Search NASA⌕ Search

SEARCH · Search NASA

Results for “DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Borehole Disposal Research in the United States - 17427

The U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) manages a research and development (R and D) program for the disposal of spent nuclear fuel and high-level radioactive waste in the United States. Deep boreholes are being evaluated for disposal of some smaller DOE-managed waste as an alternative to disposal in a mined geologic repository. The deep borehole disposal concept consists of drilling borehole(s) to a total depth of about 5,000 m (16,400 ft - or greater than three miles) into crystalline basement rock, placing waste packages in the lower emplacement zone portion of the borehole, and sealing and plugging the upper portion of the borehole. The required bottom-hole diameter of the borehole(s) depends on the waste package configuration for the reference concept, but ranges from 22 to 43 cm (8.5 to 17 inches). Additional research and development is desired in several important areas for further consideration of deep borehole disposal of radioactive waste. A Deep Borehole Field Test (DBFT) will be conducted by DOE to further assess the viability of deep borehole disposal as an alternative for the disposal of smaller DOE-managed waste forms. The DBFT will be used to evaluate three main areas: 1) evaluation of the capability for drilling and construction of deep, large-diameter boreholes; 2) downhole scientific analyses to assess hydrogeochemical conditions that control waste stability and containment; and 3) engineering activities to assess the viability and safety of waste package emplacement and retrieval in deep boreholes. The DBFT will include first drilling a characterization borehole, followed by an optional field test borehole, to a total depth of about 5,000 m (16,400 feet) into crystalline basement rock in a geologically stable continental location. The initial smaller diameter characterization borehole will be drilled and completed to facilitate downhole scientific testing and analysis. If site conditions are found to be suitable, DOE intends to drill a larger-diameter field test borehole to evaluate emplacement activities using surrogate waste packages. The surrogate waste packages will not contain any radioactive waste, nor will any radioactive waste be used in these tests. One of the advantages of deep borehole disposal is that it would give DOE the flexibility to consider options for disposal of smaller waste forms. Deep borehole disposal also potentially offers earlier disposal of some wastes than might be possible in a mined repository, and could reduce costs associated with projected treatments of some wastes. In order to accomplish the DBFT, DOE will require the support of multiple national laboratories, along with a site contractor to acquire a suitable test site and to manage the site and the required testing activities. DOE issued a competitive solicitation via a request for proposal (RFP) in July, 2015, which requested proposals to provide a test site and site management services. The contract was awarded in January, 2016, to a team led by Battelle Memorial Institute which included a proposed test site in Pierce County, North Dakota. After efforts to acquire both the initial test site in North Dakota and an alternative proposed site in Spink County, South Dakota were unsuccessful, activities were suspended. The experiences in Pierce County, ND and Spink County, SD highlighted the importance of public engagement and support for the DBFT, and that relevant levels of government and other public stakeholders should be involved from the beginning. Using the lessons learned in North and South Dakota, DOE issued a new RFP on August 22, 2016 which emphasized local, state, and tribal (if applicable) government engagement, as well as public and other stakeholder involvement ahead of proposal submittals and throughout the contract execution phases. The new RFP allowed for multiple initial awards and multiple phases of contract execution. In December, 2016, DOE announced the selection of four companies - AECOM, ENERCON, RE/SPEC, and TerranearPMC - to begin exploring the possibility of conducting a DBFT under the terms of the new RFP. Ultimately, only one site will be chosen for the field test. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of Greater Than Class C Low-Level Radioactive Waste in Andrews County, Texas - 16408

The U.S. Nuclear Regulatory Commission (NRC) staff has recommended approval of an initiative to permit the Texas Commission on Environmental Quality (TCEQ) to license the disposal of commercial and co-mingled Greater Than Class C Low-Level Radioactive Waste (GTCC LLW) in Andrews County, Texas. Such a framework is clearly articulated in the Section 274 of the Atomic Energy Act of 1954, as amended. The NRC staff also recommended approval to proceed with a rulemaking to align the Waste Classification Tables in Title 10 of the Code of Federal Regulations (CFR), Part 61.55 with the paragraph 61.2 definition of 'waste' to provide a disposal pathway for waste containing certain alpha-emitting transuranic elements with concentrations exceeding 100 nanocuries per gram (nCi/g). A pathway for the disposal of commercial and co-mingled GTCC LLW, including waste with certain alpha emitting transuranic elements exceeding 100 nCi/g (TRU waste), might emerge if the initiative described in the Commissions' July 22, 2015 document, SECY-15-0094, Historical and Current Issues Related to Disposal of GTCC LLW, is approved. The NRC staff recommendations envisioned the NRC and TCEQ working together to review a site-specific performance assessment that would be submitted by Waste Control Specialists LLC (WCS) as part of an amendment to its existing Radioactive Materials License No. R04100. The TCEQ's recommendations were prompted by a petition for rulemaking filed by WCS to allow the disposal of GTCC waste in Texas. On September 10, 2014, the TCEQ Commissioners directed their staff to engage stakeholders and request input from the NRC and the U.S. Department of Energy (DOE) regarding actions needed to proceed with any future rulemaking. On January 30, 2015, the TCEQ requested clarification from the NRC regarding their legal authority and jurisdiction to regulate GTCC, GTCC-like, and TRU waste. The deliberations that have transpired over the past year have raised important legal, policy, and technical matters. This initiative could provide a safe disposal pathway for certain waste streams that have been orphaned over the past 30 years. One important realization that has emerged is the conservative assumptions used to establish the upper limits for Class C LLW when Part 61 was promulgated in 1981 would be much too restrictive when applied to a modern, highly engineered disposal facility located in arid west Texas. Waste that was not suitable for near surface disposal in 1981 could certainly be demonstrated to be safely disposed at the WCS Federal Waste Disposal Facility in Andrews County, Texas. This paper will address the legal, policy, and technical matters supporting this important topic currently under consideration both nationally and within the State of Texas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRC Monitoring of Salt Waste Disposal at the Savannah River Site - 13147

As part of monitoring required under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA), the NRC staff reviewed an updated DOE performance assessment (PA) for salt waste disposal at the Saltstone Disposal Facility (SDF). The NRC staff concluded that it has reasonable assurance that waste disposal at the SDF meets the 10 CFR 61 performance objectives for protection of individuals against intrusion (chap.61.42), protection of individuals during operations (chap.61.43), and site stability (chap.61.44). However, based on its evaluation of DOE's results and independent sensitivity analyses conducted with DOE's models, the NRC staff concluded that it did not have reasonable assurance that DOE's disposal activities at the SDF meet the performance objective for protection of the general population from releases of radioactivity (chap.61.41) evaluated at a dose limit of 0.25 mSv/yr (25 mrem/yr) total effective dose equivalent (TEDE). NRC staff also concluded that the potential dose to a member of the public is expected to be limited (i.e., is expected to be similar to or less than the public dose limit in chap.20.1301 of 1 mSv/yr [100 mrem/yr] TEDE) and is expected to occur many years after site closure. The NRC staff used risk insights gained from review of the SDF PA, its experience monitoring DOE disposal actions at the SDF over the last 5 years, as well as independent analysis and modeling to identify factors that are important to assessing whether DOE's disposal actions meet the performance objectives. Many of these factors are similar to factors identified in the NRC staff's 2005 review of salt waste disposal at the SDF. Key areas of interest continue to be waste form and disposal unit degradation, the effectiveness of infiltration and erosion controls, and estimation of the radiological inventory. Based on these factors, NRC is revising its plan for monitoring salt waste disposal at the SDF in coordination with South Carolina Department of Health and Environmental Control (SCDHEC). DOE has completed or begun additional work related to salt waste disposal to address these factors. NRC staff continues to evaluate information related to the performance of the SDF and has been working with DOE and SCDHEC to resolve NRC staff's technical concerns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRC Consultation and Monitoring at the Savannah River Site: Focusing Reviews of Two Different Disposal Actions - 12181

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms, and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning large-scale excavation and construction activities within an aerially constrained site for construction of a repository for low and short-lived intermediate level radioactive waste at the Bulgarian national disposal facility - 15372

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived intermediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million 3 of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. Construction of the loess-cement cushion in the disposal area will require detailed planning and coordination, particularly as the cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are accounted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discussion on the merits of deep borehole disposal, especially with recycling - 15389

With the continued global expansion of the nuclear industry, disposal of spent nuclear fuel (SNF) and high level waste (HLW) continues to be a largely unimplemented (but extensively studied) activity throughout the world and can continue to do so due to the safe practices of 'interim' SNF/used nuclear fuel (UNF) and HLW storage. However as the industry continues to operate and expand in both existing and new countries, the accumulated SNF/UNF and HLW will continue to grow in both quantity and locations across the globe; hence, requiring more effort to control and monitor. Countries with nuclear power programs, or are considering starting nuclear power programs, must consider the potential financial and the engineering burden associated with both the interim storage and the disposal of SNF/UNF and HLW produced by these programs: can the cost of disposal be reasonably captured in the cost of electricity produced from nuclear programs and are there suitable sites for disposal in their country, such as a mined-geologic site, for the expected accumulated quantity of SNF and HLW? Answering these questions may be particularly vexing for countries with small nuclear programs where establishing viable disposal sites for SNF and HLW and funding of the development of these sites may be a challenge. In an effort to establish an alternative to traditional, expensive, mined-geologic disposal sites, the deep borehole option has been (re-)considered by multiple countries and entities to be a relatively simple solution to disposal of SNF and HLW. However, disposal of SNF in deep boreholes must overcome several issues including: (1) limiting-sized borehole diameters; (2) limited ability for retrieval; and (3) potential hang-up issues associated with lowering longer (e.g., > 180 inches) canisters down into a deep borehole. Since most SNF is a resource when recycled (i.e., UNF) and to dispose of it in an irretrievable manner would be wasteful, a more optimal alternative that could overcome these issues and maximize the benefits of the UNF is to recycle the UNF and dispose of the resulting HLW into deep boreholes. The multiple and mutual benefits of this approach are elucidated in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Implementation of IAEA's Borehole Disposal Concept for Sealed Radioactive Sources - 18545

With funding from the Government of Canada, and support from the U.S. Nuclear Regulatory Commission's (NRC's) Office of International Program and many others, the International Atomic Energy Agency (IAEA) is supporting the field deployment of the Borehole Disposal Concept (BDC) for secure disposal of radioactive sources in Ghana, the Philippines and Malaysia. This is a first-of-its-kind implementation. Though small in volume, disused sealed radioactive sources can be intensively radioactive and create a significant safety and security liability for the majority of the 168 Member States in the IAEA. Millions of sealed radioactive sources have been manufactured since 1901, and it is estimated that hundreds of thousands are now unwanted. The irony is that some of the countries with the smallest inventories have the greatest difficulties managing their radioactive wastes. The BDC was originally conceptualized in an IAEA-study undertaken by the South African Nuclear Energy Corporation (NECSA) for countries with small inventories of disused sealed radioactive sources. There are multiple, passive engineered and natural barriers in the BDC design, including an inner stainless-steel capsule (which holds the wastes), an inner cement containment barrier, an outer stainless steel container and outer backfill cement, as well as the surrounding geosphere. In common subsurface geochemical environments, these barriers will isolate the wastes from the biosphere, provide effective containment and ensure long-term safety. To greatly limit the likelihood of inadvertent human intrusion (safety), and deliberate human intrusion (security), these waste packages will be disposed of in a narrow diameter borehole (26 cm) at depths greater than 30 m. This type of borehole disposal creates an exceptionally small footprint, removes the wastes from normal human surficial activities, and isolates the waste packages from near-surface processes. Over the past 20 years, the IAEA, NECSA and many others have advanced the BDC on the shoulders of the IAEA's broader work supporting safe and secure disposal of radioactive wastes and management of sealed radioactive sources. With recent funding and support from many others, the IAEA has assisted Ghana, Malaysia and the Philippines in assessing their inventories and conditioning their disused sealed radioactive sources, in drilling investigation boreholes and characterizing their proposed sites, and in designing their disposal systems. These countries plan to place the uppermost waste package at depths greater than 100 m. While activities in the Philippines remain focused on-site characterization, Ghana is in the latter stages of developing their Safety Case for operational and 'post-closure' safety and Malaysia has completed their Safety Case and submitted a license application to construct and operate a BDC facility. Though this paper identifies the support provided to Member States by the IAEA, it is the Ghana Atomic Energy Commission and the Malaysian Nuclear Agency that are responsible for the safety and security of the disposals and that have been responsible for carrying-out their disposal programs. Once the BDC is licensed by the relevant national regulatory bodies, these first-of-a-kind disposal approaches will provide a template for other countries to safely dispose of their disused sealed radioactive sources - permanently eliminating their safety and security liabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Waste Disposal Strategy for RH LLW Stored in the ATR Canal - 19453

The Advanced Test Reactor (ATR), located at Idaho National Laboratory (INL), is 250 megawatt research reactor designed and operated for the United States Department of Energy for irradiation testing of advanced nuclear fuels and material samples. The pressurized light-water moderated and cooled reactor achieved criticality in 1967. It is designed to allow high neutron flux irradiation of structural materials and nuclear fuels to replicate long-term exposure of materials in traditional lower-flux reactor cores. The ATR also produces rare isotopes for the use in the medical and other industries. The ATR is one of only four reactors in the world with this high-flux irradiation capability. Adjacent to the ATR is a water-filled canal which is used to handle casks, prepare experiments, perform irradiation experiments, and store irradiated components generated from reactor operations. The canal is used to store irradiated (activated) metals that are subsequently determined to be waste. In many instances, these items are too radioactive to remove from the canal and remain in temporary storage until a sufficient decay period has elapsed to where they can be safely removed. The more highly-radioactive remote-handled (RH) waste items requiring hundreds of years to decay have been in storage in the canal since the first ATR core internal changeout (CIC) which was conducted in the 1970's. The INL has recently completed construction and startup of a new Remote-Handled Low-Level Waste (RH LLW) Disposal Facility, which will serve as the final disposal capability for legacy RH (greater than 200 mR/hr on contact) metal waste currently stored in the canal. The ATR will need to develop a method for packaging, characterizing, removing, and shipping this material to the new disposal facility. Based on the configuration of the new disposal cells at the RH LLW Disposal Facility, the ATR must produce an entire new process for handing and packaging the legacy RH waste and preparing it for transport and final disposal. The ATR Canal RH LLW Cleanup Project scope is to develop the processes, tools, and equipment for safely sizing, packaging, and removing RH LLW from the canal. This paper presents highlights and challenges the project faces to develop and implement this capability: - Designing new tools, fabricating new equipment, and implementing new processes at an active Hazard Category-I nuclear facility. - Ensuring new equipment and tools are compatible with the existing equipment and processes at both the generator and the disposal facilities. - Sizing legacy waste under water using remote tools and equipment to minimize void space in waste disposal canisters while ensuring as low as reasonably achievable (ALARA) goals are met. - Loading waste containers underwater and preparing them to meet the liquid-free criteria of the disposal facility waste acceptance criteria (WAC). - Providing a new shielded transport container to transfer waste from ATR to the new on-site RH LLW Disposal Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Borehole Disposal: Update on the Science, Technology, and Potentially Suitable Radioactive Wastes - 20170

A recent Special Issue of the Energies Journal on Deep Borehole Disposal of Nuclear Waste has delivered a timely update on the science and technology of borehole disposal and the types of radioactive wastes it could potentially accommodate. The Special Issue papers discuss (i) circumstances under which a national waste management programme might wish to consider deep borehole disposal [1], (ii) a status report of deep borehole disposal options in Germany [2], (iii) the use of deep horizontal drill-holes in sedimentary, metamorphic or igneous rocks for disposal of spent nuclear fuel and high-level radioactive waste [3], (iv) the analysis of corrosion performance of engineered barrier systems [4], (v) a review of the potential cementing systems suitable for deep borehole disposal [5], (vi) the thermal evolution around heat-generating waste for a wide range of material properties and disposal configurations [6], (vii) a geochemical analysis of deep brines focussed on fluid-rock interactions [7], (viii) post-closure performance assessment calculations for deep borehole disposal of Cs/Sr capsules [8], and (ix) an example safety case for deep borehole disposal of nuclear wastes [9]. This paper provides an overview of the main findings from these publications and highlights some of the technological and scientific challenges that need to be overcome when developing a deep borehole disposal concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Justification Of The Use Of Boreholes For Disposal Of Sealed Radiological Sources

Soon there will be only 14 states in two compacts that are able to dispose of Low Level Waste (LLW): the Northwest and Rocky Mountain compact with disposal options in Richland, Washington, and the Atlantic compact with disposal options in Barnwell, South Carolina. How do states not in one of the two compacts dispose of their LLW? The Off-Site Source Recovery Project can take possession and dispose of some of the unwanted transuranic sources at the Waste Isolation Pilot Plant (WIPP). However, there will be no path forward for states outside of the two compacts for disposal of their non-transuranic LLW. A solution that has been much discussed, debated and researched, but has not been put into wide scale practice, is the borehole disposal concept. It is the author's position that companies that drill and explore for oil have been disposing of sources in borehole-like structures for years. It should be noted that these companies are not purposely disposing of these sources, but the sources are irretrievable and must be abandoned. Additionally, there are Nuclear Regulatory Commission (NRC) regulations that must be followed to seal the well that contains the lost and abandoned source. According to the NRC Event Notification Reports database, there were a minimum of 29 reports of lost and abandoned sources in oil wells between December 1999 and October 2006. The sources were lost at depths between 2,018-18,887 feet, or 600-5,750 meters. The companies that are performing explorations with the aid of sealed radiological sources must follow regulation 10 CFR Part 39. Subsection 15 outlines the procedures that must be followed if sources are determined to be irretrievable and abandoned in place. If the NRC allows and has regulations in place for oil companies, why can't states and/or companies be allowed to dispose of LLW in a similar fashion?

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Assessment of Cover Degradation Features at the Mexican Hat, Utah, UMTRCA Disposal Site - 19556

The Mexican Hat, Utah, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site is located on the Navajo Reservation in southeast Utah. The US Nuclear Regulatory Commission licensed the site to the US Department of Energy Office of Legacy Management (LM) for custody and long-term care. LM manages long-term surveillance and maintenance activities at the site with the principal goal of protecting human health and the environment. The disposal cell was designed to encapsulate low-level radioactive mill tailings and other residual radioactive materials (RRM) in a way that minimizes the need for active maintenance and limits radon gas emanation and precipitation infiltration. The disposal cell has a multicomponent cover, consisting of a 60 cm thick (24 inch), low-permeability, bentonite-amended radon barrier, overlain by a 15 cm thick (6 inch) sandy gravel bedding/filter layer and a 30 cm thick (12 inch) riprap erosion-protection layer. Under UMTRCA, designs intended to control and contain RRM shall be effective for up to 1000 years, to the extent reasonably achievable and, in any case, for at least 200 years. In 2016, multiple subtle depressions were identified on the rock cover along the toe and lower portions of the northeast side slope of the disposal cell. Due to concerns regarding potential impacts to disposal cell performance and erosion resistance, evaluations of the depressions and cell cover design and construction were initiated. The evaluations included reviews of the disposal cell as-built drawings and supporting design calculations for the rock cover components. Also, in 2017, a weather monitoring station was installed at the site to collect continuous site-specific meteorological data, and repeatable ground-based light imaging, detection, and ranging (lidar) topographical and aerial photogrammetry surveys were implemented to monitor for potential changes in the surface depression features. The evaluations also included visual inspections of the depressions, and in 2018, small-area manual excavations of the rock cover components (test pits) were performed to observe the conditions of the cover components, scan for radioactivity, and observe evidence of erosion on the surface of the radon barrier material. Voids and incisions were discovered within the radon barrier on the north and northeast side slopes of the disposal cell. Visual observations at test pits indicate that the bedding/filter material is highly segregated and may not be in conformance with the disposal cell engineering and construction design specifications. Post-construction development of a weak to strongly cemented material has also been observed immediately below the base of the bedding layer in test pits with observed radon barrier degradation. A series of radiological surveys have been performed at the site, and radiological readings have not exceeded natural background conditions in the vicinity of the site. Thus, the site remains protective of human health and the environment. Implementation of continuous radiological monitoring at the site will be initiated in fall 2018 through the deployment of radon cups and thermoluminescent dosimeters to obtain data that provides supporting evidence that the disposal cell remains protective of human health and the environment. Evaluations to determine the cause(s) of the depression features and associated radon barrier erosion are ongoing. Possible mechanisms of cover degradation identified thus far include segregated bedding material that would allow for higher precipitation runoff velocities, resulting in erosion of the radon barrier; post-construction cementation of radon barrier or aeolian material that could negatively affect the performance of the radon barrier; cation exchange leading to the development of cementation; and aeolian deposition affecting precipitation runoff. Moreover, geotechnical sampling and testing is planned to verify spatial cover conditions relative to design specifications. The resulting information will be used to identify possible causes for the surface depressions and associated radon barrier degradation, gain insight on potential long-term performance implications along the side slopes of the disposal cell, and identify potential corrective actions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On Temperature Limits for the Outer Surface of a Container in a Disposal Facility - 20313

The temperature in a disposal facility for high-level radioactive waste (HLRW) is an issue for safety. When the recommencement of the search for and selection of a site for a disposal facility for HLRW in Germany was stipulated by the Site Selection Act (StandAG 2017) in 2017, a precautionary temperature limit of 100 deg. C on the outer surface of the containers with high-level radioactive waste in the disposal facility section was set. This precautionary temperature limit shall be applied in preliminary safety analyses provided that the 'maximum physically possible temperatures' in the respective host rocks have not yet been determined due to pending research. Therefore, this issue is addressed and discussed in this paper, contributing to 'pending research' by a review of the literature. This paper briefly discusses a few examples of thermohydraulic, mechanical, chemical and biological processes in a disposal facility, because temperature limits are derived based on safety impacts regarding THMCB-processes. The temperature-dependent processes have been extracted from databases for features, events and processes (FEP-databases). Furthermore, it is discussed if the feasibility to retrieve and recover HLRW is hampered at high temperatures. A design temperature concerning single components of a disposal facility for the preservation of their features can be derived when a safety concept is established. However, the interactions of all relevant processes in a disposal concept must be considered to determine a specific temperature limit for the outer surface of the containers. Therefore, applicable temperature limits may vary for particular safety and disposal concepts in the following host rocks: rock salt, clay stone and crystalline rock. Technical solutions for retrieval and design options for recovery seem to be viable up to temperatures of 200 deg. C with different, sometimes severe, downsides according to expert judgement. Temperature limits regarding the outer surface of the containers can be derived specifically for each safety concept and design of the disposal facility in a host rock. General temperature limits without reference to specific safety concepts or the particular design of the disposal facility may narrow down the possibilities for optimisation of the disposal facility and could adversely affect the site selection process in finding the best suitable site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in Geologic Disposal System Modeling and Application to Crystalline Rock

The Used Fuel Disposition Campaign (UFDC) of the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Office of Fuel Cycle Technology (OFCT) is conducting research and development (R&D) on geologic disposal of used nuclear fuel (UNF) and high-level nuclear waste (HLW). Two of the high priorities for UFDC disposal R&D are design concept development and disposal system modeling (DOE 2011). These priorities are directly addressed in the UFDC Generic Disposal Systems Analysis (GDSA) work package, which is charged with developing a disposal system modeling and analysis capability for evaluating disposal system performance for nuclear waste in geologic media (e.g., salt, granite, clay, and deep borehole disposal). This report describes specific GDSA activities in fiscal year 2016 (FY 2016) toward the development of the enhanced disposal system modeling and analysis capability for geologic disposal of nuclear waste. The GDSA framework employs the PFLOTRAN thermal-hydrologic-chemical multi-physics code and the Dakota uncertainty sampling and propagation code. Each code is designed for massively-parallel processing in a high-performance computing (HPC) environment. Multi-physics representations in PFLOTRAN are used to simulate various coupled processes including heat flow, fluid flow, waste dissolution, radionuclide release, radionuclide decay and ingrowth, precipitation and dissolution of secondary phases, and radionuclide transport through engineered barriers and natural geologic barriers to the biosphere. Dakota is used to generate sets of representative realizations and to analyze parameter sensitivity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shale disposal of U.S. high-level radioactive waste.

This report evaluates the feasibility of high-level radioactive waste disposal in shale within the United States. The U.S. has many possible clay/shale/argillite basins with positive attributes for permanent disposal. Similar geologic formations have been extensively studied by international programs with largely positive results, over significant ranges of the most important material characteristics including permeability, rheology, and sorptive potential. This report is enabled by the advanced work of the international community to establish functional and operational requirements for disposal of a range of waste forms in shale media. We develop scoping performance analyses, based on the applicable features, events, and processes identified by international investigators, to support a generic conclusion regarding post-closure safety. Requisite assumptions for these analyses include waste characteristics, disposal concepts, and important properties of the geologic formation. We then apply lessons learned from Sandia experience on the Waste Isolation Pilot Project and the Yucca Mountain Project to develop a disposal strategy should a shale repository be considered as an alternative disposal pathway in the U.S. Disposal of high-level radioactive waste in suitable shale formations is attractive because the material is essentially impermeable and self-sealing, conditions are chemically reducing, and sorption tends to prevent radionuclide transport. Vertically and laterally extensive shale and clay formations exist in multiple locations in the contiguous 48 states. Thermal-hydrologic-mechanical calculations indicate that temperatures near emplaced waste packages can be maintained below boiling and will decay to within a few degrees of the ambient temperature within a few decades (or longer depending on the waste form). Construction effects, ventilation, and the thermal pulse will lead to clay dehydration and deformation, confined to an excavation disturbed zone within a few meters of the repository, that can be reasonably characterized. Within a few centuries after waste emplacement, overburden pressures will seal fractures, resaturate the dehydrated zones, and provide a repository setting that strongly limits radionuclide movement to diffusive transport. Coupled hydrogeochemical transport calculations indicate maximum extents of radionuclide transport on the order of tens to hundreds of meters, or less, in a million years. Under the conditions modeled, a shale repository could achieve total containment, with no releases to the environment in undisturbed scenarios. The performance analyses described here are based on the assumption that long-term standards for disposal in clay/shale would be identical in the key aspects, to those prescribed for existing repository programs such as Yucca Mountain. This generic repository evaluation for shale is the first developed in the United States. Previous repository considerations have emphasized salt formations and volcanic rock formations. Much of the experience gained from U.S. repository development, such as seal system design, coupled process simulation, and application of performance assessment methodology, is applied here to scoping analyses for a shale repository. A contemporary understanding of clay mineralogy and attendant chemical environments has allowed identification of the appropriate features, events, and processes to be incorporated into the analysis. Advanced multi-physics modeling provides key support for understanding the effects from coupled processes. The results of the assessment show that shale formations provide a technically advanced, scientifically sound disposal option for the U.S.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Hazard Analysis for the Remote-Handled Low-Level Waste Disposal Project

The need for remote handled low level waste (LLW) disposal capability has been identified. A new onsite, remote-handled LLW disposal facility has been identified as the highest ranked alternative for providing continued, uninterrupted remote-handled LLW disposal capability for remote-handled LLW that is generated as part of the nuclear mission of the Idaho National Laboratory and from spent nuclear fuel processing activities at the Naval Reactors Facility. Historically, this type of waste has been disposed of at the Radioactive Waste Management Complex. Disposal of remote-handled LLW in concrete disposal vaults at the Radioactive Waste Management Complex will continue until the facility is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). This document supports the conceptual design for the proposed remote-handled LLW disposal facility by providing an initial nuclear facility hazard categorization and by identifying potential hazards for processes associated with onsite handling and disposal of remote-handled LLW.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗