Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Development and Deployment of NASA's Budget Execution Dashboard

This paper discusses the successful implementation of a highly visible company-wide management system and its potential to change managerial and accounting policies, processes and practices in support of organizational goals. Applying the conceptual framework of innovation in organizations, this paper describes the development and deployment process of the NASA Budget Execution Dashboard and the first two fiscal years of its use. It discusses the positive organizational changes triggered by the dashboard, like higher visibility of financial goals and variances between plans and actuals, increased involvement of all management levels in tracking and correcting of plan deviations, establishing comparable data standards across a strongly diversified organization, and enhanced communication between line organizations (NASA Centers) and product organizations (Mission Directorates). The paper also discusses the critical success factors experienced in this project: Strong leadership and division of management roles, rapid and responsive technology development, and frequent communication among stakeholders.

Putz, Peter↗

Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

Source record↗

Mapping a recent forest fire with ERTS-1 MSS data

Accurate fire boundary delineation provides essential information to forest managers in allocating suppression costs and planning regeneration efforts. The objective of this study was to test the capability of computer-aided analysis of ERTS-1 MSS data to accurately define the boundary of a recent forest fire and to discriminate spectral classes within the perimeter. Two frames of ERTS-1 MSS data were selected for analysis of the Moccasin Mesa Fire in Mesa Verde National Park. Data sets were collected one-half growing season and one full growing season after the fire. Results indicate that computer-aided analysis of ERTS-1 MSS data has the capability for accurately delineating fire boundaries and determining acreage of the burned area. Distinct spectral classes may also be defined within the fire perimeter.

Hitchcock, H. C.↗

Low Latency DESDynI Data Products for Disaster Response, Resource Management and Other Applications

We are developing onboard processor technology targeted at the L-band SAR instrument onboard the planned DESDynI mission to enable formation of SAR images onboard opening possibilities for near-real-time data products to augment full data streams. Several image processing and/or interpretation techniques are being explored as possible direct-broadcast products for use by agencies in need of low-latency data, responsible for disaster mitigation and assessment, resource management, agricultural development, shipping, etc. Data collected through UAVSAR (L-band) serves as surrogate to the future DESDynI instrument. We have explored surface water extent as a tool for flooding response, and disturbance images on polarimetric backscatter of repeat pass imagery potentially useful for structural collapse (earthquake), mud/land/debris-slides etc. We have also explored building vegetation and snow/ice classifiers, via support vector machines utilizing quad-pol backscatter, cross-pol phase, and a number of derivatives (radar vegetation index, dielectric estimates, etc.). We share our qualitative and quantitative results thus far.

applications↗

Accelerating Nuclear-Integrated Data Centers in the USA: SWOT Analysis, Power-Thermal Management Strategies, and Industrial-Scale Demonstration and Potential Deployment

Driven by the growth in digital services, cloud computing, AI, and manufacturing, data centers face rising energy demands that challenge traditional power sources and cooling efficiency. This study explores using nuclear power to meet these demands, focusing on accelerated reactor technology deployment and highlighting needs such as N+1/N+2 power supplies and integrated power-thermal management. A SWOT analysis addresses grid connectivity, reactors, and site selection, particularly DOE sites. Reactor technology demonstration and deployment could be accelerated by leveraging test facilities such as MARVEL, MAGNET, TED, FAS, DOME, LOTUS, ATR, Energy System Proving Grounds, and upcoming Energy Launch Pads, along with modeling and simulation tools such as RELAP5, MOOSE, VERA, RAVEN, and FORCE. The potential power and thermal management options, including various cooling technologies, waste-heat utilization, and an industrial-scale demonstration plan, aim to accelerate the integration of nuclear power and data centers in the USA, while emphasizing community and stakeholder engagement and synergistic efforts.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)

This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.

Source record↗

Resource Management in the Microgravity Science Division

In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

Casselle, Justine↗

Arizona Water Resources: Utilizing Aerial Imagery and NASA Earth Observations to Assess Pinyon-Juniper Tree Mortality in Flagstaff, AZ

Pinyon-juniper woodlands (PJW) are a vital habitat and food source for several wildlife species and a source of both utility and cultural importance for Indigenous groups. In 2021, amidst a decades-long drought, an extensive juniper mortality event occurred at Wupatki National Monument (WNM) in Arizona. In response, the National Park Service (NPS) is evaluating which land management practices will be beneficial. In partnership with the NPS, the NASA DEVELOP team used remote sensing data to map PJW mortality and analyze the relation of tree mortality to stand density, climate, and topography in north-central Arizona from 2015 to 2021. To identify the extent of PJW, the team performed an unsupervised classification using National Agricultural Imagery Program (NAIP) data with validation sources including NPS-created land cover maps, Landscape Fire and Resource Management Planning Tools (LANDFIRE), NPS and United States Forest Service (USFS) vegetation maps, and Landsat 8 Operational Land Imager (OLI) and Thermal Infrared Sensor (TIRS) data. Terra Moderate Resolution Imaging Spectroradiometer (MODIS), Global Precipitation Measurement (GPM) Integrated Multi-satellite Retrievals for GPM (IMERG), Soil Moisture Active Passive (SMAP), Shuttle Radar Topography Mission (SRTM), and Landsat 8-derived Normalized Difference Vegetation Index (NDVI) and Normalized Difference Moisture Index (NDMI) were used to analyze factors contributing to pinyon-juniper mortality. Although no relationships were found in the broader study region, PJW mortality was weakly correlated to elevation, soil moisture, and land surface temperature within WNM. Results from this study can inform NPS vegetation management that best protects natural and cultural resources.

Margaret Jaenicke↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Computer network environment planning and analysis

The GSFC Computer Network Environment provides a broadband RF cable between campus buildings and ethernet spines in buildings for the interlinking of Local Area Networks (LANs). This system provides terminal and computer linkage among host and user systems thereby providing E-mail services, file exchange capability, and certain distributed computing opportunities. The Environment is designed to be transparent and supports multiple protocols. Networking at Goddard has a short history and has been under coordinated control of a Network Steering Committee for slightly more than two years; network growth has been rapid with more than 1500 nodes currently addressed and greater expansion expected. A new RF cable system with a different topology is being installed during summer 1989; consideration of a fiber optics system for the future will begin soon. Summmer study was directed toward Network Steering Committee operation and planning plus consideration of Center Network Environment analysis and modeling. Biweekly Steering Committee meetings were attended to learn the background of the network and the concerns of those managing it. Suggestions for historical data gathering have been made to support future planning and modeling. Data Systems Dynamic Simulator, a simulation package developed at NASA and maintained at GSFC was studied as a possible modeling tool for the network environment. A modeling concept based on a hierarchical model was hypothesized for further development. Such a model would allow input of newly updated parameters and would provide an estimation of the behavior of the network.

Dalphin, John F.↗

The impact of plant‐derived fire management prescriptions on fire‐responsive bird species

Abstract In fire‐prone regions, the occurrence of some faunal species is contingent on the presence of resources that arise through post‐fire plant succession. Through planned burning, managers can alter resource availability and aim to provide the conditions required to promote biodiversity. Understanding how species occurrence changes at different spatial and temporal scales after fire is essential to achieve this goal. However, many fire prescriptions are guided primarily by the responses of fire‐sensitive plants when setting tolerable fire intervals. This approach assumes that maintaining floristic diversity will satisfy the requirements of fauna. We surveyed bird species in two semi‐arid vegetation types across an environmental gradient in south‐eastern Australia. We conducted four surveys at each of 253 sites across a 75‐year chronosequence of time since fire and used generalized additive mixed models to examine changes in the occurrence of birds in response to time since fire. Model predictions were compared to plant‐derived fire prescriptions currently guiding fire management in the region. Time since fire was a significant predictor for 18 of 28 species modeled, in at least one vegetation type, over a gradient of 1.3° of latitude. We detected considerable variation in the responses of some species, both between vegetation types and geographically within a vegetation type. Our evaluation of plant‐derived fire prescriptions suggests that the intervals considered acceptable for maintaining floristic diversity may not be sustainable for populations of birds requiring longer unburnt vegetation, with 6 of the 12 species assessed attaining a mean occurrence probability of 20.3% by the minimum tolerable fire interval, and 57.3% by the maximum tolerable fire interval, in their respective vegetation types. Our findings highlight the potential vulnerability of fire‐responsive bird species if fire prescriptions are applied in a manner that fails to account for the slow development of habitat resources needed by some species, and the variation detected within the responses of species. This highlights the need for species‐specific data collected at an appropriate spatial scale to inform management plans.

Makdissi, Rhys↗

Impact of remote sensing upon the planning, management and development of water resources. Summary of computers and computer growth trends for hydrologic modeling and the input of ERTS image data processing load

An analysis of current computer usage by major water resources users was made to determine the trends of usage and costs for the principal hydrologic users/models. The laws and empirical relationships governing the growth of the data processing loads were described and applied to project the future data loads. Data loads for ERTS CCT image processing were computed and projected through the 1985 era. The analysis showns significant impact due to the utilization and processing of ERTS CCT's data.

Castruccio, P. A.↗

Study of airborne science experiment management concepts for application to space shuttle. Volume 1: Executive summary

The management concepts and operating procedures are documented as they apply to the planning of shuttle spacelab operations. Areas discussed include: airborne missions; formulation of missions; management procedures; experimenter involvement; experiment development and performance; data handling; safety procedures; and applications to shuttle spacelab planning. Characteristics of the airborne science experience are listed, and references and figures are included.

Mulholland, D. R.↗

The Application of Remotely Sensed Data and Models to Benefit Conservation and Restoration Along the Northern Gulf of Mexico Coast

New data, tools, and capabilities for decision making are significant needs in the northern Gulf of Mexico and other coastal areas. The goal of this project is to support NASA s Earth Science Mission Directorate and its Applied Science Program and the Gulf of Mexico Alliance by producing and providing NASA data and products that will benefit decision making by coastal resource managers and other end users in the Gulf region. Data and research products are being developed to assist coastal resource managers adapt and plan for changing conditions by evaluating how climate changes and urban expansion will impact land cover/land use (LCLU), hydrodynamics, water properties, and shallow water habitats; to identify priority areas for conservation and restoration; and to distribute datasets to end-users and facilitating user interaction with models. The proposed host sites for data products are NOAA s National Coastal Data Development Center Regional Ecosystem Data Management, and Mississippi-Alabama Habitat Database. Tools will be available on the Gulf of Mexico Regional Collaborative website with links to data portals to enable end users to employ models and datasets to develop and evaluate LCLU and climate scenarios of particular interest. These data will benefit the Mobile Bay National Estuary Program in ongoing efforts to protect and restore the Fish River watershed and around Weeks Bay National Estuarine Research Reserve. The usefulness of data products and tools will be demonstrated at an end-user workshop.

Quattrochi, Dale↗

Pacific Northwest Resources Inventory Demonstration

The Pacific Northwest Land Resource Inventory Demonstration project is designed to demonstrate to users from state and local agencies in Washington, Oregon, and Idaho the cost effective role that Landsat derived information can play in natural resource planning and management when properly supported by ground and aircraft data. The project has been organized into five main phases: (1) maps and overlays, (2) early digital image analysis, (3) demonstration of applications using interactive image analysis, (4) Landsat products and land resources information systems, and (5) documentation. The demonstration project has been applied to Washington forestry, water inventory in southern Idaho, and monitoring of tansy ragwort in western Oregon.

Nichols, J. D.↗

LANDSAT supports data needs for EPA 208 planning

Excerpts from federal legislation and regulations mandating areawide waster treatment management as a means of restoring and maintaining the integrity of the nation's water are presented along with requirements for grants to the states for water quality planning, management, and implementation. Experiences using LANDSAT to identify nonpoint sources of water pollution as well as land/use/land cover features in South Dakota, Kentucky, Georgia, New Jersey, and Texas are described. Present activities suggest that this type of remote sensing is an efficient, effective tool for areawide water quality planning. Interaction with cognizant federal, state, and local government personnel involved in EPA section 208 planning activities can guide the development of new capabilities and enhance their utility and prospect for use.

Source record↗

Demonstrating Autonomous Mission Operations Onboard the International Space Station

The NASA Autonomous Mission Operations (AMO) project conducted an experiment to turn over operation and management of selected International Space Station (ISS) sys- tems to the on-board crew. ISS crews managed two different spacecraft systems: the Total Organic Carbon Analyzer (TOCA), a water quality analyzer, and Station Support Com- puters (SSC) laptops, which are non-critical crew computer systems. These systems were selected because they are representative of systems a future crew may need to operate au- tonomously during a deep space mission. The crew autonomously operated these systems, taking on mission operations functions traditionally performed by support teams on the ground, using new software tools that provide decision support algorithms for planning, monitoring and fault management, hardware schematics, system briefs, and data displays that are normally unavailable to the crew. The experiment lasted seven months, during which ISS crews managed TOCA and SSCs on 22 occasions. The AMO software processed data from TOCA and SSCs continuously during this seven month period. The combined performance of the software and crew achieved a 88 success rate on managing TOCA activity, the system for which ground-truth was available.

Autonomous Mission Operations↗