Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Streamlining Tactical Operator Handoffs During Multi-Vehicle Applications

Increased automation has shifted the operator control paradigm from a single operator controlling a single vehicle, to multiple operators collaborating to control multiple vehicles; this paradigm is known as m:N. Many questions remain unanswered in this new operational paradigm about the division of assets as workload for individual operators varies overtime. This paper explores the management of workload by enabling operators to temporarily handoff vehicles among each other. A study was conducted to explore both a manual and assisted method for performing handoffs during manipulated contingency scenarios. The assisted handoff method allowed subjects to easily choose and group nominal and/or contingency vehicles. The number of contingencies was also manipulated to determine the effect workload had on how pilots utilized the ability to handoff vehicles. Results show subjects performed handoffs more often when there were more contingencies and when the assisted handoff tool was available. In addition, the assisted tool make subjects feel more comfortable, enabling them to feel like they could take longer to resolve contingency situations. Lastly, even during contingencies, subjects were able to successfully complete secondary tasks.

M:N operations↗

Streamlining Tactical Operator Handoffs During Multi-Vehicle Operations

Increased automation has shifted the operator control paradigm from a single operator controlling a single vehicle, to multiple operators collaborating to control multiple vehicles; this paradigm is known as m:N. Many questions remain unanswered in this new operational paradigm about the division of assets as workload for individual operators varies over time. This paper explores the management of workload by enabling operators to temporarily handoff vehicles among each other. A study was conducted to explore both a manual and assisted method for performing handoffs during manipulated contingency scenarios. The assisted handoff method allowed subjects to easily choose and group nominal and/or contingency vehicles. The number of contingencies was also manipulated to determine the effect workload had on how pilots utilized the ability to handoff vehicles. Results show subjects performed handoffs more often when there were more contingencies and when the assisted handoff tool was available. In addition, the assisted tool made subjects feel more comfortable, enabling them to feel like they could take longer to resolve contingency situations. Lastly, even during contingencies, subjects were able to successfully complete secondary tasks.

m:N operations↗

Preliminary Development of Multi-Vehicle (m:N) Operations with NASA Langley’s Remote Vehicle Operations Center

To achieve the vision of Advanced Air Mobility (AAM), a transition from localized operations of aircraft to remote operations is being pursued across many use cases. This transition will allow fewer human operators to manage more increasingly autonomous aircraft (i.e., m operators managing N vehicles, or m:N). To study this operational concept, the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) has developed a prototype remote vehicle operations center and ground control station (GCS) software to conduct research with simulated and real flight operations. To date, flight operations at LaRC have been limited to one vehicle per operator. However, the current paper describes initial development and considerations for enabling m:N flight operations at LaRC. Further, the research described in this paper provides the foundation for a concept of operations (ConOps) that will be developed to support remote operators managing multiple increasingly autonomous vehicles, with the goal of exploring human-autonomy teaming (HAT) concepts that enable more advanced m:N operations. Two key enablers have been identified to facilitate successful m:N operations: GCS software updates for multi-vehicle management and procedural updates for vehicle handoffs during off-nominal events. Additionally, specific modifications were identified across five key areas: technology and software, team structure, inter-team communication, contingency plans, and operator decision flows. Next steps in forming the LaRC m:N ConOps will include working with subject-matter experts to identify off-nominal scenarios, implementing the recommended GCS functionality for m:N operations, and performing integration testing of facility capabilities and new operational procedures. Although the future m:N ConOps will be tailored to the NASA LaRC remote operations facility and flight range, it is intended to be a transparent, accessible, and reality-based exemplar for external organizations seeking to create or evaluate their own m:N operational concepts.

m:N↗

Risk Management Structured for Today's Environment

Today's project management environment provides NASA with myriad challenges. We have smaller budgets and, consequently, smaller programs and shorter lead times. We have less money for development, and no money to recover from contingencies or mishaps. The NASA Administrator is leading the Agency away from operations, instilling a renewed focus on scientific research and the development and application of new cutting-edge technologies. We are using performance-based and fixed-price contracts with industry, and we are forming more and more partnerships with the international community. In addition to the environment, we have many NASA-unique conditions that challenge mission success. They include a higher level of performance requirements, limited production numbers, higher development efforts and cost, the inability to operate a space element fully under realistic conditions on the ground, limited access to the product during operation, and, of course, the need for more science for fewer dollars and on a shorter schedule.

Michael A. Greenfield↗

Small Unmanned Aerial System (UAS) Flight Testing of Enabling Vehicle Technologies for the UAS Traffic Management Project

Small unmanned aerial systems (sUAS) have been studied and results indicate that there is a large array of highly-beneficial applications. These applications are too numerous to list, but include search and rescue, fire spotting, precision agriculture, etc. to name a few. Typically sUAS vehicles weigh less than 55 pounds and will be performing flight operations in the presence of manned aircraft and other sUAS. Certain sUAS applications, such as package delivery, will include operations in the close proximity of the general public. The full benefit from sUAS is contingent upon the resolution of several technological areas to enable free and widespread use of these vehicles. Technological areas in question include, but are not limited to: autonomous sense and avoid and deconfliction of sUAS from other sUAS and manned aircraft, communications and interfaces between the vehicle and human operators, and high-reliability autonomous systems. The NASA UAS Traffic Management (UTM) project is endeavoring to develop a traffic management system and concept of operations for these types of vehicles. An extensive sUAS flight test effort was performed to partially address vehicle-related technological areas and to shape an understanding of future developmental and test efforts for vehicles intended to use the UTM traffic management system. The flight testing described herein had the following objectives: 1) Install and test Dedicated Short Range Communications (DSRC) systems developed for the automotive industry for potential sense and avoid sUAS applications; 2) Evaluate the use of cellular 4G systems to provide vehicle control; 3) Obtain high-resolution video imagery in support of image-based optical detection sense and avoid systems; 4) Acquire data in fixed-wing flight to support validation and maturation of an autonomous range containment system known as Safeguard in fixed-wing flight. A total of 53 flights were performed over 12 operational days at Beaver Dam Airpark in Elberon, VA. This work was sponsored by the UTM project that is part of the Aviation Operations and Safety Program (AOSP) at NASA.

Glaab, Louis J.↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Guidelines for contingency planning NASA (National Aeronautics and Space Administration) ADP security risk reduction decision studies

Guidance is presented to NASA Computer Security Officials for determining the acceptability or unacceptability of ADP security risks based on the technical, operational and economic feasibility of potential safeguards. The risk management process is reviewed as a specialized application of the systems approach to problem solving and information systems analysis and design. Reporting the results of the risk reduction analysis to management is considered. Report formats for the risk reduction study are provided.

Tompkins, F. G.↗

High-Rate Communications Outage Recorder Operations for Optimal Payload and Science Telemetry Management Onboard the International Space Station

All International Space Station (ISS) Ku-band telemetry transmits through the High-Rate Communications Outage Recorder (HCOR). The HCOR provides the recording and playback capability for all payload, science, and International Partner data streams transmitting through NASA's Ku-band antenna system. The HCOR is a solid-state memory recorder that provides recording capability to record all eight ISS high-rate data during ISS Loss-of-Signal periods. NASA payloads in the Destiny module are prime users of the HCOR; however, NASDA and ESA will also utilize the HCOR for data capture and playback of their high data rate links from the Kibo and Columbus modules. Marshall Space Flight Center's Payload Operations Integration Center manages the HCOR for nominal functions, including system configurations and playback operations. The purpose of this paper is to present the nominal operations plan for the HCOR and the plans for handling contingency operations affecting payload operations. In addition, the paper will address HCOR operation limitations and the expected effects on payload operations. The HCOR is manifested for ISS delivery on flight 9A with the HCOR backup manifested on flight 11A. The HCOR replaces the Medium-Rate Communications Outage Recorder (MCOR), which has supported payloads since flight 5A.1.

Shell, Michael T.↗

Feasibility Study of Two Candidate Reaction Wheel/thruster Hybrid Control Architecture Designs for the Cassini Spacecraft

As the first spacecraft to achieve orbit at Saturn in 2004, Cassini has collected science data throughout its four-year prime mission (2004-08), and has since been approved for a first and second extended mission through 2017. Cassini carries a set of three "fixed" reaction wheels and a backup reaction wheel (reaction wheel #4) is mounted on top of an articulable platform. If necessary, this platform could be articulated to orient the backup reaction wheel with the degraded wheel. The reaction wheels are used primarily for attitude control when precise and stable pointing of a science instrument such as the narrow angle camera is required. In 2001-02, reaction wheel #3 exhibited signs of bearing cage instability. As a result, reaction wheel #4 was articulated to align with reaction wheel #3. Beginning in July 2003, Cassini was controlled using wheel #1, #2, and #4. From their first use in the spring of 2000 until today, reaction wheels #1 and #2 have accumulated more than3.5 billions revolutions each. As such, in spite of very carefully management of the wheel spin rates by the mission operation team, there are some observed increases in the drag torque of the wheels' bearings. Hence, the mission operations team must prepare for the contingency scenario in which the reaction wheel #1 (in addition to wheel #3) had degraded. In this hypothetical fault scenario, the two remaining reaction wheels (#2 and #4) will not be able to provide precise and stable three-axis control of the spacecraft. In this study, we evaluate the feasibility of controlling Cassini using the two remaining reaction wheels and four thrusters to meet the science pointing requirements for two key science operational modes: the Optical Remote Sensing and Downlink, Fields, Particles, & Waves operation modes. The performance (e.g., pointing control error, pointing stability, hydrazine consumption rate, etc.) of the hybrid controllers in both operations scenarios will be compared with those achieved using an all-thruster controller design. Strength and weaknesses of the hybrid control architecture are assessed quantitatively.

Cassini↗

Managing Situation Awareness on the Flight Deck

Awareness is required of the plane, the path and the people, both now and in the future. The steps to situation awareness are to monitor and evaluate the current situation. Anticipate the future to stay ahead of the airplane and consider contingencies, having a plan for 'what if situations. Continually update and modify the plan and share it with all crew members.

Chappell, Sheryl L.↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems, e.g., emergency asset management. Included is an example case study: Hurricane Dolly damaging a synthetic 2000-bus test system during its landing in Southern Texas. We perform statistical analysis of damages and discuss topological effects on the example synthetic grid. Also, we include a cursory evaluation of impacts using simplified operational models. Finally, we discuss how our method can be extended to use even higher-fidelity meteorological data sets and suggest directions for future work.

contingencies↗

STS-93: Columbia / Chandra Mission Overview (from JSC)

A press briefing held on July 7, 1999 reviews the progress of the Chandra X ray Observatory project. The tape begins with an animated view of the launch of the Chandra X ray Observatory from the shuttle, as it was planned. Next is a press briefing. Bryan Austin, the Lead Flight Director, discusses the five day mission, and the reason for the shortened length, due to the added weight from the Chandra Observatory. He also reviews the other payloads, and activities that will take place during the mission. Kenneth Ledbetter, Science Director Mission Development, discusses the 4 great observatories and the role of each. They are the Hubble, which observed visible light; Compton Gamma Ray Observatory, the Chandra, and the Space Infrared Telescope Facility. A time line of the expected operational lifetime of each of the 4 great observatories is shown. Specific information about the Chandra Telescope is reviewed. The last press briefing presenter is Fred Wojtalik, who is the Chandra Program Manager. He reviews the Chandra's components, and acknowledges a few of the many companies that contributed to its building. He also reviews the orbital activation and checkout sequences. Question that follows, center around contingency plans if some part of the planned sequence is not successful. The costs are reviewed, and concerns about the Initial Upper Stage, the propulsion unit required to take the Chandra to its high orbit are addressed. The Chandra is planned to take an eliptical orbit, which is higher than the other space telescopes, thus far launched due to the requirement to avoid Earth generated X rays.

Source record↗

Fast simultaneous feasibility testing and applications for electrical power grids

Fast simultaneous feasibility testing (SFT) for management of an electrical power grid is achieved through various innovations. The computation problem relates to evaluation of candidate solutions for external power flows into a power grid, with respect to predetermined constraints and contingencies. Storage and computations are reduced by formulating the problem in terms of transactional nodes (e.g. third party connections for generators and loads) instead of the larger number of bus nodes. Further advantages are achieved by precomputing matrices that can be reused across multiple SFT invocations, organizing matrices and operations to reduce storage and computation, and eliminating branches that have no contingency violations. The fast SFT further enables new applications for integrating SFT with a Security-Constrained Unit Commitment (SCUC) optimizer for efficient single pass solutions; operating SFT as a service to multiple SCUC solvers; or integration with Security-Constrained Economic Dispatch (SCED) optimization.

97 MATHEMATICS AND COMPUTING↗

Tell Me about Your Lemonade Stand

At STARSYS, we execute many Firm Fixed Price (FFP) programs for the development of mechanical systems for spacecraft. Contracting this way pre-suppose that we have the ability to establish and hold scope for a system that has yet to be defined. To do FFP, it is critical that we have program managers who are masters at cost control. Fortunately, we have some "masters" in our company. They just seem to have a knack for driving to a financial target. Doesn't matter if the program has contingency or not. Doesn't seem to matter if they use MS Project, Excel spread-sheets, or the back of an envelope. Doesn't even seem to matter whether the program is set up as a financial challenge or a winner.

Tibbitts, Scott↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

Application of Hybrid Optimization-Expert System for Optimal Power Management on Board Space Power Station

The space power system has two sources of energy: photo-voltaic blankets and batteries. The optimal power management problem on-board has two broad operations: off-line power scheduling to determine the load allocation schedule of the next several hours based on the forecast of load and solar power availability. The nature of this study puts less emphasis on speed requirement for computation and more importance on the optimality of the solution. The second category problem, on-line power rescheduling, is needed in the event of occurrence of a contingency to optimally reschedule the loads to minimize the 'unused' or 'wasted' energy while keeping the priority on certain type of load and minimum disturbance of the original optimal schedule determined in the first-stage off-line study. The computational performance of the on-line 'rescheduler' is an important criterion and plays a critical role in the selection of the appropriate tool. The Howard University Center for Energy Systems and Control has developed a hybrid optimization-expert systems based power management program. The pre-scheduler has been developed using a non-linear multi-objective optimization technique called the Outer Approximation method and implemented using the General Algebraic Modeling System (GAMS). The optimization model has the capability of dealing with multiple conflicting objectives viz. maximizing energy utilization, minimizing the variation of load over a day, etc. and incorporates several complex interaction between the loads in a space system. The rescheduling is performed using an expert system developed in PROLOG which utilizes a rule-base for reallocation of the loads in an emergency condition viz. shortage of power due to solar array failure, increase of base load, addition of new activity, repetition of old activity etc. Both the modules handle decision making on battery charging and discharging and allocation of loads over a time-horizon of a day divided into intervals of 10 minutes. The models have been extensively tested using a case study for the Space Station Freedom and the results for the case study will be presented. Several future enhancements of the pre-scheduler and the 'rescheduler' have been outlined which include graphic analyzer for the on-line module, incorporating probabilistic considerations, including spatial location of the loads and the connectivity using a direct current (DC) load flow model.

Momoh, James↗