Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAMPAIGN STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Integrated sampling and data flow for Hanford vitrification - 15337

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear facility being designed, built, and commissioned for the U.S. Department of Energy (DOE) by Bechtel National, Inc. and its subcontractor URS Corporation. The WTP facilities are under construction to complete the design and construction, as well as planning to support the startup, commissioning, and operation for vitrifying the radioactive waste stored in aging underground tanks at the Hanford Site. The work progress includes development of waste feed acceptance and qualification program, including methodologies for processing feed batches. Qualification data from staged feed samples will support the verification that waste acceptance criteria (WAC) and processability requirements are met. This verification is required to ensure safe operation of WTP processes for vitrifying the waste, while establishing specific campaign and batch sheets to comply with glass form acceptance requirements. Sampling and data integration are critical for process control and monitoring of the feed through unit operations. Data collection begins with process knowledge of staged feed for determining the required WAC analyses and testing for unit operations. The waste feed qualification data form the baseline information for WTP operation. The qualification data will be tracked and compared with sample analyses at different steps in vitrification operation. All aspects of data life cycle will be managed by the WTP Plant Engineering organization. The data management approach is established in this manner to allow maintaining campaign traceability through glass production records, while safely processing the corresponding feed campaigns and complying with permitting requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Spent Nuclear Fuel Transportation: Rail Conveyance Transmissibility

Equipos Nucleares, S.A. (ENSA) and the US Department of Energy (DOE) are preparing a full scale Spent Nuclear Fuel (SNF) transportation test. This transportation testing will include road, rail, coastal, and trans-Atlantic shipments. The test campaign will use a full scale commercial transportation package and cradle. The package will be loaded with two instrumented fuel assemblies to measure strains at cladding locations and accelerations on the fuel assemblies, and thirty “dummy” assemblies. This testing is designed to closely match an actual SNF shipment. Accelerometers will also be used at various locations throughout the full conveyance system (i.e. rail car/truck, cask, transport cradle, and basket) to study the transmission of loads through the system and to provide validation for numerical models. Previous testing and modeling work has shown how the structural transmissibility of the transport system can affect the magnitude of these loads, and the importance of modeling all aspects of the transport system (i.e. rail car/truck, transport cradle, cask, basket, and fuel) (Ref 1, 2). This paper describes preliminary models that were constructed to estimate load transmission during rail transport, from the bottom of the cradle to an individual fuel rod within the package. The modeling studies in this paper evaluate the system response to postulated shock pulses and random vibration loads. These models describe the transmissibility of the conveyance, and demonstrate how loads can be amplified or attenuated as they are transmitted through the structure. This is done by coupling the rail vehicle dynamics code NUCARS, to the general finite element modeling code ANSYS, and the explicit dynamics code LS-DYNA. Models such as the ones presented herein will be used during the test campaign to help analyze and evaluate the test data as it is collected.

Cladding, Spent Fuel and Radiactive Waste, Used Fu↗

Hanford Waste Transfer Planning and Control - 13465

Hanford tank waste cleanup requires efficient use of double-shell tank space to support single-shell tank retrievals and future waste feed delivery to the Waste Treatment and Immobilization Plant (WTP). Every waste transfer, including single-shell tank retrievals and evaporator campaign, is evaluated via the Waste Transfer Compatibility Program for compliance with safety basis, environmental compliance, operational limits and controls to enhance future waste treatment. Mixed radioactive and hazardous wastes are stored at the Hanford Site on an interim basis until they can be treated, as necessary, for final disposal. Implementation of the Tank Farms Waste Transfer Compatibility Program helps to ensure continued safe and prudent storage and handling of these wastes within the Tank Farms Facility. The Tank Farms Waste Transfer Compatibility Program is a Safety Management Program that is a formal process for evaluating waste transfers and chemical additions through the preparation of documented Waste Compatibility Assessments (WCA). The primary purpose of the program is to ensure that sufficient controls are in place to prevent the formation of incompatible mixtures as the result of waste transfer operations. The program defines a consistent means of evaluating compliance with certain administrative controls, safety, operational, regulatory, and programmatic criteria and specifies considerations necessary to assess waste transfers and chemical additions. Current operations are most limited by staying within compliance with the safety basis controls to prevent flammable gas build up in the tank headspace. The depth of solids, the depth of supernatant, the total waste depth and the waste temperature are monitored and controlled to stay within the Compatibility Program rules. Also, transfer planning includes a preliminary evaluation against the Compatibility Program to assure that operating plans will comply with the Waste Transfer Compatibility Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Approach to Legacy and Ongoing Waste Management Within the Fuel Services Division - 19124

Since 2011, a Fuel Services Division (FSD) employee has been dedicated to oversee divisional waste management with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations in Blind River and Port Hope. The Blind River Refinery (BRR) and Port Hope Conversion Facility (PHCF) were previously owned by the federal Crown Corporation, Eldorado Nuclear, becoming part of Cameco in 1988 and Cameco Fuel Manufacturing (CFM), previously known as Zircatec Precision Industries, becoming part of Cameco in 2006. Accumulated legacy radioactive waste is stored at each of the facilities. This radioactive waste has accumulated from operations beginning in the 1930's in Port Hope and the 1980's in Blind River. Due to minimal commercially available outlets for the disposal and/or treatment of these wastes, the waste was managed onsite by storage in underutilized space in buildings, trailers and/or in the secured yard. This relatively low-cost practice meant that over decades, the inventory increased at an unsustainable rate until available space became a limiting factor. During this time, the labelling, inventory records, characterization details and other history of many of the waste materials was not maintained adequately. Due to the volume of waste that had accumulated, campaigns to address these deficiencies in information were not considered feasible, sustaining the issue of accumulation of low-level radioactive waste. Since 2011, FSD has completed annual campaigns to address the accumulated legacy waste, which has included processing of material for decontamination to meet the unrestricted release criteria under the Canadian Nuclear Substance and Radiation Devices Regulations (NSRDR), disposal of marginally contaminated wastes (<500 ppm uranium) at a permitted landfill in the United States, processing of contaminated materials to reduce the volume of low-level radioactive waste and disposal at a designated facility in Port Hope. In addition FSD has undertaken significant changes to radioactive waste management practices at each of the facilities. Multiple characterization techniques, including visual observation, review of process and other historical records, laboratory analysis and radiation scanning have been utilized in campaign planning to identify the scope and appropriate waste management technique(s) to reduce the inventory of stored material. This divisional waste management program has resulted in a significant change to how radioactive waste is generated, inventoried, characterized and managed within FSD and has increased the visibility within the leadership team of the opportunities and challenges of waste management, such as alignment with decommissioning planning, project planning and budgeting. The heightened awareness has led to better financial and physical resource planning to execute waste projects with a current projected elimination of the legacy waste within FSD by 2025. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystalline Silicotitanate (CST) Ion Exchange Media Performance Evaluations to Support TSCR DSA IX Media Equilibrium Contacts

The primary objective of this work is to calculate the maximum loading expected on the Hanford Tank Side Cesium Removal (TSCR) ion exchange columns. A key consideration in the design of the columns is the amount of 137 Cs that loads onto the Crystalline Silicotitanate (CST) and the heat generated by the loaded column during storage. Per request of Washington River Protection Solutions (WRPS), Savannah River National Laboratory (SRNL) has utilized ZAM, a computer program developed by the research group of Professor Rayford G. Anthony of Texas A&M University, to predict the cesium loading on the CST for a variety of waste compositions expected to be processed by TSCR. The study evaluated cesium loadings for the following waste compositions: 1. Seventeen DFLAW campaign batches to cover projected supernate composition ranges within which TSCR may be expected to operate within the first ten years, 2. Hanford tank AP-105 and AP-107 waste solutions that will be processed by the TSCR system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspectives on Previous DOE Transportation Acquisition Efforts - 19049

The Department of Energy (DOE) is planning for future large-scale transport of commercial Spent Nuclear Fuel (SNF) and High-Level Radioactive Waste (HLW) to eventual disposal and/or storage facilities. Various options for procuring transportation services are being evaluated. To inform this work, a review of past comments received on DOE transportation acquisition activities in the early 1990's through 2016 was conducted. Through the course of data collection, staff analyzed comments submitted from ten DOE initiatives from DoE's Office of Civilian Radioactive Waste Management (OCRWM) and DoE's Office of Nuclear Energy (DOE-NE). This paper summarizes and outlines key themes arising from these comments. Past issues identified by a wide variety of commenters (nuclear industry and cask vendors, nuclear utilities and purchasers, states, Tribes, local governments, rail carriers, nongovernmental organizations, trade organizations, engineering firms, and members of the public) were examined. These issues concerned DoE's activities to make maximum use of the private sector to transport and store SNF and HLW. The key themes analyzed include: Uniqueness of the Shipping Campaign, Views on Privatization, Industry Risk and Privatization, Unclear Roles and Responsibilities, and Responsibilities Recommended for DOE to Maintain. This paper concludes by discussing lessons that can be learned from analyzing these public comments and what that may mean moving forward in the U.S. radioactive waste management program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Satellite Observations of the Tropical Terrestrial Carbon Balance and Interactions With the Water Cycle During the 21st Century

A constellation of satellites are now in orbit providing information about terrestrial carbon and water storage and fluxes. These combined observations show that the tropical biosphere has changed significantly in the last two decades from the combined effects of climate variability and land use. Large areas of forest have been cleared in both wet and dry forests, increasing the source of carbon to the atmosphere. Concomitantly, tropical fire emissions have declined, at least until 2016, from changes in land-use practices and rainfall, increasing the net carbon sink. Measurements of carbon stocks and fluxes from disturbance and recovery and of vegetation photosynthesis show significant regional variability of net biosphere exchange (NBE) and gross primary productivity (GPP) across the tropics and are tied to seasonal and interannual changes in water fluxes and storage. Comparison of satellite based estimates of evapotranspiration (ET), photosynthesis, and the deuterium content of water vapor with patterns of total water storage and rainfall demonstrate the presence of vegetation-atmosphere interactions and feedback mechanisms across tropical forests. However, these observations of stocks, fluxes and inferred interactions between them do not point unambiguously to either positive or negative feedbacks in carbon and water exchanges. These ambiguities highlight the need for assimilation of these new measurements with Earth System models for a consistent assessment of process interactions, along with focused field campaigns that integrate ground, aircraft and satellite measurements, to quantify the controlling carbon and water processes and their feedback mechanisms.

58 GEOSCIENCES↗

Indonesian Highly Enriched Uranium-Bearing Waste Elimination - 17393

The Department of Energy's National Nuclear Security Administration (NNSA) and the Y-12 National Security Complex (Y-12) have been working with PT Industri Nuklir Indonesia (PT Inuki), an Indonesian medical isotope producer, since 2014 to disposition all highly enriched uranium (HEU) stored at the government-owned Research Center for Science and Technology (PUSPIPTEK) near Serpong, Indonesia. To eliminate the 1.5 kilograms of liquid HEU at the facility, Y-12 proposed a method to down-blend the leftover process solutions with a depleted uranium solution made on-site to render low-enriched uranium (LEU). This method is essentially irreversible since the uranium enrichment is degraded using a molecular level of intimate mixing in aqueous solution. This cooperation was tied to a presidential commitment made at the 2016 Nuclear Security Summit to down-blend all remaining HEU in Indonesia by September 2016. While all unirradiated HEU was down-blended to LEU in March 2016, the campaign to down-blend the 1.4 kilograms of irradiated HEU began in late July 2016 and was completed in August, making Indonesia and all of Southeast Asia free of HEU. As part of this cooperation, Y-12 and NNSA also proposed a subsequent disposition option for the LEU solution whereby the irradiated and unirradiated solutions will be chemically manipulated to prepare a dry LEU oxide suitable for interim storage and yield a uranium-free liquid stream that can be discarded as radioactive waste. In the fall of 2016, Y-12 and NNSA plan to begin developing the LEU solution disposition methodology with the Indonesian facility using small-scale batch-wise methods within existing hot cells, involving straightforward precipitation, ion exchange, decantation, and calcination methods. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Imaging and quantification of spreading and trapping of carbon dioxide in saline aquifers using meter-scale laboratory experiments

The role of capillary forces during buoyant migration of CO 2 is critical toward plume immobilization within the postinjection phase of a geological carbon sequestration operation. However, the inherent heterogeneity of the subsurface makes it very challenging to evaluate the effects of capillary forces on the storage capacity of these formations and to assess in situ plume evolution. To overcome the lack of accurate and continuous observations at the field scale and to mimic vertical migration and entrapment of realistic CO 2 plumes in the presence of a background hydraulic gradient, we conducted two unique long-term experiments in a 2.44 m × 0.5 m tank. X-ray attenuation allowed measuring the evolution of a CO 2 -surrogate fluid saturation, thus providing direct insight into capillarity-dominated and buoyancy-dominated flow processes occurring under successive drainage and imbibition conditions. The comparison of saturation distributions between two experimental campaigns suggests that layered-type heterogeneity plays an important role on nonwetting phase (NWP) migration and trapping, because it leads to (i) longer displacement times (3.6 months versus 24 days) to reach stable trapping conditions, (ii) limited vertical migration of the plume (with center of mass at 39% versus 55% of aquifer thickness), and (iii) immobilization of a larger fraction of injected NWP mass (67.2% versus 51.5% of injected volume) as compared to the homogenous scenario. Finally, while these observations confirm once more the role of geological heterogeneity in controlling buoyant flows in the subsurface, they also highlight the importance of characterizing it at scales that are below seismic resolution (1–10 m).

54 ENVIRONMENTAL SCIENCES↗

FARM supervisory capabilities for thermal energy storage

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, an overview of the major capabilities of the latest release of FARM is provided, along with a summary of the tool demonstration campaign conducted at the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility. These results assess the performance of the control system architecture embedding FARM both as a Validator of the HERON power dispatcher and as a real time Supervisory control scheme. Additionally, the report outlines the areas that FARM might benefit from, along with proposed solutions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analytical Model Methodology Development and Demonstration of Approach on Used Fuel Performance Characterization for Condition of Normal Transportation

U.S. Nuclear Regulatory Commission (NRC) rules require that used nuclear fuel (UNF) rods maintain their integrity during handling, transportation, and storage to ensure maintenance of the fuel retaining boundary, safety against criticality, and long term fuel retrievability for processing and disposal. Consequently, understanding the mechanical performance of UNF rods under cumulative loading stemming from handling, normal conditions of transport (NCT), and normal conditions of storage (NCS) is necessary as their performance under these conditions establishes part of their safety basis. The U.S. Department of Energy (DOE) commissioned a multi-laboratory team consisting of subject matter experts at Pacific Northwest National Laboratory, Idaho National Laboratory, Sandia National Laboratory, and Oak Ridge National Laboratory to develop a methodology to examine the structural performance and potential for failure of UNF under NCT and to perform a demonstration of this methodology for a typical UNF transportation campaign. This team prepared a Research, Development, and Demonstration (RD&D) Plan that describes a methodology, including development and use of analytical models, to evaluate loading and associated mechanical responses of UNF rods and key structural components during NCT. The initial scope of this plan has now been fully executed. The demonstration of the methodology laid out in the RD&D plan is focused on structural performance evaluation of Westinghouse Electric 17×17 OFA pressurized water reactor fuel assemblies with a discharge burnup range of 30 58 GWd/MTU (assembly average), loaded in a representative high-capacity (=32 fuel rod assemblies) transportation package and transported on a 3000 mile rail journey. In general, the modeling and simulation approach consists of three levels; the cask level, the fuel assembly level, and the fuel rod level. This modeling approach utilized finite element analysis sub-modeling techniques to accurately model the complete spent nuclear fuel transport system on the railcar (cask restraint structure, cask, basket, assembly, and fuel rods). The sub-modeling approach allows for more detailed finite element models of individual system components, faster analysis run times for the individual sub-models, and flexibility when updating or modifying the sub-models to incorporate better excitation data, initial material properties, or other pertinent information. The final results of the initial demonstration are that cladding strains were not large enough to cause structural failure, but cyclic strains roughly projected for the entire route were significant in some cases. The number of cycles that the model hits certain strain "bins" are counted. These are extrapolated for a 3000 mile trip and the damage ratio is calculated which is the number of cycles the fuel rods hit certain strain bins over the 3000 mile journey divided by the number of cycles to failure. Under the final model and set of inputs, the total damage from summation of the worst shock and vibration cases is ~18% of the expected fatigue limit. Therefore the fuel rods are not expected to fail during NCT given the assumptions listed. Additionally, a number of sensitivity studies were performed. It was found that the areas of highest sensitivity were the cladding elastic modulus, the spacer grid stiffness, the spacer grid location, and gaps between the assembly and the cask; these findings can be used to guide future work.

Used Nuclear Fuel, Storage, Transportation, Normal↗

Wind Loading on Parabolic Trough Collectors: Wind and Structural Loads Measurements at an Operational Powerplant

Concentrated Solar Power (CSP) is a promising method for using solar power for electricity generation with thermal energy storage for industrial applications. Solar collectors constitute almost 1/3 of the total cost of the power plant. One of the primary drivers of unrealiability of these collectors is wind-driven loading of mirrors, support structures, and drives. To date, the design of the solar collector structures has relied on data from wind tunnels that do not adequately capture the dynamic effects observed at scale. NREL initiated a field measurement campaign at the operational Nevada Solar One (NSO) parabolic trough powerplant. At this plant, parabolic trough solar collectors track the sun from east to west in the course of a day and face varying wind loads depending on the wind properties and the angle of the troughs. The aim of the project is a detailed characterization of prevailing wind and turbulence conditions and resulting operational loads on parabolic troughs, providing insights into structural dynamic response, and generating a comprehensive wind-loading dataset for validating simulations of wind loading on collector structures. The measurements at NSO consist of sonic anemometers on masts at different heights to characterize the incoming flow and conditions at four trough rows at the edge of the trough field. In addition, a Doppler Lidar scans the horizontal plane above the troughs. The wind measurements at NSO have been continuously collecting data since October 2021 and are combined with structural load measurements that started in November 2022. The load measurements were installed on the same four outermost trough rows and include support structure bending moments, drive torque moments, dynamic accelerations of the spaceframe, mirror displacement, and tilt angles. Measurements are planned to continue until May 2023, providing a first-of-a-kind, high-resolution multi-month dataset of combined wind and load measurements. In this presentation, we show first results of the measurement campaign. Based on the measurements, we identified three main factors altering the flow over the parabolic troughs: Wind speed, wind direction, and the angle of the parabolic troughs. Most interactions between incoming wind and the trough field are observed when the wind blows perpendicular to the trough rows. In this case, the first rows experience the highest wind speed and block the downwind rows, creating conditions with decreased wind speed and enhanced turbulence within the trough field. Also, turbulent length scales are smaller after the first row. This leads to the highest static loads (bending and torque moments) at the first row but potentially increased dynamic loads within the field. We illustrate our findings with case studies focused on different wind conditions and will present fatigue analysis to highlight the impact of wind-driven loads on collector structures.

CSP collectors↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Content Evaluation of the North Anna High Burn-Up Sister Fuel Rod Segments for Transportation in the 10-160B and NAC-LWT

The U.S. Department of Energy’s (DOE’s) Used Fuel Disposition Campaign (UFDC) Program has transported high-burnup nuclear sister fuel rods from a commercial nuclear power plant for purposes of evaluation and testing. The evaluation and testing of high-burnup used nuclear fuel is integral to DOE initiatives to collect information useful in determining the integrity of fuel cladding for future safe transportation of the fuel, and for determining the effects of aging, on the integrity of UNF subjected to extended storage and subsequent transportation. The UFDC Program, in collaboration with the U.S. Nuclear Regulatory Commission and the commercial nuclear industry, has obtained individual used nuclear fuel rods for testing. The rods have been received at Oak Ridge National Laboratory (ORNL) for both separate effects testing (SET) and small-scale testing (SST). To meet the research objectives, testing on multiple 6 inch fuel rod pins cut from the rods at ORNL will be performed at Pacific Northwest National Laboratory (PNNL). Up to 10 rod equivalents will be shipped. Options were evaluated for multiple shipments using the 10-160B (based on 4.5 rod equivalents) and a single shipment using the NAC-LWT. Based on the original INL/Virginia Power transfer agreement, the rods are assumed to 152 inches in length with a 0.374-inch diameter. This report provides a preliminary content evaluation for use of the 10-160B and NAC-LWT for transporting those fuel rod pins from ORNL to PNNL. This report documents the acceptability of using these packagings to transport the fuel segments from ORNL to PNNL based on the following evaluations: enrichment, A2 evaluation, Pu-239 FGE evaluation, heat load, shielding (both gamma and neutron), and content weight/structural evaluation.

10-160B↗

Generic Repository Concepts and Thermal Analysis for Advanced Fuel Cycles

The current posture of the used nuclear fuel management program in the U.S. following termination of the Yucca Mountain Project, is to pursue research and development (R&D) of generic (i.e., non-site specific) technologies for storage, transportation and disposal. Disposal R&D is directed toward understanding and demonstrating the performance of reference geologic disposal concepts selected to represent the current state-of-the-art in geologic disposal. One of the principal constraints on waste packaging and emplacement in a geologic repository is management of the waste-generated heat. This paper describes the selection of reference disposal concepts, and thermal management strategies for waste from advanced fuel cycles. A geologic disposal concept for spent nuclear fuel (SNF) or high-level waste (HLW) consists of three components: waste inventory, geologic setting, and concept of operations. A set of reference geologic disposal concepts has been developed by the U.S. Department of Energy (DOE) Used Fuel Disposition Campaign, for crystalline rock, clay/shale, bedded salt, and deep borehole (crystalline basement) geologic settings. We performed thermal analysis of these concepts using waste inventory cases representing a range of advanced fuel cycles. Concepts of operation consisting of emplacement mode, repository layout, and engineered barrier descriptions, were selected based on international progress and previous experience in the U.S. repository program. All of the disposal concepts selected for this study use enclosed emplacement modes, whereby waste packages are in direct contact with encapsulating engineered or natural materials. The encapsulating materials (typically clay-based or rock salt) have low intrinsic permeability and plastic rheology that closes voids so that low permeability is maintained. Uniformly low permeability also contributes to chemically reducing conditions common in soft clay, shale, and salt formations. Enclosed modes are associated with temperature constraints that limit changes to the encapsulating materials, and they generally have less capacity to dissipate heat from the waste package and its immediate surroundings than open modes such as that proposed for a repository at Yucca Mountain, Nevada. Open emplacement modes can be ventilated for many years prior to permanent closure of the repository, limiting peak temperatures both before and after closure, and combining storage and disposal functions in the same facility. Open emplacement modes may be practically limited to unsaturated host formations, unless emplacement tunnels are effectively sealed everywhere prior to repository closure. Thermal analysis of disposal concepts and waste inventory cases has identified important relationships between waste package size and capacity, and the duration of surface decay storage needed to meet temperature constraints. For example, the choice of salt as the host medium expedites the schedule for geologic disposal by approximately 50 yr (other factors held constant) thereby reducing future reliance on surface decay storage. Rock salt has greater thermal conductivity and stability at higher temperatures than other media considered. Alternatively, the choice of salt permits the use of significantly larger waste packages for SNF. The following sections describe the selection of reference waste inventories, geologic settings, and concepts of operation, and summarize the results from the thermal analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of AP-Farm Simulant Composition for Rotary Microfilter Testing

This document identifies the feed composition of a Hanford AP tank farm simulant for rotary microfiltration testing. The composition is based on an Hanford Tank Waste Operations Simulator (HTWOS) model run in combination with Tank Waste Information Network (TWINS) data and mineralogical studies of actual waste solids. The feed simulant is intended to be used in test runs at SRNL. The simulant will be prepared in two parts: (1) A supernate, composed of water-soluble salts and (2) The undissolved (actually, undissolvable) solids. Test slurries with distinct solids concentrations (e.g., 0.5, 5 and 10 wt%) are then prepared as needed. The base for the composition of supernate and solids is the modeled feed sequence for a deployment scenario of the Supplemental Pretreatment units within AP-farm. These units comprise a filtration part, the RMF, and a Cesium-removal part, a Small Column Ion Exchange. The primary use of this simulant is for filtration testing - however, in case that it is also used for ion-exchange tests, the amount of Cs-137 that would need to be added is available in Table 1 and Attachment 3. A modified model run (MMR-049) of the Hanford Tank Waste Operations Simulator (HTWOS) system plan 6 case 3 was performed to identify the feed sequence. Case 3 assumed supplemental treatment besides the low activity waste (LAW) melter with supplemental pretreatment supporting the pretreatment facility. The MMR did not cap the duration of supplemental pretreatment to 15 months, but rather used it throughout the entire treatment mission as an add-on option to the pretreatment facility at the Waste Treatment and Immobilization Plant (WTP). Tank 241-AP-105 (AP-105) was chosen as the feed tank to the filtration unit. Other parameters included a fixed minimum of 0.5 wt% solids in the feed and a maximum Na-concentration of 5M in the supernate. The solids rejection from the filtration unit was set to 99.99% and the maximum allowed amount of solids within tank AP-105 was set to 10 wt%. A comprehensive description of the run and the full suite of results were issued as SVF-2364-00. The list of individual feed events including the amounts of liquid and solids transferred for the first five years is added as Attachment 2; the chemical composition of the supernate feed comprises Attachment 3. For the simulant composition, only the first five years of proposed feed delivery were taken into account. The main outcome of MMR-049 was that for the first five years, the feed would come mostly from AP-farms. Multiple delivery campaigns to AP-105 are included in this average feed, while minimizing the amount of contributing tanks to the solids in the feed mix.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗