Search NASA⌕ Search

SEARCH · Search NASA

Results for “Center Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Manufacturing and Integration Status of the JWST OSIM Optical Simulator

OSIM is a full field, cryogenic, optical simulator of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE). It provides simulated point source/star images for optical performance testing of the JWST Integrated Science Instrument Module (ISIM). OSIM is currently being assembled at the Goddard Space Flight Center (GSFC). In this paper, we describe the capabilities, design, manufacturing and integration status, and uses of the OSIM during the optical test program of ISIM and the Science Instruments. Where applicable, the ISIM tests are also described.

Sullivan, Joe↗

Status of FEP encapsulated solar cell modules used in terrestrial applications

The Lewis Research Center has been engaged in transferring the FEP encapsulated solar cell technology developed for the space program to terrestrial applications. FEP encapsulated solar cell modules and arrays were designed and built expressly for terrestrial applications. Solar cell power systems were installed at three different land sites, while individual modules are undergoing marine environment tests. Four additional power systems are being completed for installation during the summer of 1974. These tests have revealed some minor problems which have been corrected. The results confirm the inherent utility of FEP encapsulated terrestrial solar cell systems.

Ratajczak, A. F.↗

Status of the national transonic facility

The National Transonic Facility at NASA Langley Research Center, scheduled for completion in July, 1982, is described with emphasis on model and instrumentation activities, calibration plans and some initial research plans. Performance capabilities include a Mach number range of 0.2-1.2, a pressure range of 1-9 atmospheres, and a temperature range of 77-350 K, which will produce a maximum Reynolds number of 120 million at a Mach number of 1.0, based on a 0.25 m chord. A comprehensive tunnel calibration program is planned, which will cover basic tunnel calibration, data qualities, and data comparisons with other facilites and flights.

Mckinney, L. W.↗

Status of Brayton Cycle Power Conversion Development at NASA GRC

The NASA Glenn Research Center (GRC) is pursuing the development of Brayton cycle power conversion for various NASA initiatives. Brayton cycle power systems offer numerous advantages for space power generation including high efficiency, long life, high maturity, and broad scalability. Candidate mission applications include surface rovers and bases, advanced propulsion vehicles, and earth orbiting satellites. A key advantage is the ability for Brayton converters to span the wide range of power demands of future missions from several kilowatts to multi-megawatts using either solar, isotope, or reactor heat sources. Brayton technology has been under development by NASA since the early 1960's resulting in engine prototypes in the 2 to 15 kW-class that have demonstrated conversion efficiency of almost 30% and cumulative operation in excess of 40,000 hours. Present efforts at GRC are focusing on a 2 kW testbed as a proving ground for future component advances and operational strategies, and a 25 kW engine design as a modular building block for 100 kW-class electric propulsion and Mars surface power applications.

Mason, Lee S.↗

Status of the RBCC Direct-Connect Mixer Combustor Experiment

The NASA Glenn Research Center is developing hydrogen based combined cycle propulsion technology for a single-stage-to-orbit launch vehicle application under a project called GTX. Rocket Based Combined Cycle (RBCC) propulsion systems incorporate one or more rocket engines into an airbreathing flow path to increase specific impulse as compared to an all rocket-powered vehicle. In support of this effort, an RBCC direct-connect test capability was established at the Engine Components Research Laboratory to investigate low speed, ejector ramjet, and initial ramjet operations and performance. The facility and test article enables the evaluation of two candidate low speed operating schemes; the simultaneous mixing and combustion (SMC) and independent ramjet stream (IRS). The SMC operating scheme is based on the fuel rich operations of the rocket where performance depends upon mixing between the rocket plume and airstream. In contrast, the IRS scheme fuels the airstream separately and uses the rocket plume to ignite the fuel-air mixture. This paper describes the test hardware and facility upgrades installed to support the RBCC tests. It also defines and discusses low speed technical challenges being addressed by the experiments. Finally, preliminary test results, including rocket risk mitigating tests, unfueled airflow tests, and the integrated system hot fire test will be presented.

Walker, James F.↗

Status of the RBCC Direct-Connect Mixer Combustor Experiment

The NASA Glenn Research Center is developing hydrogen based combined cycle propulsion technology for a single-stage-to-orbit launch vehicle application under a project called GTX. Rocket Based Combined Cycle (RBCC) propulsion systems incorporate one or more rocket engines into an airbreathing flow path to increase specific impulse as compared to an all rocket-powered vehicle. In support of this effort, an RBCC direct-connect test capability was established at the Engine Components Research Laboratory to investigate low speed, ejector ramjet, and initial ramjet operations and performance. The facility and test article enables the evaluation of two candidate low speed operating schemes; the simultaneous mixing and combustion (SMC) and independent ramjet stream (IRS). The SMC operating scheme is based on the fuel rich operations of the rocket where performance depends upon mixing between the rocket plume and airstream. In contrast, the IRS scheme fuels the airstream separately and uses the rocket plume to ignite the fuel-air mixture. This paper describes the test hardware and facility upgrades installed to support the RBCC tests. It also defines and discusses low speed technical challenges being addressed by the experiments. Finally, preliminary test results, including rocket risk mitigating tests, unfueled airflow tests, and the integrated system hot fire test will be presented.

Walker, James F.↗

Development Status of the J-2X

In June 2006, the NASA Marshall Space Flight Center (MSFC) and Pratt & Whitney Rocketdyne began development of an engine for use on the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The development program will be completed in December 2012 at the end of a Design Certification Review and after certification testing of two flight configuration engines. A team of over 600 people within NASA and Pratt & Whitney Rocketdyne are currently working to prepare for the fall 2008 Critical Design Review (CDR), along with supporting an extensive risk mitigation test program. The J-2X will power the Ares I upper stage and the Ares V earth departure stage (EDS). The initial use will be in the Ares I, used to launch the Orion crew exploration vehicle. In this application, it will power the upper stage after being sent aloft on a Space Shuttle-derived. 5-segment solid rocket booster first stage. In this mission. the engine will ignite at altitude and provide the necessary acceleration force to allow the Orion to achieve orbital velocity. The Ares I upper stage, along with the J-2X. will then be expended. On the Ares V. first stage propulsion is provided by five RS-68B engines and two 5-segment boosters similar to the Ares I configuration. In the Ares V mission. the J-2X is first started to power the EDS and its payload. the Altair lunar lander. into earth orbit, then shut-down and get prepared for its next start. The EDS/Altair will remain in a parking orbit, awaiting rendezvous and docking with Orion. Once the two spacecraft are mated, the J-2X will be restarted to achieve earth departure velocity. After powering the Orion and Altair, the EDS will be expended. By using the J-2X Engine in both applications, a significant infrastructure cost savings is realized. Only one engine development is required, and the sustaining engineering and flight support infrastructures can be combined. There is also flexibility for changing, the production and flight manifest because a single production line can support both missions with minimal differences between each engine configuration kit.

Kynard, Mike↗

Five-Segment Solid Rocket Motor Development Status

In support of the National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC) is developing a new, more powerful solid rocket motor for space launch applications. To minimize technical risks and development costs, NASA chose to use the Space Shuttle s solid rocket boosters as a starting point in the design and development. The new, five segment motor provides a greater total impulse with improved, more environmentally friendly materials. To meet the mass and trajectory requirements, the motor incorporates substantial design and system upgrades, including new propellant grain geometry with an additional segment, new internal insulation system, and a state-of-the art avionics system. Significant progress has been made in the design, development and testing of the propulsion, and avionics systems. To date, three development motors (one each in 2009, 2010, and 2011) have been successfully static tested by NASA and ATK s Launch Systems Group in Promontory, UT. These development motor tests have validated much of the engineering with substantial data collected, analyzed, and utilized to improve the design. This paper provides an overview of the development progress on the first stage propulsion system.

Priskos, Alex S.↗

WSTF Propulsion and Pyrotechnics Corrective Action Test Program Status-2000

Extensive propulsion and pyrotechnic testing has been in progress at the NASA Johnson Space Center White Sands Test Facility (WSTF) since 1995. This started with the Mars Observer Propulsion and Pyrotechnics Corrective Action Test Program (MOCATP). The MOCATP has concluded, but extensive pyrovalve testing and research and development has continued at WSTF. The capability to accurately analyze and measure pyrovalve combustion product blow-by, evaluate propellant explosions initiated by blow-by, and characterize pyrovalve operation continues to be used and improved. This paper contains an overview of testing since MOCATP inception, but focuses on accomplishments since the status was last reported at the 35th Joint Propulsion Conference, June, 1999. This new activity includes evaluation of 3/8 inch Conax pyrovalves; development and testing of advanced pyrovalve technologies; investigation of nondestructive evaluation techniques to inspect pyrotechnically induced hydrazine explosions both through testing and modeling. Data from this collection of projects are now being formatted into a pyrovalve applications and testing handbook and consensus standard to benefit pyrovalve users and spacecraft designers. The handbook is briefly described here and in more detail in a separate paper. To increase project benefit, pyrovalve manufacturers are encouraged to provide additional valves for testing and consideration, and feedback is encouraged in all aspects of the pyrotechnic projects.

Saulsberry, R.↗

Space mechanisms needs for future NASA long duration space missions

Future NASA long duration missions will require high performance, reliable, long lived mechanical moving systems. In order to develop these systems, high technology components, such as bearings, gears, seals, lubricants, etc., will need to be utilized. There has been concern in the NASA community that the current technology level in these mechanical component/tribology areas may not be adequate to meet the goals of long duration NASA mission such as Space Exploration Initiative (SEI). To resolve this concern, NASA-Lewis sent a questionnaire to government and industry workers (who have been involved in space mechanism research, design, and implementation) to ask their opinion if the current space mechanisms technology (mechanical components/tribology) is adequate to meet future NASA Mission needs and goals. In addition, a working group consisting of members from each NASA Center, DoD, and DOE was established to study the technology status. The results of the survey and conclusions of the working group are summarized.

Fusaro, Robert L.↗

Space mechanisms needs for future NASA long duration space missions

Future NASA long duration missions will require high performance, reliable, long lived mechanical moving systems. In order to develop these systems, high technology components such as bearings, gears, seals, lubricants, etc., will need to be utilized. There has been concern in the NASA community that the current technology level in these mechanical component/tribology areas may not be adequate to meet the goals of long duration NASA mission such as Space Exploration Initiative (SEI). To resolve this concern, NASA-Lewis sent a questionnaire to government and industry workers (who have been involved in space mechanism research, design, and implementation) to ask their opinion if the current space mechanisms technology (mechanical components/tribology) is adequate to meet future NASA Mission needs and goals. In addition, a working group consisting of members from each NASA Center, DoD, and DOE was established to study the technology status. The results of the survey and conclusions of the working group are summarized.

Fusaro, Robert L.↗

NASA technology applications team: Applications of aerospace technology

This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

Source record↗

STS-44 Mission Highlights Resource Tape. Part 2 of 2

In this second part of a two part video set of the mission of STS-44, an in-orbit press conference was held. The astronauts (Cmdr. Fred Gregory, Pilot Tom Hendricks, Payload Specialist Tom Hennen, and Mission Specialists Jim Voss, Story Musgrave, and Mario Runco) conversed via satellite with the Johnson Press Center at the Johnson Space Center, Houston, Texas. Journalists asked questions regarding the mission, the status of the mission's experiments, the problems with living in a microgravity environment, upcoming NASA space programs, and future objectives of the Space Shuttle missions.

Source record↗

STS-80 Flight Day 14

On this fourteenth day of the STS-80 mission, the flight crew, Cmdr. Kenneth D. Cockrell, Pilot Kent V. Rominger, Mission Specialists, Tamara E. Jernigan, Thomas D. Jones, and F. Story Musgrave, spend this day working with tools inside the crew cabin. The astronauts answer questions on the status of their mission from reporters at the Johnson Space Center in Houston and the Kennedy Space Center in Florida during a news conference.

Source record↗

Proceedings of the NASA First Wake Vortex Dynamic Spacing Workshop

A Government and Industry workshop on wake vortex dynamic spacing systems was conducted on May 13-15, 1997, at the NASA Langley Research Center. The purpose of the workshop was to disclose the status of ongoing NASA wake vortex R&D to the international community and to seek feedback on the direction of future work to assure an optimized research approach. Workshop sessions examined wake vortex characterization and physics, wake sensor technologies, aircraft/wake encounters, terminal area weather characterization and prediction, and wake vortex systems integration and implementation. A final workshop session surveyed the Government and Industry perspectives on the NASA research underway and related international wake vortex activities. This document contains the proceedings of the workshop including the presenters' slides, the discussion following each presentation, the wrap-up panel discussion, and the attendees' evaluation feedback.

Creduer, Leonard↗

[X-33 Systems]

Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Allied-Signal Aerospace's contribution to the program. The following is a summary of the work reviewed under their portion of the agreement: (1) Communication Systems; (2) Environmental Control Systems- Active Thermal Control System (ATCS), Purge and Vent System, Hydrogen Detection System (HDS), Avionics Bay Inerting System (ABIS), and Flush Air Data System (FADS); (2) Landing Systems; (3) Power Management and Generation Systems; (4) Flight Control Actuation System (FCAS)- Electric Power Control & Distribution System (EPCDS), and Battery Power System (BPS); and (5) Vehicle Management Systems (VMS)- VMS Hardware, VMS Software Development Activities, and System Integration Laboratory (SIL).

Source record↗

International VLBI Service for Geodesy and Astrometry 2000 Annual Report

This volume of reports is the 2000 Annual Report of the International Very Long Base Interferometry (VLBI) Service for Geodesy and Astrometry (IVS). The individual reports were contributed by VLBI groups in the international geodetic and astrometric community who constitute the permanent components of IVS. The IVS 2000 Annual Report documents the work of the IVS components for the period March 1, 1999 (the official inauguration date of IVS) through December 31, 2000. The reports document changes, activities, and progress of the IVS. The entire contents of this Annual Report also appear on the IVS web site at http://ivscc.gsfc.nasa.gov/publications/ar2000. This book and the web site are organized as follows: (1) The first section contains general information about IVS, a map showing the location of the components, information about the Directing Board members, and the report of the IVS Chair; (2) The second section of Special Reports contains a status report of the IVS Working Group on GPS phase center mapping, a reproduction of the resolution making IVS a Service of the International Astronomical Union (IAU), and a reprint of the VLBI Standard Interface (VSI); (3) The next seven sections hold the component reports from the Coordinators, Network Stations, Operation Centers, Correlators, Data Centers, Analysis Centers, and Technology Development Centers; and (4) The last section includes reference information about IVS: the Terms of Reference, the lists of Member and Affiliated organizations, the IVS Associate Member list, a complete list of IVS components, the list of institutions contributing to this report, and a list of acronyms. The 2000 Annual Report demonstrates the vitality of the IVS and the outstanding progress we have made during our first 22 months.

Vandenberg, N. R.↗