Search NASA⌕ Search

SEARCH · Search NASA

Results for “spaceport”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Climate Change Adaptation Activities at the NASA John F. Kennedy Space Center, FL., USA

In 2010, the Office of Strategic Infrastructure and Earth Sciences established the Climate Adaptation Science Investigators (CASI) program to integrate climate change forecasts and knowledge into sustainable management of infrastructure and operations needed for the NASA mission. NASA operates 10 field centers valued at $32 billion dollars, occupies 191,000 acres and employs 58,000 people. CASI climate change and sea-level rise forecasts focus on the 2050 and 2080 time periods. At the 140,000 acre Kennedy Space Center (KSC) data are used to simulate impacts on infrastructure, operations, and unique natural resources. KSC launch and processing facilities represent a valued national asset located in an area with high biodiversity including 33 species of special management concern. Numerical and advanced Bayesian and Monte Carlo statistical modeling is being conducted using LiDAR digital elevation models coupled with relevant GIS layers to assess potential future conditions. Results are provided to the Environmental Management Branch, Master Planning, Construction of Facilities, Engineering Construction Innovation Committee and our regional partners to support Spaceport development, management, and adaptation planning and design. Potential impacts to natural resources include conversion of 50% of the Center to open water, elevation of the surficial aquifer, alterations of rainfall and evapotranspiration patterns, conversion of salt marsh to mangrove forest, reductions in distribution and extent of upland habitats, overwash of the barrier island dune system, increases in heat stress days, and releases of chemicals from legacy contamination sites. CASI has proven successful in bringing climate change planning to KSC including recognition of the need to increase resiliency and development of a green managed shoreline retreat approach to maintain coastal ecosystem services while maximizing life expectancy of Center launch and payload processing resources.

plant communities↗

Launch Control Network Engineer

The Spaceport Command and Control System (SCCS) is being built at the Kennedy Space Center in order to successfully launch NASA’s revolutionary vehicle that allows humans to explore further into space than ever before. During my internship, I worked with the Network, Firewall, and Hardware teams that are all contributing to the huge SCCS network project effort. I learned the SCCS network design and the several concepts that are running in the background. I also updated and designed documentation for physical networks that are part of SCCS. This includes being able to assist and build physical installations as well as configurations. I worked with the network design for vehicle telemetry interfaces to the Launch Control System (LCS); this allows the interface to interact with other systems at other NASA locations. This network design includes the Space Launch System (SLS), Interim Cryogenic Propulsion Stage (ICPS), and the Orion Multipurpose Crew Vehicle (MPCV). I worked on the network design and implementation in the Customer Avionics Interface Development and Analysis (CAIDA) lab.

Medeiros, Samantha↗

Independent Space Operators: Gaining a Voice in Design for Operability

Affordable and sustainable space exploration remains an elusive goal. We explore the competitive advantages of evolving towards independent operators for space transportation in our economy. We consider the pros and cons of evolving business organizations that operate and maintain space transportation system assets independently from flight system manufacturers and from host spaceports. The case is made that a more competitive business climate for creating inherently operable, dependable, and supportable space transportation systems can evolve out of today's traditional vertical business model-a model within which the voice of the operator is often heard, but rarely acted upon during crucial design commitments and critical design processes. Thus new business models may be required, driven less by hardware consumption and more by space system utilization.

incentives↗

Launch Control System Software Development System Automation Testing

The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This system requires high quality testing that will measure and test the capabilities of the system. For the past two years, the Exploration and Operations Division at Kennedy Space Center (KSC) has assigned a group including interns and full-time engineers to develop automated tests to save the project time and money. The team worked on automating the testing process for the SCCS GUI that would use streamed simulated data from the testing servers to produce data, plots, statuses, etc. to the GUI. The software used to develop automated tests included an automated testing framework and an automation library. The automated testing framework has a tabular-style syntax, which means the functionality of a line of code must have the appropriate number of tabs for the line to function as intended. The header section contains either paths to custom resources or the names of libraries being used. The automation library contains functionality to automate anything that appears on a desired screen with the use of image recognition software to detect and control GUI components. The data section contains any data values strictly created for the current testing file. The body section holds the tests that are being run. The function section can include any number of functions that may be used by the current testing file or any other file that resources it. The resources and body section are required for all test files; the data and function sections can be left empty if the data values and functions being used are from a resourced library or another file. To help equip the automation team with better tools, the Project Lead of the Automated Testing Team, Jason Kapusta, assigned the task to install and train an optical character recognition (OCR) tool to Brandon Echols, a fellow intern, and I. The purpose of the OCR tool is to analyze an image and find the coordinates of any group of text. Some issues that arose while installing the OCR tool included the absence of certain libraries needed to train the tool and an outdated software version. We eventually resolved the issues and successfully installed the OCR tool. Training the tool required many images and different fonts and sizes, but in the end the tool learned to accurately decipher the text in the images and their coordinates. The OCR tool produced a file that contained significant metadata for each section of text, but only the text and coordinates of the text was required for our purpose. The team made a script to parse the information we wanted from the OCR file to a different file that would be used by automation functions within the automated framework. Since a majority of development and testing for the automated test cases for the GUI in question has been done using live simulated data on the workstations at the Launch Control Center (LCC), a large amount of progress has been made. As of this writing, about 60% of all of automated testing has been implemented. Additionally, the OCR tool will help make our automated tests more robust due to the tool's text recognition being highly scalable to different text fonts and text sizes. Soon we will have the whole test system automated, allowing for more full-time engineers working on development projects.

Automation↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

The "Very Cool" James Webb Space Telescope!

For over twenty years, scientists, engineers, technicians, and other personnel have been working on the next generation space telescope. As a partnership between NASA (National Aeronautics and Space Administration), CSA (Canadian Space Agency), and ESA (European Space Angency), the James Webb Space Telescope will complement the previous research performed by the Hubble by utilizing a larger primary mirror, which will also be optimized for infrared wavelengths. This combination will allow JWST to collect data and take images of light having traveled over 13.7 billion light years. This presentation will focus on the mission, as well as the contamination control challenges during the integration and testing in the NASA Goddard Spacecraft Systems Development and Integration Facility (SSDIF), one of the largest cleanrooms in the world. Additional information will be presented regarding space simulation testing down to a cool 20 degrees Kelvin [-424 degrees Fahrenheit] that will occur at Johnson Space Center in Houston, TX, and more testing and integration to happen at Northrop Grumman Corp., in Redondo Beach, CA. Launch of the JWST is currently scheduled for the spring of 2019 at Ariane Spaceport in French Guiana, South America.

space sciences↗

Database Tool for Master Console Operators

The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires highly trained and knowledgeable personnel. Master Console Operators (MCO) are currently working on familiarizing themselves with any possible scenario that they may encounter. An intern was recruited to help assist them with creating a tool to use for the process.

Ferrell, Sean↗

Research and Development of The Immersive Simulations and Engineering Environment

March of 2018 marked the conclusion of the primary updates to the immersive Simulations and Engineering Environment (iSEE) at Kennedy Space Center (KSC). Many of the problems that had arisen during the previous semester have been addressed and rectified. These included the malfunction to one of the lab's primary routers, the inefficiency of the capture environment, and various interface issues in the analysis software, Jack. This semester was primarily research and development oriented with some focus on implementation of the new hardware and software that was received last semester. The new computers and cameras that arrived sometime during the winter were installed, and the lab received its second operation opportunity. The second operation was a major milestone for the lab, both in terms of what the abilities were and what can be learned from its use. The operation performed was a virtual simulation of a critical task that would occur, if it should be needed, in the Multi Payload Processing Facility. It was done to gather human factors data on its safety and process controls. The technicians were able to come to a number of conclusions about how to perform their task as a result of utilizing iSEE. Another key breakthrough this semester was the introduction to Jack Script, a scripting language built into our analysis software that further extend Jack capabilities. In addition to the aforementioned, many preparations were made for family day, an exposition for KSC families to come out and tour the spaceport. Due to family day being moved to the spring, the video made last fall had to be updated with recent environment changes in preparation for the Family Day demonstrations.

Motion Capture↗

Astrobee Free Flyers: Integrated and Tested. Ready for Launch!

As of March 2019, four Astrobee free-flying robots have been integrated, tested and shipped to NASA’s Johnson Space Center, Texas, ready to be launched to space. Two of these Astrobee units (Honey and Bumble) will be launched to the International Space Station (ISS) on April 17, 2019, on the Cygnus NG-11 (Northrop Grumman) cargo resupply spacecraft from the Mid-Atlantic Regional Spaceport (MARS) launch facility, at NASA's Wallops Flight Facility, in Virginia, while the third unit (Queen) will be launched in mid-July 2019, with the cargo resupply mission Space-X 18, from Cape Canaveral, at NASA’s Kennedy Space Center. The primary purpose of the Astrobee system is to provide an autonomous and flexible platform for research on zero-g free-flying robotics, with the ability to accommodate guest researchers looking to utilize the unique capabilities of this platform in the microgravity of low earth orbit, and to advance the state of the art of guest science software and research payloads, which range from gecko-inspired adhesives for perching on smooth surfaces, to augmented reality interfaces to help astronauts and robots work together effectively, to RFID reader, performing inventory of RFID tagged items inside the ISS. Astrobee will also serve utility functions, such as free-flying cameras to record video and provide assistance during astronaut activities, and as mobile sensor platforms to conduct surveys of the ISS. In this paper we will give an overview of the status of the Astrobee system, which includes the docking station already launched and mounted in the JAXA JEM module of the ISS, the Astrobee robots, the Astrobee robotic arms, the ground data system (GDS) and the development of the several guest science payloads.

Carlino, Roberto↗

Lunar Landing and Launch Pad Construction – Concepts and Criteria

When a lander vehicle launches or lands on the Moon, the rocket engine exhaust plume impinges on the surface and interacts with the regolith to create blast ejecta and associated cratering of the surface. Lunar regolith blast ejecta travels at high velocities (>2,000 m/s) for long distances (kilometers) in a vacuum environment [1] creating hazards for surrounding assets and it can also impact the bottom of the lander vehicle, risking damage to the engines, thermal insulation and sensors. Ballistic particles can possibly enter cislunar space and achieve orbit as debris, if the ejecta is sufficiently energetic. The cratering and regolith erosion can endanger the vehicle itself by affecting the soil stability under the landing gear. Landing on unpredictable terrain with varying topography, natural craters and rock hazards is also hazardous risks tipping a lander at dangerous angles in extreme conditions that may also violate maximum slope angles for subsequent launch operations. During launch (Figure 1), an overpressure pulse created by the ignition of the rocket engines can pose significant ejecta risks to the vehicle. Dust clouds raised during landing limit the efficacy of sensors and reduce visibility for the astronaut pilots, creating significant real-time risk during landing site selection by the pilot or computer navigation system. Future lunar spaceports will require mitigations to these launch and landing risks [2]. There are four main objectives of this effort:1) To establish the state of the art in LLP construction methodologies. 2) To propose criteria for trade studies of LLP concepts. 3) To publicly share the authors’ ideas for potential LLP solutions. 4) To serve as the starting point for future development of LLP technologies. Establishing the state of the art in the area of off-Earth Launch & Landing Pad concepts will base-line the work that has been completed thus far and highlight the wide span between current Technology Readiness Levels (TRLs)and operational readiness. The authors aim to communicate the need for funding in this area in the near term by illustrating that there is much work to be completed before a truly viable option exists. Setting forth criteria for trade studies of LLP concepts is important for several reasons. The first and most straightforward is to establish a framework for performing trade studies on LLP concepts. This will enable NASA to select the most promising concepts for continued development, and it will also help technology developers understand how their concepts compare with others and the priorities of development effort.

landing pad↗

Charged Particle Dynamics in the Lunar Environment

As the Artemis Program streams forward, organizations of scientists and engineers across the country have been coming together to solve the complex network of problems to once again achieve the milestone of successfully touching down on the moon. This project is no exception, and it has been an honor to work with the Electrostatics and Surface Physics Laboratory (ESPL), a lab within the Exploration Research and Technology Programs’ Spaceport Technologies Office (UB-G) located at the National Aeronautics and Space Administration at Kennedy Space Center (NASA KSC). The authors and their mentor James R. Phillips III3, in tandem with researchers from the Astrodynamics and Space Robotics Laboratory (ASRL) at the University of Central Florida (UCF), have been working on creating a state-of-the-art (SOA) granular gas dynamics model for particulate contamination prevention and mitigation purposes. In essence, the underlying objective for this project is to more accurately model the resulting electrodynamic interactions between lunar regolith grains with applications to dust mitigation and rocket engine plume surface interactions. To achieve this goal, the team has been expanding upon existing open source classical molecular dynamics code developed by Sandia National Laboratories (SNL). The following reports on the details of the problem at hand as well as the contributions that the authors have made towards resolution, including but not limited to the encoding of physical attributes and interactions for non-spherical polydisperse particle distributions within various bed geometries and preemptive data analysis implementations. Significant data analysis processes were utilized, and several original algorithms were created to perform critical evaluations, resulting in only a 0.006% error in discrepancy.

Annelisa B Esparza↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the pre-launch and launch operations. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The display software of the LCS is responsible for visualizing the various data that can be received from the hardware and software components of the LCS. Since this system is providing critical information to engineers in the firing room, the visualization of data across the system must be easy to understand, but also reliable and accurate.

Software↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket and the Orion capsule, designed to take humans back to the moon in 2024, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the launch. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The messaging software of LCS is responsible for handling the various data types that can be sent between the hardware and software components of the LCS. Since this system is interacting with numerous devices, controllers, and viewports in real time, the distribution of data across the system must be fast, but also reliable and accurate. To verify the accuracy and reliability of the system, developers on the project have created a set of tests to be performed that covers all operations allowed by the system. Given the extensive Application Programming Interface(API) provided by the messaging software, these unit tests are rather time-consuming and costly (in terms of man-hours) to perform. Therefore, an automated testing framework is used to perform supplemental tests automatically when updates are made to the code base.

Rebecca McFadden↗

HALE-X -- A USFS-NASA Partnership with Swift Engineering to Demonstrate Sustained IR Imagery for Weeks to Months with Next Generation Solar-electric Uncrewed Aircraft Systems UAS

HALE-X (High Altitude Long Endurance experiment) is an innovative partnership between the US Forest Service, NASA and Swift Engineering designed to test high altitude UAS capabilities for providing persistent, real-time mapping and intelligence over a wildfire incident. Platform and payload testing is scheduled to occur during summer 2021 at SpacePort America and adjacent airspace in New Mexico.

HALE-X↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Space Operations↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Karen Richon↗