Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPITALIZED COST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Airport Financing and User Charge Systems in the USA

This paper examines the financing of U.S. public airports in a turbulent era of change, and projects toward the future. It begins by briefly outlining historical patterns that have changed the industry, and airport facilities in particular. It then develops basic principles of public finance as applied to public infrastructure, followed by the applicable principles of management. Following that, the current airport financing system is analyzed and contrasted with a socially optimal financing system. A concluding section suggests policy reforms and their likely benefits. The principles of finance and management discussed here are elementary. However, their implications are radical for U.S. airport policy. There is a great deal of room to improve the allocation of aviation infrastructure resources. The application of these basic principles makes it evident that in many cases, current practice is wasteful, environmentally unsound, overly costly, and inequitable. Future investments in public aviation capital will continue to be wasteful until more efficient pricing systems are instituted. Thus, problem in the U.S. is not one of insufficient investment in airport infrastructure, but investment in the wrong types of infrastructure. In the U.S., the vast majority of publically-owned airports are owned by local governments. Thus, while the federal government bad a great deal of influence in financing airports, ultimately these are local decisions. The same is true with many other public infrastructure issues. Katz and Herman (1997) report that in 1995, U.S. net public capital stock equaled almost $4.6 trillion, 72% of which ($3.9 trillion) was owned by state and local governments, most of it in buildings, highways, Streets, sewer systems, and water supply facilities. Thus, public infrastructure finance is fundamentally a local government issue, with implications for federal and state governments in the design of their aid programs.

Bartle, John R.↗

What can nuclear energy do for society.

It is pointed out that the earth's crust holds 30,000 times as much energy in the form of fissionable atoms as fossil fuel. Moreover, nuclear fuel costs less per unit of energy than fossil fuel. Capital equipment used to release nuclear energy, on the other hand, is expensive. For commercial electric-power production and marine propulsion, advantages of nuclear power have outweighed disadvantages. As to nuclear submarines, applications other than military may prove feasible. The industry has proposed cargo submarines to haul oil from the Alaskan North Slope beneath the Arctic ice. Other possible applications for nuclear power are in air-cushion-vehicles, aircraft, and rockets.-

Rom, F. E.↗

Benefits of VTOL aircraft in offshore petroleum logistics support

The mission suitability and potential economic benefits of advanced VTOL aircraft were investigated for logistics support of petroleum operations in the North Sea and the Gulf of Mexico. Concepts such as the tilt rotor and lift/cruise fan are promising for future operations beyond 150 miles offshore, where their high cruise efficiency provides savings in trip time, fuel consumption, and capital investment. Depending upon mission requirements, the aircraft operating costs are reduced by as much as 20 percent to 50 percent from those of current helicopters.

Wilcox, D. E.↗

End-to-End Information System design at the NASA Jet Propulsion Laboratory

Recognizing a pressing need of the 1980s to optimize the two-way flow of information between a ground-based user and a remote space-based sensor, an end-to-end approach to the design of information systems has been adopted at the Jet Propulsion Laboratory. The objectives of this effort are to ensure that all flight projects adequately cope with information flow problems at an early stage of system design, and that cost-effective, multi-mission capabilities are developed when capital investments are made in supporting elements. The paper reviews the End-to-End Information System (EEIS) activity at the Laboratory, and notes the ties to the NASA End-to-End Data System program.

Hooke, A. J.↗

Economic considerations in space industrialization

The industrial categories of the United States economy are surveyed to identify those which can function using dominantly lunar raw materials or lunar derived feedstocks (LDF) and solar energy. Sixty-four standard industrial categories (SIC) appear to be compatible with LDF inputs; another 166 SIC's might be adaptable to LDF and space industry if substitution of materials and/or terrestrial supplements were introduced. Analytic tools are presented to use in deciding optimal strategies by which a generalized economy can be developed in space in an optimal manner within given constraints of capital, products derived at a given time, local production costs, cost of import from earth and other factors.

Ayres, R. U.↗

Chemicals from biomass - The U.S. prospects for the turn of the century

Historically, chemicals from biomass have been and are expected to be economical in three major areas: byproducts, specialty items and polymers. Assessments of producing major chemicals from biomass in a processing plant based on the available conversion techniques indicate that they are not economically attractive, with the possible exception of conversion to ammonia and ethanol. The deterrents are the heavy capital investments, dependability of raw material supply and transportation costs for large plants, lack of operation experience, inadaptability of market variations, and competition from petroleum and coal. More importantly, it is also shown that even if chemicals from biomass were economical today, the resultant savings in petroleum would be far less than those achieved through other options available for the utilization of biomass as fuel and structural material. Thus, it is concluded that near-term research and development must be toward improved conversion processes, recovery of valuable products from waste streams at existing plants, more efficient use of biomass of energy and more efficient production of superior material products.

Sarbolouki, M. N.↗

Solar pond power plant feasibility study for Davis, California

The feasibility of constructing a solar pond power plant at Davis, California was studied. Site visits, weather data compilation, soil and water analyses, conceptual system design and analyses, a material and equipment market survey, conceptual site layout, and a preliminary cost estimate were studied. It was concluded that a solar pond power plant is technically feasible, but economically unattractive. The relatively small scale of the proposed plant and the high cost of importing salt resulted in a disproportionately high capital investment with respect to the annual energy production capacity of the plant. Cycle optimization and increased plant size would increase the economical attractiveness of the proposed concept.

Wu, Y. C.↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

An Architecture to Promote the Commercialization of Space Mission Command and Control

This paper describes a command and control architecture that encompasses space mission operations centers, ground terminals, and spacecraft. This architecture is intended to promote the growth of a lucrative space mission operations command and control market through a set of open standards used by both gevernment and profit-making space mission operators.

cost efficient operations standardisation money ca↗

Air-cushion tankers for Alaskan North Slope oil

A concept is described for transporting oil from the Arctic to southern markets in 10,000-ton, chemically fueled air-cushion vehicles (ACV's) configured as tankers. Based on preliminary cost estimates the conceptual ACV tanker system as tailored to the transportation of Alaskan North Slope oil could deliver the oil for about the same price per barrel as the proposed trans-Alaska pipeline with only one-third of the capital investment. The report includes the description of the conceptual system and its operation; preliminary cost estimates; an appraisal of ACV tanker development; and a comparison of system costs, versatility, vulnerability, and ecological effect with those of the trans-Alaska pipeline.

Anderson, J. L.↗

Process Feasibility Study in Support of Silicon Material Task 1

Analysis of process system properties was continued for silicon source materials under consideration for producing silicon. The following property data are reported for dichlorosilane which is involved in processing operations for silicon: critical constants, vapor pressure, heat of vaporization, heat capacity, density, surface tension, thermal conductivity, heat of formation and Gibb's free energy of formation. The properties are reported as a function of temperature to permit rapid engineering usage. The preliminary economic analysis of the process is described. Cost analysis results for the process (case A-two deposition reactors and six electrolysis cells) are presented based on a preliminary process design of a plant to produce 1,000 metric tons/year of silicon. Fixed capital investment estimate for the plant is $12.47 million (1975 dollars) ($17.47 million, 1980 dollars). Product cost without profit is 8.63 $/kg of silicon (1975 dollars)(12.1 $/kg, 1980 dollars).

Li, K. Y.↗

Industrialization study, phase 2

The potentials and requirements of advanced photovoltaic technologies still in their early developmental stages were evaluated and compared to the present day single crystal silicon wafer technology and to each other. The major areas of consideration include polycrystalline and amorphous silicon, single crystal and polycrystalline gallium arsenide, and single crystal and polycrystalline cadmium sulfide. A rank ordering of the advanced technologies is provided. The various ranking schemes were based upon present-day efficiency levels, their stability and long-term reliability prospects, material availability, capital investments both at the laboratory and production level, and associated variable costs. An estimate of the timing of the possible readiness of these advanced technologies for technology development programs and industrialization is presented along with a set of recommended government actions concerning the various advanced technologies.

Source record↗

Instrumentation for Lunar Volatile Analysis

Understanding the available lunar resources is key to incorporating their availability into exploration architectures. Previous lunar missions have provided insight into the potential resources on the moon as an initial step enabling in-situ resource utilization (ISRU). Orbiting missions, such as Clementine and Lunar Prospector, have mapped the lunar polar region and found enhanced hydrogen signals on kilometer-scale resolution. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission provided the first direct measurement of water ice in a permanently shadowed region. Future missions will provide ground truth data to measure and quantify lunar volatiles.One approach to exploration capitalizes on commercial partnerships for Class D risk aware missions. Partnerships with commercial partners enable rapid design cycles, leveraging the investment of the commercial industry in instrument development. Modified Commercial off the Shelf (COTS) hardware can be utilized to enhance capabilities in exploration missions. The hardware under development at the Kennedy Space Center for availability within the Commercial Lunar Payload Services opportunities capitalizes on modified COTS, enabling an aggressive delivery schedule and low-cost development. The modified hardware has been integrated and tested in a thermal vacuum environment, with final flight modifications currently in work. The use of a modified COTS instruments will be discussed for space applications.

Captain, J.↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

Effectiveness of Loan Guarantees versus Tax Incentives for Space Launch Ventures

Over the course of the past few years, several new and innovative fully or partiailly reusable launch vehicle designs have been initiated with the objective of reducing the cost of space transportation. These new designs are in various stages hardware development for technology and system demonstrators. The larger vehicles include the Lockheed Martin X-33 technology demonstrator for VentureStar and the Space Access launcher. The smaller launcher ventures include Kelly Space and Technology and Rotary Rocket Company. A common denominator between the new large and small commercial launch systems is the ability to obtain project financing and at an affordable cost. Both are having or will have great difficulty in obtaining financing in the capital markets because of the dollar amounts and the risk involved. The large established companies are pursuing multi-billion dollar developments which are a major challenge to finance because of the size and risk of the projects. The smaller start-up companies require less capital for their smaller systems, however, their lack of corporate financial muscle and launch vehicle track record results in a major challenge to obtain financing also because of high risk. On Wall Street, new launch system financing is a question of market, technical, organizational, legal/regulatory and financial risk. The current limit of acceptable financial risk for Space businesses on Wall Street are the telecommunications and broadcast satellite projects, of which many in number are projected for the future. Tbc recent problems with Iridium market and financial performance are casting a long shadow over new satellite project financing, making it increasingly difficult for the new satellite projects to obtain needed financing.

Scottoline, S.↗

Extension of the Time-Spectral Approach to Overset Solvers for Arbitrary Motion

Forced periodic flows arise in a broad range of aerodynamic applications such as rotorcraft, turbomachinery, and flapping wing configurations. Standard practice involves solving the unsteady flow equations forward in time until the initial transient exits the domain and a statistically stationary flow is achieved. It is often required to simulate through several periods to remove the initial transient making unsteady design optimization prohibitively expensive for most realistic problems. An effort to reduce the computational cost of these calculations led to the development of the Harmonic Balance method [1, 2] which capitalizes on the periodic nature of the solution. The approach exploits the fact that forced temporally periodic flow, while varying in the time domain, is invariant in the frequency domain. Expanding the temporal variation at each spatial node into a Fourier series transforms the unsteady governing equations into a steady set of equations in integer harmonics that can be tackled with the acceleration techniques afforded to steady-state flow solvers. Other similar approaches, such as the Nonlinear Frequency Domain [3,4,5], Reduced Frequency [6] and Time-Spectral [7, 8, 9] methods, were developed shortly thereafter. Additionally, adjoint-based optimization techniques can be applied [10, 11] as well as frequency-adaptive methods [12, 13, 14] to provide even more flexibility to the method. The Fourier temporal basis functions imply spectral convergence as the number of harmonic modes, and correspondingly number of time samples, N, is increased. Some elect to solve the equations in the frequency domain directly, while others choose to transform the equations back into the time domain to simplify the process of adding this capability to existing solvers, but each harnesses the underlying steady solution in the frequency domain. These temporal projection methods will herein be collectively referred to as Time-Spectral methods. Time-Spectral methods have demonstrated marked success in reducing the computational costs associated with simulating periodic forced flows, but have yet to be fully applied to overset or Cartesian solvers for arbitrary motion with dynamic hole-cutting. Overset and Cartesian grid methodologies are versatile techniques capable of handling complex geometry configurations in practical engineering applications, and the combination of the Time-Spectral approach with this general capability potentially provides an enabling new design and analysis tool. In an arbitrary moving-body scenario for these approaches, a Lagrangian body moves through a fixed Eulerian mesh and mesh points in the Eulerian mesh interior to the solid body are removed (cut or blanked), leaving a hole in the Eulerian mesh. During the dynamic motion some gridpoints in the domain are blanked and do not have a complete set of time-samples preventing a direct implementation of the Time-Spectral method. Murman[6] demonstrated the Time-Spectral approach for a Cartesian solver with a rigid domain motion, wherein the hole cutting remains constant. Similarly, Custer et al. [15, 16] used the NASA overset OVERFLOW solver and limited the amount of relative motion to ensure static hole-cutting and interpolation. Recently, Mavriplis and Mundis[17] demonstrated a qualitative method for applying the Time-Spectral approach to an unstructured overset solver for arbitrary motion. The goal of the current work is to develop a robust and general method for handling arbitrary motion with the Time-Spectral approach within an overset or Cartesian mesh method, while still approaching the spectral convergence rate of the original Time-Spectral approach. The viscous OVERFLOW solver will be augmented with the new Time-Spectral algorithm and the capability of the method for benchmark problems in rotorcraft and turbomachinery will be demonstrated. This abstract begins with a brief synopsis of the Time-Spectral approach for overset grids and provides details of e current approach to allow for arbitrary motion. Model problem results in one and two dimensions are included to demonstrate the viability of the method and the convergence properties. Section IV briefly outlines the implementation into the OVERFLOW solver, and the abstract closes with a description of the benchmark test cases which will be included in the final paper.

Leffell, Joshua Isaac↗

Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Bruce, Robert↗