Search NASA⌕ Search

SEARCH · Search NASA

Results for “CHECKOUT EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Checking Automated-Welder Programs By Computer

Computer system detects and displays actual and potential errors in programs for computer-controlled electron-beam welder. Uses personal computer, separate from welding computer. Programmed specifically to highlight errors in welding program. Eliminates need for preweld full-power test run reducing checkout time to about half hour. Assures much higher quality, damage-free welding. Used to create and edit new programs for welder. Control computer thereby free for production. Useful for checking programs for such other computer-controlled equipment as inertia welders, robots, machine tools, and heat treaters.

Damicone, L. O.↗

International Space Station USOS Crew Quarters On-orbit vs Design Performance Comparison

The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout.

Broyan, James Lee, Jr.↗

Test plan/procedure for the checkout of the USA cable communications test configuration for the electromagnetic compatibility (EMC) tests

A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.

Perry, J. C.↗

Shuttle payload interface verification equipment study. Volume 1: Executive summary

A preliminary design analysis of a stand alone payload integration device (IVE) is provided that is capable of verifying payload compatibility in form, fit and function with the shuttle orbiter prior to on-line payload/orbiter operations. The IVE is a high fidelity replica of the orbiter payload accommodations capable of supporting payload functional checkout and mission simulation. A top level payload integration analysis developed detailed functional flow block diagrams of the payload integration process for the broad spectrum of P/L's and identified degree of orbiter data required by the payload user and potential applications of the IVE.

Source record↗

The ERDA/LeRC Photovoltaic Systems Test Facility

The ERDA/LeRC Photovoltaic Systems Test Facility (STF) provides a vital support function to the overall ERDA National Solar Photovoltaic Program. It allows preliminary investigation and checkout of components, subsystems, and complete photovoltaic systems before installation in actual service. The STF can also be used to determine optimum system configurations and operating modes. A facility description is presented, taking into account the solar cell array, the energy storage equipment, the power conditioning equipment, electric utility distribution network and loads, and instrumentation and data acquisition systems. Safety procedures which have been set up for maintenance and inspection of the solar array are discussed. Attention is also given to a number of investigations regarding the effect of environmental factors on solar cell array operation.

Forestieri, A. F.↗

Update of KSC activities for the space transportation system

The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.

Gray, R. H.↗

Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

Anderson, Herbert A.↗

STS-103 Crew Activities Report: Flight Day 7 Highlights

Today Discovery's astronauts begin preparing the spacecraft for it's scheduled return to Earth by checking out the flight control system and reaction control jets that support re-entry. Later in the day the astronauts begin stowing equipment used during the past week and start buttoning up on-orbit systems. The Ku-band antenna which provides most of the capacity for data and television relay was stowed around 8:45 p.m. The recently refurbished Hubble Space Telescope moves slowly through it's checkout sequence before resuming science operations. Both the flight control system (FCS) and the reaction control jets (RCS) were without issue, with all systems ready to support Discovery's return to Earth.

Source record↗

Miniature Exercise Device-2 (MED-2): Preliminary ISS Evaluation Results for a Compact Motorized Resistive and Aerobic Rowing Exercise Device

Future human missions beyond Low Earth Orbit (LEO) will require onboard equipment to provide exercise capabilities for the crew to counter the adverse physiological effects of long-duration microgravity. To accomplish this within the physical constraints of a space vehicle or transit module, a single miniature device that provides both resistive and aerobic exercise modalities is required. To meet this need, Johnson Space Center’s (JSC) Software, Robotics, and Simulation Division (ER) developed the Miniature Exercise Device-2 (MED-2). MED-2 integrates a torque-controlled servomotor and a series-elastic actuator to provide highly-controllable load profiles and a large magnitude output performance in a very small package. This innovative technology is derived from years of JSC/ER design, development and operational experience with cutting-edge robotics, motor controllers, software and actuator/sensor miniaturization, including Robonaut 2 and MED-1. MED-2 was presented at the 2016 ISS R&D Conference. This is an update now that the last of six crewmembers will have completed planned MED-2 sessions on the International Space Station (ISS) in May 2018.Current state-of-the-art ISS exercise equipment consists of two treadmills, a resistive exercise device and two cycle ergometers with a total mass of several thousand pounds and a total volume of several cubic yards. This equipment has proven vital to mitigate the musculoskeletal and cardiovascular degradation effects of microgravity. However, due to the large operational volume and mass of these ISS devices, tailoring them for smaller vehicles, such as Orion, is not possible. In addition, each of the current ISS devices targets a single specific modality. Compared to the existing spaceflight (and even terrestrial) exercise equipment, MED-2 is a new archetype altogether. The combined features of compact size, multi-modality and high-performance is attributable to its innovative series elastic actuator and motor controller. Following its arrival on ISS in 2016, MED-2 was evaluated in two parts. The first and shorter evaluation was an engineering functional checkout of the hardware. As this was a novel exercise device previously never used on ISS, the initial checkout assessed the operation of the hardware and ensured the motion and dynamic range of the crew did not present any collision or other hazards. The second portion of the study collected the heart rates, kinematics and utilized operational volumes of six astronauts to determine the quality of both the resistive and aerobic exercise modalities as delivered by MED-2. Investigators from JSC Biomedical Research and Environmental Science Division (SK) and Glenn Research Center are currently evaluating the data and preparing preliminary results. For the resistive exercise modality, MED-2 demonstrated a range of constant resistive loads from 10-150 lbf. With a displacement range of 84 inches, the MED-2 accommodates users from 5th percentile Japanese female through 95th percentile American male for all of its certified exercises. The displacement measurement accuracy has also been verified within 2.5 percent full range. The crew was able to successfully perform all prescribed resistive exercises, except Goblet Squats which were not feasible with a constant load profile. For the aerobic exercise modality, MED-2 simulated a rowing motion with prescribed and user-selected resistance levels. It has demonstrated rates up to 60 strokes per minute on the ground. MED-2 loads and displacements performance are the same as those cited for the resistive modality. Although each of the crew was able to perform the prescribed aerobic rowing sets, there was considerable variability in the rowing motion among different crewmembers. Also, as expected, the crew was unable to get the full benefits of a typical terrestrial rowing stroke because the current configuration does not allow the user to reach past their feet. These observations have already informed the requirements for other microgravity rowing devices currently in development. One of the unique features of the MED-2 device is the intuitive touch-screen control system. This One Portal graphical user interface (GUI) was developed based on JSC/ER’s heritage knowledge and experience of developing and sustaining the current ISS exercise equipment. Through this interface, the crew easily performed prepared prescriptions as well as had the ability to adjust exercise modality, load and other exercise details such as number of repetitions and number of sets. This touch-screen and GUI fulfilled the MED-2 project goal to simplify the interaction between the user and the device. Furthermore, the extent to which MED-2 utilizes a touchscreen and GUI to control exercise equipment is unmatched among the existing ISS exercise devices. As a motorized device, MED-2 technology can provide a customizable force profile that can be varied as a function of strap displacement, strap velocity or a combination of these and other variables. During 2017, JSC/ER developed and flight-certified a resistive exercise algorithm that mimics the 1-G inertial effects of free-weights and enables adjustable eccentric-to-concentric loading ratios. Subsequent development will explore varying the load profiles and incorporating additional exercises beyond the current list of certified movements.

Exercise↗

Space Shuttle cargo processing.

The spacecraft processing techniques to be used at the Kennedy Space Center for the assembly and check-out of Space Shuttle cargoes are discussed. The processing flow for vertically handled spacecraft, which are inserted into the Shuttle orbiter cargo bay while the orbiter is in the vertical position and often are attached to a separate solid booster stage, includes assembly into unified payloads in the Vertical Processing Facility, followed by Cargo Integration Test Equipment tests to ensure cargo bay compatibility, and transportation to the launch pad. Horizontally handled spacecraft such as Spacelab, which are inserted into the Orbiter cargo bay while it is in the Orbiter Processing Facility in the horizontal position, are assembled and checked out within the Operations and Checkout Building, where the CITE tests are performed and the Spacelab will be disassembled, and then transported to the Orbiter Processing Facility. It is pointed out that during the Space Shuttle era, when the number of spacecraft to be processed simultaneously at Kennedy will double or triple, all spacecraft processing facilities will be required to handle the workload.

Neilon, J. J.↗

Modular checkout and test system.

Description of the development and performance of a new modular checkout and test system that represents a new concept proposed for the operational support of the space shuttle. The system is shown to have reached an advanced stage of experimental development and to be capable of meeting the requirements of the shuttle orbiter and booster with a minimum of equipment, facility, personnel, and time costs.

Warzecha, L. W.↗

PROPULSE 980: A Hydrogen Peroxide Enrichment System

The PROPULSE 980 unit is a transportable processing plant that enriches aerospace grade hydrogen peroxide from 90% to 98% final concentration. The unit was developed by Degussa-H Is, in cooperation with Orbital, NASA Marshall Space Center, and NASA Stennis Space Center. The system is a self-contained unit that houses all of the process equipment, instrumentation and controls to perform the concentration operation nearly autonomously. It is designed to produce non-bulk quantities of 98% hydrogen peroxide. The enrichment unit design also maintains system, personnel and environmental safety during all aspects of the enrichment process and final product storage. As part of the Propulse 980 checkout and final buyoff, it will be disassembled at the Degussa-H Is Corporation plant in Theodore, AL, transported to the Stennis Space Center, reassembled and subjected to a series of checkout tests to verify design objectives have been met. This paper will summarize the basic project elements and provide an update on the present status of the project.

Boxwell, Robert↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Ground Operations Aerospace Language (GOAL). Volume 3: Data bank

The GOAL (Ground Operations Aerospace Language) test programming language was developed for use in ground checkout operations in a space vehicle launch environment. To insure compatibility with a maximum number of applications, a systematic and error-free method of referencing command/response (analog and digital) hardware measurements is a principle feature of the language. Central to the concept of requiring the test language to be independent of launch complex equipment and terminology is that of addressing measurements via symbolic names that have meaning directly in the hardware units being tested. To form the link from test program through test system interfaces to the units being tested the concept of a data bank has been introduced. The data bank is actually a large cross-reference table that provides pertinent hardware data such as interface unit addresses, data bus routings, or any other system values required to locate and access measurements.

Source record↗

Reducing/Eliminating ESD Hazards During Pyro Operations

Several safety concerns have occurred during pyro operations at 30% or lower RH in the OPF area based on the increase of electrostatic discharge (ESD). These concerns targeted the safety of personnel, flight hardware, and ground support equipment (GSE). Two proposed methods considered to control ESDs during pyro operations at 30% or lower RH are the use of an ionizer blower and to increase the moisture content. In order to demonstrate that the ionizer is effective in neutralizing static charge, a series of experimental runs were conducted in the Electrostatics Laboratory located in the Operations & Checkout (O&C) Building at NASA Kennedy Space Center (KSC). The effectiveness of the ionizer blower was evaluated based upon the time lapse of a charged metal plate from initial 1000 to 400 volts. Distance, RH, and angle of attack were studied. A full factorial experiment (2(exp 3) = 8) was conducted. Since we did not have a statistical analysis program, such as SAS, available, calculations were done manually based on the method of ANOVA (Analysis of Variances), but R(exp 2) (fitness of curve) was not obtained. As conjectured, distance was found to be the major influencial variable. Therefore, we concluded that the best possible combination of situations would be to position the ionizer blower as close as possible and facing directly into the charged plate. This scenario resulted in the quickest discharge rate, which would be the most beneficial during pyro operations below 30% RH. The second method of increasing the moisture content in the work environment through a modification of the OPF ECS current configuration appeared to be dependent on budget constraints and currently not planned to be modified. Finally, some recommendations are discussed such as to test the ionizer in an actual field experiment with a mockup pyro connector and a technician with all the NASA KSC Safety-compliant PPE to assess the realistic effectiveness of the ionizer blower.

Soriano, Jose Francisco↗

Space shuttle propulsion systems on-board checkout and monitoring system development study (extension). Volume 2: Guidelines for for incorporation of the onboard checkout and monitoring function on the space shuttle

Guidelines are presented for incorporation of the onboard checkout and monitoring function (OCMF) into the designs of the space shuttle propulsion systems. The guidelines consist of and identify supporting documentation; requirements for formulation, implementation, and integration of OCMF; associated compliance verification techniques and requirements; and OCMF terminology and nomenclature. The guidelines are directly applicable to the incorporation of OCMF into the design of space shuttle propulsion systems and the equipment with which the propulsion systems interface. The techniques and general approach, however, are also generally applicable to OCMF incorporation into the design of other space shuttle systems.

Source record↗

Kennedy Space Center processing of Shuttle small payloads

There are many steps involved in preparing a payload for a mission into space on the Space Shuttle. Operations at the John F. Kennedy Space Center (KSC) are the last of those steps for the hardware before the payload is launched. To assure a successful and efficient KSC processing flow, a great deal of planning between the Robert H. Goddard Space Flight Center (GSFC) and KSC personnel is required before the payload arrives at KSC. After arrival, pre-flight operations occur between payload personnel, GSFC personnel, and KSC personnel for integration of the payload into its carrier (if required), in preparation for installation into a Orbiter. Once installed into an Orbiter, final test(s), checkout, and close-out of the payload is performed by GSFC and KSC personnel before launch. Mission support varies depending on the payload flying, but once the mission is complete and the Orbiter has returned to KSC, post-flight operations begin. This usually involves a reverse flow of the pre-flight operations. KSC operations conclude when the payload, its ground support equipment (GSE), and personnel depart KSC. A list of lessons learned is generated at the end of each payload flow, to avoid repeating the same mistakes (if any) for the next payload or for multiple repeat flights of the same payload. Always monitored are planned changes that may affect the payloads, GSE, KSC facilities, payload personnel, GSFC personnel, and/or KSC personnel.

Haddad, Michael E.↗

Flight simulation testing equipment for composite material systems

A test program is discussed which aims at establishing the time-temperature-stress characteristics of several classes of high-temperature composite materials in order to determine their suitability for applications in supersonic cruise aircraft. Five advanced composite materials (a boron epoxy, a boron polyimide, a graphite epoxy, a graphite polyimide, and diffusion-bonded boron aluminum) are being evaluated using a flight-test simulator capable of long-term automatic testing based on random loading and realistic flight temperature profiles. The design, construction, and checkout of this simulator are described along with the digital load programmer, load magnitude controllers, the hydraulic pumping system, the heating and cooling systems, the control console, and the data recording system. Typical results for short-term tests performed at constant temperatures and accelerated load rates are presented in terms of a random-load spectrum and a wearout model.

Haskins, J. F.↗