Search NASA⌕ Search

SEARCH · Search NASA

Results for “space flight operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

A proven approach for more effective software development and maintenance

Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the mission operations and ground data systems software domains throughout Code 500.

Pajerski, Rose↗

Chandra Space Flight Software: Using Software to Autonomously Operation the Largest and Most Sensitive X-Ray Telescope in the World

Chandra is the world's largest and most sensitive X-ray telescope. The Chandra X-ray Observatory is the third in NASA's family of "Great Observatories." The Chandra X-ray Observatory, launched by Space Shuttle Columbia on July 23, 1999, is NASA's newest Great Observatory. The Chandra space flight software is the operational software, which controls and directs the Chandra X-ray Observatory. The Chandra flight software has executed faultlessly for over 13,000 hours on-orbit. The Chandra flight software directly controls the Pointing, Aspect Determination, Electrical Power Subsystem, Propulsion system, and the Command, Communications, and Data Management subsystems. The software controls the spacecraft operations during all phases of the mission. The software also performs thermal control of the telescope to maintain pointing accuracy and monitors radiation levels throughout the orbit so that the Science Instruments can be safed if radiation thresholds are exceeded. The efficient operation of Chandra flight software has enabled the gathering of crucial science data. The Chandra flight software fault protection is the key to early detection and prevention of science instrument or spacecraft damage in an operating platform/environment, which is completely unforgiving. Permanently open Sun Shade Door and ACIS focal plane radiator sensitivity exposes science instruments and mirrors to damage for pointing anomalies causing an attitude excursion. The Chandra flight software must prevent these attitude excursions from occurring for ANY failure. Another example is that the power system has an unregulated bus, which imposes severe operating requirements on Chandra flight software to control array pointing and battery connection/disconnect using a unique algorithmic and logic approach. The Chandra flight software has enabled a truly autonomous vehicle with greater than 99% of all mission data collected as planned. Less than 15% of spacecraft operations are conducted in view (1 hour out of 8) leading to very extended periods without ground contact. The Chandra flight software implements the flexible mission plan during this out of view period, manages the solid state recorder capacity, controls all pointing and maneuvers, provides fault detection for all satellite subsystems, and initiates communications with the ground at the appropriate time. This paper will describe the software architecture features, key design elements and software testing techniques that have facilitated Chandra's success.

Crumbley, Tim↗

Nexus: Planning Tomorrow, Today

To prepare for future human space flight programs, the Mission Operations Laboratory (MOL) at the Marshall Space Flight Center (MSFC) has been investigating new planning and scheduling paradigms. To support and prove this investigation, MOL technologists have developed a working prototype of a scheduling system to support the new paradigms. The new planning and scheduling system is called Nexus and has a web site at http://nexus.nasa.gov/. Nexus is based on a comprehensive modeling schema to capture all scheduling requirements typical to human space missions, an incremental scheduling engine tailored to the modeling schema, and remote access (including Personal Data Assistant (PDA) access) to the scheduling system. This paper describes the proposed paradigm shift and the enabling software. It also describes a typical Nexus demonstration which emphasizes how it works, how it enables the paradigm shift, and possible applications. Demonstrations include access to the full functionally of Nexus from a personal computer and access to limited functionally via a PDA. An appendix includes a description and screen shots of the demonstrations.

Jaap, John↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Integrated Testing Regimen: Assessment of Countermeasures for Long Duration Space Flight

Space flight has been shown to induce changes in the physiology of crewmembers which can adversely affect their performance. The objectives of Countermeasures Evaluation and Validation Project (CEVP) are to develop and validate potential countermeasures to the deleterious effects of space flight for operational implementation and use. In order to accomplish this objective, a group of standardized tests, the Integrated Testing Regimen or ITR, will be utilized for the evaluation of candidate countermeasures. Additionally, the ITR will illuminate intersystem effects of the potential countermeasures and provide normative values for the physiological responses. Due to the small number of crewmembers available as test subjects, statistically rigorous validation of countermeasures presents a challenging problem. Strategies for reliable evaluation of small N clinical studies will be utilized for these activities. These approaches will permit effective analysis of promising countermeasure to support human space flights of increasing duration.

Sams, Clarence F.↗

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗

Flight software operation of the Hubble Space Telescope fine guidance sensor

The Hubble Space Telescope (HST) is to carry five major scientific instruments to collect imagery, spectrographic, and photometric astronomical data. The Pointing Control System is designed to achieve pointing accuracies and line of sight jitter levels an order of magnitude less than can be achieved with ground mounted telescopes. This paper describes the operation of the pointing control system flight software in targeting a celestial object in a science instrument aperture and in performing the coordinate transformations necessary for commanding the fine guidance sensor and determining the attitude-error corrections.

Rodden, J. J.↗

Addressing Human Error in International Space Station Flight Control Teams: Advances in Ground Training for Science Operators

In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork.Academic research in teamwork has resulted in the identification of many factors which make cross-functional teaming difficult, including leadership, trust building, and communication challenges. These factors, especially when combined with the challenging environmental factors flight control teams must contend with daily, make the goal of minimizing operator errors in payload operations challenging to achieve. To address such teamwork errors, trainers at the POIC have drawn best practices from high reliability industries such as commercial aviation, healthcare, and nuclear power plants, as well as from our sister ISS control center in Houston, Texas, to develop and institute a new training program focused specifically on teamwork skills.This training program, called the Team Skills Curriculum, is based on the concept of Crew Resource Management (CRM) which was developed by NASA in the 1970s for the commercial aviation industry in response to a series of aviation disasters resulting from ineffective teamwork. CRM was later tailored by the Johnson Space Center (JSC) for use in astronaut and flight control training. The result, called Space Flight Resource Management (SFRM) was formally introduced into manned spaceflight training in the late 90s. SFRM has evolved over the years, but the focus has remained on helping operators develop the skills needed to work as part of an effective team. Using these concepts as well as the latest research in cross-functional teaming and data on specific errors occurring at the POIC, trainers in the integrated flight control training branch created a custom training program for both new and certified payload operations specialists.

Harris, Samantha S.↗

The flight telerobotic servicer: NASA's first operational space robot

Alternatives to the exploration of Mars by direct human presence are under consideration by both the United States and the Soviet Union. In these concepts, autonomous surface vehicles would navigate the planet performing a variety of detailed exploratory functions such as mapping, seismic measurements, sample collection and analysis. Both of these approaches to the exploration of Mars depend to a high degree on the ability of robotic machinery to perform complex functions without real time human direction. Closer to home and in time, robotics will begin to play a role in space operations in the construction and maintenance of Space Station Freedom. The Flight Telerobotic Servicer Project is introduced as an element of the Space Station Freedom, and its objectives and some special challenges it faces are discussed.

Fuechsel, Charles F.↗

A tow concept for the space shuttle orbiter approach and landing test

The tow concept provides the means for evaluating the orbiter aerodynamic performance and handling qualities in the same configuration as expected in actual space shuttle flight operation. A Boeing 747-100 aircraft has engine-out capability to tow the orbiter to an altitude that permits a safe orbiter approach and landing. The tow concept also provides a means for conducting a comprehensive ground test program before proceeding into the actual ALT flight operations. The implementation of the tow concept requires only a minor structural modification in the nose section of the orbiter vehicle; requires minor modifications in the 747 cargo bay; and makes use of those orbiter onboard systems installed in the ALT orbiter vehicle. The 747 wake turbulence does not constitute a problem for the orbiter during take-off or climb to altitude. The impact that the tow concept would have on the cost and schedule of the space shuttle program was not evaluated in this study.

Bonner, T. F., Jr.↗

Integrating Automation into a Multi-Mission Operations Center

NASA Goddard Space Flight Center's Space Science Mission Operations (SSMO) Project is currently tackling the challenge of minimizing ground operations costs for multiple satellites that have surpassed their prime mission phase and are well into extended mission. These missions are being reengineered into a multi-mission operations center built around modern information technologies and a common ground system infrastructure. The effort began with the integration of four SMEX missions into a similar architecture that provides command and control capabilities and demonstrates fleet automation and control concepts as a pathfinder for additional mission integrations. The reengineered ground system, called the Multi-Mission Operations Center (MMOC), is now undergoing a transformation to support other SSMO missions, which include SOHO, Wind, and ACE. This paper presents the automation principles and lessons learned to date for integrating automation into an existing operations environment for multiple satellites.

Surka, Derek M.↗

Addressing Human Error in International Space Station Flight Control Teams: Advances in Ground Training for Science Operators

In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork. To address these teamwork errors, trainers at the POIC have drawn best practices from high reliability industries as well as from our sister ISS control center at the Johnson Space Center (JSC) in Houston, Texas, to develop and implement a new training program focused specifically on teamwork skills. This training program, called Team Skills Training, is inspired by modern and historical training programs developed by NASA and is specifically tailored to the needs of the payload operations flight control team at the POIC. The program consists of training for both certified and trainee flight controllers, and covers team skills topics such as situational awareness, leadership, and communication skills. To maximize effectiveness, the program uses novel instructional techniques which extend beyond the classroom to encourage students to apply what they have learned to their day to day work. Minimizing operator errors in flight control is an endeavor which requires constant vigilance and continuous improvement. At the POIC, Team Skills Training is an important step in this journey.

Harris, Samantha S.↗

Weather Requirements and Procedures for Step 1: High Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS) Flight Operations in the National Air Space (NAS)

This cover sheet is for version 2 of the weather requirements document along with Appendix A. The purpose of the requirements document was to identify and to list the weather functional requirements needed to achieve the Access 5 vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the National Airspace System (NAS) for Step 1." A discussion of the Federal Aviation Administration (FAA) references and related policies, procedures, and standards is provided as basis for the recommendations supported within this document. Additional procedures and reference documentation related to weather functional requirements is also provided for background. The functional requirements and related information are to be proposed to the FAA and various standards organizations for consideration and approval. The appendix was designed to show that sources of flight weather information are readily available to UAS pilots conducting missions in the NAS. All weather information for this presentation was obtained from the public internet.

Source record↗

The Space Shuttle - Key considerations

Typical Space Shuttle flight operations, including launch/insertion, on-orbit operations, de-orbit, and ground turnaround, are summarized. The orbiter, main engine, and solid rocket boosters will be reusable. The Shuttle will be able to abort ascent and return the orbiter plus payload to the launch site if necessary. Mission capabilities include a 7-30 day duration, crew of 4-7 (with 1-4 payload specialists), and 14,500-29,500 kg payloads. Payload accommodations, including cabin, crew provisions, pointing and position stability, thermal constraints, electric power, communications, payload deployment and retrieval, contamination control, and kits for extended missions, are considered. The Thermal Protection System, utilizing pyrolized carbon and silica tiles, is described. The Space Shuttle Main Engine design and performance are considered and compared to those of the J-2 engine used on Saturn/Apollo missions.

Malkin, M. S.↗

STS-114: Discovery Day 3 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and John Shannon, Space Shuttle Flight Operations and Integration Manager are seen in this STS-114 flight day three Mission Status Briefing. Hill expresses that the Discovery Orbiter is performing beautifully and that STS-114 crew performed a picture perfect rendezvous. He also shows a video of the Rendezvous Pitch Maneuver (RPM) where Commander Eileen Collins slowly flips Discovery in a circle to give the Expedition 11 crew a view of Discovery's heat resistant tiles. He talks about the removal of the Multi-Purpose Logistics Module (MPLM) from Discovery's payload bay using the ISS Robotic Arm. Shannon discusses two objectives that his team is fulfilling on this mission. They include: 1) Understanding the health of Space Shuttle Discovery; and 2) Assessing the performance of the External Tank. Questions from the news media pertaining to the life expectancy of the Space Shuttle Discovery, battery lifetime on the wing leading edge impact sensors, foam loss, PAL ramps, and the safety of the Space Shuttle Discovery are addressed.

Source record↗

Satellite laser ranging work at the Goddard Space Flight Center

The pulsed-laser satellite ranging systems presently being operated by the Goddard Space Flight Center are described along with their range and accuracy capabilities. The major subsystems are outlined, operation of the fixed system and the two mobile systems is discussed, and the performance of all three systems is evaluated. It is noted that these systems have an accuracy of better than 10 cm on a carefully surveyed range as well as in regular satellite ranging operations and are capable of ranging to all currently launched retroreflector-equipped satellites with the exception of Timation III. Future improvements discussed include a third mobile system which will be able to range distant satellites, such as Timation III, with an accuracy of better than 5 cm and the use of a frequency-doubled Nd:YAG laser in place of the ruby lasers now being employed.

Mcgunigal, T. E.↗