Cost analysis of water recovery systems

A methodology was developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware based on an extrapolation of past hardware development experience. Major items of costs within water recovery systems were identified and related to physical and/or performance criteria. Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced water recovery systems. The results of the study are expected to assist NASA in long-range planning and allocation of resources in a cost effective manner in support of earth orbital programs. This report deals with the cost analysis of the five leading water reclamation systems, namely: (1) RITE waste management-water system, (2) reverse osmosis system, (3) multifiltration system, (4) vapor compression system, and (5) closed air evaporation system with electrolytic pretreatment.

Yakut, M. M.↗

Low cost payload studies

Low cost payload studies aimed at the reduction of Space Shuttle cost, with the emphasis on mission support subsystem equipment, are reviewed. Spacecraft design, manufacturing and operational approaches are specified and quantified to demonstrate the feasibility of reductions of cost from present-day estimates. Space Shuttle design capabilities for retrieval, repair, and reuse of future payloads are indicated as cost reduction possibilities. It is also pointed out that an increased volume and weight carrying capability of the Space Shuttle can alter the design approach to future payloads to reduce cost. Details are given on some specific subsystem component design alterations integrated in an overall low-cost payload design. Refurbishment is discussed as the final area of interest for low cost payload design. Total program savings of up to 50% are found to be possible in the studies.

Moore, W. F.↗

Space Tug Docking Study. Volume 5: Cost Analysis

The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

Source record↗

Estimating airline operating costs

A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.

Maddalon, D. V.↗

Low cost Ku-band earth terminals for voice/data/facsimile

A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.

Kelley, R. L.↗

Life cycle costing with a discount rate

This article studies life cycle costing for a capability needed for the indefinite future, and specifically investigates the dependence of optimal policies on the discount rate chosen. The two costs considered are reprocurement cost and maintenance and operations (M and O) cost. The procurement price is assumed known, and the M and O costs are assumed to be a known function, in fact, a non-decreasing function, of the time since last reprocurement. The problem is to choose the optimum reprocurement time so as to minimize the quotient of the total cost over a reprocurement period divided by the period. Or one could assume a discount rate and try to minimize the total discounted costs into the indefinite future. It is shown that the optimum policy in the presence of a small discount rate hardly depends on the discount rate at all, and leads to essentially the same policy as in the case in which discounting is not considered.

Posner, E. C.↗

Assessment of economic factors affecting the satellite power system. Volume 1: System cost factors

The factors relevant to SPS costing and selection of preferred SPS satellite configurations were studied. The issues discussed are: (1) consideration of economic factors in the SPS system that relate to selection of SPS satellite configuration; (2) analysis of the proper rate of interest for use in SPS system definition studies; and (3) the impacts of differential inflation on SPS system definition costing procedures. A cost-risk comparison of the SPS satellite configurations showed a significant difference in the levelized cost of power from them. It is concluded, that this difference is the result more of differences in the procedures for assessing costs rather than in the satellite technologies required or of any advantages of one satellite configuration over the other. Analysis of the proper rate of interest for use in SPS system is 4 percent. The major item of differential inflation to be expected over this period of time is the real cost of labor. This cost is likely to double between today and the period of SPS construction.

Hazelrigg, G. A., Jr.↗

Structural cost optimization of photovoltaic central power station modules and support structure

The results of a comprehensive study of photovoltaic module structural support concepts for photovoltaic central power stations and their associated costs are presented. The objective of the study has been the identification of structural cost drivers. Parametric structural design and cost analyses of complete array systems consisting of modules, primary support structures, and foundations were performed. Area related module cost was found to be constant with design, size, and loading. A curved glass module concept was evaluated and found to have the potential to significantly reduce panel structural costs. Conclusions of the study are: array costs do not vary greatly among the designs evaluated; panel and array costs are strongly dependent on design loading; and the best support configuration is load dependent

Sutton, P. D.↗

Effects of design on cost of flat-plate solar photovoltaic arrays for terrestrial central station power applications

The paper examines the impact of module and array designs on the balance-of-plant costs for flat-plate terrestrial central station power applications. Consideration is given to the following types of arrays: horizontal, tandem, augmented, tilt adjusted, and E-W tracking. The life-cycle cost of a 20-year plant life serves as the costing criteria for making design and cost tradeoffs. A tailored code of accounts is developed for determining consistent photovoltaic power plant costs and providing credible photovoltaic system cost baselines for flat-plate module and array designs by costing several varying array design approaches.

Tsou, P.↗

Study of turboprop systems reliability and maintenance costs

The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.

Source record↗

Cost analysis of composite fan blade manufacturing processes

The relative manufacturing costs were estimated for large high technology fan blades prepared by advanced composite fabrication methods using seven candidate materials/process systems. These systems were identified as laminated resin matrix composite, filament wound resin matrix composite, superhybrid solid laminate, superhybrid spar/shell, metal matrix composite, metal matrix composite with a spar and shell, and hollow titanium. The costs were calculated utilizing analytical process models and all cost data are presented as normalized relative values where 100 was the cost of a conventionally forged solid titanium fan blade whose geometry corresponded to a size typical of 42 blades per disc. Four costs were calculated for each of the seven candidate systems to relate the variation of cost on blade size. Geometries typical of blade designs at 24, 30, 36 and 42 blades per disc were used. The impact of individual process yield factors on costs was also assessed as well as effects of process parameters, raw materials, labor rates and consumable items.

Stelson, T. S.↗

An algorithm for minimum-cost set-point ordering in a cryogenic wind tunnel

An algorithm for minimum cost ordering of set points in a cryogenic wind tunnel is developed. The procedure generates a matrix of dynamic state transition costs, which is evaluated by means of a single-volume lumped model of the cryogenic wind tunnel and the use of some idealized minimum-costs, which is evaluated by means of a single-volume lumped model of the cryogenic wind tunnel and the use of some idealized minimum-cost state-transition control strategies. A branch and bound algorithm is employed to determine the least costly sequence of state transitions from the transition-cost matrix. Some numerical results based on data for the National Transonic Facility are presented which show a strong preference for state transitions that consume to coolant. Results also show that the choice of the terminal set point in an open odering can produce a wide variation in total cost.

Tripp, J. S.↗

Life Cycle Cost Analysis of Shuttle-Derived Launch Vehicles, Volume 1

The design, performance, and programmatic definition of shuttle derived launch vehicles (SDLV) established by two different contractors were assessed and the relative life cycle costs of space transportation systems using the shuttle alone were compared with costs for a mix of shuttles and SDLV's. The ground rules and assumptions used in the evaluation are summarized and the work breakdown structure is included. Approaches used in deriving SDLV costs, including calibration factors and historical data are described. Both SDLV cost estimates and SDLV/STS cost comparisons are summarized. Standard formats are used to report comprehensive SDLV life cycle estimates. Hardware cost estimates (below subsystem level) obtained using the RCA PRICE 84 cost model are included along with other supporting data.

Source record↗

Cost of phosphate removal in municipal wastewater treatment plants

Construction and operating costs of advanced wastewater treatment for phosphate removal at municipal wastewater treatment plants have been investigated on orders from the Federal Environmental Bureau in Berlin. Particular attention has been paid to applicable kinds of precipitants for pre-, simultaneous and post-precipitation as well as to different phosphate influent and effluent concentrations. The article offers detailed comments on determination of technical data, investments, capital costs, operating costs and annual costs as well as potential cost reductions resulting from precipitation. Selected results of the cost investigation are shown in graphical form as specific investments, operating and annual costs depending on wastewater flow.

Schuessler, H.↗

Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

Gates, W. R.↗

Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

Gates, W. R.↗

A probabilistic analysis of silicon cost

Silicon materials costs represent both a cost driver and an area where improvement can be made in the manufacture of photovoltaic modules. The cost from three processes for the production of low-cost silicon being developed under the U.S. Department of Energy's (DOE) National Photovoltaic Program is analyzed. The approach is based on probabilistic inputs and makes use of two models developed at the Jet Propulsion Laboratory: SIMRAND (SIMulation of Research ANd Development) and IPEG (Improved Price Estimating Guidelines). The approach, assumptions, and limitations are detailed along with a verification of the cost analyses methodology. Results, presented in the form of cumulative probability distributions for silicon cost, indicate that there is a 55% chance of reaching the DOE target of $16/kg for silicon material. This is a technically achievable cost based on expert forecasts of the results of ongoing research and development and do not imply any market prices for a given year.

Reiter, L. J.↗

Space station: Cost and benefits

Costs for developing, producing, operating, and supporting the initial space station, a 4 to 8 man space station, and a 4 to 24 man space station are estimated and compared. These costs include contractor hardware; space station assembly and logistics flight costs; and payload support elements. Transportation system options examined include orbiter modules; standard and extended duration STS fights; reusable spacebased perigee kick motor OTV; and upper stages. Space station service charges assessed include crew hours; energy requirements; payload support module storage; pressurized port usage; and OTV service facility. Graphs show costs for science missions, space processing research, small communication satellites; large GEO transportation; OVT launch costs; DOD payload costs, and user costs.

Source record↗