Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Hydraulic Drive of a Shipping Lock Gate with Automated Frequency-Throttle Control System

This project developed and built a hydraulic actuator prototype with an automated control system for moving the lifting and lowering gates of a shipping lock. In the course of the design engineering, a hydraulic actuator was experimentally developed. Trial operation of a hydraulic actuator was conducted on Lock No. 26 of the Balakovo RGSiS. This design of a hydraulic actuator is recommended to be used in upgrading and designing locks of hydraulic engineering constructions.

42 ENGINEERING↗

Enhancements to the New TREAT Automatic Reactor Control System (ARCS)

The Transient Reactor Test (TREAT) facility recently replaced the automatic reactor control system (ARCS). Here, this paper discusses some of the enhancements that were made during the ARCS replacement such as calculations to take into account the nonadiabatic effects and increasing the dynamic range for power and period indication. This paper also discusses upgrades that had been planned but were unable to implemented and potential upgrades for the future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Anomaly Detection and Mitigation in FACTS-based Wide-Area Voltage Control Systems using Machine Learning

With the increasing deployment of Flexible AC Transmission System (FACTS) devices in wide-area voltage control systems (WAVCS) for achieving improved voltage stability of bulk power systems, the possibility for cyber attacks on these systems is also increasing. Successful stealthy cyber attacks that are difficult to detect by traditional informational technology (IT)-based cybersecurity solutions or threshold-based bad data detectors can lead to a voltage collapse in power grid. This paper presents the testbed-based attacks implementation and real-time evaluation of machine learning (ML) algorithm for detecting and mitigating stealthy cyber attacks on FACTS-based WAVCS on a hardware-in-the-loop (HIL) testbed. Initially, we discuss the implementation of a fuzzy logic controller (FLC) that controls a Static VAR Compensator (SVC) device deployed in a two-area four-machine Kundur power system for improving transient voltage stability. Later, the ML-based Anomaly Detection and Mitigation (ADM) system is implemented on the cyber-physical HIL testbed to detect and mitigate various stealthy cyber attacks, which are injected in real-time over the wide-area network (WAN). The experimental results show accurate and effective performance of ADM system in detecting and mitigating anomalies while keeping the grid stable and within the system operating limits, as defined by the North America Electric Reliability Corporation (NERC).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault isolation and fault-tolerant control for nonlinear stochastic distribution control systems with multiplicative faults

Here, in this paper, a fault isolation, diagnosis and fault tolerant control algorithm is proposed for nonlinear multiple multiplicative faults stochastic distribution control systems employing Takagi–Sugeno fuzzy system. To obtain the detailed fault information, a fault detection algorithm is introduced to discover the fault occurrence time. Then a fault isolation observer is built to produce the residual, and the error system is separated to subsystems affected only by disturbance and multiplicative faults. Moreover, a fault estimation scheme is presented to obtain the fault magnitude information. When faults occur, the system output probability density function will deviate from the desired distribution. So the model predictive control fault tolerant control scheme is needed to minimize the impact of faults as much as possible to make sure that the post fault output probability density function track the desired probability density function. The validity of the designed algorithm is demonstrated through a simulation example, where the fault tolerant control algorithm ensures that the system output probability density function still track the given output probability density function despite the complex case of multiple multiplicative faults occurring simultaneously.

42 ENGINEERING↗

GQuEST Control System Resolution

GQuEST (Gravity from Quantum Entanglement of Space-Time), is a collaboration verifying a quantum gravity model by measuring holographic effects on a microscopic scale. Its interferometer apparatus filters excessive optical noise and requires a control system that can adjust the filtration to accommodate for frequency changes in the output light. We stress-test this control system by simulating filter behaviors with parameters in their outermost regimes, and we have determined a threshold that maintains precision while minimizing resource usage. These results are important for the successful operation of GQuEST's interferometer, enabling more accurate tests of quantum gravity models and thereby advancing our understanding of gravity at the quantum mechanical level.

Nguyen, David↗

Extending the Remote Control Capabilities in the CMS Detector Control System with Remote Procedure Call Services

The CMS Detector Control System (DCS) is implemented as a large distributed and redundant system, with applications interacting and sharing data in multiple ways. The CMS XML-RPC is a software toolkit implementing the standard Remote Procedure Call (RPC) protocol, using the Extensible Mark-up Language (XML) and a custom lightweight variant using the JavaScript Object Notation (JSON) to model, encode and expose resources through the Hypertext Transfer Protocol (HTTP). The CMS XML-RPC toolkit complies with the standard specification of the XML-RPC protocol that allows system developers to build collaborative software architectures with self-contained and reusable logic, and with encapsulation of well-defined processes. The implementation of this protocol introduces not only a powerful communication method to operate and exchange data with web-based applications, but also a new programming paradigm to design service-oriented software architectures within the CMS DCS domain. This paper presents details of the CMS XML-RPC implementation in WinCC Open Architecture (OA) Control Language using an object-oriented approach.

43 PARTICLE ACCELERATORS↗

Software Dependability for Digital Instrumentation and Control Systems in Nuclear Power Plants - Lessons Learnt from a DOE Sponsored Project

This paper discusses the lessons learnt from a sponsored study undertaken under the sponsorship of the Department of Energy by a team of scientists at the Ohio State University in collaboration with Technology Resources and experts around the world. This paper makes recommendations for future research and studies based on these lessons learnt. The purpose of the research was to provide a software dependability quantification framework that would allow its evaluation along the software development life cycle for safety critical instrumentation and control systems (I and C) such as those found in nuclear power plants. A typical example of safety critical system is the reactor protection system. The research funded by the Department of Energy built on preliminary research carried out for the US NRC that had focused solely on software reliability quantification. Quantification of software dependability is important for safety critical I and C because the regulatory framework in use in the United States for nuclear power plants is risk informed. Quantification of risk requires quantification of all contributors to risk and those include instrumentation and control systems. The purpose of the study was to help developers of software-based I and C with an early evaluation of the potential risk an application would represent at different stages of the software development life cycle by building gates at the end of each life cycle phase. Life cycle phases of software development comprehend phases such as requirements, design, coding and test. The gates' function would be to stop development from moving forward if the assessed dependability objective for that phase were not met. Gates thresholds were to be defined based on measurements collected during the life cycle phase under evaluation and phases that preceded it and an understanding of the mechanisms that would lead to threatening the dependability objectives. The information contained in the gates would in addition help steer the development towards areas that needed improvement. The following are four high level conclusions to our study. First the study demonstrates a lack of consensus on mechanisms that will threaten the dependability attributes. This lack of consensus should be resolved. The lack of consensus appears for all measures to the exception of reliability. Second, measures should be developed for software availability and safety. Third, for all dependability attributes (with the exception of reliability) consistency of the measurement threads should evaluated and measurement-based development gates derived. Finally our ability to perform such type of research depends in a significant manner on access to vendor and/or utility data. The licensing environment and the first-of-a-kind nature of current software-based applications for nuclear I and C make it difficult to collect the relevant data. An approach which would either increase access to data by providing 'immunity' to the vendor or utility or the development of a software-based I and C for the sole purpose of data collection for research should be investigated. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cryogenic control system operational experience at SNS

Abstract The helium cryogenic system at Spallation Neutron Source (SNS) provides cooling to 81 superconducting radio frequency cavities. To support the operation of the cryogenic facility, a highly reliable control system consisting of software, hardware, and Human Machine Interface (HMI) has been developed and improved during the first fifteen years of operation. Integrating the cryogenic control system with other subsystems of the SNS complex is an important aspect to the success of the operation. The operating experience, lessons learned and recommendations to consider for future facilities will be detailed in this paper.

Howell, M. (ORCID:0000000310360707)↗

The DESI instrument control systems: status and early testing

The Dark Energy Spectroscopic Instrument (DESI) is a new instrument currently under construction for the Mayall 4-m telescope at Kitt Peak National Observatory. It will consist of a wide-field optical corrector with a 3.2 degree diameter field of view, a focal plane with 5,000 robotically controlled fiber positioners and 10 fiber-fed broad-band spectrographs. The DESI Instrument Control System (ICS) coordinates fiber positioner operations, interfaces to the Mayall telescope control system, monitors operating conditions, reads out the 30 spectrograph CCDs and provides observer support and data quality monitoring. In this paper, we summarize the ICS design, review the current status of the project and present results from a multi-stage test plan that was developed to ensure the system is fully operational by the time the instrument arrives at the observatory in 2019.

79 ASTRONOMY AND ASTROPHYSICS↗

Overview of the preliminary design of the ITER plasma control system

An overview of the Preliminary Design of the ITER Plasma Control System (PCS) is described here, which focusses on the needs for 1st plasma and early plasma operation in hydrogen/helium (H/He) up to a plasma current of 15 MA with moderate auxiliary heating power in low confinement mode (L-mode). Candidate control schemes for basic magnetic control, including divertor operation and kinetic control of the electron density with gas puffing and pellet injection, were developed. Commissioning of the auxiliary heating systems is included as well as support functions for stray field topology and real-time plasma boundary reconstruction. Initial exception handling schemes for faults of essential plant systems and for disruption protection were developed. The PCS architecture was also developed to be capable of handling basic control for early commissioning and the advanced control functions that will be needed for future high performance operation. A plasma control simulator is also being developed to test and validate control schemes. To handle the complexity of the ITER PCS, a systems engineering approach has been adopted with the development of a plasma control database to keep track of all control requirements.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Thermal Control System for an Isostatic Press

This paper proposes a concept of operation for an isostatic pressing capability using a proposed thermally controlled system developed using system engineering methodology. The concept utilizes a computer controlled fluid based heat exchange system capable of heating or cooling a pressure vessel in which high explosive (HE) is isostatically pressed. A press operator controls the system through a computer interface.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Online Parameter Estimation Methods for Adaptive Cruise Control Systems

Modeling Adaptive Cruise Control (ACC) vehicles enables the understanding of the impact of these vehicles on traffic flow. In this work, two online methods are used to provide real time system identification of ACC enabled vehicles. The first technique is a recursive least squares (RLS) approach, while the second method solves a nonlinear joint state and parameter estimation problem via particle filtering (PF). We provide a parameter identifiability analysis for both methods to analytically show that the model parameters are not identifiable using equilibrium driving. The accuracy and computational runtime of the online methods are compared to a commonly used offline simulation-based optimization (i.e., batch optimization) approach. The methods are tested on synthetic data as well as on empirical data collected directly from a 2019 model year ACC vehicle using data from sensors that are part of the stock ACC system. The online methods are scalable and provide comparable accuracy to the batch method. RLS runs in real time and is two orders of magnitude faster than the batch method for modest sized (e.g., 15 min) datasets. The particle filter also runs in real- time, and is also suitable in streaming applications in which the datasets can grow arbitrarily large.

33 ADVANCED PROPULSION SYSTEMS↗

Information Signals in Automatic Production Control Systems

Attention focuses on the functional relations between the information signals processed in automatic production control systems, with a view to constructing a monitoring system for network interactions that is able to detect abnormal operation. The parameters of information signals, types of functional relations, and methods of determining such relations by statistical analysis are described. The sample size for reliable determination of the basic relations between the information signals is estimated.

42 ENGINEERING↗

TFR-2578 MARVEL Reactivity Control System (RCS)

This document contains the Level 3 requirements associated with the subsystems of the Reactivity Control System (RCS) in the Microreactor Applications Research Validation and Evaluation (MARVEL) project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TFR-2574 MARVEL Instrumentation and Control System (ICS)

This document contains the Level 3 requirements associated with the subsystems of the Instrumentation Control System (ICS) in the Microreactor Applications Research Validation and Evaluation (MARVEL) project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modernizing the SNS Control System

The Spallation Neutron Source at Oak Ridge National Laboratory has been operating since 2006. An upgrade to double the machine power from 1.4 MW to 2.8 MW is currently underway and a project to add a second target station is in the preliminary design phase. While each project will add the controls needed for their specific scope, the existing control system hardware, software, and infrastructure require upgrades to maintain high availability and ensure the system will meet facility requirements into the future. While some systems have received new hardware due to obsolescence, much of the system is original apart from some maintenance and technology refresh. Software will also become obsolete and must be upgraded for sustainability. Further, requirements for system capacity can be expected to increase as more subsystems upgrade to smarter devices capable of higher data rates. This paper covers planned improvements to the integrated control system with a focus on reliability, sustainability, and future capability.

White, Karen S.↗

Electronic Production Control System News Note

The CMD subprogram develops and deploys multi-application weapon component manufacturing capabilities needed to replace sunset technologies, upgrade existing technologies, and introduce new technologies that support the nuclear weapons stockpile. Sandia National Laboratories (SNL) is currently developing an Electronic Production Control System (EPCS) for ASIC production in the back end of line (BEOL) flow. A pre-production version of EPCS has been released and is operating as intended. We are currently processing all ASIC products, including CVV validation ASICs. The BEOL flow includes wafer probe, packaging, quality inspection, initial electrical test, dynamic burn-in, final electrical test, quality inspection, final visual inspection, radiation testing, SNL acceptance, DOE SSO acceptance, and qualification testing steps. EPCS will execute this production workflow (initiate, control, and electronically track each product); it will implement defect prevention strategies; it will create an electronic inventory control system that is accountable for all ASIC material from inception to delivery; it will electronically collect and store any and all required quality evidence and most of the electronic BEOL data; and it will create a management reporting module with production statistics and timelines. The defect prevention strategies include the use of 2D marks on our ASICs with 2D scanners so that there will be no manual entry of part numbers (scanners), will not allow testing the wrong parts in Test and Burn-in. Other defect prevention strategies will negate the possibility of neither using the wrong test or burn-in program for any part nor the use of BEOL machines or boards that are out of calibration. In summary, EPCS is being implemented and it will greatly improve the product acceptance through full electronic data collection and quality control and defect prevention through bar codes, scanners, tracking training of personnel, and tracking tool availability.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Reinforcement Learning for Intelligent Building Energy Management System Control *

A building energy management system (BEMS) is a computer-based system designed to monitor and control a building's energy needs. Modern BEMS rely on the sensing and connectivity capabilities of Internet of Things (IoT) technology to intelligently adjust the energy consumption to reduce cost while respecting the consumers' preferences. Increasingly, control decisions are made based on predictions by models trained using supervised machine learning methods, which still requires control policies to be formulated in a rule-based fashion. When using reinforcement learning (RL) instead, control policies are learned by observing the utility in terms of cost and comfort associated with actions such as a change in the heating system's setpoint. The resulting RL-based controllers can capture not only the dynamics of the building and the associated electrical devices, but also fluctuations in electricity prices and user demand, avoiding the need to combine multiple predictive models with tailored control policies. This chapter will provide an overview of RL-based approaches for BEMS. After sketching the taxonomy of general RL methods, we discuss the implications of relying on the individual methods in a BEMS context. Existing work applying RL is presented along the key devices controlled by BEMS systems. Finally, we summarize the state-of-the-art and sketch limitations and open research directions.

Kotevska, Olivera↗