Search NASA⌕ Search

SEARCH · Search NASA

Results for “ARTEMIS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Design and Implementation of the ARTEMIS Lunar Transfer Using Multi-Body Dynamics

The use of multi-body dynamics to design the transfer of spacecraft from Earth elliptical orbits to the Earth-Moon libration (L(sub 1) and L(sub 2)) orbits has been successfully demonstrated by the Acceleration Reconnection and Turbulence and Electrodynamics of the Moon's Interaction with the Sun (ARTEMIS) mission. Operational support of the two ARTEMIS spacecraft is a final step in the realization of a design process that can be used to transfer spacecraft with restrictive operational constraints and fuel limitations. The focus of this paper is to describe in detail the processes and implementation of this successful approach.

Folta, David↗

Building Booster Separation Aerodynamic Databases for Artemis II

NASA’s Artemis II mission will mark the return of humans to near-lunar space for the first time since Apollo. Shortly after launch on the Space Launch System (SLS), a critical phase of ascent occurs when 16 small rockets fire to push the boosters away from the core. Minimizing the risk of failure during separation requires the construction of multiple 13-dimensional databases, including perturbations in position, flight conditions, and engine thrust. The SLS Computational Fluid Dynamics team used NASA’s FUN3D flow solver on the Pleiades and Electra supercomputers to run 5,780 simulations at nominal conditions and over 8,000 simulations with a core stage engine failure to generate the databases needed to verify the booster separation system for Artemis II.

Meeroff, Jamie G.↗

Risk and Performance Assessment of Generic Mission Architectures: Showcasing the Artemis Mission

A has initiated a strong push to return face. In this work, we astronaut assess performance and risk for proposed mission architectures using a new Mission Architecture Risk Assessment (MARA) tool. The MARA tool can produce statistics about the availability of components and overall performance of the mission considering potential failures of any of its components. In a Monte Carlo approach, the tool repeats the mission simulation multiple times while a random generator lets modules fail according to their failure rates. The results provide statistically meaningful insights into the overall performance of the chosen architecture. A given mission architecture can be freely replicated in the tool, with the mission timeline and basic characteristics of employed mission modules (habitats, rovers, power generation units, etc.) specified in a configuration file. Crucially, failure rates for each module need to be known or estimated. The tool performs an event-driven simulation of the mission and accounts for random failure events. Failed modules can be repaired, which takes crew time but restores operations. In addition to tracking individual modules, MARA can assess the availability of predefined functions throughout the mission. For instance, the function of resource collection would require a rover to collect the resources, a power generation unit to charge the rover, and a resource processing module. Together, the modules that are required for a given function are called a functional group. Similarly, we can assess how much crew time is available to achieve a mission benefit (e.g. research, building a base, etc) as opposed to spending crew time on repairs. Here we employ the method on the proposed NASA Artemis mission. Artemis aims to return United States astronauts to the lunar surface by 2024. Results provide insights into mission failure probabilities, up- and downtime for individual modules and crew-time resources spent on the repair of failed modules. The tool also allows us to tweak the mission architecture in order to find setups that produce more favorable mission performance. As such, the tool can be an aid in improving the mission architect abling cost-benefit analysis for mission improvement.

Rumpf, Clemens M.↗

Guidance Modifications & Enhancement for Space Launch System Block-1 in Support ARTEMIS I and Beyond

As NASA has conducted extensive simulation and testing of the Space Launch System for the Artemis I mission, opportunities were identified for improvements to the Guidance, Navigation and Controls algorithms. These improvements will allow more effective use of the capabilities of the SLS vehicle, and enhance safety of the crew on board. This paper describes several planned updates to the Powered Explicit Guidance algorithm and auxiliary guidance algorithms for Artemis I and subsequent SLS missions.

Naeem Ahmad↗

Assessment of Artemis-1 Pogo Flight Instrumentation System

As the space industry continues to strive for more efficient launch vehicles, it must relyon increasingly accurate predictive models. Verification of models typically requires physical testing. Flight data measurements offer the most real and therefore the most accurate data for model correlation. As NASA prepares for the inaugural launch of Space Launch System(SLS), Artemis-1, they must rely heavily on predictive system models to ensure flight safety.NASA has implemented a Development Flight Instrumentation (DFI) system in hopes of recovering useful flight data to aid in model correlation. Historically, some of the most important flight measurements are those that monitor the potentially destructive dynamic interaction of the structural and propellant modes – a phenomenon known as pogo. Pogo is a dynamic instability that can occur on a launch vehicle during any phase of ascent. During this investigation an end-to-end assessment of the Artemis-I Pogo-related DFI was performed to identify any obstacles inherent in the current instrumentation system which may prevent successful measurement of the data necessary to validate the current predictive fluid-structural models. Input drive signals were approximated and applied to a state-space system model to derive predicted pressure and acceleration responses. These predicted responses were then fed through a simulation of the data acquisition process in order to recover predicted measurements. Finally, a mock Flight Data Analysis (FDA) was performed to assess the ability of these measurements to meet the Flight Test Objectives(FTO).

Adam Johnson↗

2020 International Astronautical Congress Conference Presentation - ANALYTICAL TECHNIQUES FOR ASSESSING GATEWAY AND OTHER SPACECRAFT ANTENNA LINE-OF-SIGHT FOR THE ARTEMIS PROGRAM

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. The Gateway, a critical piece of infrastructure for the long-term Artemis mission profiles, will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, its degree of Earth and lunar visibility, the versatile surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration drop-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Gateway↗

NASA's Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

Lisa Watson-Morgan↗

Assessment of Artemis-1 Pogo Flight Instrumentation System

As the space industry continues to strive for more efficient launch vehicles, it must rely on increasingly accurate predictive models. Verification of models typically requires physical testing. Flight data measurements offer the most real and therefore the most accurate data for model correlation. As NASA prepares for the inaugural launch of Space Launch System (SLS), Artemis-1, they must rely heavily on predictive system models to ensure flight safety. NASA has implemented a Development Flight Instrumentation (DFI) system in hopes of recovering useful flight data to aid in model correlation. Historically, some of the most important flight measurements are those that monitor the potentially destructive dynamic interaction of the structural and propellant modes – a phenomenon known as pogo. Pogo is a dynamic instability that can occur on a launch vehicle during any phase of ascent. During this investigation an end-to-end assessment of the Artemis-I Pogo-related DFI was performed to identify any obstacles inherent in the current instrumentation system which may prevent successful measurement of the data necessary to validate the current predictive models of the Main Propulsion System (MPS). Input drive signals were approximated and applied to a system-level SLS state-space model to derive predicted pressure and acceleration responses. These predicted responses were then fed through a simulation of the data acquisition process in order to recover predicted measurements. Finally, a mock Flight Data Analysis (FDA) was performed to assess the ability of these measurements to meet the Flight Test Objectives (FTO).

Adam Johnson↗

Space Communications in Support of the Artemis Program

NASA has been challenged to send the first woman and first person of color to the South Pole of the moon by 2024. Named the Artemis Program, this effort serves as a proving ground for the greater Moon-to-Mars campaign and establishes a lunar outpost by 2028. The Artemis Program relies on simultaneous operation of multiple flight assets separated by large angular distances that require a unique communication strategy and is a departure from the previous Apollo-era architecture. NASA’s Space Communications and Navigation (SCaN) Program is designing a scalable, extensible, and reusable network architecture to provide communication and navigation services in support of lunar exploration. This architecture serves at the foundational infrastructure, paving the way for future exploration of Mars. In pursuance of this new architecture, the SCaN Program is augmenting NASA’s space communications networks by upgrading the current 34-meter beam waveguide antenna systems and incorporating an 18-meter class subnet. This paper presents an overview of NASA’s plans to provide high data rate communication and navigation services for lunar exploration efforts including: operations concepts to support the lunar communications architecture, major network enhancements and new capabilities, and a Mars-forward approach that maximizes the reuse of these capabilities. Capabilities include:(1) Delay/Disruption Tolerant Networking (DTN), (2) Multiple Spacecraft Per Aperture (MSPA, also known as Multiple Spacecraft Per Antenna), and (3) Simultaneous Ka-band uplink and downlink. The mid-2020s era is a historic opportunity to advance NASA’s space communications infrastructure as humans return to the moon and continue to interplanetary exploration, starting with Mars. The space communication infrastructure is a lifeline that supports these endeavors, furthering humankinds’ exploration and understanding of the universe.

Philip A Baldwin↗

Augmenting the Space Environment Complex's Thermal Vacuum Capabilities for Artemis 1 Orion Spacecraft Testing

The Space Environments Complex at Glenn Research Center’s Neil A Armstrong Test Facility (formerly Plum Brook Station) recently successfully completed Artemis 1 thermal vacuum testing. The Space Environments Complex boasts the world’s largest thermal vacuum chamber with a 122-foot tall, 100-foot diameter aluminum assembly vacuum chamber. The fifty-year old chamber has been adapted over its history to conduct several unique test campaigns in a variety of test environments. Artemis 1 Orion spacecraft testing is the most complex test campaign the Space Environments Complex has undergone to date, with temperature limits between -250 F to +300F in a high vacuum with significant requirements for quality data and contamination control of a flight vehicle. This presentation covers the improvements and innovations in the cryoshroud and thermal systems, data acquisition, as well as contamination and cleanliness to accommodate the rigors of a flight vehicle during a six-week thermal vacuum test. Additionally, the presentation covers successes and lessons learned from the testing.

Erin Reed↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Optical Communications Operations Concept for the Artemis II Crewed Mission to the Moon

NASA’s Artemis II mission will fly a human crew of 4 to the Moon aboard the Orion spacecraft for the first time since the Apollo missions. The Orion spacecraft includes an optical communication payload, known on board as “OpCom,” which is part of NASA’s Orion Artemis II Optical Communications (O2O) demonstration. OpCom will be controlled directly from the Mission Control System (MCC) in Houston and will support forward links up to 20 Mbps and return links up to 250 Mbps for at least 1 hour per mission day. It will be used to transfer files and provide real-time video SD and HD video to/from MCC. We describe the OpCom system architecture and operations concept.

optical communications↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

Feasibility Study of a Multi Tilt-rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronaut candidates for the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of bank angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi tilt-rotor aircraft platform as a candidate platform for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi tilt-rotor platform. The modeling-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling because the vehicle operates across a wide range of flight conditions. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

Feasibility Study of a Multi-Tilt-Rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronauts of the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of tilt angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi-tilt-rotor aircraft platform as a candidate for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi-tilt-rotor platform. The model-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi-tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

Nightside Time Domain Electromagnetic Sounding with ARTEMIS: Challenges of Isolating Induction from the Lunar Interior

Electromagnetic sounding analyses THEMIS-ARTEMIS magnetic field data to isolate and identify induced magnetic fields to determine the electrical conductivity of the lunar interior. The transfer function method uses two observations one near the Moon and one far from lunar effects. We focus on induction within the nightside wake cavity performing a visual inspection in the time domain. Large transients are naturally occurring and can excite telluric currents within conducting layers within the lunar interior according to the skin depth of the signal. Time windows within wake passes with one probe close and the other far have been identified within 10 years of ARTEMIS data. We discuss initial conclusions and challenges of isolating interior induction within the lunar plasma environment.

Moons↗

Analysis of the Artemis I Orion Spacecraft Power System Performance

NASA successfully completed an uncrewed test flight of the Orion spacecraft during the 26-day Artemis I mission in November and December 2022. The Artemis I mission profile included several potentially stressing features for Orion electrical power system (EPS) performance, including eclipse duration, multiple propulsive or navigational maneuvers which constrained positioning of the solar array wings (SAWs), and the proximity and phasing of various events together. All of these features vary significantly with Earth-sun-moon geometry, providing a unique challenge for predicting EPS performance before an exact launch date is known. This presentation will provide a brief mission overview, discuss the different computer models with varying levels of fidelity used to analyze Orion EPS performance, as well as the screening process developed to incorporate EPS performance as a consideration for launch epoch selection. Final preflight model predictions of EPS performance will be compared to in-flight telemetry measurements, and several EPS anomalies observed will be briefly discussed.

Orion↗