Search NASA⌕ Search

SEARCH · Search NASA

Results for “Commercial Crew Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Dust Mitigation Technology Development for Future Lunar Missions with the Dust Solution Testing Initiative (DuSTI) Project

The jagged, hard, and electro-statically-charged dust on the lunar surface is one of the most significant hazards to human exploration of the Moon. The safety of the crew members and sustainability of habitats, science, and supporting hardware depend on effective dust mitigation techniques and technologies. As NASA pursues a new generation of lunar missions with the Artemis program, the Dust Solution Testing Initiative (DuSTI) project is pursuing dust mitigation solutions by performing tests on promising commercial off the shelf (COTS) technologies over FY21.

dust↗

NASA's Exploration Architecture

A Bold Vision for Space Exploration includes: 1) Complete the International Space Station; 2) Safely fly the Space Shuttle until 2010; 3) Develop and fly the Crew Exploration Vehicle no later than 2012; 4) Return to the moon no later than 2020; 5) Extend human presence across the solar system and beyond; 6) Implement a sustained and affordable human and robotic program; 7) Develop supporting innovative technologies, knowledge, and infrastructures; and 8) Promote international and commercial participation in exploration.

Tyburski, Timothy↗

The Space Launch System -The Biggest, Most Capable Rocket Ever Built, for Entirely New Human Exploration Missions Beyond Earth's Orbit

NASA is developing the Space Launch System -- an advanced heavy-lift launch vehicle that will provide an entirely new capability for human exploration beyond Earth's orbit. The Space Launch System will provide a safe, affordable and sustainable means of reaching beyond our current limits and opening up new discoveries from the unique vantage point of space. The first developmental flight, or mission, is targeted for the end of 2017. The Space Launch System, or SLS, will be designed to carry the Orion Multi-Purpose Crew Vehicle, as well as important cargo, equipment and science experiments to Earth's orbit and destinations beyond. Additionally, the SLS will serve as a backup for commercial and international partner transportation services to the International Space Station. The SLS rocket will incorporate technological investments from the Space Shuttle Program and the Constellation Program in order to take advantage of proven hardware and cutting-edge tooling and manufacturing technology that will significantly reduce development and operations costs. The rocket will use a liquid hydrogen and liquid oxygen propulsion system, which will include the RS-25D/E from the Space Shuttle Program for the core stage and the J-2X engine for the upper stage. SLS will also use solid rocket boosters for the initial development flights, while follow-on boosters will be competed based on performance requirements and affordability considerations.

Shivers, C. Herb↗

Development of a multi-media crew-training program for the terminal configured vehicle mission simulator

This paper describes the work being done at the National Aeronautics and Space Administration's (NASA) Langley Research Center on the development of a multi-media crew-training program for the Terminal Configured Vehicle (TCV) Mission Simulator. Brief descriptions of the goals and objectives of the TCV Program and of the TCV Mission Simulator are presented. A detailed description of the training program is provided along with a description of the performance of the first group of four commercial pilots to be qualified in the TCV Mission Simulator.

Rhouck, J. A.↗

Development of a multi-media crew-training program for the Terminal Configured Vehicle Mission Simulator

This paper describes the work being done at the National Aeronautics and Space Administration's (NASA) Langley Research Center on the development of a multi-media crew-training program for the Terminal Configured Vehicle (TCV) Mission Simulator. Brief descriptions of the goals and objectives of the TCV Program and of the TCV Mission Simulator are presented. A detailed description of the training program is provided along with a description of the performance of the first group of four commercial pilots to be qualified in the TCV Mission Simulator.

Houck, J. A.↗

Transfers from TLI to Lunar Frozen Orbits with Applications to NASA’s CLPS & Artemis Programs

This paper will focus on trajectory transfers from trans-lunar injection (TLI) to lunar frozen orbits with applications to NASA’s Commercial Lunar Payload Services (CLPS) and Artemis Human Landing System (HLS) programs. For a CLPS application, the CS-3 mission is explored, which will deploy a communications relay satellite in lunar elliptical frozen orbit followed by landing a payload on the lunar farside during dawn. Given HLS will land a crew near the lunar south pole with lighting and timing requirements, the effect of varying the Earth-Moon transit duration to influence the approach direction upon landing will be explored.

lunar frozen orbits↗

Ares V: Enabling Unprecedented Payloads for Space in the 21st Century

Numerous technical and programmatic studies since the U.S. space program began in the 1960s has emphasized the need for a heavy lift capability for exploration beyond low Earth orbit (LEO). The Saturn V once embodied that capability until it was retired. Now the Ares V cargo launch vehicle (CaLV) promises to restore and improve on that capability, providing unprecedented opportunities for human and robotic exploration, science, national security and commercial uses. This paper provides an overview of the capabilities of Ares V, both as an opportunity for payloads of increased mass and/or volume, and as a means of reducing risk in the payload design process. The Ares V is part of NASA s Constellation Program, which also includes the Ares I crew launch vehicle (CLV), Orion crew exploration vehicle (CEV), and Altair lunar lander. This architecture is designed to carry out the national space policy goals of completing the International Space Station (ISS), retiring the Space Shuttle fleet, and expanding human exploration beyond LEO. The Ares V is designed to loft upper stages and/or cargo, such as the Altair lander, into LEO. The Ares I is designed to put Orion into LEO with a crew of up to four for rendezvous with the ISS or with the Ares V Earth departure stage for journeys to the Moon. While retaining the goals of heritage hardware and commonality, the Ares V configuration continues to be refined through a series of internal trades. The current reference configuration was recommended by the Ares Projects and approved by the Constellation Program during the Lunar Capabilities Concept Review (LCCR) June 2008. The reference configuration defines the Ares V as 381 feet (116m) tall with a gross lift-off mass (GLOM) of 8.1 million pounds (3,704.5 mT). Its first stage will generate 11 million pounds of sea-level liftoff thrust. It will be capable of launching 413,800 pounds (187.7 mT) to LEO, 138,500 pounds (63 mT) direct to the Moon or 156,700 pounds (71.1 mT) in its dual-launch architecture role with Ares I. It could also launch 123,100 pounds (55.8 mT) to Sun-Earth L2. Assessment of astronomy payload requirements since Spring 2008 has indicated that Ares V has the potential to support a range of payloads and missions. Some of these missions were impossible in the absence of Ares V s capabilities. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. A 2008 study by a National Research Council (NRC) panel, as well as analyses presented by astronomers and planetary scientists at two weekend conferences in 2008, support the position that Ares V has benefit to a broad range of planetary and astronomy missions. This early dialogue with Ares V engineers is permitting the greatest opportunity for payload/transportation/mission synergy and with the least financial impact to Ares V development. In addition, independent analyses suggest that Ares V has the opportunity to enable more cost-effective mission design. 1

Creech, Steve↗

"Virtual Cockpit Window" for a Windowless Aerospacecraft

A software system processes navigational and sensory information in real time to generate a three-dimensional-appearing image of the external environment for viewing by crewmembers of a windowless aerospacecraft. The design of the particular aerospacecraft (the X-38) is such that the addition of a real transparent cockpit window to the airframe would have resulted in unacceptably large increases in weight and cost. When exerting manual control, an aircrew needs to see terrain, obstructions, and other features around the aircraft in order to land safely. The X-38 is capable of automated landing, but even when this capability is utilized, the crew still needs to view the external environment: From the very beginning of the United States space program, crews have expressed profound dislike for windowless vehicles. The wellbeing of an aircrew is considerably promoted by a three-dimensional view of terrain and obstructions. The present software system was developed to satisfy the need for such a view. In conjunction with a computer and display equipment that weigh less than would a real transparent window, this software system thus provides a virtual cockpit window. The key problem in the development of this software system was to create a realistic three-dimensional perspective view that is updated in real time. The problem was solved by building upon a pre-existing commercial program LandForm C3 that combines the speed of flight-simulator software with the power of geographic-information-system software to generate real-time, three-dimensional-appearing displays of terrain and other features of flight environments. In the development of the present software, the pre-existing program was modified to enable it to utilize real-time information on the position and attitude of the aerospacecraft to generate a view of the external world as it would appear to a person looking out through a window in the aerospacecraft. The development included innovations in realistic horizon-limit modeling, three-dimensional stereographic display, and interfaces for utilization of data from inertial-navigation devices, Global Positioning System receivers, and laser rangefinders.

Abernathy, Michael F.↗

The Predicted Growth of the Low Earth Orbit Space Debris Environment: An Assessment of Future Risk for Spacecraft

Space debris is a worldwide-recognized issue concerning the safety of commercial, military, and exploration spacecraft. The space debris environment includes both naturally occuring meteoroids and objects in Earth orbit that are generated by human activity, termed orbital debris. Space agencies around the world are addressing the dangers of debris collisions to both crewed and robotic spacecraft. In the United States, the Orbital Debris Program Office at the NASA Johnson Space Center leads the effort to categorize debris, predict its growth, and formulate mitigation policy for the environment from low Earth orbit (LEO) through geosynchronous orbit (GEO). This paper presents recent results derived from the NASA long-term debris environment model, LEGEND. It includes the revised NASA sodium potassium droplet model, newly corrected for a factor of two over-estimation of the droplet population. The study indicates a LEO environment that is already highly collisionally active among orbital debris larger than 1 cm in size. Most of the modeled collision events are non-catastrophic (i.e., They lead to a cratering of the target, but no large scale fragmentation.). But they are potentially mission-ending, and take place between impactors smaller than 10 cm and targets larger than 10 cm. Given the small size of the impactor these events would likely be undetectable by present-day measurement means. The activity continues into the future as would be expected. Impact rates of about four per year are predicted by the current study within the next 30 years, with the majority of targets being abandoned intacts (spent upper stages and spacecraft). Still, operational spacecraft do show a small collisional activity, one that increases over time as the small fragment population increases.

Krisko, Paula H.↗

A Distributed Simulation Framework Applied to Artemis Analysis, Studies, Integration, and Test

The National Aeronautics and Space Administration (NASA) established the Artemis Program, a series of missions to return humans to the Moon and explore further than before. To execute the Artemis missions, NASA is collaborating with commercial and international partners to create the necessary infrastructure and logistics plan that will establish a long term presence on the Moon ahead of exploring Mars. NASA and its partners are developing a collection of space and surface systems to support crewed missions to the lunar surface that will provide the mobility, habitation, logistics, and exploration support necessary for Artemis mission successes which includes robust scientific investigations. This paper details the design, capabilities, and uses of the Artemis Distributed Simulation (ADS) being developed by the NASA Exploration Systems Simulations (NExSyS) Team to support Artemis architecture studies. ADS utilizes international interoperability standards to connect a collection of independent vehicle and service simulations; these include but are not limited to elements such as rovers, landers, and habitation elements along with services like communications, environment, visualization, and data logging. ADS’s distributed nature allows for the complex aggregation of constituent Artemis elements; this includes efficient scenario modification with the addition or removal of individual simulations representing Artemis elements or services. This capability provides support for the rapid performance of various Artemis mission trade studies exploring alternate configurations. Currently, ADS uses NASA developed simulations for development and testing; however, through the use of international simulation interoperability standards, ADS provides an integration framework to incorporate dissimilar authoritative vendor simulations as Artemis systems mature and vendor simulations become available. Vendor simulations will be able to join ADS and interact with other Artemis elements and vehicles while limiting the exposure of proprietary data. This paper describes the expansion of an existing distributed simulation infrastructure to accommodate a collaborative and dynamic framework for the Artemis Program. This work includes updated federation designs, integration into existing NASA facilities, advancements in visualizations, and advancements in human driven inputs. This paper will also outline recently completed and ongoing support and collaboration with NASA studies and testing, namely results from energetics and Human-In-The-Loop (HITL) studies. The paper concludes with a plan for future developments and facility integration to enable enhanced studies in preparation for a return of humans to the lunar surface.

Artemis↗

Science Off the Earth: an Integrated Approach to Science Operations in the Artemis Era and Beyond

Humanity is standing on the cusp of its next giant leap – an international, sustainable, and commercial return to the moon. Unlike the Apollo missions, the expectation that a permanent human presence will be established is well founded. Initially, crewed missions to the lunar surface are expected to last between 6 and 30 days and occur approximately once per year, however the robust suite of landers and orbiting assets proposed by both commercial and government entities provide an opportunity to conduct science research on the moon and in cis-lunar space, 24x7 for many years. In the 50 years since the conclusion of Apollo, NASA’s crewed space science missions have been evolving. This can be seen clearly from Skylab and the Space Shuttle’s Spacelab to the International Space Station (ISS). Presently aboard the ISS, international crews spend nearly half their time working on experiments while many payloads collect science non-stop with either very limited, or no crew interaction. Additionally, a fleet of orbiting experiments complement and validate those investigations performed on the ISS. As the number, variety, and complexity of these investigation increase, it becomes ever more necessary to integrate across the many entities involved to prevent duplication of effort, ensure complementary results, reduce cost, and create a sustainable environment to conduct groundbreaking scientific research in space. In this paper, we examine how the various elements of the Artemis program including NASA’s Lunar Gateway, Commercial Lunar Payload Services (CLPS) endeavor, the Human Landing Systems (HLS), surface habitats, rovers and many more will be operated to ensure interoperability, maximize science return, and enable success for government, commercial and private partners.

Science Operations↗

Science Off the Earth: An Integrated Approach to Science Operations in the Artemis Era and Beyond

Humanity is standing on the cusp of its next giant leap – an international, sustainable, and commercial return to the moon. Unlike the Apollo missions, the expectation that a permanent human presence will be established is well founded. Initially, crewed missions to the lunar surface are expected to last between 6 and 30 days and occur approximately once per year, however the robust suite of landers and orbiting assets proposed by both commercial and government entities provide an opportunity to conduct science research on the moon and in cis-lunar space, 24x7 for many years. In the 50 years since the conclusion of Apollo, NASA’s crewed space science missions have been evolving. This can be seen clearly from Skylab and the Space Shuttle’s Spacelab to the International Space Station (ISS). Presently aboard the ISS, international crews spend nearly half their time working on experiments while many payloads collect science non-stop with either very limited, or no crew interaction. Additionally, a fleet of orbiting experiments complement and validate those investigations performed on the ISS. As the number, variety, and complexity of these investigation increase, it becomes ever more necessary to integrate across the many entities involved to prevent duplication of effort, ensure complementary results, reduce cost, and create a sustainable environment to conduct groundbreaking scientific research in space. In this paper, we examine how the various elements of the Artemis program including NASA’s Lunar Gateway, Commercial Lunar Payload Services (CLPS) endeavor, the Human Landing Systems (HLS), surface habitats, rovers and many more will be operated to ensure interoperability, maximize science return, and enable success for government, commercial and private partners.

Science Operations↗

NASA's Space Launch System Progress Report

Exploration beyond Earth orbit will be an enduring legacy for future generations, as it provides a platform for science and exploration that will define new knowledge and redefine known boundaries. NASA s Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program s Saturn V that sent Americans to the Moon in the 1960s and 1970s. The SLS offers a flexible design that may be configured for the Orion Multi-Purpose Crew Vehicle with associated life-support equipment and provisions for long journeys or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 tonnes (t) in 2017 and will be evolvable to 130 t after 2021. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of Mars. Building on the foundation laid by over 50 years of human and scientific space flight and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs the SLS team is delivering both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable. This panel will address the planning and progress being made by NASA s SLS Program.

May, Todd A.↗

Progress and Status of the 2nd Generation Reusable Launch Vehicle Program

Safe, low-cost space transportation is the key enabler of the commercial development and civil exploration of space. Human space flight remains a hazardous endeavor in spite of advances in aerospace technology. NASA intends to reduce the resources devoted to routine space operations, thus enabling additional science research, technology development, and exploration activities. NASA developed the Integrated Space Transportation Plan (ISTP) to address the needs for space access. ISTP is a balanced and comprehensive plan that embodies strategies for achieving goals for earth-to-orbit and in-space transportation operations. ISTP calls for near-term safety related upgrades to the Space Shuttle, development of a Crew Return Vehicle, a new Space Launch Initiative (SLI), and development of an Aero-Space Base to provide foundation technology for future space systems. NASA formed the SLI to coordinate the development of the 2nd Generation Reusable Launch Vehicle (RLV) architecture, The SLI is implemented by the 2nd Generation RLV Program Office.

Dumbacher, Daniel L.↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

Lunar Explorer Instrument for space biology Applications (LEIA): An overview of planned science concept of operations

Radiation and reduced gravity pose biological risks to crewed deep space exploration. To better understand deep space radiation biology, the LEIA mission will measure charged particles and fast neutrons as well as yeast growth, metabolic rate, and bioengineered production of carotenoids at the lunar surface. LEIA will be delivered to the south polar region of the Moon by the Commercial Lunar Payload Services (CLPS) program. The LEIA science concept of operations was developed to isolate radiation and partial gravity from other environmental conditions experienced by the payload. Due to CLPS integration requirements, there will be at least eight months from loading yeast into the payload until activation on the lunar surface. Replicate yeast strains will be loaded in a randomized complete block design to minimize batch differences in desiccation tolerance and positional effects in the microfluidics culture system. Temperature and relative humidity will be controlled throughout integration and flight to maintain yeast viability and to enable measurement of yeast growth parameters within the lunar surface operations timeframe, with the ground control matching environmental conditions where possible. LEIA is co-manifested with the European Space Agency’s PROSPECT mission, which will be operating a drill during yeast growth. Vibration translated through the lunar lander will be mitigated and quantified to account for potential impacts on LEIA optical measurements and yeast growth rate. Total space radiation dose, including the transit exposure from Earth to the Moon, will be measured to obtain more accurate charged particle and fast neutron dose rates on the lunar surface. These radiation data will also yield ground truth radiation dose experienced by the yeast during the mission. Quantifying these environmental factors impacting the LEIA payload will allow more accurate ground control experiments to better isolate the biological responses to radiation and reduced gravity at the lunar surface.

Lunar Surface Mission↗

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗