSME TOPO Data Base (CSTDB) on the same platform. This system will allow NASA engineers to retrieve any unique defect signatures and trends associated with different failure modes and anomalous phenomena over the entire SSME test history across turbo pump families.

Source record↗

Develop advanced nonlinear signal analysis topographical mapping system

The SSME has been undergoing extensive flight certification and developmental testing, which involves some 250 health monitoring measurements. Under the severe temperature pressure, and dynamic environments sustained during operation, numerous major component failures have occurred, resulting in extensive engine hardware damage and scheduling losses. To enhance SSME safety and reliability, detailed analysis and evaluation of the measurements signal are mandatory to assess its dynamic characteristics and operational condition. Efficient and reliable signal detection techniques will reduce catastrophic system failure risks and expedite the evaluation of both flight and ground test data, and thereby reduce launch turn-around time. The basic objective of this contract are threefold: (1) Develop and validate a hierarchy of innovative signal analysis techniques for nonlinear and nonstationary time-frequency analysis. Performance evaluation will be carried out through detailed analysis of extensive SSME static firing and flight data. These techniques will be incorporated into a fully automated system. (2) Develop an advanced nonlinear signal analysis topographical mapping system (ATMS) to generate a Compressed SSME TOPO Data Base (CSTDB). This ATMS system will convert tremendous amounts of complex vibration signals from the entire SSME test history into a bank of succinct image-like patterns while retaining all respective phase information. A high compression ratio can be achieved to allow the minimal storage requirement, while providing fast signature retrieval, pattern comparison, and identification capabilities. (3) Integrate the nonlinear correlation techniques into the CSTDB data base with compatible TOPO input data format. Such integrated ATMS system will provide the large test archives necessary for a quick signature comparison. This study will provide timely assessment of SSME component operational status, identify probable causes of malfunction, and indicate feasible engineering solutions. The final result of this program will yield an ATMS system of nonlinear and nonstationary spectral analysis software package integrated with the Compressed SSME TOPO Data Base (CSTDB) on the same platform. This system will allow NASA engineers to retrieve any unique defect signatures and trends associated with different failure modes and anomalous phenomena over the entire SSME test history across turbo pump families.

Jong, Jen-Yi↗

Solar Airplanes and Regenerative Fuel Cells

A solar electric aircraft with the potential to "fly forever" has captured NASA's interest, and the concept for such an aircraft was pursued under Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project. Feasibility of this aircraft happens to depend on the successful development of solar power technologies critical to NASA's Exploration Initiatives; hence, there was widespread interest throughout NASA to bring these technologies to a flight demonstration. The most critical is an energy storage system to sustain mission power during night periods. For the solar airplane, whose flight capability is already limited by the diffuse nature of solar flux and subject to latitude and time of year constraints, the feasibility of long endurance flight depends on a storage density figure of merit better than 400-600 watt-hr per kilogram. This figure of merit is beyond the capability of present day storage technologies (other than nuclear) but may be achievable in the hydrogen-oxygen regenerative fuel cell (RFC). This potential has led NASA to undertake the practical development of a hydrogen-oxygen regenerative fuel cell, initially as solar energy storage for a high altitude UAV science platform but eventually to serve as the primary power source for NASAs lunar base and other planet surface installations. Potentially the highest storage capacity and lowest weight of any non-nuclear device, a flight-weight RFC aboard a solar-electric aircraft that is flown continuously through several successive day-night cycles will provide the most convincing demonstration that this technology's widespread potential has been realized. In 1998 NASA began development of a closed cycle hydrogen oxygen PEM RFC under the Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project and continued its development, originally for a solar electric airplane flight, through FY2005 under the Low Emissions Alternative Power (LEAP) project. Construction of the closed loop system began in 2002 at the NASA Glenn Research Center in Cleveland, Ohio. System checkout was completed, and testing began, in July of 2003. The initial test sequences were done with only a fuel cell or electrolyzer in the test rig. Those tests were used to verify the test apparatus, procedures, and software. The first complete cycles of the fully closed loop, regenerative fuel cell system were successfully completed in the following September. Following some hardware upgrades to increase reactant recirculation flow, the test rig was operated at full power in December 2003 and again in January 2004. In March 2004 a newer generation of fuel cell and electrolyzer stacks was substituted for the original hardware and these stacks were successfully tested at full power under cyclic operation in June of 2004.

Bents, David J.↗

The J-2X Upper Stage Engine: From Heritage to Hardware

NASA's Global Exploration Strategy requires safe, reliable, robust, efficient transportation to support sustainable operations from Earth to orbit and into the far reaches of the solar system. NASA selected the Ares I crew launch vehicle and the Ares V cargo launch vehicle to provide that transportation. Guiding principles in creating the architecture represented by the Ares vehicles were the maximum use of heritage hardware and legacy knowledge, particularly Space Shuttle assets, and commonality between the Ares vehicles where possible to streamline the hardware development approach and reduce programmatic, technical, and budget risks. The J-2X exemplifies those goals. It was selected by the Exploration Systems Architecture Study (ESAS) as the upper stage propulsion for the Ares I Upper Stage and the Ares V Earth Departure Stage (EDS). The J-2X is an evolved version ofthe historic J-2 engine that successfully powered the second stage of the Saturn I launch vehicle and the second and third stages of the Saturn V launch vehicle. The Constellation architecture, however, requires performance greater than its predecessor. The new architecture calls for larger payloads delivered to the Moon and demands greater loss of mission reliability and numerous other requirements associated with human rating that were not applied to the original J-2. As a result, the J-2X must operate at much higher temperatures, pressures, and flow rates than the heritage J-2, making it one of the highest performing gas generator cycle engines ever built, approaching the efficiency of more complex stage combustion engines. Development is focused on early risk mitigation, component and subassembly test, and engine system test. The development plans include testing engine components, including the subscale injector, main igniter, powerpack assembly (turbopumps, gas generator and associated ducting and structural mounts), full-scale gas generator, valves, and control software with hardware-in-the-loop. Testing expanded in 2007, accompanied by the refinement of the design through several key milestones. This paper discusses those 2007 tests and milestones, as well as updates key developments in 2008.

Byrd, THomas↗

Development of a Comprehensive Physics-Based Model for Study of NASA Gateway Lunar Dust Contamination

NASA is committed to landing the first woman and first person of color on the Moon by 2025 to begin a sustaining presence. A major component of this mission is NASA’s orbiting lunar outpost, Gateway, that will be subjected to the harsh environment of space during its 7-day orbit around the Moon. One aspect of this environment that is not well quantified is microscopic lunar regolith particles, or simply, lunar dust. As Apollo 17 Mission Commander Eugene Cernan said, “I think dust is probably one of our greatest inhibitors to a nominal operation on the moon. I think we can overcome other physiological or physical or mechanical problems except dust” [1]. These dust particles, most of which are smaller than the width of two human hairs and of highly irregular shape, are composed mainly of dielectric materials. Such characteristics can allow the dust particles to collect electric charge from the surrounding environment, resulting in electrostatic interactions between the dust, electromagnetic fields, and electrically charged surfaces [2-3]. Due to the nature of these fields, dust can collect on and contaminate charged surfaces. Lunar dust introduced into the Gateway environment by a lunar ascent vehicle element returning from the surface of the Moon presents risks to Gateway hardware such as radiators, solar arrays, antennae, and docking mechanisms. To quantify this risk and inform NASA, International Partner, and Commercial Provider stakeholders, Booz Allen, in partnership with NASA, is developing a toolset to model the interaction of charged lunar dust particles with the cis-lunar and deep-space environments. This includes a comprehensive physics model of the space plasma and solar radiation environment and electromagnetic interaction of spacecraft and lunar dust. Spacecraft charging and plasma environment are solved using the open-source code from The French Aerospace Lab (ONERA) and the European Space Agency (ESA), known as Spacecraft Plasma Interaction Software (SPIS) [4]. The physics of particle charging and motion is handled by a time-dependent implementation of Orbital-Motion-Limited (OML) theory which accounts for plasma flows and positive potential grains [5-7], using Siemens STAR-CCM+ as the framework. Model validation includes lab experiments by NASA experts and academia, as well as future on-orbit dust detecting payloads on the exterior of Gateway and Commercial Lunar Payload Services (CLPS) missions to the lunar surface [7-9]. The results and analyses will inform Gateway Program system owners at risk for lunar dust contamination.

Complex Plasma↗

Solar Cruiser Technology Maturation Plans

The NASA Marshall Space Flight Center (MSFC) developed the Solar Cruiser mission concept to mature solar sail technology for use in future Heliophysics missions, as well as missions of interest across a broad user community (e.g., space weather and Earth polar observatories). Solar Cruiser will serve as a pathfinder for missions that observe the solar environment from unique vantage points such as a high inclination solar mission opening a fundamentally new range of observational capabilities for the Heliophysics Program and for space weather monitoring. Sustained observations away from the Sun-Earth line (SEL) present unique opportunities for answering the outstanding science questions of Heliophysics, improving space-weather monitoring and prediction, and revealing new information about our Sun and solar system. Propellantless solar sails can be used to create artificial equilibria and maintain indefinite station-keeping at locations sunward of L1 along the SEL, or at any desired offset from the SEL leading or trailing the Earth in its orbit. They can change the heliocentric inclination of a spacecraft from the ecliptic to as high as solar polar, stopping and remaining at any intermediate inclination orbit in between. Sails can be used to hover over the Earth’s poles, using solar photon pressure to offset the Earth’s gravitational attraction, creating functional equivalents of geostationary earth orbits. The Solar Cruiser mission would fly a small spacecraft with a large (>1,600 square meter) solar sail containing embedded reflectivity control devices (RCDs) and photovoltaic cells. The mission concept includes successful deployment of the solar sail, validation of all sail subsystems, controlled station-keeping inside of the Sun-Earth L1 point, attitude control of the sail with the RCDs (including spinning and de-spinning), demonstration of pointing performance for science imaging, and an increase in heliocentric inclination (out of the ecliptic). To demonstrate the requisite sail technology, the Solar Cruiser project will design, fabricate, deploy, and fly the Solar Sail Propulsion Element (SSPE). The SSPE incorporates the following three systems: • The Solar Sail System (SSS) provides the large propulsive surface required for acceleration and smaller reflectivity-changing surfaces for roll control. • The Active Mass Translator System (AMT) provides SSPE motion with respect to the sailcraft bus for pitch and yaw control. • The Solar Sail Attitude Determination and Control System (SSADCS) consists of embedded software to 1) provide autonomous sailcraft attitude estimation, attitude pointing control, and reaction wheel momentum management following sail deployment and 2) execute the uplinked inertial attitude pointing commands to maintain the desired sailcraft trajectory. The plans for maturing each of these technology systems to TRL 5 and beyond are described herein.

Solar Sail↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

Global 3D Data Visualization and Analysis Platform with Advanced Machine Learning Capabilities in Support of Lunar Exploration

Introduction: The science goals for NASA’s Artemis program include: a) Understanding the character and origin of lunar polar volatiles, b) Conducting experimental science in the lunar environment and c) Investigating and mitigating exploration risks. The permanently shadowed regions (PSRs) on the Lunar south pole are expected to host large quantities of water-ice and volatiles that are important for sustainable Lunar exploration. There are several missions such as onboard Korea Pathfinder Lunar Orbiter (KPLO: Korean name Danuri) with onboard ShadowCam camera, Astrobotic Peregrine Mission One [4], and other efforts underway to obtain high resolution topographic, minerals, volatiles and other information on the moon. We envision a need in immediate future for platforms to integrate these data sets, provide rendering and visualization capabilities in the context of a 3D Lunar globe for easier information access and analysis. NASA's Celestial Mapping System (CMS) is developed to address the need for 3D tools for planetary science investigations, mission planning, in-situ operations, in a 3D-first design constructed around a unified view of a planetary globe. At present CMS provides many critical functionalities that include: 1) equipment planning and optimized placement on Lunar surface 2) line-of-sight (LOS) analysis 3) powerful measurement tools based on 3D terrain with realistic 3D models to represent rovers, astronauts and equipment 4) visualization of derived mapping products (e.g. resource maps), and 5) a data engine for hosting new observations that are not available in other contemporary lunar data tools. Planetary Data Ingestion: CMS can consume and analyze data from locally hosted and external third party sources. It is compatible with Open Geospatial Consortium (OGC) data and file standards and currently integrates datasets from the Astrogeology Science Center of USGS. This includes global and local data acquired from NASA (LRO, Clementine, Lunar Orbiter) and JAXA (SELENE/Kaguya), with capability of integrating more datasets. In addition, users can specify other WMS-hosted data endpoints, which CMS can then query and stream data from automatically. To set-up an automated process for ingestion and accurate rendering, visualization and analysis of external 3rd party planetary datasets within CMS, we initiated the process of ingesting unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool. This tool was developed to enhance the extremely low-light images of the interior of PSRs and provide the ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the Nobile region on the Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Figure 1 shows the dark PSR zone form the original NAC layer of LRO as the base layer (left image) and the illuminated areas within that crater (center) which was created by ingesting and merging several of HORUS generated images. At present we employ a semi-automated process to ensure spatial accuracy and merger of several overlapping zones. However, we are in the process of completely automating this process by employing AI based techniques that would rank, sort, and stack the images based on their information density. The georectification of the images would employ selected features. Analysis on Ingested Planetary Datasets: Once an external planetary data-set is successfully ingested, georectified and merged seamlessly as a data-layer; CMS’ numerous analysis tools can be used on this data. A Line of Sight (LOS) tool has been developed for CMS which analyzes terrain profiles and obstructions to determine visibility for remote observers. Figure 1 (right image) shows the viewshed analysis on the same PSR in the Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. The Measurements tool allows the user to take area and distance measurements of features on the terrain using various shapes. Measurement type can be specified in a number of ways: Line, Path, Polygon, Circle, Ellipse, Square, Rectangle or Freehand. Once the shape is specified, elevation information can then be extracted along each of these shapes. Figure 2 (left) shows the measurements performed on a crater n illuminated PSR in Nobile region. The equipment placement tool allows the user to place a 3D equipment model at a desired location and analyze its coverage area. The equipment placement tool is coupled with LOS to determine the coverage. Figure 2 (right) shows an equipment placed on the Lunar terrain and it’s coverage area. The red rays are blocked sight lines and the green rays are non-obstructed sight lines with the cyan lines showing the point of intersection with the terrain. More details are provided in the video demonstrations in Reference 5. Overcoming Polar Distortions: 3D geospatial applications exhibit significant distortions in polar imagery due to several reasons: 1) distortions in the source imagery, 2) incompatible tessellation algorithms at the poles, and 3) map projections. We are leveraging new tessellation algorithms and reprojecting data using projections that are better suited for Lunar poles. The goal is to seamlessly switch to polar projections while maintaining 3D view and navigation.

Maps↗

Global 3D Data Visualization and Analysis Platform With Advanced Machine Learning Capabilities in Support of Lunar Exploration

Introduction: The science goals for NASA’s Artemis program include: a) Understanding the character and origin of lunar polar volatiles, b) Conducting experimental science in the lunar environment and c) Investigating and mitigating exploration risks [1]. The permanently shadowed regions (PSRs) on the Lunar south pole are expected to host large quantities of water-ice and volatiles that are important for sustainable Lunar exploration [2]. There are several missions such as onboard Korea Pathfinder Lunar Orbiter (KPLO: Korean name Danuri) with onboard ShadowCam camera [3], Astrobotic Peregrine Mission One [4], and other efforts underway to obtain high resolution topographic, minerals, volatiles and other information on the moon. We envision a need in immediate future for platforms to integrate these data sets, provide rendering and visualization capabilities in the context of a 3D Lunar globe for easier information access and analysis. NASA's Celestial Mapping System (CMS) [5] is developed to address the need for 3D tools for planetary science investigations, mission planning, in-situ operations, in a 3D-first design constructed around a unified view of a planetary globe. At present CMS provides many critical functionalities that include: 1) equipment planning and optimized placement on Lunar surface 2) line-of-sight (LOS) analysis 3) powerful measurement tools based on 3D terrain with realistic 3D models to represent rovers, astronauts and equipment 4) visualization of derived mapping products (e.g. resource maps), and 5) a data engine for hosting new observations that are not available in other contemporary lunar data tools [5, 7]. Planetary Data Ingestion: CMS can consume and analyze data from locally hosted and external third party sources. It is compatible with Open Geospatial Consortium (OGC) data and file standards and currently integrates datasets from the Astrogeology Science Center of USGS. This includes global and local data acquired from NASA (LRO, Clementine, Lunar Orbiter) and JAXA (SELENE/Kaguya), with capability of integrating more datasets. In addition, users can specify other WMS-hosted data endpoints, which CMS can then query and stream data from automatically. To set-up an automated process for ingestion and accurate rendering, visualization and analysis of external 3rd party planetary datasets within CMS, we initiated the process of ingesting unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool [8]. This tool was developed to enhance the extremely low-light images of the interior of PSRs and provide the ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the Nobile region on the Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Figure 1 shows the dark PSR zone form the original NAC layer of LRO as the base layer (left image) and the illuminated areas within that crater (center) which was created by ingesting and merging several of HORUS generated images. At present we employ a semi-automated process to ensure spatial accuracy and merger of several overlapping zones. However, we are in the process of completely automating this process by employing AI based techniques that would rank, sort, and stack the images based on their information density. The georectification of the images would employ selected features. Analysis on Ingested Planetary Datasets: Once an external planetary data-set is successfully ingested, georectified and merged seamlessly as a data-layer; CMS’ numerous analysis tools can be used on this data. A Line of Sight (LOS) tool has been developed for CMS which analyzes terrain profiles and obstructions to determine visibility for remote observers [5,6]. Figure 1 (right image) shows the viewshed analysis on the same PSR in the Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. The Measurements tool allows the user to take area and distance measurements of features on the terrain using various shapes. Measurement type can be specified in a number of ways: Line, Path, Polygon, Circle, Ellipse, Square, Rectangle or Freehand. Once the shape is specified, elevation information can then be extracted along each of these shapes. Figure 2 (left) shows the measurements performed on a crater n illuminated PSR in Nobile region. The equipment placement tool allows the user to place a 3D equipment model at a desired location and analyze its coverage area. The equipment placement tool is coupled with LOS to determine the coverage. Figure 2 (right) shows an equipment placed on the Lunar terrain and it’s coverage area. The red rays are blocked sight lines and the green rays are non-obstructed sight lines with the cyan lines showing the point of intersection with the terrain. More details are provided in the video demonstrations in Reference 5. Overcoming Polar Distortions: 3D geospatial applications exhibit significant distortions in polar imagery due to several reasons: 1) distortions in the source imagery, 2) incompatible tessellation algorithms at the poles, and 3) map projections. We are leveraging new tessellation algorithms and reprojecting data using projections that are better suited for Lunar poles. The goal is to seamlessly switch to polar projections while maintaining 3D view and navigation.

Maps↗

ESMD Space Grant Faculty Report

The strength of the Exploration Systems Mission Directorate ESMD Faculty Project lies in its ability to meet National Aeronautics Space Administration NASA's Strategic Educational Outcome 1 by developing a sustainable and long-term integration of student involvement at academic institutions with all NASA Centers. This outcome is achieved by a three-fold approach: 1) by collecting Senior Design projects pertaining to Constellation work performed at each of the ten NASA Centers, 2) by engaging students at Minority Serving Institutions in the art of systems engineering and systems design of technologies required for space exploration, and 3) by identifying potential internships at each Center relative to exploration that provide students who are supported by their institutional Space Grant to engage in on-going mission-level and explorative systems designs. The objectives of the ESMD Faculty Project are to: 1. Aid the Centers (both Education Offices and associated technical organizations) in providing relevant opportunities for the ESMD Space Grant Program to support student and faculty in Senior Design projects 2. Enable better matches between the ESMD work required and what the Space Grant Consortia can do to effectively contribute to NASA programs 3. Provide the Space Grant Consortia an opportunity to strengthen relations with the NASA Centers 4. Develop better collective understanding of the U.S. Space Exploration Policy by the Center, Space Grant, faculty, Education Office, and students 5. Enable Space Grant institution faculty to better prepare their students to meet current and future NASA needs 6. Enable the Center Education Offices to strengthen their ties to their technical organizations and Space Grant Consortia 7. Aid KSC in gaining a greater and more detailed understanding of each of the Center activities Senior Design projects are intended to stimulate undergraduate students on current NASA activities related to lunar, Mars, and other planetary missions and to bring out innovative and novel ideas that can be used to complement those currently under development at respective NASA Centers. Additionally, such academic involvement would better the prospects for graduating seniors to pursue graduate studies and to seek careers in the space industry with a strong sense for systems engineering and understanding of design concepts. Internships, on the other hand, are intended to provide hands-on experience to students by engaging them in diverse state-of-the-art technology development, prototype bread-boarding, computer modeling and simulations, hardware and software testing, and other activities that provide students a strong perspective of NASA's vision and mission in enhancing the knowledge of Earth and space planetary sciences. Ten faculty members, each from a Space Grant Consortium-affiliated university, worked at ten NASA Centers for five weeks between June 2 and July 3, 2008. The project objectives listed above were achieved. In addition to collecting data on Senior Design ideas and identifying possible internships that would benefit NASA/ESMD, the faculty fellows promoted and collected data when required for other ESMD-funded programs and helped the Center's Education Office, as,needed. 4

Guo, Jiang↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Promoted-Combustion Chamber with Induction Heating Coil

An improved promoted-combustion system has been developed for studying the effects of elevated temperatures on the flammability of metals in pure oxygen. In prior promoted-combustion chambers, initial temperatures of metal specimens in experiments have been limited to the temperatures of gas supplies, usually near room temperature. Although limited elevated temperature promoted-combustion chambers have been developed using water-cooled induction coils for preheating specimens, these designs have been limited to low-pressure operation due to the hollow induction coil. In contrast, the improved promoted-combustion chamber can sustain a pressure up to 10 kpsi (69 MPa) and, through utilization of a solid induction coil, is capable of preheating a metal specimen up to its melting point [potentially in excess of 2,000 F (approximately equal to 1,100 C)]. Hence, the improved promoted combustion chamber makes a greater range of physical conditions and material properties accessible for experimentation. The chamber consists of a vertical cylindrical housing with an inner diameter of 8 in. (20.32 cm) and an inner height of 20.4 in. (51.81 cm). A threaded, sealing cover at one end of the housing can be unscrewed to gain access for installing a specimen. Inlet and outlet ports for gases are provided. Six openings arranged in a helical pattern in the chamber wall contain sealed sapphire windows for viewing an experiment in progress. The base of the chamber contains pressure-sealed electrical connectors for supplying power to the induction coil. The connectors feature a unique design that prevents induction heating of the housing and the pressure sealing surfaces; this is important because if such spurious induction heating were allowed to occur, chamber pressure could be lost. The induction coil is 10 in. (25.4 cm) long and is fitted with a specimen holder at its upper end. At its lower end, the induction coil is mounted on a ceramic base, which affords thermal insulation to prevent heating of the base of the chamber during use. A sapphire cylinder protects the coil against slag generated during an experiment. The induction coil is energized by a 6-kW water-cooled power supply operating at a frequency of 400 kHz. The induction coil is part of a parallel-tuned circuit, the tuning of which is used to adjust the coupling of power to the specimen. The chamber is mounted on a test stand along with pumps, valves, and plumbing for transferring pressurized gas into and out of the chamber. In addition to multiple video cameras aimed through the windows encircling the chamber, the chamber is instrumented with gauges for monitoring the progress of an experiment. One of the gauges is a dual-frequency infrared temperature transducer aimed at the specimen through one window. Chamber operation is achieved via a console that contains a computer running apparatus-specific software, a video recorder, and real-time video monitors. For safety, a blast wall separates the console from the test stand.

Richardson, Erin↗

Evaluation of an Anthropometric Human Body Model for Simulated EVA Task Assessment

One of the more mission-critical tasks performed in space is extravehicular activity (EVA) which requires the astronaut to be external to the station or spacecraft, and subsequently at risk from the many threats posed by space. These threats include, but are not limited to: no significant atmosphere, harmful electromagnetic radiation, micrometeoroids, and space debris. To protect the astronaut from this environment, a special EVA suit is worn which is designed to maintain a sustainable atmosphere (at 1/3 atmosphere) and provide protection against the hazards of space. While the EVA suit serves these functions well, it does impose limitations on the astronaut as a consequence of the safety it provides. Since the astronaut is in a virtual vacuum, any atmospheric pressure inside the suit serves to pressurize the suit and restricts mobility of flexible joints (such as fabric). Although some of the EVA suit joints are fixed, rotary-style joints, most of the mobility is achieved by the simple flexibility of the fabric. There are multiple layers of fabric, each of which serves a special purpose in the safety of the astronaut. These multiple layers add to the restriction of motion the astronaut experiences in the space environment. Ground-based testing is implemented to evaluate the capability of EVA-suited astronauts to perform the various tasks in space. In addition to the restriction of motion imposed by the EVA suit, most EVA activity is performed in a micro-gravity (weight less) environment. To simulate weightlessness EVA-suited testing is performed in a neutral buoyancy simulator (NBS). The NBS is composed of a large container of water (pool) in which a weightless environment can be simulated. A subject is normally buoyant in the pressurized suit; however he/she can be made neutrally buoyant with the addition of weights. In addition, most objects the astronaut must interface with in the NBS sink in water and flotation must be added to render them "weightless". The implementation of NBS testing has proven to invaluable in the assessment of EVA activities performed with the Orbiter and is considered to be a key step in the construction of the International Space Station (ISS). While the NBS testing is extremely valuable, it does require considerable overhead to maintain and operate. It has been estimated that the cost of utilizing the facility is approximately $10,000 per day. Therefore it is important to maximize the utility of NBS testing for optimal results. One important aspect to consider in any human/worksite interface is the considerable wealth of anthropometric and ergonomic data available. A subset of this information specific to EVA activity is available in NASA standard 3000. The difficulty in implementing this data is that most of the anthropometric information is represented in a two-dimensional format. This poses some limitations in complete evaluation of the astronaut's capabilities in a three-dimensional environment. Advances in computer hardware and software have provided for three-dimensional design and implementation of hardware with the advance of computer aided design (CAD) software. There are a number of CAD products available and most companies and agencies have adopted CAD as a fundamental aspect of the design process. Another factor which supports the use of CAD is the implementation of computer aided manufacturing (CAM) software and hardware which provides for rapid prototyping and decreases the time to product in the design process. It is probable that most hardware to be accessed by astronauts in EVA or IVA (intravehicular activity) has been designed by a CAD system, and is therefore represented in three-dimensional space for evaluation. Because of the implementation of CAD systems and the movement towards early prototyping, a need has arisen in industry and government for tools which facilitate the evaluation of ergonomic consideration in a three-dimensional environment where the hardware has been designed by the CAD tools. One such product is Jack which was developed by the University of Pennsylvania with funding from several government agencies, including NASA. While the primary purpose of Jack is to model human figures in a ground-based (gravity) environment, it can be utilized to evaluate EVA-suited activities as well. The effects of simulated gravity must be turned off by turning off "behaviors". Although Jack provides human figures for manipulation, the primary instrument to be evaluated for EVA mobility is the work envelope provided by the EVA suit. An EVA Jack suit model has been developed by NASA-JSC and was utilized in this study. This suit model provided a more restrictive motion environment as expected for an EVA suited subject. As part of this study, the anthropometric dimensions for a 50th percentile male were compared with basic anthropometric data and were found to be representative for the population group expected in the NASA flight program. The joints for the suit were created in a manner which provided consistent performance with EVA reach envelopes published in NASA standard #3000.

Etter, Brad↗

Assessing the Needs of NASA's Near Real-Time Earth Observation Products

"The 2017-2027 Decadal Survey for Earth Science and Applications from Space stated that NASA's Earth Science with planned implementation of applications provides sustained earth observations for societal benefits [1]. The Decadal Survey indicated that data latency is invaluable for time-sensitive applications including disaster risk reduction, wildland fire carbon emissions quantification, real-time measurements of the state of the hydrologic systems and many more. Data latency refers to the time between earth observation and data products available to users. During the past 13 years, NASA's Land, Atmosphere Near Real-Time Capability for Earth Observing Systems (LANCE) continues to provide free access to earth observation products that are made available much quicker than routine processing allows. The latency of most LANCE data products is Near Real-time (NRT) which is defined as less than three hours from satellite observations [2]. LANCE is managed by the Earth Science Data and Information System (ESDIS) Project at NASA Goddard Space Flight Center [3], and a User Working Group (UWG) is responsible for providing guidance to LANCE. LANCE data are used by direct users and brokers who add value to the data [4]. NASA Earth Applied Sciences Program (ASP) is one of the primary users of LANCE, which collaborates with partner organizations and provides support to scientists to solve problems in applications of earth observations. ASP promotes the use of LANCE NRT data products to demonstrate applications in decision making, facilitates end-user feedback to the science team to improve data products, and provides information on future demands for research. LANCE supports applications that need a rapid response including detecting wildland fires and volcanic eruptions, tracking smoke, ash and dust plumes, monitoring air quality and tracking extreme weather events such as hurricanes, landslides, and floods. To gather feedback regarding the availability, accessibility and actionability of NASA's NRT data products for societal benefit, three surveys and a few discussions with experts involved in the topic within ASP were conducted from the perspective of users. Feedback has been collected from users who are interested in using low latency NASA data within application communities of agriculture, disasters, water resources, health and air quality, ecological conservation, wildland fires and capacity building. Analysis-ready NRT data products in a variety of formats have been mentioned many times in the collected feedback, especially for applied users with little to no experience using research-grade earth observation products. Users prefer to have products that can be easily integrated into their existing workflows and take their analysis to the data. HDF5 is a commonly used data format for research, but typically requires some conversion to a more friendly format for applications and regular use in decision-making. Users prefer the GeoTIFF data format that can be directly ingested into a GIS mapping software and platform for data analysis and visualization. For example, LANCE’s fire, flood, SO2 and Black Marble Nighttime Blue/Yellow Composite data products have been integrated into NASA Disasters Mapping Portal, which is an GIS-based open data portal, for users in the disaster management community. There are 291 LANCE NRT layers available through GIBS and Worldview, where users can download a snapshot in GeoTIFF format. Operational users expect data to be processed as close to the user as possible. The collected feedback indicates that LANCE fire products within 3 hours latency would meet the needs of the wildland fire community. The ideal latency for volcanic application is 10-15 minutes. Users in Volcanic Ash Advisory Centers (VAAC) reported that the first forecast volcanic product should be issued within 75 minutes from the volcano eruption [5]. Overall, for disaster applications, data latency within 3 hours is useful while latency greater than 12 hours is not timely enough for operational use. Capacity building and training are critical for users to be able to access, interpret and use data products and tools for their decision making, especially for applied users with limited experience using earth observation products. LANCE data products have been used in a number of capacity building projects domestically and internationally [6]. As LANCE continues to bring new products into the system, users request training to utilize LANCE new and upcoming data products and capabilities in their applications. Due to the limitation of bandwidth and downstream flow paths, users in some developing countries need tools to select and download data for a specific area of interest instead of bulk downloads. The collected feedback also shows the lack of available SAR satellite low latency data products. The advantages of SAR to monitor conditions and changes on the ground through darkness, clouds, volcanic ash, and other atmospheric conditions, are appealing to low latency users. For example, terabytes of low latency but cloudy optical images are not helpful in rapidly identifying the extent of flood or fire impacts. LANCE could be complemented with low latency measurements via the upcoming NASA-ISRO Synthetic Aperture Radar (NISAR) mission [7]. Requests for higher spatial resolution products are expressed. A user from the wildland fire management community reported that products with 30-m spatial resolution could be used to detect small fires. The 30-m Landsat OLI fire data is now part of NASA’s Fire Information for Resource Management System (FIRMS) US/Canada [8]. Within the open and free NASA resources, LANCE disseminates NRT data products in a manner that allows them to be accessible and understandable to both scientific and applied users. In many application areas, latency plays an important or even decisive role where low latency earth observations help people to observe areas of interest, detect and track changes in the environment and make timely decisions. NASA’s Earth Applied Sciences Program promotes the use of LANCE NRT products and builds a bridge between application users and research teams. The collected feedback indicates data latency within 3 hours is useful for most of the applications, and shows the needs of user-friendly, analysis-ready products, and requests training on LANCE’s new and upcoming data products. User feedback has been provided to LANCE UWG for guidance and recommendations, and for translating findings into something actionable.

Tian Yao↗

Ground Processing Affordability for Space Vehicles

Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and standard repairs need to be in-place as well as easily added. Many routine inspections and maintenance can be like an aircraft overhaul. Modifications and technology upgrades should be expected. Another factor affecting ground operations efficiency is trending. It is essential for RLV's, and also useful for ELV's which fly the same or similar models again. Good data analysis of technical and processing performance will determine fixes and improvements needed for safety, design, and future processing. Collecting such data on new or low-frequency vehicles is a challenge. Lessons can be learned from the Space Shuttle, or even the Concorde aircraft. For all of the above topics, efficient business systems must be established for comprehensive program management and good throughput. Drawings, specifications, and manuals for an entire launch vehicle are often in different formats from multiple vendors, plus they have proprietary constraints. Nonetheless, the integration team must ensure that all data needed is compatible and visible to each appropriate team member. Ground processing systems for scheduling, tracking, problem resolution, etc. must be well laid-out. The balance between COTS (commercial off the shelf) and custom software is difficult. Multiple customers, vendors, launch sites, and landing sites add to the complexity of efficient IT (Information Technology) tools.

Ingalls, John↗