Search NASA⌕ Search

SEARCH · Search NASA

Results for “Advanced Small Modular Reactors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Irradiation of UC1+x kernels using the MiniFuel vehicle: Microstructure, phase analysis, and initial post-irradiation examination

Uranium carbide is a candidate fuel form for a wide range of advanced reactors, including larger Generation IV reactors as well as small modular reactors and microreactors. However, its commercial deployment timeline faces challenges via traditional qualification approaches. To address this issue, an accelerated fission rate irradiation test was performed to collect basic fuel performance data to inform fuel performance models and potential future integral tests. Hyperstoichiometric UC (UC1+x) kernels were irradiated in the High Flux Isotope Reactor using the MiniFuel irradiation vehicle. The test matrix spanned two temperature regimes (700 °C and 800 °C) and burnup levels (1.8 % FIMA and 2.8 % FIMA). Between 21 and 63 kernels were tested at each unique temperature and burnup condition. As-fabricated microstructural analysis revealed a multiphase composition with UC, UC2, UC2−y, and U-C-O bearing phases for the irradiated kernels. Following irradiation, fission gas release, swelling, and microstructures were analyzed. Measured fission gas release was below 5 % for all irradiation conditions, reaching a maximum at the highest temperature and burnup condition. A binary swelling response was observed; the lower burnup and temperature conditions resulted in negligible swelling, but the higher burnup and temperature conditions produced significant anisotropic swelling and densification in a subset of kernels. The basic microstructural exams of kernels following irradiation were not capable of showing a correlation between kernels that exhibited excessive swelling and those that did not. Characterization of a subset of samples using the Advanced Photon Source and more detailed microstructural examination of unirradiated kernels revealed that a subset of kernels contained very high UC2 phase fractions. The anomalous swelling response is hypothesized to have been driven by this chemical variation. The results of this irradiation highlight the potential of accelerated fission rate irradiation testing to explore such behaviors and inform the development of fuel specifications.

Adorno Lopes, Denise [ORNL] (ORCID:000900023705987↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Once-Through Steam Generator Model Analysis Using Python and Advanced Optimization Tools (Summer Internship Report)

This study focuses on the parametric analysis of design parameters for a once-through steam generator (OTSG) model, using python and advanced optimization tools to facilitate applications such as the flowing autoclave steam generator (FASG) test cases. Building on previous research involving another OTSG with a different design, this project aims to enhance our understanding of how steam generators (SGs) behave and how their outputs are influenced by changes in design. The reason for this design change is to allow for more precise modeling and optimization of SG performance, to provide a comparative analysis between the two designs, and to set up the model for integration with the FASG test case. The OTSG python-model is a mathematical representation (including fluid flow and heat transfer equations/models/correlations) of a steam-generating unit in a pressurized water reactor-type small modular reactor system. Design studies involve changing the model’s input design parameters to observe the resulting effects on the output of the system. By using advanced optimization tools, such as the Risk Analysis Virtual Environment (RAVEN) developed at Idaho National Laboratory, detailed design parametric studies and model optimization were performed. Six input parameters—pressure, temperature, and mass flow rate for the inlet of the primary-side (hot fluid) and secondary-side (cold fluid), respectively, of the SG—were randomly perturbed via RAVEN’s Monte Carlo Sampler module, using uniform distributions (i.e., ±1%, ±5% and ±10% relative changes) for 600 samples. The analysis provides valuable insights into SG optimization and can be used for sensor placement optimization to effectively monitor and obtain experimental data in other tests.

20 FOSSIL-FUELED POWER PLANTS↗

Assessing I 2 S-LWR economic competitiveness using systematic differential capital cost evaluation methodology

One of the major factors impeding nuclear power plant (NPP) construction is their economics. In this study, a systematic differential economics evaluation approach was developed through the use of the Code of Accounts guidelines to assess the costs of nuclear power plants. The methodology, entirely based on publicly available data, may serve as a template to evaluate direct costs for reactors of any size and design at any stage of developments. In particular, this approach was used to assess the costs of the Integral Inherently Safe Light Water Reactor (I 2 S-LWR). The I 2 S-LWR is a design concept of a large (~1000 MWe) light water reactor. One of its key design features promoting inherent safety is implementation of an integral primary circuit configuration, which however necessitates a compact design of the core and primary circuit components. Through the methodology here presented, a representative loop PWR design was taken as a reference and the differential cost was estimated for each individual account based on the design difference, or similarity. Cost scaling techniques were applied to the accounts representing systems that differ from the ones of the reference PWR. Cost estimating techniques were used to evaluate cost of innovative components that are not part of standard PWR designs. By evaluating the cost difference of the I 2 S-LWR from the standard PWR, rather than the absolute cost, the uncertainty in the estimate is reduced. A similar approach was used by ORNL to estimate the cost of a Fluoride-salt High-temperature Reactor (FHR). A traditional four-loop PWR plant with a core thermal power of 3417 MWth (1144 MWe) was selected as the reference. Costs for that plant were prepared in 1978 by the Department of Energy (DOE) Energy Economics Data Base (EEDB), averaging actual cost incurred in the construction of several nuclear power plants (NPP), itemized with a great level of detail according to the Code of Accounts. This best estimate costs are denoted PWR12-BE. For each account, the cost of equipment, site labor and site material is provided. Industry experts at Westinghouse Electric Company performed a “sanity check” of the cost items, adjusting the cost of several items to match the current market and supply chain data. The detailed cost assessment of I 2 S-LWR was performed, systematically analyzing cost for each account, and applying the differential economics approach. First, Relative importance of each account, i.e., its contribution to the total cost was established, to help focus analysis on the most significant contributors. Moreover, the accounts describing components that are different than that of the PWR12-BE were identified. The integral configuration of the reactor has important implications on the cost of the reactor plant equipment (accounts 22x). Turbine generator equipment (Accounts 23x) is not believed to be much different than that of the reference design. I 2 S-LWR structures (Accounts 21x) mainly differ from that of a standard LWR as several buildings (containment building, shield building, annex building, waste processing building, fuel storage building) are integrated into a single building (nuclear island). Yardwork has a higher cost for the I 2 S-LWR, as the NI is partially below grade. On the other hand, due to its compact Nuclear Island footprint, I 2 S-LWR facilitates (and includes in its reference version) the use of seismic isolators, which contribute to reducing the direct cost. The total capital investment cost (TCIC), on the $/kW basis, of I 2 S-LWR is 5.84% lower than that of PWR12-BE, in spite of the lower power output of I 2 S-LWR. However, for the Western US (0.7 g), benefits of the seismic isolation are more pronounced, and the I 2 S-LWR total capital investment cost is 13.02% lower than that of PWR12-BE. If the I 2 S-LWR is compared to a PWR10-BE (traditional loop design, but scaled to the same power level as I 2 S-LWR), the savings are even higher, in the range 11.12%–17.89%. The analysis indicates that I 2 S-LWR has potential to offer an economically attractive design, with TCIC lower than that of a nuclear power plant based on a traditional loop PWR design. In other words, I 2 S-LWR design offers significantly enhanced safety, while at the same time improving economics. The differential economics approach developed in this paper can be used in identifying changes in cost of key components in order to improve the economics of a nuclear reactor design. The method can also help compare the economics of advanced Generation IV reactors and innovative water-cooled SMR (Small Modular Reactors) with respect to standard LWR technologies. In summary, the differential economics approach and can be used as a tool capable of helping stakeholder decisions.

Economic↗

Techno-Economic Assessment of the Factory Production of Small Modular Reactor

The demand for electricity continues to grow around the world while pressures remain high to reduce carbon emissions. Nuclear energy provides a strong and reliable baseload power component without a high output of greenhouse gases. Global nuclear energy capacity is increasing with 62 reactors under construction in 14 countries. Nuclear energy will be crucial as energy demands are met with a sustainable and diverse energy portfolio. Small modular reactors (SMRs) are small scale (less than 300 MWe) reactors that incorporate the same advanced technologies included in recent LR nuclear reactor designs. SMRs are designed to include the latest reactor technology including passive safety features. SMRs offer economic advantages over LRs such as lower up-front capital and easier integration into the existing power grid. The modular characteristic of SMRs would allow incremental additions to power plants years after its completion. The cost of constructing SMR power plants will determine their future in the energy industry. Three SMR reactors are in advanced stages of design in the United States; the Westinghouse 225 MWe, mPower 180 MWe and nuScale 45 MWe. SMRs are expected to have lower capital expenses of reactor components due to factory production. Current estimates predict these savings to reduce SMR capital 30-40%. Existing studies have estimated SMR capital using economies of scale and holistic discounts applied to an overall capital expense figure, but do not include the expense of an SMR factory facility. To better understand the actual costs associated with construction of an SMR power plant, capital components will be broken down according to its place in the construction phase. The expense of a factory facility will also be included with SMR capital expenses to determine its significance and benefits to overall capital expenses. Results from this study show that SMRs can compete with LRs in terms of startup costs. The capital cost of building a factory for SMRs was previously overlooked for SMR capital estimates. The annualized capital expenses expected for an SMR factory are very small, but offer significant discounts to the overall capital costs for SMRs. Case 3 shows that factory production can reduce SMR capital expenses to the range of 30%-40% when compared to Case 1 in this study. Factory savings of this magnitude would require factory production of several SMR reactor and generator components including the reactor pressure vessel, control rods, steam generation, and chemical and volume control system, containment, condenser and turbo-generator. SMRs will also benefit from lower indirect expenses due to a much smaller construction duration. It is expected that SMRs will have capital costs competitive with LRs. The differences between Case 2 and Case 3 in this study show that SMRs are heavily dependent on the cost reductions coming from factory production. The factory facility represents a small increase in capital expense, but accounts for a large reduction of cost for factory components. SMRs have the potential to meet growing energy demands in the United States and around the world, but their economic viability is dependent on a factory facility that will lower the capital expenses of reactor and generator components. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Deimos Experiment: Advanced Reactor Testbed

Advanced reactor initiatives are growing significantly through programs nationwide. This research area includes small modular reactors, microreactors, and space reactors. Many of the reactors being designed are untested concepts. They include unique moderators, varying fuel types, high temperatures, and compact configurations. The shift in fuel type, from highly enriched uranium (HEU) to high assay, low enriched uranium (HALEU), is particularly important as it has driven many of the other changes. For example, lower enrichment requires advanced moderators, which in turn require different reflectors to make the systems compact. The change in materials including the transition from HEU to HALEU affects the temperature feedback of the systems. Additionally, these advanced reactor concepts generally have a thermal neutron spectrum in contrast to earlier fast spectrum advanced reactor. With the extensive changes from previous reactor designs, validation experiments are needed. The National Criticality Experiments Research Center (NCERC) is uniquely equipped to perform such experiments. The Deimos experiment, designed for execution at NCERC, will serve as a testbed for advanced reactor concepts. It will use HALEU fuel in a graphite matrix, provide the ability to use advanced moderators, and allow measurements of temperature reactivity coefficients (TRCs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Fidelity Digital Twins for BWRX-300 Critical Systems

This project developed and demonstrated digital-twin technology for advanced nuclear systems under the ARPA-E GEMINA program, with a focus on the BWRX-300 small modular reactor. The primary objective was to reduce operation and maintenance (O&M) costs through predictive health monitoring and model-based fault detection. The project combined MIT’s high-fidelity physics models and machine-learning and digital-twin algorithms, and GE Hitachi’s digital-twin algorithms and operational expertise to build physics-based digital twins capable of real-time system monitoring and maintenance scheduling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strategic Plan for Nuclear Energy – Knowledge Base for Advanced Modeling and Simulation (NE-KAMS)

NE-KAMS knowledge base will assist computational analysts, physics model developers, experimentalists, nuclear reactor designers, and federal regulators by: (1) Establishing accepted standards, requirements and best practices for V&V and UQ of computational models and simulations, (2) Establishing accepted standards and procedures for qualifying and classifying experimental and numerical benchmark data, (3) Providing readily accessible databases for nuclear energy related experimental and numerical benchmark data that can be used in V&V assessments and computational methods development, (4) Providing a searchable knowledge base of information, documents and data on V&V and UQ, and (5) Providing web-enabled applications, tools and utilities for V&V and UQ activities, data assessment and processing, and information and data searches. From its inception, NE-KAMS will directly support nuclear energy research, development and demonstration programs within the U.S. Department of Energy (DOE), including the Consortium for Advanced Simulation of Light Water Reactors (CASL), the Nuclear Energy Advanced Modeling and Simulation (NEAMS), the Light Water Reactor Sustainability (LWRS), the Small Modular Reactors (SMR), and the Next Generation Nuclear Power Plant (NGNP) programs. These programs all involve computational modeling and simulation (M&S) of nuclear reactor systems, components and processes, and it is envisioned that NE-KAMS will help to coordinate and facilitate collaboration and sharing of resources and expertise for V&V and UQ across these programs. In addition, from the outset, NE-KAMS will support the use of computational M&S in the nuclear industry by developing guidelines and recommended practices aimed at quantifying the uncertainty and assessing the applicability of existing analysis models and methods. The NE-KAMS effort will initially focus on supporting the use of computational fluid dynamics (CFD) and thermal hydraulics (T/H) analysis for M&S of nuclear reactor systems, components and processes, and will later expand to include materials, fuel system performance and other areas of M&S as time and funding allow.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improved Uncertainty Quantification with Advanced Reactor Application

This document provides an overview of the economic and technical challenges related to bringing small modular reactors to market and then presents an outline for how to address the new challenges. The purpose of this project was to proactively design software for its intended use to provide a strategic positioning for work in the future. This project seeks to augment the short-term stop-gap approach of trying to use legacy software well outside of its range of applicability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only SMR technologies, but also Advanced Reactors design. An Electrical Penetration Assembly (EPA) is a component used to allow electrical power and signal conductors as well as optical fiber through the nuclear reactor’s containment structure while maintaining a pressure barrier. The EPA ensures the containment's integrity both during the normal operation and also accident conditions by providing a sealed passage for power and signals. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and also more severe normal operating conditions.This document describes cost effective approaches to qualify a unique EPA for Small Modular Reactor (SMR) technologies as legacy LWR EPA technologies will likely have inherent material performance insufficiencies. The DBA profiles for SMRs (and some Advanced Reactor Technologies) are more severe than the legacy qualification requirements making the design of the qualification testing system challenging as the temperatures and pressures can approach the limits permitted by ASME Pressure Vessel Code, as well as accident temperatures exceeding the capability of polymeric gaskets and dielectrics. Small Modular Reactors are designed to have, as the name suggests, modularity which implies sized for factory fabrication and subsequent assembly at the power plant site. SMR containment is much smaller than a legacy Light Water Reactor containment. The containment walls are likely to be comprised of stainless steel. Qualifying Electrical Penetration Assemblies (EPAs) through these steel vessels are of interest in this work. Methods are presented here that discuss critical safety and cost effectiveness for these SMR EPA’s test systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Means of Meeting Chapter 15 Requirements for a Small Modular Reactor Cooled by Lead-Bismuth

The mission of the Department of Energy Office of Nuclear Energy (DOE-NE) is to advance nuclear power as a resource capable of meeting the nation’s energy, environmental, and national security needs by resolving technical, cost, safety, proliferation resistance, and security barriers through Research, Development, and Demonstration (RD&D). To assist in accomplishing this, DOE-NE has established the Gateway for Accelerated Innovation in Nuclear (GAIN) to provide the nuclear community with access to the technical, regulatory, and financial support necessary to move innovative nuclear energy technologies toward commercialization. As part of this program, a GAIN Voucher was awarded to the Columbia Basin Consulting Group (CBCG) to develop for the Lead-Bismuth Reactor (LBR): (1) a means of meeting Chapter 15 requirements and (2) to perform an assessment against a gap analysis developed by the U.S. Nuclear Regulatory Commission (NRC) for Chapter 15. These two assessments will determine to what extent the LBR can adapt to or meet the Chapter 15 Accident Analysis requirements, and determine gaps that may still exist and what additional information is needed in order to close them. The CBCG LBR design is being developed with a high level of passive safety. It has the advantages of the classical liquid metal reactor, i.e. small size and passive safety, while having the additional advantage of a chemically inert coolant. The CBCG and the Pacific Northwest National Laboratory (PNNL) collaborated to develop an initial licensing pathway for the CBCG Lead-Bismuth conceptual reactor design. It was found that the reactor is well along the licensing pathway and is licensable although some additional design information is needed to establish a complete licensing basis. The missing information is identified in this report and it is noted that much of the missing information can be obtained from the Fast Flux Test Facility (FFTF), a DOE liquid metal test reactor. It was also found that the traditional Chapter 15 requirements for assessing the response of a reactor to possible accident sequences can be adapted to the LBR concept. The Chapter 15 review examined several classes of initiating events and accidents that are normally covered in Chapter 15: reactivity initiated events, reduction in heat removal events, local fuel failure events, and events initiated on the steam supply side. Although some design information is lacking at present, the LBR can be expected to respond as required by Chapter 15 requirements to almost all of the first three events. For events initiated on the steam side, design information is lacking and so conclusions cannot be reached at present. On the other hand, it should be quite possible to develop the design information for the steam supply side and the impact of events initiated on this side can be assessed in a subsequent study.

Wootan, David W.↗

Parametric Study of Factors that Affect Calculated Dose from TRISO Fueled Microreactor Transportation Accident

Microreactors are very small nuclear reactors with a power output up to 50 megawatts electric (MWe) which also meet the standards of an “advanced nuclear reactor.” Microreactors are designed to be factory-built, modular in nature, and may be transportable. These compact small-sized reactors in some design configurations are small enough to be transported by truck which could help solve certain energy challenges. This report refers to these reactors as transportable microreactors or transportable nuclear power plants (TNPPs). Transportable microreactors are being considered for a wide range of independent operation applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Road Map for the Development of Commercial Maritime Applications of Advanced Nuclear Technology

The U.S. Department of Energy (DOE) is making significant investments in advanced nuclear reactor development and demonstration programs such as the Advanced Reactor Demonstration Program (ARDP). The innovations in advanced nuclear reactor technologies (defined in Section 1.4.1), including concepts of microreactors and small modular reactors (SMRs), have opened the door to a wide range of applications beyond land-based power stations providing electricity to the grid. Applications for transportation and industrial operations could offer reliable carbon-free energy to achieve decarbonization goals by supporting energy-intensive activities such as alternative fuel production, water desalinization, and local power supply. The DOE recognizes the transformational power of these technologies and is investing in foundational research and development as well as reactor demonstration projects. However, unique and significant challenges exist in each application domain to bring projects into reality beyond just the underlying reactor technology maturation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A roadmap for nuclear energy technology

The prospects for the future use of nuclear energy worldwide can best be understood within the context of global population growth, urbanization, rising energy need and associated pollution concerns. As the world continues to urbanize, sustainable development challenges are expected to be concentrated in cities of the lower-middle-income countries where the pace of urbanization is fastest. As these countries continue their trajectory of economic development, their energy need will also outpace their population growth adding to the increased demand for electricity. OECD IEA’s energy system deployment pathway foresees doubling of the current global nuclear capacity by 2050 to reduce the impact of rapid urbanization. The pending “retirement cliff” of the existing U.S. nuclear fleet, representing over 60 percent of the nation’s emission-free electricity, also poses a large economic and environmental challenge. To meet the challenge, the U.S. DOE has developed the vision and strategy for development and deployment of advanced reactors. As part of that vision, the U.S. government pursues programs that aim to expand the use of nuclear power by supporting sustainability of the existing nuclear fleet, deploying new water-cooled large and small modular reactors to enable nuclear energy to help meet the energy security and climate change goals, conducting R&D for advanced reactor technologies with alternative coolants, and developing sustainable nuclear fuel cycle strategies. Since the current path relying heavily on water-cooled reactors and “once-through” fuel cycle is not sustainable, next generation nuclear energy systems under consideration aim for significant advances over existing and evolutionary water-cooled reactors. Among the spectrum of advanced reactor options, closed-fuel-cycle systems using reactors with fast-neutron spectrum to meet the sustainability goals offer the most attractive alternatives. However, given these circumstances, unless the new public-private partnership models emerge to tackle the licensing and demonstration challenges for these advanced reactor concepts, realization of their enormous potential is not likely, at least in the U.S.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economics of Hybrid-Energy Systems and the Impact on Advanced Reactor Design and Operation

The economics of electricity production in the U.S. is changing with the introduction of recent federal regulations limiting carbon dioxide emissions in the electric power industry. This has already resulted in the closing of coal plants, plants which in the past to a degree served to balance production with daily variation in load. The resulting loss of electricity production is being made up with wind and solar renewables and gas-fired units, and with an increasing need for energy storage. It would appear that with the loss of the baseload component of the coal plants, the duty-cycle of the gas-fired units may necessarily increase, encroaching on the traditional nuclear plant domain with its inexpensive fuel. Gas plants are costly to operate on a continuous basis with relatively volatile fuel prices. It appears then that nuclear plants that are capable of flexible operation have the potential on an economic basis to displace gas-fired power units. For flexible operation with renewables advanced reactors have advantages over the current generation of pressurized water reactors (PWR) and the new small modular reactors (SMR). For PWRs and SMRs, pellet-cladding mechanical interaction, xenon poisoning, and thermal stress concentrations in structures place limits on the all-important response time for operation with renewables. These phenomena are, however, not as limiting for the liquid-metal fast reactor (LMR). This may permit greater power ramp rates than in a light water reactor which bestows an economic advantage in energy systems with renewables. An economic model is developed for studying electric grid options including plant mix and market rules for the case of a high renewable fraction. It returns the minimum cost solution from among a mix of plant types including nuclear, gas, and storage (i.e. hybrid energy systems) for a given fraction of electricity production by renewables. This model can be used to assess the economic advantage of nuclear plants over gas plants and advanced reactors over light water reactors in an electric grid with a high fraction of renewables. The model has an explicit treatment of plant dynamic effects, an important feature for analysis of hybrid energy systems with a renewables production component that is unpredictable and uncontrollable.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic Analysis of Hybrid Energy Systems under Flexible Operation and Variable Renewable Generation -- Part I: Dynamic Performance Analysis and Part II: Dynamic Cost

Dynamic analysis of hybrid energy systems (HES) under flexible operation and variable renewable generation is considered in order to better understand various challenges and opportunities associated with the high system variability arising from the integration of renewable energy into the power grid. Unique consequences are addressed by devising advanced HES solutions in which multiple forms of energy commodities, such as electricity and chemical products, may be exchanged. Dynamic models of various unit operations are developed and integrated within two different HES options. One HES option, termed traditional, produces electricity only and consists of a primary heat generator (PHG) (e.g., a small modular reactor), a steam turbine generator, a wind farm, and a battery storage. The other HES option, termed advanced, includes not only the components present in the traditional option but also a chemical plant complex to repurpose excess energy for non-electricity services, such as for the production of chemical goods (e.g., transportation fuel). In either case, a given HES is connected to the power grid at a point of common coupling and requested to deliver a certain electricity generation profile as dictated by a regional power grid operator based on a predicted demand curve. Dynamic analysis of these highly-coupled HES are performed to identify their key dynamical properties and limitations and to prescribe solutions for best managing and mitigating the high variability introduced from incorporating renewable energy into the energy mix. A comparative dynamic cost analysis is also conducted to determine best HES options. The cost function includes a set of metrics for computing fixed costs, such as fixed operations and maintenance (O&M) and overnight capital costs, and also variable operational costs, such as cost of variability, variable O&M cost, and cost of environmental impact, together with revenues. Assuming different options for implementing PHG (e.g., natural gas, coal, nuclear), preliminary results identify the level of renewable penetration at which a given advanced HES option (e.g., a nuclear hybrid) becomes increasingly more economical than a traditional electricity-only generation solution. Conditions are also revealed under which carbon resources may be better utilized as carbon sources for chemical production rather than as combustion material for electricity generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗