Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELTA LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Integrated Vehicle Ground Vibration Testing in Support of NASA Launch Vehicle Loads and Controls Analysis

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the Ares I crew launch vehicle and Ares V cargo launch vehicle. Ares I and V will form the space launch capabilities necessary to fulfill NASA's exploration strategy of sending human beings to the Moon, Mars, and beyond. As with all new space vehicles there will be a number of tests to ensure the design can be Human Rated. One of these is the Integrated Vehicle Ground Vibration Test (IVGVT) that will be measuring responses of the Ares I as a system. All structural systems possess a basic set of physical characteristics unique to that system. These unique characteristics include items such as mass distribution, frequency and damping. When specified, they allow engineers to understand and predict how a structural system like the Ares I launch vehicle behaves under given loading conditions. These physical properties of launch vehicles may be predicted by analysis or measured through certain types of tests. Generally, these properties are predicted by analysis during the design phase of a launch vehicle and then verified through testing before the vehicle is Human Rated. The IVGVT is intended to measure by test the fundamental dynamic characteristics of Ares I during various phases of operational/flight. This testing includes excitations of the vehicle in lateral, longitudinal, and torsional directions at vehicle configurations representing different trajectory points. During the series of tests, properties such as natural frequencies, mode shapes, and transfer functions are measured directly. These data will then be used to calibrate loads and Guidance, Navigation, and Controls (GN&C) analysis models for verifying analyses of Ares I. NASA launch vehicles from Saturn to Shuttle have undergone Ground Vibration Tests (GVTs) leading to successful launch vehicles. A GVT was not performed on the unmanned Delta III. This vehicle was lost during launch. Subsequent analyses indicated that had a GVT been conducted on the vehicle, problems with vehicle modes and control may have been discovered and corrected, avoiding loss of the vehicle/mission. This paper will address GVT planning, set-up, conduction and analyses, for the Saturn and Shuttle programs, and also focus on the current and on-going planning for the Ares I and V IVGVT.

Tuma, Margaret L.↗

Diffusion algorithms and data reduction routine for onsite real-time launch predictions for the transport of Delta-Thor exhaust effluents

The National Aeronautics and Space Administration/Marshall Space Flight Center multilayer diffusion algorithms have been specialized for the prediction of the surface impact for the dispersive transport of the exhaust effluents from the launch of a Delta-Thor vehicle. This specialization permits these transport predictions to be made at the launch range in real time so that the effluent monitoring teams can optimize their monitoring grids. Basically, the data reduction routine requires only the meteorology profiles for the thermodynamics and kinematics of the atmosphere as an input. These profiles are graphed along with the resulting exhaust cloud rise history, the centerline concentrations and dosages, and the hydrogen chloride isopleths.

Stephens, J. B.↗

Mission Trades for Aerocapture at Neptune

A detailed Neptune aerocapture systems analysis and spacecraft design study was performed to improve our understanding of the techonology requirement for such a hard mission. The primary objective was to engineer a point design based on blunt body aeroshell technology and quantitatively assess feasibility and performance. This paper reviews the launch vehicle, propulsion, and trajectory options to reach Neptune in the 2015-2020 time frame using aerocapture and all-propulsive vehicles. It establishes the range of entry conditions that would be consistent with delivering a - 1900 kg total entry vehicle maximum expected mass to Neptune including a - 790 kg orbiter maximum expected mass to the science orbit. Two Neptune probes would be also be delivered prior to the aerocapture maneuver. Results show that inertial entry velocities in the range of 28 to 30 km/s are to be expected for chemical and solar electric propulsion options with several gravity assists (combinations of Venus, Earth and Jupiter gravity assists). Trip times range from approximately 10-11 years for aerocapture orbiters to 15 years for all-propulsive vehicles. This paper shows that the use of aerocapture enables this mission given the payload to deliver around Neptune compared to an all-propulsive orbit insertion approach. However, an all-propulsive chemical insertion option is possible for lower payload masses than the one needed for this science mission. Both approaches require a Delta IV heavy class launch vehicle.

aerocapture↗

A Cryogenic Propellant Production Depot for Low Earth Orbit

The cost of access to space beyond low Earth orbit can be lowered if vehicles can refuel in orbit. The power requirements for a propellant depot that electrolyzes water and stores cryogenic oxygen and hydrogen can be met using technology developed for space solar power. A propellant depot is described that will be deployed in a 400 km circular equatorial orbit, receive tanks of water launched into a lower orbit from Earth by gun launch or reusable launch vehicle, convert the water to liquid hydrogen and oxygen, and store up to 500 metric tonnes of cryogenic propellants. Orbital maneuvering vehicles will transfer the Earth-launched propellant tanks from the lower orbit to the depot orbit. The propellant stored in the depot can support transportation from low Earth orbit to geostationary Earth orbit, the Moon, LaGrange points, Mars, etc. The propellant tanks on the depot are modified versions of those used in the Delta IV-Heavy launch vehicle. The tanks are configured in an in-line gravity-gradient configuration to minimize drag and settle the propellant. Temperatures can be maintained by body-mounted radiators; these will also provide some shielding against orbital debris. Power is supplied by a pair of solar arrays mounted perpendicular to the orbital plane, which rotate once per orbit to track the Sun. The majority of the power will be used to run the electrolysis system. Technology needed for an orbiting propellant depot can be tested and demonstrated in the near-term on the ground, on a Shuttle-deployed free-flyer, and on the International Space Station. Further along, an orbital depot can be deployed that stores liquid hydrogen and oxygen launched from Earth, to be followed by a full conversion and storage depot.

Potter, Seth D.↗

Electric propulsion options for 10 kW class earth space missions

Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment have been evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA II 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10(7) to 2.1x10(7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA II 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10(6) to 3.6x10(6) N-s, and approximately 662 to 1072 m/s, respectively.

Patterson, M. J.↗

Electric Propulsion Options for 10 kW Class Earth-Space Missions

Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment were evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA 2 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10 (exp 7) to 2.1x10 (exp 7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA 2 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10 (exp 6) to 3.6x10 (exp 6) N-s, and approximately 662 to 1072 m/s, respectively.

Patterson, M. J.↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy Probe (MAP) is a Medium Class Explorers (MIDEX) mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The main science objective of the MAP mission is to produce an accurate full-sky map of the cosmic microwave background temperature fluctuations anisotropy. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta into a 185 km circular orbit. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a Lissajous orbit about the Earth-Sun L2 point. The mission duration is approximately 27 months with 3 to 4 months of transfer time to the final mission orbit about L2. The MAP transfer orbit consisted of 3.5 phasing loops: the first loop has a 7-day period, the second and third loops have a 9-day period, and the last half loop has a 4-day period as illustrated in Figure 1, which also indicates the placement of maneuvers. A Pfinal correction maneuver was performed 18 hours after the last perigee to more closely achieve the targeted lissajous orbit. The lunar encounter or swingby took place approximately 30 days after launch. After the lunar encounter, the spacecraft will cruise for approximately 120 days before it arrives at L2. A Mid-Course Correction (MCC) maneuver was executed seven days after the swingby to further refine the trajectory. Once the MAP satellite is injected into the L2 Lissajous orbit, it will perform occasional stationkeeping maneuvers to maintain the Lissajous orbit for a minimum of two years (and a goal of four years). Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes. Extensive trajectory error covariance analysis was performed to predict ephemeris accuracy for the OD process using a Bayesian least-squares technique. The orbit determination error analysis is essential for maneuver planning and maneuver recovery study. Several tracking scenarios were investigated for each phase of the mission. This paper provides a summary of the premission trajectory covariance error analysis, as well as actual real-time OD results. The use and impact of the various tracking stations, systems, and measurements will be discussed. Details of the operational OD support and the inferred OD accuracy will be presented, and the results will be compared to the premission covariance analysis, In addition, there will be a discussion of the challenges presented to OD support including delta-Vs at apogee as well as perigee, and effects due to spacecraft attitude mode, in light of their implications to the OD accuracy and covariance analysis.

Truong, Son H.↗

Planetary explorer liquid propulsion study

An analytical evaluation of several candidate monopropellant hydrazine propulsion system approaches is conducted in order to define the most suitable configuration for the combined velocity and attitude control system for the Planetary Explorer spacecraft. Both orbiter and probe-type missions to the planet Venus are considered. The spacecraft concept is that of a Delta launched spin-stabilized vehicle. Velocity control is obtained through preprogrammed pulse-mode firing of the thrusters in synchronism with the spacecraft spin rate. Configuration selection is found to be strongly influenced by the possible error torques induced by uncertainties in thruster operation and installation. The propulsion systems defined are based on maximum use of existing, qualified components. Ground support equipment requirements are defined and system development testing outlined.

Mckevitt, F. X.↗

Skynet 2-b/Delta 105

A British defense communications satellite is discussed for launch into synchronous orbit over the Indian Ocean aboard a NASA Delta three-stage launch vehicle from Cape Canaveral.

Source record↗

Structures for remotely deployable precision antennas

Future space missions such as the Earth Science Geostationary Platform (ESGP) will require highly accurate antennas with apertures that cannot be launched fully formed. The operational orbits are often inaccessible to manned flight and will involve expendable launch vehicles such as the Delta or Titan. There is therefore a need for completely deployable antenna reflectors of large size capable of efficiently handling millimeter wave electromagnetic radiation. The parameters for the type of mission are illustrated. The logarithmic plot of frequency versus aperture diameter shows the regions of interest for a large variety of space antenna applications, ranging from a 1500-meter-diameter radio telescope for low frequencies to a 20-meter-diameter infrared telescope. For the ESGP, a major application is the microwave radiometry at high frequencies for atmospheric sounding. Almost all existing large antenna reflectors for space employ a mesh-type reflecting surface. Examples are shown and discussed which deal with the various structural concepts for mesh antennas. Fortunately, those concepts are appropriate for creating the very large apertures required at the lower frequencies for good resolution. The emphasis is on the structural concepts and technologies that are appropriate to fully automated deployment of dish-type antennas with solid reflector surfaces. First the structural requirements are discussed. Existing concepts for fully deployable antennas are then described and assessed relative to the requirements. Finally, several analyses are presented that evaluate the effects of beam steering and segmented reflector design on the accuracy of the antenna.

Hedgepeth, J. M.↗

Microspacecraft and Earth observation: Electrical field (ELF) measurement project

The Utah State University space system design project for 1989 to 1990 focuses on the design of a global electrical field sensing system to be deployed in a constellation of microspacecraft. The design includes the selection of the sensor and the design of the spacecraft, the sensor support subsystems, the launch vehicle interface structure, on board data storage and communications subsystems, and associated ground receiving stations. Optimization of satellite orbits and spacecraft attitude are critical to the overall mapping of the electrical field and, thus, are also included in the project. The spacecraft design incorporates a deployable sensor array (5 m booms) into a spinning oblate platform. Data is taken every 0.1 seconds by the electrical field sensors and stored on-board. An omni-directional antenna communicates with a ground station twice per day to down link the stored data. Wrap-around solar cells cover the exterior of the spacecraft to generate power. Nine Pegasus launches may be used to deploy fifty such satellites to orbits with inclinations greater than 45 deg. Piggyback deployment from other launch vehicles such as the DELTA 2 is also examined.

Olsen, Tanya↗

Roentgensatellit (ROSAT)

The DSN (Deep Space Network) mission support requirements for ROSAT (Roentgensatellit) are summarized. ROSAT is an international cooperative program between NASA and the Bundesministerium fuer Forschung and Technologie (BMFT). The satellite was launched on a Delta 2 vehicle and placed in a circular orbit at an altitude of 580 km, with a 53-deg inclination. The mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profile; DSN support coverage; frequency assignments; support parameters for telemetry and command; and tracking support responsibility.

Guckenbiehl, F.↗

X-ray timing explorer mission

The XTE will address a number of fundamental questions about the nature of the cosmos. The large effective area (about 0.8 sq m total) and broad band of sensitivity (2-200 keV) of its three instruments make it especially valuable for timing of intensity variations and for the determination of broadband spectra from high-energy sources. For the first time, studies of variability ranging from about 1 microsecond to several years will be carried out. XTE's design and flexibility of operations will allow it to respond rapidly to changes in the X-ray sky (within hours) and will facilitate multifrequency observations. It is scheduled for launch on a Delta II vehicle prior to April 1996.

Bradt, H. V.↗

Propellantless AOCS Design for a 160-m, 450-kg Sailcraft of the Solar Polar Imager Mission

An attitude and orbit control system (AOCS) is developed for a 160-m, 450-kg solar sail spacecraft of the Solar Polar Imager (SPI) mission. The SPI mission is one of several Sun- Earth Connections solar sail roadmap missions currently envisioned by NASA. A reference SPI sailcraft consists of a 160-m, 150-kg square solar sail, a 250-kg spacecraft bus, and 50-kg science payloads, The 160-m reference sailcraft has a nominal solar thrust force of 160 mN (at 1 AU), an uncertain center-of-mass/center-of-pressure offset of +/- 0.4 m, and a characteristic acceleration of 0.35 mm/sq s. The solar sail is to be deployed after being placed into an earth escaping orbit by a conventional launch vehicle such as a Delta 11. The SPI sailcraft first spirals inwards from 1 AU to a heliocentric circular orbit at 0.48 AU, followed by a cranking orbit phase to achieve a science mission orbit at a 75-deg inclination, over a total sailing time of 6.6 yr. The solar sail will be jettisoned after achieving the science mission orbit. This paper focuses on the solar sailing phase of the SPI mission, with emphasis on the design of a reference AOCS consisting of a propellantless primary ACS and a microthruster-based secondary (optional) ACS. The primary ACS employs trim control masses running along mast lanyards for pitch/yaw control together with roll stabilizer bars at the mast tips for quadrant tilt (roll) control. The robustness and effectiveness of such a propellantless primary ACS would be enhanced by the secondary ACS which employs tip-mounted, lightweight pulsed plasma thrusters (PPTs). The microPPT-based ACS is mainly intended for attitude recovery maneuvers from off-nominal conditions. A relatively fast, 70-deg pitch reorientation within 3 hrs every half orbit during the orbit cranking phase is shown to be feasible, with the primary ACS, for possible solar observations even during the 5-yr cranking orbit phase.

Wie, Bong↗

(abstract) Tropospheric Emission Spectrometer (TES)

A descope of the EOS program now requires that all EOS platforms after AM1 be launched on DELTA-class vehicles, which results in much smaller platforms (and payloads) than previously envisaged. A major part of the TES hardware design effort has therefore been redirected towards meeting this challenge. The development of the TES concept continues on a schedule to permit flight on the EOS CHEM platform in 2002, where it is planned to be accompanied by HIRDLS and MLS.

spectrometry troposphere EOS emission spectrometry↗

Ion Propulsion: An Enabling Technology for the Dawn Mission

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape (heliocentic) trajectory with an escape velocity of 11 km/s. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta-V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only post-launch mission delta-V not provided by IPS. The IPS was used during the 14 months at Vesta for all science orbit transfers and then for Vesta escape. Deterministic thrusting for Ceres began in late August 2012 with a planned arrival date at Ceres in early 2015, whereupon IPS will be used for all science orbit transfers. As of January 2013 the IPS has been operated for approximately 28,000 hours, consumed approximately 280 kg of xenon, and provided a delta-V of approximately 7.5 km/s, the most post-launch delta-V of any spacecraft yet flown. IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. Use of the IPS together with a medium-priced launch vehicle enabled this high delta-V mission to be performed within the Discovery Program cost cap. This paper provides an overview of the Dawn IPS and its mission operations through departure for Ceres.

Dawn mission overview↗

FASTSAT a Mini-Satellite Mission...A Way Ahead

The Fast Affordable Science and Technology Spacecraft (FASTSAT) is a mini-satellite weighing less than 150 kg. FASTSAT was developed as government-industry collaborative research and development flight project targeting rapid access to space to provide an alternative, low cost platform for a variety of scientific, research, and technology payloads. The initial spacecraft was designed to carry six instruments and launch as a secondary rideshare payload. This design approach greatly reduced overall mission costs while maximizing the on-board payload accommodations. FASTSAT was designed from the ground up to meet a challenging short schedule using modular components with a flexible, configurable layout to enable a broad range of payloads at a lower cost and shorter timeline than scaling down a more complex spacecraft. The integrated spacecraft along with its payloads were readied for launch 15 months from authority to proceed. As an ESPA-class spacecraft, FASTSAT is compatible with many different launch vehicles, including Minotaur I, Minotaur IV, Delta IV, Atlas V, Pegasus, Falcon 1/1e, and Falcon 9. These vehicles offer an array of options for launch sites and provide for a variety of rideshare possibilities.

Boudreaux, Mark↗