Search NASA⌕ Search

SEARCH · Search NASA

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Dithiocarbamate Self-Assembled Monolayers as Efficient Surface Modifiers for Low Work Function Noble Metals

Tuning the work function of the electrode is one of the crucial steps to improve charge extraction in organic electronic devices. Here, we show that N,N-dialkyl dithiocarbamates (DTC) can be effectively employed to produce low work function noble metal electrodes. Work functions between 3.1 and 3.5 eV are observed for all metals investigated (Cu, Ag, and Au). Ultraviolet photoemission spectroscopy (UPS) reveals a maximum decrease in work function by 2.1 eV as compared to the bare metal surface. Electronic structure calculations elucidate how the complex interplay between intrinsic dipoles and dipoles induced by bond formation generates such large work function shifts. Subsequently, we quantify the improvement in contact resistance of organic thin film transistor devices with DTC coated source and drain electrodes. These findings demonstrate that DTC molecules can be employed as universal surface modifiers to produce stable electrodes for electron injection in high performance hybrid organic optoelectronics.

36 MATERIALS SCIENCE↗

The correlation between acoustic and magnetic properties in the long working metal boiler drum with the parameters of the electron microscope

The present paper presents comparative analysis of measurement results of acoustic and magnetic properties in long working metal of boiler drums and the results obtained by methods of electronic microscopy. The structure of the metal sample from the fracture zone to the base metal (metal working sample long) and the center of the base metal before welding (weld metal sample) was investigated by electron microscopy. Studies performed by spectral acoustic, magnetic noise and electron microscopic methods were conducted on the same plots and the same samples of long working and weld metal of high-pressure boiler drums. The analysis of research results showed high sensitivity of spectral-acoustic and magnetic-noise methods to definition changes of microstructure parameters. Practical application of spectral-acoustic and magnetic noise NDT method is possible for the detection of irregularities and changes in structural and phase state of the long working and weld metal of boiler drums, made of a special molybdenum steel (such as 20M). The above technique can be used to evaluate the structure and physical-mechanical properties of the long working metal of boiler drums in the energy sector.

36 MATERIALS SCIENCE↗

Experimental verification of the capillary plasma triggered long spark gap under the extremely low working coefficient in air

The paper has proposed a new triggering method for long spark gap based on capillary plasma ejection and conducted the experimental verification under the extremely low working coefficient, which represents that the ratio of the spark gap charging voltage to the breakdown voltage is particularly low. The quasi-neutral plasma is ejected from the capillary and develops through the axial direction of the spark gap. The electric field in the spark gap is thus changed and its breakdown is incurred. It is proved by the experiments that the capillary plasma ejection is effective in triggering the long spark gap under the extremely low working coefficient in air. The study also indicates that the breakdown probabilities, the breakdown delay, and the delay dispersion are all mainly determined by the characteristics of the ejected plasma, including the length of the plasma flow, the speed of the plasma ejection, and the ionization degree of the plasma. Moreover, the breakdown delay and the delay dispersion increase with the length of the long spark gap, and the polarity effect exists in the triggering process. Lastly, compared with the working patterns of the triggering device installed in the single electrode, the working pattern of the devices installed in both the two electrodes, though with the same breakdown process, achieves the ignition under longer gap distance. To be specific, at the gap length of 14 cm and the working coefficient of less than 2%, the spark gap is still ignited accurately.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

From passive storage to daily waste retrieval; changing the working culture at Sellafield's pile fuel storage pond

The Pile Fuel Storage Pond (PFSP) was built in 1948/50 to treat materials from the Windscale Piles. Multiple operational regimes over the intervening 60 years have resulted in a complex inventory of spent nuclear fuels, solid and liquid intermediate level wastes. A coordinated programme of work, designed to retrieve and safely dispose of the pond contents, has been implemented to enable the decommissioning of the facility. The long period of passive storage operations which preceded the implementation of the programme meant that the operator was faced with a dual challenge of providing new technical capability and changing a working culture that was inappropriate for the dynamic environment required to successfully deliver the programme. It was recognised that the nature of the programme meant that implementing a standard manufacturing approach to operations would not be appropriate. In order to create a dynamic retrievals focussed working culture, the operator has vigorously embraced change programmes aimed at improving a number of working practices including encouraging innovation, managing integrated but flexible production schedules, and encouraging work-face problem solving. The combined impact of beginning to resolve the technical challenges and focussing on the delivery culture has resulted in the facility making a step change towards becoming fully retrievals operations focussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Work and energy for particles in electromagnetic field

Defining the energy and work for particles interacting with electromagnetic field (EMF) is an open problem, because—due to the gauge-freedom—there exist various non-equivalent possibilities. It is argued that a consistent definition can be provided via the Lorenz gauge. To this end, I work out a system of two electromagnetically coupled classical particles. One of them is much heavier and models the source of work. The definition of energy in the Lorenz gauge is causal and consistent, because it leads to an approximate conservation law due to which the work done by the heavy particle (source of work) can be defined either via the kinetic energy of the heavy particle, or via the full time-dependent energy (kinetic + potential in the Lorenz gauge) of the light particle.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Scalable Work Stealing

Irregular and dynamic parallel applications pose significant challenges to achieving scalable performance on large-scale multicore clusters. These applications often require ongoing, dynamic load balancing in order to maintain efficiency. While effective at small scale, centralized load balancing schemes quickly become a bottleneck on large-scale clusters. Work stealing is a popular approach to distributed dynamic load balancing; however its performance on large-scale clusters is not well understood. Prior work on work stealing has largely focused on shared memory machines. In this work we investigate the design and scalability of work stealing on modern distributed memory systems. We demonstrate high efficiency and low overhead when scaling to 8,192 processors for three benchmark codes: a producer-consumer benchmark, the unbalanced tree search benchmark, and a multiresolution analysis kernel.

99 GENERAL AND MISCELLANEOUS↗

Characterizing and Mitigating Work Time Inflation in Task Parallel Programs

Task parallelism raises the level of abstraction in shared memory parallel programming to simplify the development of complex applications. However, task parallel applications can exhibit poor performance due to thread idleness, scheduling overheads, and work time inflation – additional time spent by threads in a multithreaded computation beyond the time required to perform the same work in a sequential computation. We identify the contributions of each factor to lost efficiency in various task parallel OpenMP applications and diagnose the causes of work time inflation in those applications. Increased data access latency can cause significant work time inflation in NUMA systems. Our locality framework for task parallel OpenMP programs mitigates this cause of work time inflation. Our extensions to the Qthreads library demonstrate that locality-aware scheduling can improve performance up to 3X compared to the Intel OpenMP task scheduler.

Olivier, Stephen L.↗

Integrated Work Management: Overview, Course 31881

Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

99 GENERAL AND MISCELLANEOUS↗

Integrated Work Management: PIC, Course 31884

The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

99 GENERAL AND MISCELLANEOUS↗

Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

30 DIRECT ENERGY CONVERSION↗

Quantifying the Role of APB Tubes on the Work-hardening of Ordered Phases

For sixty years, it has been theorized that antiphase boundary (APB) tubes, which are defects produced by deformation, contribute to the high strength of ordered alloys or intermetallic compounds. The concept of an APB tube was originally proposed by Vidoz and Brown [A.E. Vidoz, L.M. Brown, "On work-hardening in ordered alloys", Philosophical Magazine, 7 (1962) 1167–1175] in 1962 to explain the ~50% increase in strength observed when an alloy, such as Ni 3 Fe, is chemically ordered compared to when it is disordered. The existence of APB tubes was only definitively confirmed by Chou and Hirsch in 1981 [C.T. Chou, P.B. Hirsch Antiphase domain boundary tubes in plastically deformed ordered Fe 30.5 at.% Al alloy, Philosophical Magazine, A. 44 (1981) 1415–1419] using a transmission electron microscope (TEM). Prior to the current work, there had been no studies trying to correlate the presence of APB tubes with their effect on the mechanical properties. The main finding of this project was that APB tubes do not contribute to the strength of the strongly-ordered intermetallic compounds FeAl and Ni 3 Al. This was shown by removing the APB tubes by heating the materials and showing that the mechanical properties were unaffected. In addition, in-situ deformation experiments were undertaken in a TEM on both disordered and ordered Ni 3 Fe, in which it was shown that defects (superdislocations) in the ordered alloy underwent many more interaction events than defect (dislocations) in the disordered alloy. This difference can explain the increase in the increase in strength observed when this material is ordered. The project supported a PhD student, Rachel Osmundsen, who successfully defended her thesis in April, 2022. It also supported the principal investigator, Ian Baker, two PhD exchange students and an undergraduate researcher. The work involved collaborations with the following people and use of the following facilities: Dr. Si Chen, Advanced Photon Source at Argonne National Laboratory, for synchrotron X-ray diffraction; and Dr. Katherine Shanks and Dr. Kelly Nygren, Cornell High Energy Synchrotron Source (CHESS), for synchrotron X-ray diffraction. The work led to 12 papers published in refereed journals with two papers currently submitted to journals. There were also 16 presentation made at conferences and universities on the work, ten of which were invited.

36 MATERIALS SCIENCE↗

2021-2022 Remote Work Study Final Results

The COVID-19 pandemic has forced many organizations—from national laboratories to private companies—to change their workforce model to incorporate remote work. This study and the summarized results sought to understand the experiences of remote workers and the ways that remote work can impact recruitment and retention, employee engagement, and career development. Sandia, like many companies, has committed to establishing a hybrid work model that will persist postpandemic, and more Sandia employees than ever before have initiated remote work agreements. This parallels the nationwide increase in remote employment and motivates this study on remote work as an enduring part of workforce models.

99 GENERAL AND MISCELLANEOUS↗

The Challenges of Safe Troubleshooting Work

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed. Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident. The primary challenges include: Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state. Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging. Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present. Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency. There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Increasing Extractable Work in Small Qubit Landscapes

An interesting class of physical systems, including those associated with life, demonstrates the ability to hold thermalization at bay and perpetuate states of high free-energy compared to a local environment. In this work we study quantum systems with no external sources or sinks for energy, heat, work, or entropy that allow for high free-energy subsystems to form and persist. We initialize systems of qubits in mixed, uncorrelated states and evolve them subject to a conservation law. We find that four qubits make up the minimal system for which these restricted dynamics and initial conditions allow an increase in extractable work for a subsystem. On landscapes of eight co-evolving qubits, interacting in randomly selected subsystems at each step, we demonstrate that restricted connectivity and an inhomogeneous distribution of initial temperatures both lead to landscapes with longer intervals of increasing extractable work for individual qubits. We demonstrate the role of correlations that develop on the landscape in enabling a positive change in extractable work.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Characterization of Stress Corrosion Cracking Initiation Precursors in Cold-Worked Alloy 690 Using Advanced High-Resolution Microscopy

Although highly cold-worked UNS N06690 has been shown to be susceptible to stress corrosion crack growth in pressurized water reactor primary water, it is unclear whether cold-work promotes stress corrosion crack initiation under constant load test conditions. To evaluate the stress corrosion cracking initiation response, constant load tensile and blunt notch compact tension testing were performed on 21% and 31% cold-worked samples from two thermally treated UNS N06690 materials in 360 °C simulated pressurized water reactor primary water. High-resolution examinations were conducted mid- and post-test to record the evolution of grain boundary precursor damage and intergranular crack nucleation by focused ion beam milling combined with scanning electron microscopy and by transmission electron microscopy. The surface and sub-surface morphology of intergranular cavities, local corrosion and shallow cracks were documented. Nanometer-sized cavities were observed associated with grain boundary carbides in all specimens. The 31% cold-work specimens consistently exhibited shallow intergranular cracks with oxidized crack flanks and a high density of cavities ahead of the oxide front. Three-dimensional distribution of carbides and cavities ahead of the cracked grain boundaries was analyzed to gain mechanistic insights into the processes that lead to crack initiation in highly cold-worked UNS N06690.

36 MATERIALS SCIENCE↗

A comparison between computer-controlled and set work rate exercise based on target heart rate

Two methods are compared for observing the heart rate (HR), metabolic equivalents, and time in target HR zone (defined as the target HR + or - 5 bpm) during 20 min of exercise at a prescribed intensity of the maximum working capacity. In one method, called set-work rate exercise, the information from a graded exercise test is used to select a target HR and to calculate a corresponding constant work rate that should induce the desired HR. In the other method, the work rate is controlled by a computer algorithm to achieve and maintain a prescribed target HR. It is shown that computer-controlled exercise is an effective alternative to the traditional set work rate exercise, particularly when tight control of cardiovascular responses is necessary.

Pratt, Wanda M.↗