Gunnar uranium mine environmental remediation - Northern Saskatchewan

The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of the decommissioning of the Thetis reactor

The Thetis research reactor on the site of the Nuclear Sciences Institute of the Ghent University has been in operation from 1967 until December 2003. This light-water moderated graphite-reflected low-enriched uranium pool-type reactor has been used for various purposes e.g. the production of radioisotopes and activation analyses. During the first years its core power was 15 kW. In the early '70, a core enlargement allowed for operation at typically 150 kW, while the maximum was allowed to be 250 kW In September 2007, Ghent University entrusted to SCK-CEN the management of the back-end of the spent fuel and the decommissioning of the reactor. In 2010, the spent fuel was removed from the reactor and transported to Belgoprocess for cementation in 400 l drums and interim storage awaiting final disposal. This activity allows tackling the decommissioning of the reactor. The objective is to complete its decommissioning by the end of 2014. In the framework of the decommissioning of the Thetis reactor, SCK-CEN set-up the final decommissioning plan and the decommissioning licensing file. These documents include among others a radiological inventory of the reactor. The graphite moderator blocks, the control and the safety pates, the liner of the pool were modeled to assess the activation products (isotopic vector and intensity). At the end of the unloading of the reactor in 2010 a brief mapping of the equipment's and internals of the reactor pool was performed. In 2012, we realized a more detailed mapping. These results confirmed those performed earlier and allowed to confirm the assumptions made in the final decommissioning plan. We set-up the terms of reference for the first decommissioning phase of the reactor namely the dismantling of the reactor i.e. reactor pool, circuits and rabbit system, equipment's and ventilation ducts. The removal of asbestos is also included into this phase. We conducted the selection process and the awarding of this decommissioning job. We gained the decommissioning license in May 2012. We also prepared the software tool allowing managing the decommissioning project by updating the inventory and recording the progress, the characterization measurements and the material and waste production. This software allows also to trace all the material streams and to report to the Authorities. This software is a simplified release of the ones developed by SCK-CEN in the framework of other decommissioning projects like BR3 and Belgonucleaire. The dismantling of the reactor i.e. reactor pool, circuits and rabbit system, will be performed in 2013. In 2014, it is planned to map all the surfaces of the infrastructure to highlight residual contamination of floor, walls and ceiling. The contaminated surfaces will be decontaminated and controlled. The objective is to reach the free release of the reactor building and laboratories by the end of 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electron Transport in Tellurium Nanowires

The temperature and magnetic field dependences of the voltage-current characteristics of tellurium nanowires manufactured via the insertion of tellurium into chrysotile asbestos pores from a melt have been measured. The measurements have been performed within a broad range of temperatures and magnetic fields. The results of such measurements are analyzed by means of their comparison with the predictions of theoretical models developed for the case of one-dimensional structures. The obtained dependences are concluded to most closely correspond to Luttinger liquid theory predictions. This result agrees with the concepts that the major mechanism of current in such one-dimensional wires does not depend on the material inserted into pores, but depends only on the dimension of conducting wires.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

The legacy of weapons grade plutonium production: Health status of Hanford complex workers who manage the waste

The extent and etiology of health effects in workers who maintain underground storage tanks at the Hanford Nuclear Reservation (Hanford) have been subjects of controversy and concern for several decades. Hanford is a decommissioned nuclear production complex managed by the US Department of Energy in southeast Washington State. This integration-of-evidence review evaluates the relationship between exposure to vapors from mixed chemical and radioactive waste stored in underground storage tanks at Hanford and worker health. Hanford workers’ health information was gathered from technical reports, media reports, and published literature, including the systematic search of seven databases. This review describes the health status and health concerns of Hanford tank farm workers based on the integration of the available health effects data from disparate sources. In interviews with external groups, Hanford workers reported both irritant-type symptoms and diseases that they believe are attributable to tank farm vapors. However, the results of this integration-of-evidence review indicated that no pervasive pattern of occupational disease was identified that can be associated with exposure to tank farm vapors. Inhalation exposure to asbestos and beryllium is associated with lung disease from various types of nuclear industry work but not from work on tank farms. This review concluded that while irritant-type symptoms and isolated cases of occupational disease are plausible under certain conditions, the currently available data do not support a pervasive pattern of occupational disease associated with vapor exposure.

Cherry, Debra↗

Closure Report for Corrective Action Unit 548: Areas 9, 10, 18, 19, and 20 Housekeeping Sites, Nevada National Security Site, Nevada

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 548, Areas 9, 10, 18, 19, and 20 Housekeeping Sites, and complies with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 548 consists of the following Corrective Action Sites (CASs), located in Areas 9, 10, 12, 18, 19, and 20 of the Nevada National Security Site: · CAS 09-99-02, Material Piles (2) · CAS 09-99-04, Wax, Paraffin · CAS 09-99-05, Asbestos, Vermiculite · CAS 09-99-07, Tar Spill · CAS 10-22-02, Drums · CAS 10-22-05, Gas Block · CAS 10-22-07, Gas Block · CAS 10-22-34, Drum · CAS 10-22-38, Drum; Cable · CAS 12-99-04, Epoxy Tar Spill · CAS 12-99-08, Cement Spill · CAS 18-14-01, Transformers (3) · CAS 19-22-01, Drums · CAS 19-22-11, Gas Block (2) · CAS 19-44-01, Fuel Spill · CAS 20-22-07, Drums (2) · CAS 20-22-09, Drums (3) · CAS 20-22-14, Drums (2) · CAS 20-22-16, Drums (2) · CAS 20-24-09, Battery Closure activities began in July 2011 and were completed in December 2011 and included removal and disposal of material piles, spills, sanitary debris, a lead acid battery, lead and steel shot, and stained soil. Activities were conducted according to the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003). Closure activities generated sanitary waste, hydrocarbon waste, low-level waste, hazardous waste, and mixed waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 548 · The transfer of CAU 548 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Renovations - Volume 17: Insulation - A Guide for Contractors to Share with Homeowners

This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

building↗

Data Sharing Report Characterization of Isotope Row Facilities Oak Ridge National Laboratory Oak Ridge TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort was designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The process for D&D and final dismantlement of facilities requires that the known contaminants of concern (COCs) be evaluated and quantified and to identify and quantify any additional contaminants in order to satisfy the waste acceptance criteria requirements for the desired disposal pathway. Known facility contaminants include, but are not limited to, asbestos-containing material (ACM), radiological contaminants, and chemical contaminants including polychlorinated biphenyls (PCBs) and metals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot.

The approach was to perform a document search, supplemented by a visual site inspection, to identify potential environmental contamination associated with the property. Factors evaluated included hazardous substances; petroleum products and derivatives; environmental restoration sites; areas of concern; storage tanks; oil/water separators; grease traps; wash racks; waste tanks; pesticides; military munitions/ordnance; medical or bio-hazardous waste; radioactive waste; solid/municipal waste; indoor air quality; groundwater; wastewater treatment, collection, and disposal/discharge; drinking water quality; utilities; asbestos; polychlorinated biphenyls (PCBs); radon; lead-based paint; cultural resources; floodplains; and natural/biological resources.

54 ENVIRONMENTAL SCIENCES↗

Supplemental Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot

The “subject property” is comprised of a parcel of land within the Kirtland Military Reservation, Bernalillo County, New Mexico, as shown on the map in Appendix B of this document. The land requirement for the parking lot addition to the 9940 Main Complex is approximately 2.7 acres. The scope of this Supplemental Environmental Baseline Survey (SEBS) is for the parking lot addition land transfer only. For details on the original 9940 Main Complex see Environmental Baseline Survey, Land Use Permit Request for the 9940 Complex PERM/0-KI-00-0001, August 21, 2003, and for details on the 9940 Complex Expansion see Environmental Baseline Survey, Proposed Land Use Permit Expansion for 9940 DETS Complex, June 24, 2009. The 2.7-acre parcel of land for the new parking lot, which is the subject of this EBS (also referred to as the “subject property”), is adjacent to the southwest boundary of the original 12.3- acre 9940 Main Complex. No testing is known to have taken place on the subject property site. The only activity known to have taken place was the burial of overhead utility lines in 2014. Adjacent to the subject property, the 9940 Main Complex was originally a 12.3-acre site used by the Department of Energy (DOE) under a land use permit from the United States Air Force (USAF). Historical use of the site, dating from 1964, included arming, fusing, and firing of explosives and testing of explosives systems components. In the late 1970s and early 1980s experiments at the 9940 Main Complex shifted toward reactor safety issues. From 1983 to 1988, fuel coolant interaction (FCI) experiments were conducted, as were experiments with conventional high explosives (HE). Today, the land is used for training of the Nuclear Emergency Response community and for research on energetic materials. In 2009, the original complex was expanded to include four additional 20-acre areas: 9940 Training South, 9940 Training East, T-Range 6, and Training West Landing Zone. The proposed use of the subject property is for the purpose of adding a parking lot to serve the increase in customer vehicles that is occurring as the 9940 Main Complex is more heavily utilized, and as the 2009 Expansion areas come online as operational training facilities. The subject property would be used only for parking, not for testing or training activities. The parking lot would have a gravel surface. Current and future work at the 9940 Main Complex involves arming, fuzing, and firing of explosives and the testing of explosive systems components in both terrestrial and aquatic settings. It also involves specialized training activities for a variety of first responder customers, both DOE and non-DOE agencies. The approach was to perform a document search, supplemented by a visual site inspection, to identify potential environmental contamination associated with the property. Factors evaluated included hazardous substances; petroleum products and derivatives; environmental restoration sites; areas of concern; storage tanks; oil/water separators; grease traps; wash racks; waste tanks; pesticides; military munitions/ordnance; medical or bio-hazardous waste; radioactive waste; solid/municipal waste; indoor air quality; groundwater; wastewater treatment, collection, and disposal/discharge; drinking water quality; utilities; asbestos; polychlorinated biphenyls (PCBs); radon; lead-based paint; cultural resources; floodplains; and natural/biological resources. Each of these factors is evaluated separately in Section 5, Findings for Subject Property. The property categorization for this subject property would be considered Category 1- “An area or real property where no storage, release, or disposal of hazardous substances or petroleum products or their derivatives has occurred into the environment or structures or disposed on the subject property (including no migration of these substances from adjacent properties).” There appears to be sufficient information to categorize the subject property and it appears that no further effort needs to be made to obtain additional information. There are no findings of an adverse nature on the subject property itself or from adjacent properties. It is recommended that the proposed transfer of the subject property from the USAF to DOE proceed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements Doc for Refurb of JASPER Facility in B131HB

The Joint Actinide Shock Physics Experimental Research (JASPER) Program target fabrication facility is currently located in building 131 (B131) of the Lawrence Livermore National Laboratory (LLNL). A portion of this current facility has been committed to another program as part of a larger effort to consolidate LLNL capabilities into newer facilities. This facility assembles precision targets for scientific studies at the Nevada National Security Site (NNSS). B131 is also going through a modernization project to upgrade the infrastructure and abate asbestos. These activities will interrupt the continuous target fabrication efforts for the JASPER Program. Several options are explored to meet the above conflicting requirements, with the final recommendation to prepare a new facility for JASPER target fabrication operations before modernization efforts begin in the current facility assigned to JASPER. This recommendation fits within all schedule constraints and minimizes the disruption to the JASPER Program. This option is not without risk, as it requires moving an aged, precision coordinate measuring machine, which is essential to the JASPER Program’s success. The selected option balances the risk to the machine with continuity of operations.

42 ENGINEERING↗

Historic American Landscapes Survey: Arco Naval Proving Ground (Idaho National Laboratory)

Based on historical evaluations in 1993 and 1997, historians determined that the then-remaining Arco NPG structures were significant to the nation’s history through their association with World War II . Through ensuing discussions with the SHPO, it was further determined that the infrastructure and associated landscape were also significant. According to provisions of INL’s Cultural Resource Management Plan (CRMP) as legitimized through a 2004 Programmatic Agreement between DOE-ID, the Idaho State Historic Preservation Office (SHPO), and Advisory Council on Historic Preservation (ACHP) historians identified the World War II structures as DOE “Signature Properties”. As defined by DOE-HQ, Signature Properties “denote its [DOE’s] most historically important properties across the complex…and/or those properties that are viewed as having tourism potential.” The INL is a secure site and the INL land and structures are not accessible to the public and, therefore have no “tourism potential”. Although DOE-ID actively sought other uses for the vacant, unused buildings, none were identified and the buildings present safety and health concerns. A condition assessment found lead based paint, asbestos, rodent infestation/droppings, small animal carcasses, mold, and, in CF-633, areas of radiological contamination. In early 2013, DOE-ID notified the Idaho SHPO, ACHP, and, as required by the INL CRMP and PA, DOE-Headquarters Federal Preservation Officer, of their intent to demolish the vacant buildings (CF-606, CF-607, CF-613, CF-632, and CF-633). The proposed “end-state” of the buildings will be either grass and/or gravel pads. Through the NHPA Section 106 consultation process, measures to mitigate the adverse impacts of demolition were determined and agreed to through a Memorandum of Agreement (MOA) between DOE-ID, SHPO, and ACHP. The measures include the development and installation of interpretive signs to be placed at a publicly accessible location, retention of original components of CF-633, and completion of this HALS standard format report. Buildings, infrastructure, and features that are not scheduled for removal are documented here as well as properties that are scheduled for removal and the overall Arco NPG landscape. The Arco NPG, located in the remote high-desert of eastern Idaho aided in the defense and eventual ally victory in the Pacific Theater of World War II, in addition to revising national standards for the safe storage and transport of conventional ordnance.

99 GENERAL AND MISCELLANEOUS↗

Site 300 City Water Master Plan

Lawrence Livermore National Laboratory (LLNL), a scientific research facility, operates an experimental test site known as Site 300. The site is located in a remote area of southeastern Alameda County, California, and consists of about 100 facilities spread across 7,000-acres. The Site 300 water system includes groundwater wells and a system of storage tanks, booster pumps, and underground piping to distribute water to buildings and significant areas throughout the site. Site 300, which is classified as a non-transient non-community (NTNC) water system, serves approximately 110 employees through 109 service connections. The distribution system includes approximately 76,500-feet of water mains varying from 4- to 10-inches in diameter, mostly asbestos cement (AC) pipe, and eleven water storage tanks. The water system is divided into four pressure zones fed by three booster pump stations to tanks in each zone.

42 ENGINEERING↗

Health and Safety Audit Design Manual

The Health and Safety Audit is an electronic audit tool developed by the Oak Ridge National Laboratory to assist in the identification and selection of health and safety measures when a home is being weatherized (i.e., receiving home energy upgrades), especially as part of the US Department of Energy (DOE) Weatherization Assistance Program, or during home energy-efficiency retrofit or remodeling jobs. The audit is specifically applicable to existing single-family homes (including mobile homes), and is generally applicable to individual dwelling units in low-rise multifamily buildings. The health and safety issues covered in the audit are grouped in nine categories: mold and moisture, lead, radon, asbestos, formaldehyde and volatile organic compounds (VOCs), combustion, pest infestation, safety, and ventilation. Development of the audit was supported by the US Department of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control and the DOE Weatherization Assistance Program.

47 OTHER INSTRUMENTATION↗

Replacement of Wooden Wing Walls and Deteriorated Concrete Pad at Manhattan Project Era Magazine TA-16-58

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to replace missing and broken asbestos shingles, reconstruct deteriorated wooden wing walls, and remove and replace a concrete pad on Building 58 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL). Building TA-16-58 is a Manhattan Project Era magazine that was evaluated and determined eligible, in consultation with the State Historic Preservation Office (June 5, 2003 and June 22, 2003, respectively), for listing in the National Register of Historic Places (Register) in ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16 and in Sentinels of the Atomic Dawn: A Multiple -Property Evaluation of the Remaining Manhattan Project Properties at Los Alamos (1942–1946) (McGehee et al. 2003a, 2003b). The building is a LANL candidate for preservation as identified in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL 2017a ). It is also eligible for inclusion in the Manhattan Project National Historical Park (i.e., identified in the Park legislation), and is located within the TA-16 potential Cold War historic district (McGeh ee 1995a, 1995b; LANL 2012,).

99 GENERAL AND MISCELLANEOUS↗

Stockham Waste Management Contract SOW

Sandia National Laboratories, New Mexico (SNL/NM) is a multi-program Research and Development Facility, owned by the Department of Energy (DOE) and operated by Sandia Corporation, a Lockheed Martin Company (LMC). Sandia waste management operations include radioactive and mixed waste and hazardous waste (including classified and explosive). Waste management activities include managing and characterizing the waste, completing waste disposal requests, and providing guidance on sorting, packaging, & storing wastes, preparing all necessary disposal request documents, and/or recycling, maintaining accurate records, help the line organizations in assuring the compliance of all waste management activities, and preparing compliance-related documentation. Additional contaminants may include polychlorinated biphenyls (PCBs), asbestos, and beryllium. Some radioactive and hazardous waste may also be managed as classified waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permanent Foam Fixatives for Radioactive Contamination Control: Environmental Chamber Testing

The Department of Energy (DOE) Office of Environmental Management (EM) is tasked with closing cleanup sites throughout the DOE-EM complex. A major component of successfully closing the sites is the deactivation and decommissioning (D&D) of radioactively contaminated buildings in nuclear facilities. Deactivation consists of the process of placing a contaminated facility in stable condition in order to minimize any risks that could affect workers, the public, and the environment. Successful deactivation and decommissioning consists of leaving the buildings in an agreed upon end state to provide future protection against hazards. Hazards include radiation but can also include asbestos, polychlorinated biphenyls, and other environmental and physical hazards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

H-Canyon Jumper Gasket Sealing Evaluation

H-Canyon Documented Safety Analysis approved December 2019 credits the leak integrity of H-Canyon (HCA) process tanks, piping, and jumpers in preventing the release of radioactive material in a post seismic environment. Demonstration of leak tightness capability for this equipment was achieved through substantial analytical effort. However, one potential weak point that affects leak integrity exists at the gasketed joint between Hanford Connectors (HC) and nozzles. Review of the HCA Crane Log over a three-year period indicates the HCs periodically leak. Savannah River National Laboratory (SRNL) was requested to perform gasket compression tests that evaluate gasket relaxation characteristics, i.e., creep, and provide improvements to the HC installation process that can reduce or eliminate the frequency of leaks at HCs. A HC torque value of 312 ft-lbf is the target value used because it is the minimum torque value, with 95% confidence, when an unlubricated HC is impacted for standard sealing period of 9 seconds. In the HCA pipe-jumper connections are installed remotely by using HCs. HCs inherently add to the uncertainty of a gasketed joint because a calibrated torque value cannot be applied. The gasket material is a special material made of asbestos-fiber impregnated with Teflon. This material has been used for decades and generally performs well but does leak intermittently as gaskets creep and preloaded torque is lost. Gasket types are either snap-ring (SR) or lampshade (LS). Both gasket types cover the same seating area. The SR gasket is designed to remain with the jumper when the jumper is removed leaving the nozzle faces clean of any debris. SR gaskets are initially installed when the jumper is fabricated. Changing gaskets is time consuming and the radioactive environment presents risks to personnel. When jumpers are removed LS gaskets could be used to better seal the connection to reduce down time and ALARA concerns. That is, an LS gasket would be remotely positioned over the nozzle and the HC reinstalled. Testing also included two situations not typical of plant operation. One situation was the use of the non-standard double-layered gaskets (DG), and the other situation was the use of a LS without removal of the installed SR gasket. The DG was used when the supply of LS gaskets ended, so that testing could continue. It was of interest to demonstrate this gasket’s creep response because the DG, which was two gaskets glued together, was thicker than the LS gasket and the thicker material was expected to elicit a greater creep characteristics. The second situation of using two gaskets together by installing an LS gasket without removing the installed gasket is not allowed by the ASME Codes. However, by demonstrating the creep history of such a gasket arrangement it could be considered as an option that could possibly seal a connection while significantly reducing operational down time and personnel risk. Forty tests were conducted, and the overall results demonstrate the initial applied force and how the gasket changes with time. The change in sealing force, in terms of torque, was then measured to obtain a force history as the gaskets creep. This report documents the results of those tests as well as the method used to perform the tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Chamber Testing and Headspace Evaluation of a Commercial-Off-The-Shelf Foam Fixative to Support Deactivation and Decommissioning Activities

The Department of Energy (DOE) Office of Environmental Management (EM) is tasked with identifying high priority technical needs and the Technology Development (TD) tasks required to meet those needs in support of ongoing deactivation and decommissioning (D&D) of Department of Energy infrastructure across the United States. This work consists of placing a radioactively contaminated facility in stable condition to minimize any risks that could affect workers, the public, and the environment. Successful deactivation and decommissioning will leave the buildings in an agreed upon end state to provide future protection against a wide range of hazards that include radiation, asbestos, polychlorinated biphenyls, and other environmental and public health risks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗