Search NASA⌕ Search

SEARCH · Search NASA

Results for “transmission system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

DSO+T: Valuation Methodology and Economic Metrics (DSO+T Study: Volume 4)

This report summarizes a rigorous valuation analysis methodology used by the Distribution System Operator with Transactive (DSO+T) study to estimate the financial benefits and costs of adopting Transactive Energy coordination of distributed energy resources for key stakeholders (for example distribution system operators and customers). This was achieved by modeling the value exchanges between stakeholders and determining the annualized costs and revenues experienced by stakeholders, enabling the evaluation of overall impact on stakeholder’s annualized cash flow. Extensive work was conducted developing methods to estimate the operating costs of distribution system operators at a level of granularity that would allow the financial impact of implementing a transactive energy approach to be estimated. This work included developing parametric models for labor and software costs, distribution system capital and maintenance costs, growth rates, and factors to determine annualized costs of capital investments. Simulation results were used to calculate wholesale energy costs and revenues from retail sales. Valuation analysis methods were also developed for other stakeholders including customers, the transmission system operator, independent system operator, and generators. The resulting capability allows a complete mapping of the flow of financial value between stakeholders that can be directly integrated with the results of demand flexibility simulations. Example results are provided for a business-as-usual case and compared to a transactive energy case as well as to actual cost data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The impact of development priorities on power system expansion planning in sub-Saharan Africa

Sub-Saharan Africa faces unique barriers to electricity development due to the large proportion of the population that is un-electrified and the prevalence of rural populations. Typically, power system expansion planning models assume all potential consumers can be immediately electrified. This assumption is unrealistic in sub-Saharan Africa, where electrification will likely be a gradual process over a number of years. Furthermore, since a large proportion of the population in sub-Saharan Africa is located in rural regions, the prioritization of these regions may impact how the grid develops. In this research, we develop a multi-period optimization model for power generation and transmission system expansion planning in sub-Saharan Africa. In contrast to existing models, which assume full electrification, we consider a variety of electrification policies and analyze the impact of varying the electrification rate and policy on the cost and resources selected for power system expansion. We test our model on a case study of Rwanda. We find that varying the year in which full electrification is reached has a larger impact on cost and generation capacity than varying the electrification policy does, although, when urban and rural regions are considered equitably, more rooftop solar is built. Varying the electrification policies has a larger impact on transmission expansion than on generation expansion and this impact is amplified when starting from zero initial system capacity rather than the original Rwanda system. Additionally, a sensitivity analysis shows that tightening the bounds on CO 2eq emissions has a large impact on the generation portfolio and cost.

97 MATHEMATICS AND COMPUTING↗

Load Margin Constrained Moving Target Defense against False Data Injection Attacks

Cyber physical security of power systems with high penetration of renewable generation has attracted attention from researchers. One critical issue is that cyber-physical attacks, disguised as uncertain renewable generation, can target conventional power system state estimation (SE). Moving target defense (MTD) is a promising defense strategy to detect stealthy false data injection (FDI) attacks against SE. However, all existing studies myopically perturb the reactance of transmission lines equipped with distributed flexible AC transmission system (D-FACTS) devices without adequately considering the system voltage stability. Exacerbated by the renewable generation uncertainty, existing MTD may cause voltage instability when the power grid is under stress. To address this issue, we propose a novel MTD framework that explicitly considers system voltage stability by using continuation power flow. We utilize the sensitivity matrix of power injection to line impedance, on which an optimization problem for maximizing load margin is formulated. This framework is validated on the IEEE 14-bus system and the IEEE 118-bus system, in which net load redistribution attacks are launched by sophisticated attackers. Steady-state simulations and dynamic simulations on PSS/E show the effectiveness of the proposed framework in circumventing the voltage instability while maintaining the detection effectiveness of MTD. The impact of the proposed method on attack detection effectiveness is also revealed.

Zhang, Hang↗

Phase I: Natural Gas-Based Energy Storage at Abbott Power Plant

Compressed Natural Gas Energy Storage (CNGES), uses the potential energy of compressed natural gas within an integrated energy storage system. Specifically, an inventory of high-pressure natural gas is stored during off-peak hours in a first stage by controlling the balance of gas entering a pipeline from the transmission system, and in a second stage by using new compressors to fill vessels onsite. The natural gas storage medium is then discharged through an expander-generator to use the potential energy from the gas to generate electricity without combustion. The excess chemical energy stored in the natural gas is integrated with an existing fossil-based asset to provide power generation during peak hours and increase the reliability of the associated fossil generating facility.

03 NATURAL GAS↗

Online Output-Based Inertia Estimation of Modern Power Systems

The overall inertia of modern power systems is drastically impacted by the penetration level of converter-based resources (CBRs). The intermittent output of CBRs and their dependence on the weather conditions affirm the need for a realtime inertia estimation approach. This can help the transmission system operators(TSOs) to be continuously aware of the changes in the system inertia and to take suitable control actions. This paper is a step forward to a totally data-driven framework for power system inertia estimation using the available measurements from the phasor measurement units (PMUs). This inertia estimation is done based on the spectral analysis of the so-called Koopman linear operator. Koopman operator considers the relationship between the system's inertia and its dynamical response to slight disturbances in the load. Simulation results show that Koopman operator can approximate the system behavior in a reconstructed linear space hence inertia constant is estimated accurately.

data-driven↗

Systematic planning of moving target defence for maximising detection effectiveness against false data injection attacks in smart grid

Abstract Moving target defence (MTD) has been gaining traction to thwart false data injection attacks against state estimation (SE) in the power grid. MTD actively perturbs the reactance of transmission lines equipped with distributed flexible AC transmission system (D‐FACTS) devices to falsify the attacker's knowledge about the system configuration. However, the existing literature has not systematically studied what influences the detection effectiveness of MTD and how it can be improved based on the topology analysis. These problems are tackled here from the perspective of an MTD plan in which the D‐FACTS placement is determined. We first exploit the relation between the rank of the composite matrix and the detecting effectiveness. Then, we rigorously derive upper and lower bounds on the attack detecting probability of MTDs with a given rank of the composite matrix. Furthermore, we analyse existing planning methods and highlight the importance of bus coverage by D‐FACTS devices. To improve the detection effectiveness, we propose a novel graph theory–based planning algorithm to retain the maximum rank of the composite matrix while covering all necessary buses. Comparative results on multiple systems show the high detecting effectiveness of the proposed algorithm in both DC‐ and AC‐SE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncertainty-Informed Operation Coordination in a Water-Energy Nexus

The widespread deployment of smart heterogeneous technologies and the growing complexity in our modern society calls for effective coordination of the interdependent lifeline networks. In particular, operation coordination of electric power and water infrastructures is urgently needed as the water system is one of the most energy-intensive networks, an interruption in which may quickly evolve into a dramatic societal concern. This paper develops a novel analytic for uncertainty-aware day-ahead operation optimization of the interconnected power and water systems (PaWS). Joint probabilistic constraint (JPC) programming is employed to capture the uncertainties in wind resources and water demand forecasts. The proposed integrated stochastic model is presented as a non-linear non-convex optimization problem, where the non-linear hydraulic constraints in the water network are linearized using piece-wise linearization technique, and the non-convexity is efficiently tackled with a solution methodology to convert the proposed model with JPCs to a tractable mixed-integer linear programming (MILP) formulation that can be quickly solved to optimality. Here, the suggested framework is applied to a 15-node commercial-scale water network jointly operated with a power transmission system using a modified IEEE 57-bus test system. The numerical results demonstrate the of the proposed stochastic framework, resulting in cost reduction (13% on average when compared to the traditional setting) and energy saving of the integrated model under different realizations of uncertain renewable energy sources (RESs) and water demand scenarios. Additionally, the scalability of the proposed model is tested on a modified IEEE 118-bus test system connected to five water networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Batch Measurement Extremum Seeking Control of Distributed Energy Resources to Account for Communication Delays and Information Loss

Distributed Energy Resources (DER) have great potential to enhance the operation of electric power distribution systems. Previously, we explored the use of 2 Dimensional Extremum Seeking (2D-ES) control algorithms to enable model-free optimal control of DER to provide grid services to both the distribution and transmissions systems. Motivated by preliminary deployments of DER managed by 2D-ES algorithms in hardware-in-the-loop tests and in operational distribution grids, in this work, we extend the control scheme to accommodate communication delays and information loss. We propose a modification to the 2D-ES scheme to allow for the processing of batches of possibly noncontiguous objective function measurements at unknown and possibly uneven intervals. We provide a proof of the convergence of the batch 2D-ES (2D-BES) scheme when optimizing a generic convex objective function, as well as simulation results that demonstrate the suitability of the approach for substation active and reactive power target tracking.

Sankur, Michael↗

Conceptual design of the LHCD system on CFETR

With the capability of saving flux consumption in the current ramp up phase, controlling the safety factor (q) profile, providing the required off-axis current drive (CD), a lower hybrid current drive (LHCD) system was eventually determined to be used on the China Fusion Engineering Test Reactor (CFETR). Here, in this paper, a 20 MW/4.6 GHz system composed of 40 units of 500 kW continuous wave (CW) klystron amplifier is preliminarily designed. The feasibility of the frequency choice of 4.6 GHz in the physical aspect is discussed. In order to minimize the transmission loss, a TE01 over-mode of circular waveguide will be used in the transmission system. Although previous calculations indicates that high field side (HFS) launcher location results in waves damping at inner region than low field side (LFS) launcher, which is favorable for plasma stability, HFS launcher will be extremely difficult in engineering due to the limited space. Calculations show that the tritium breeding ratio (TBR) will be decreased by ~ 1.5% with HFS launcher, while it will be decreased by ~ 0.22% only with LFS launcher. As a result, the LH power will be coupled to plasma from the top port at LFS. The designed passive active multi-junction (PAM) launcher is arranged in an array of 5 rows and 8 columns with the height of 1181 mm and the width of 794 mm. A shielding block with a thickness of 20 cm will be equipped around the feeding waveguides to protect the feeding waveguides and to prevent neutron leakage. A preliminary scheme of the remote maintenance for the LFS launcher is given. The modeling results shows that the density for optimum coupling is ~ 1.8 × 10 17 /m 3 , lower than the 4.6 GHz cut-off density n e_co = 2.6 × 10 17 /m 3 . Around this density, the power directivity (D p ) can be high as 71%.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Offshore Wind Project Study (Final Technical Report)

Within the Long Island electric service territory and throughout New York State there is increasing interest in and mandate for increasing clean energy technologies and renewable energy generation while reducing dependency on fossil fuels for electric production with goal of a carbon free system by 2040. This report discusses the implications of the reduction of forecasted load in the Long Island electric service territory and the impact of energy efficiency; increasing reliance of wind and other renewable resources on the transmission system; opportunities for interconnecting these resources; and reductions on the reliance of baseload fossil fueled power facilities over the coming years.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Photovoltaic Plant and Battery Energy Storage System Integration at NREL's Flatirons Campus

Although utility-scale solar photovoltaic (PV) power plants are becoming a cost-effective energy resource, there is belief within the energy industry that the increasing penetrations of PV technologies could potentially impact grid reliability. This is due to the variability across timescales, the forecast uncertainty of the solar energy resource, and the impacts on both distribution and transmission systems. This can cause utilities to severely limit PV installations or to assign PV integration costs when considering a least-cost portfolio of resources. As California and other regions in the United States are marching toward fulfilling - and probably exceeding - their renewables portfolio standards goals, grid operators are beginning to face operational challenges that could have implications for existing renewable and nonrenewable generators and that will shape opportunities for future projects. In this work, we focused on developing controls and conducting demonstrations for AC-coupled PV-battery energy storage systems (BESS) in which PV and BESS are collocated and share a point of common coupling (PCC).

14 SOLAR ENERGY↗

Simulation of Cross-Border Renewable Energy Trading in South Asia [Slides]

India's national renewable energy zones for wind power and solar photovoltaics (PV) could become regional green power resources if South Asian countries liberalize their rules for cross-border energy trading (CBET). Similarly, Nepal's wealth of hydropower could be more valuable to Nepal and its neighbors with greater market integration. These are the findings of a study by the U.S. National Renewable Energy Laboratory (NREL) that tested trading scenarios for wind power, solar power, and hydropower among Bangladesh, India, Nepal, and Sri Lanka. The NREL study found that wheeling power through India's interstate transmission system (ISTS) could be just as efficient operationally as building new high-voltage direct current (HVDC) lines from the renewable energy zones directly to the importing country. This means that CBET integration could substitute for new long-distance HVDC transmission - which could cost billions of dollars - while delivering to all participating countries the same benefits for renewable energy development and decarbonization.

13 HYDRO ENERGY↗

Cross-Border Electricity Trading and Renewable Energy Zones

India's national renewable energy zones for wind power and solar photovoltaics (PV) could become regional green power resources if South Asian countries liberalize their rules for cross-border energy trading (CBET). Similarly, Nepal's wealth of hydropower could be more valuable to Nepal and its neighbors with greater market integration. These are the findings of a study by the U.S. National Renewable Energy Laboratory (NREL) that tested trading scenarios for wind power, solar power, and hydropower among Bangladesh, India, Nepal, and Sri Lanka. The NREL study found that wheeling power through India's interstate transmission system (ISTS) could be just as efficient operationally as building new high-voltage direct current (HVDC) lines from the renewable energy zones directly to the importing country. This means that CBET integration could substitute for new long-distance HVDC transmission - which could cost billions of dollars - while delivering to all participating countries the same benefits for renewable energy development and decarbonization.

14 SOLAR ENERGY↗

Demand Response Optimization and Management System for Real-TIme (DROMS-RT)

To design and demonstrate DROMS-RT, a highly distributed Demand Response Optimization and Management System for Real-Time (DROMS-RT) power flow control to support large scale integration of distributed renewable generation into the grid. AutoGrid developed a novel control and communications platform to allow highly dispatchable demand response (DR) services in time frames suitable for providing ancillary services to the transmission grid. These services will be substantially less expensive and more efficient than other forms of ancillary services options currently available to manage the intermittency associated with large-scale renewable integration. DROMSRT successfully leveraged Automated Demand Response (ADR) by fundamentally re-thinking the architecture of the DR platform from the ground up and by developing innovative new technologies in a number of areas related to DR. DROMS-RT leveraged the low-cost, open, interoperable DR signaling technology, OpenADR, and low-cost, internet-protocol based telemetry solutions to reduce the cost of hardware. This allowed DROMS-RT to provide dynamic price signals to millions of OpenADR clients. Statistically rigorous signal processing techniques were developed to reliably detect even small load reductions in the presence of noisy baseline profiles. Novel forecasting engines based on modern online machine learning algorithms enabled accurate individualized forecasts for customer loads in the presence of dynamic pricing signals, and a real-time decision engines enabled continuous optimization and optimal dispatch of DR resources across a large portfolio of heterogeneous loads that respond at varying time-scales. Moreover, the real-time optimization conducted by the decision engine can utilize grid physics to maximize load reduction at the transmission system in addition to the distribution sites, for more efficient grid operation. Finally, the Software-as-a-Service (SaaS) availability of the DROMS-RT platform has reduced the cost of deployment and enable participation of small commercial and residential customers in DR who otherwise would not be able to do so.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Distributed Energy Resources, Interconnection↗

Efficient Reformulation and Optimization for SC-ACOPF with Line Switching

This project aims to develop efficient and robust computational methods for solving the security-constrained alternating current optimal power flow problem (SC-ACOPF). The SC-ACOPF problem is a central problem in operating the electric power grids in the United States. It determines the most economically efficient way to operate the generation and transmission system to meet daily electricity demand. The solution found by solving an SC-ACOPF problem must satisfy the physics of the alternating current (AC) power flows, various generator and network operational constraints, and must maintain secure operation under various contingency scenarios, where a generator, a transmission branch, or a transformer may unexpectedly trip offline.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Aggregated EV Flexibility With TSO-DSO Coordination

Electric vehicles (EVs) are becoming a promising source of grid ancillary services due to the temporal and spatial charging flexibility, quick response and storage capability. Such advantages are increasing with government policy promotion and technology improvement. However, the exploration of EV flexibility requires the coordination of both transmission system operators (TSOs) and distribution system operators (DSOs), to ensure the safe and reliable operation of power network. In this paper, we propose a coordinated evaluation method that determines the optimal utilization of EV temporal flexibility without compromising EV owners’ usage. At the distribution level, DSOs first evaluate EV aggregators’ operational boundaries to exploit distribution level services. At the transmission level, TSOs then determine EV charging schedules and ancillary service capacity simultaneously, taking into account the requirement from DSOs. Here, we validate the model in a case study using the IEEE 123 node test feeder and EV charging sessions obtained from a transportation simulation tool that uses real-world data.

33 ADVANCED PROPULSION SYSTEMS↗

High-Frequency Signature-Based Fault Detection for Future MV Distribution Grids: Preprint

Increased deployment of Distributed Energy Resources (DERs) and microgrids are significantly changing the operation of distribution grid. Increasing penetration of power electronics based DERs also raise several operational problems such as protection coordination issues, voltage raise, recloser synchronization, stability, and frequency control. Legacy systems are designed for unidirectional power flow. Bidirectional power flows, and varying short circuit levels are some of the major challenges in implementing these legacy protection schemes for future power grid with high penetration of power electronics based DERs. Inverter based DER’s can contribute to a maximum of 2 p.u. fault current. Interconnection standards might require even lower fault current contribution. If these protection related challenges are not addressed, it will result in limiting the penetration of DERs in distribution feeders. In this paper, the feasibility of high frequency signature generated by transients is evaluated to identify and locate faults in a distribution system. The paper will discuss the need for an accurate line modeling approach to accurately capture the high frequency signatures. These high frequency signatures are naturally occurring electromagnetic transients for events such as switching events in the network, faults events, etc. This is different than that implemented in transmission systems as the proposed approach utilizes advanced signal processing techniques to retrieve valuable information from the high frequency signatures generated during faults and does not just rely on time delay measurements between reflections of the high frequency signals. In the full paper, information of a modified IEEE distribution feeder test system to accurately model the high frequency signatures will be provided. The distribution lines will be modeled using universal line modeling (ULM) technique in an electromagnetic transients program (EMTP) modeling platform. Different test cases will be simulated and these test cases will include different fault types, multiple fault locations, capacitor bank switching, etc. The feeder system modeled for these simulations will also include power electronics based DERs. Additionally, experimental results demonstrating the high frequency signatures generated due to a transient event in a medium voltage (13.8 kV) distribution line will also be presented in the full paper. Furthermore, the analysis combined with simulation and experimental results in the full paper will help demonstrate the feasibility and efficacy of the proposed protection scheme. The developed protection scheme will not just help solve problems generated by bidirectional current flow, varying short-circuit current capacity, but also help in proliferation of DERs in distribution systems.

41 EE - Solar Energy Technologies Office (EE-4S)↗