Search NASA⌕ Search

SEARCH · Search NASA

Results for “Demand management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Network management tools for a GPS datalink network

The availability of GPS (Global Position Satellite) information in real-time via a datalink system is shown to significantly increase the capacity of flight test and training ranges in terms of missions supported. This increase in mission activity. imposes demands on mission planning in the range-operations environment. In this context, network management tools which can improve the capability of range personnel to plan, monitor, and control network resources, are of significant interest. The application of both simulation and artificial intelligence techniques is described to develop such network managements tools.

Smyth, Padhraic↗

Goal-Function Tree Modeling for Systems Engineering and Fault Management

The draft NASA Fault Management (FM) Handbook (2012) states that Fault Management (FM) is a "part of systems engineering", and that it "demands a system-level perspective" (NASAHDBK- 1002, 7). What, exactly, is the relationship between systems engineering and FM? To NASA, systems engineering (SE) is "the art and science of developing an operable system capable of meeting requirements within often opposed constraints" (NASA/SP-2007-6105, 3). Systems engineering starts with the elucidation and development of requirements, which set the goals that the system is to achieve. To achieve these goals, the systems engineer typically defines functions, and the functions in turn are the basis for design trades to determine the best means to perform the functions. System Health Management (SHM), by contrast, defines "the capabilities of a system that preserve the system's ability to function as intended" (Johnson et al., 2011, 3). Fault Management, in turn, is the operational subset of SHM, which detects current or future failures, and takes operational measures to prevent or respond to these failures. Failure, in turn, is the "unacceptable performance of intended function." (Johnson 2011, 605) Thus the relationship of SE to FM is that SE defines the functions and the design to perform those functions to meet system goals and requirements, while FM detects the inability to perform those functions and takes action. SHM and FM are in essence "the dark side" of SE. For every function to be performed (SE), there is the possibility that it is not successfully performed (SHM); FM defines the means to operationally detect and respond to this lack of success. We can also describe this in terms of goals: for every goal to be achieved, there is the possibility that it is not achieved; FM defines the means to operationally detect and respond to this inability to achieve the goal. This brief description of relationships between SE, SHM, and FM provide hints to a modeling approach to provide formal connectivity between the nominal (SE), and off-nominal (SHM and FM) aspects of functions and designs. This paper describes a formal modeling approach to the initial phases of the development process that integrates the nominal and off-nominal perspectives in a model that unites SE goals and functions of with the failure to achieve goals and functions (SHM/FM). This methodology and corresponding model, known as a Goal-Function Tree (GFT), provides a means to represent, decompose, and elaborate system goals and functions in a rigorous manner that connects directly to design through use of state variables that translate natural language requirements and goals into logical-physical state language. The state variable-based approach also provides the means to directly connect FM to the design, by specifying the range in which state variables must be controlled to achieve goals, and conversely, the failures that exist if system behavior go out-of-range. This in turn allows for the systems engineers and SHM/FM engineers to determine which state variables to monitor, and what action(s) to take should the system fail to achieve that goal. In sum, the GFT representation provides a unified approach to early-phase SE and FM development. This representation and methodology has been successfully developed and implemented using Systems Modeling Language (SysML) on the NASA Space Launch System (SLS) Program. It enabled early design trade studies of failure detection coverage to ensure complete detection coverage of all crew-threatening failures. The representation maps directly both to FM algorithm designs, and to failure scenario definitions needed for design analysis and testing. The GFT representation provided the basis for mapping of abort triggers into scenarios, both needed for initial, and successful quantitative analyses of abort effectiveness (detection and response to crew-threatening events).

Patterson, Jonathan D.↗

Goal-Function Tree Modeling for Systems Engineering and Fault Management

The draft NASA Fault Management (FM) Handbook (2012) states that Fault Management (FM) is a "part of systems engineering", and that it "demands a system-level perspective" (NASAHDBK- 1002, 7). What, exactly, is the relationship between systems engineering and FM? To NASA, systems engineering (SE) is "the art and science of developing an operable system capable of meeting requirements within often opposed constraints" (NASA/SP-2007-6105, 3). Systems engineering starts with the elucidation and development of requirements, which set the goals that the system is to achieve. To achieve these goals, the systems engineer typically defines functions, and the functions in turn are the basis for design trades to determine the best means to perform the functions. System Health Management (SHM), by contrast, defines "the capabilities of a system that preserve the system's ability to function as intended" (Johnson et al., 2011, 3). Fault Management, in turn, is the operational subset of SHM, which detects current or future failures, and takes operational measures to prevent or respond to these failures. Failure, in turn, is the "unacceptable performance of intended function." (Johnson 2011, 605) Thus the relationship of SE to FM is that SE defines the functions and the design to perform those functions to meet system goals and requirements, while FM detects the inability to perform those functions and takes action. SHM and FM are in essence "the dark side" of SE. For every function to be performed (SE), there is the possibility that it is not successfully performed (SHM); FM defines the means to operationally detect and respond to this lack of success. We can also describe this in terms of goals: for every goal to be achieved, there is the possibility that it is not achieved; FM defines the means to operationally detect and respond to this inability to achieve the goal. This brief description of relationships between SE, SHM, and FM provide hints to a modeling approach to provide formal connectivity between the nominal (SE), and off-nominal (SHM and FM) aspects of functions and designs. This paper describes a formal modeling approach to the initial phases of the development process that integrates the nominal and off-nominal perspectives in a model that unites SE goals and functions of with the failure to achieve goals and functions (SHM/FM).

Johnson, Stephen B.↗

Solar array switching power management

Solar array power switching concepts are explored for a 250 kWe manned LEO platform, a 50-250 kWe load for an orbit transfer vehicle (OTV), and an unmanned platform with a 50 kWe load in GEO. A solar array switching power management (SASPM) system is under study to satisfy the switching demands. Direct connections to arrays would be implemented for voltage regulations, power distribution, and the capability of reconfiguring the arrays to meet requirements. Mission characteristics that would require the power sources were explored. The LEO platform was projected to use a concentrator, have no reconfigurability, use 250 NiH2 batteries, supply 80-0 Vdc to an ion drive, and have a 20-30 yr life. Both GEO and OTV arrays were planar, would feature reconfigurability, and supply 800 Vdc to an ion drive. NiH2 batteries would be on the OTV, while the GEO spacecraft would use AgH2 cells. A block diagram of the basic switching configuration is presented.

Cassinelli, J. E.↗

Design of an advanced flight planning system

The demand for both fuel conservation and four-dimensional traffic management require that the preflight planning process be designed to account for advances in airborne flight management and weather forecasting. The steps and issues in designing such an advanced flight planning system are presented. Focus is placed on the different optimization options for generating the three-dimensional reference path. For the cruise phase, one can use predefined jet routes, direct routes based on a network of evenly spaced grid points, or a network where the grid points are existing navaid locations. Each choice has its own problem in determining an optimum solution. Finding the reference path is further complicated by choice of cruise altitude levels, use of a time-varying weather field, and requiring a fixed time-of-arrival (four-dimensional problem).

Sorensen, J. A.↗

Project Cerberus: Flyby Mission to Pluto

The goal of the Cerberus Project was to design a feasible and cost-effective unmanned flyby mission to Pluto. The requirements in the request for proposal for an unmanned probe to Pluto are presented and were met. The design stresses proven technology that will avoid show stoppers which could halt mission progress. Cerberus also utilizes the latest advances in the spacecraft industry to meet the stringent demands of the mission. The topics covered include: (1) mission management, planning, and costing; (2) structures; (3) power and propulsion; (4) attitude, articulation, and control; (5) command, control, and communication; and (6) scientific instrumentation.

Sivier, K.↗

The Advanced Exploration Systems Water Recovery Project: Innovation on 2 Fronts

As NASA looks forward to sending humans farther away from Earth, we will have to develop a transportation architecture that is highly reliable and that can sustain life for long durations without the benefit of Earth s proximity for continuous resupply or even operational guidance. NASA has consistently been challenged with performing great feats of innovation, but particularly in this time of economic stress, we are challenged to go farther with less. The Advanced Exploration Systems (AES) projects were implemented to address both of these needs by not only developing innovative technologies, but by incorporating innovative management styles and processes that foster the needed technical innovation given a small amount of resources. This presentation explains how the AES Water Recovery Project is exhibiting innovation on both fronts; technical and process. The AES Water Recovery Project (WRP) is actively engineering innovative technologies in order to maximize the efficiency of water recovery. The development of reliable, energy-efficient, and low-mass spacecraft systems to provide environmental control and life support (ECLS) is critical to enable long-duration human missions outside of low-Earth orbit. Recycling of life support consumables is necessary to reduce resupply mass and provide for vehicle autonomy. To address this, the WRP is working on a rotary distiller that has shown enhanced performance over the state-of-the-art (SOA). Additionally, the WRP is looking at innovative ways to address issues present in the state-of-the-art (SOA) systems pertaining to toxicity and calcium scale buildup. As an AES project, the WRP has a more streamlined Skunk Works like approach to technology development intended to reduce overhead but achieve a more refined end product. The project has incorporated key partnerships between NASA centers as well as between NASA and industry. A minimal project management style has been implemented such that risks are managed and milestones tracked without overburdening the team with reporting demands that take them away from their work. A lean Systems Engineering (SE) approach has been implemented where project objectives are defined and vetted early without overprescribing the process or limiting the ability to innovate. Finally, we are working with existing flight hardware support organizations like operations, safety, materials and others to impact the system design at the breadboard level. This type of early input is a key to ensuring that the technologies are developed on the right track to becoming space flight worthy.

Sarguisingh, Miriam M.↗

Dynamic Channel Assignments for Efficient Use of Aviation Spectrum Allocations

The demand for voice and data communications continues to rise with the emergence of new aerial vehicles into the airspace and the continued growth of aviation operations throughout the National Airspace System (NAS). Recent studies have shown that the anticipated growing demand for spectrum resources will exceed the capacity of existing aviation spectrum allocations. Further, airspace configurations, via assignment of fixed channel allocations within standard service volumes, do not allow for the dynamic and efficient distribution of spectrum resources based on airspace demand; as a result, a new approach to aviation spectrum management is needed to support the forecasted needs of new airspace users. The National Aeronautics and Space Administration (NASA) is investigating applications of artificial intelligence (AI), machine learning (ML), and other advanced concepts to solve a dynamic constraint satisfaction problem which is analogous to the frequency assignment problem faced by aviation. Procedures and strategies for dynamic channel allocation can be borrowed from other large-scale mobile services (i.e., 4G/5G applications) and can provide a novel spectrum management approach that allows for the intelligent utilization of aviation spectrum throughout the airspace while maintaining the strict quality of service prescribed by aeronautical standards.

Communications↗

Proposition to Optimize Fire Stations for Wildfires

The rising trend in wildfire occurrence and severity has put a strain on wildfire management organizations by spreading out limited resources to meet increasing demand. There has been extensive prior research and data collection to determine the areas of highest risk and to predict regional wildfire damages based on historical trends. Our group aims to utilize this data to best determine fire station placement, optimizing where resources are allocated to reduce the time and investment needed to effectively mitigate wildfires. Using existing research, we are able to calculate optimal fire station locations by utilizing a single-objective facility location problem algorithm incentivized for cost reduction. Further work would be needed to refine the algorithm to accommodate for more realistic factors including access to water and roadways as well as better accounting for the costs involved, but our work serves as a proof of concept and lays the foundation for future research. Implementation of this algorithm would allow public fire planning agencies (such as CAL FIRE and Forest Service) to shift resources to where they would be most effective.

Wildfires↗

Dynamic Channel Assignments for Efficient Use of Aviation Spectrum Allocations

The demand for voice and data communications continues to rise with the emergence of new aerial vehicles into the airspace and the continued growth of aviation operations throughout the National Airspace System (NAS). Recent studies have shown that the anticipated growing demand for spectrum resources will exceed the capacity of existing aviation spectrum allocations. Further, airspace configurations, via assignment of fixed channel allocations within standard service volumes, do not allow for the dynamic and efficient distribution of spectrum resources based on airspace demand; as a result, a new approach to aviation spectrum management is needed to support the forecasted needs of new airspace users. The National Aeronautics and Space Administration (NASA) is investigating applications of artificial intelligence (AI), machine learning (ML), and other advanced concepts to solve a dynamic constraint satisfaction problem which is analogous to the frequency assignment problem faced by aviation. Procedures and strategies for dynamic channel allocation can be borrowed from other large-scale mobile services (i.e., 4G/5G applications) and can provide a novel spectrum management approach that allows for the intelligent utilization of aviation spectrum throughout the airspace while maintaining the strict quality of service prescribed by aeronautical standards.

communications↗

Integrated System for Health Management and Autonomous Control (ISHM-AC): Development and Application

Autonomous control systems represent a technological barrier from manual and automated operated control systems in an industry wide application. An increase in energy-efficient storage, transfer and use of cryogens and cryogenic propellants on Earth and in space has been observed in space related industries between NASA, government and commercial programs. An increase in efficiency of cryogenic systems demands an increase in the capabilities of the control and monitoring system that manages them. As new technologies are developed for cryogenic systems, complexity and capability increases. The increase in complexities are a natural drive to develop better and more capable health monitoring and control system management. Current research and development efforts lead the Cryogenics Test Laboratory at the Kennedy Space Center to improve its automated control and health monitoring system from a Programmable Logic Control (PLC) based-only system to a fully Integrated System for Health Management (ISHM) - Autonomous Control (AC) capable of performing autonomous operations on a cryogenic propellant transfer system. This ISHM-AC system has been developed and tested by controlling a complete simulated propellant transfer operation. The capabilities and test results of this fully integrated autonomous system for cryogenics propellant transfer operation will be presented in this paper.

Toro, Jaime A.↗

Computer support for cooperative tasks in Mission Operations Centers

Traditionally, spacecraft management has been performed by fixed teams of operators in Mission Operations Centers. The team cooperatively: (1) ensures that payload(s) on spacecraft perform their work; and (2) maintains the health and safety of the spacecraft through commanding and monitoring the spacecraft's subsystems. In the future, the task demands will increase and overload the operators. This paper describes the traditional spacecraft management environment and describes a new concept in which groupware will be used to create a Virtual Mission Operations Center. Groupware tools will be used to better utilize available resources through increased automation and dynamic sharing of personnel among missions.

Fox, Jeffrey↗

Integrated System for Health Management and Autonomous Control (ISHM-AC) for Cryogenic Operations on the Simulated Propellant Loading System

Autonomous control systems represent a technological barrier from manual and automated operated control systems in an industry wide application. An increase in energy-efficient storage, transfer and use of cryogens and cryogenic propellants on Earth and in space has been observed in space related industries between NASA, government and commercial programs. An increase in efficiency of cryogenic systems demands an increase in the capabilities of the control and monitoring system that manages them. As new technologies are developed for cryogenic systems, complexity and capability increases. The increase in complexities are a natural drive to develop better and more capable health monitoring and control system management. Current research and development efforts lead the Cryogenics Test Laboratory at the Kennedy Space Center to improve its automated control and health monitoring system from a Programmable Logic Control (PLC) based-only system to a fully Integrated System for Health Management (ISHM) - Autonomous Control (AC) capable of performing autonomous operations on a cryogenic propellant transfer system. This ISHM-AC system has been developed and tested by controlling a complete simulated propellant transfer operation. The capabilities and test results of this fully integrated autonomous system for cryogenics propellant transfer operation will be presented in this paper.

Toro Medina, Jaime A.↗

An integrated approach to space station power system autonomous control

Space Station electrical power management must be accomplished autonomously in order to decrease both airborne and ground support costs. Attention is presently given to the augmentation of terrestrial utility algorithmic decision aids for power dispatching for space station use, using expert systems to direct power demand analyses and the integration of results into operational decisions. Functions to be thus managed encompass power scheduling, energy allocation, failure cause diagnoses, goal proposal and plan preparation, consequence evaluation, and execution plan selection. The operating states of the system are normal, preventive, emergency, and restorative.

Dolce, James L.↗

Controller Strategies for Managing Air Traffic in High Altitude Arrival Sectors

Substantial increases in the volume of air traffic in the National Airspace System (NAS) are forecast for the next decade, with the number of passengers travelling on U.S. airlines expected to increase by as much as 60%. This increased demand on system capacity will be accompanied by increases in traffic complexity as air traffic service providers routinely accommodate user preferred routing requests. Changes to the NAS to meet these new demands are currently underway, including development of new decision support tools to aid controllers in monitoring and managing air traffic, and increased air-to-air and air-to-ground information exchange. Changes in roles and responsibilities of pilots and controllers in flight path management will accompany these changes in traffic patterns and information technology, however the ultimate responsibility for maintaining aircraft separation will remain with the air traffic controller. A thorough understanding of the methods controllers use to manage air traffic will help ensure that changes to the NAS are implemented in a way that maintains the controller's ability to separate aircraft as the system evolves. This presentation describes the strategies controllers use today to manage arrival traffic in its descent from cruise altitude to the Terminal Radar Approach Control (TRACON) boundary. Factors that increase the complexity of this task include the presence of overflight traffic, varying aircraft performance characteristics, winds aloft, ground speed variations with altitude, the need to merge arrival traffic into a single stream, and, when arrival traffic exceeds airport runway capacity, the added task of metering flow into the TRACON. Because of the limited information available to controllers to manage arrival traffic, their strategies are often driven by the need to reduce the task's complexity, which can result in de-optimized flight paths for individual aircraft (e.g., sub-optimal descent or speed profiles). Understanding these strategies and the cognitive demands that drive them will support a safe transition to a NAS that relies on enhanced technologies. In addition, it could enable system developers to identify opportunities for new automation-based procedures or information displays that could reduce the controller's workload and increase operational efficiency.

Smith, Nancy↗

Air Traffic Management Technology Demonstration - 3 (ATD-3) Dynamic Weather Routes Domestic En Route Concept of Operations Synopsis Version 1.0

NASA conducted a survey in 2015 of stakeholders in industry, flight operators, and others to collect data on the most pressing air traffic management (ATM) issues impacting en route operations. Weather related delays and interruptions were identified as the most significant and costly problem impacting en route operations in today's system. Additionally, future traffic demands will place greater demands on the FAA's air traffic control system, necessitate a more efficient and integrated traffic management system and provide controller tools to leverage human productivity. Consequently, NASA is assembling a suite of integrated ground and aircraft-based technologies and decision-making aids under the Airspace Technology Demonstrations 3 (ATD-3) project to continuously search for more efficient weather-avoidance routes and to rapidly respond to weather changes and associated traffic management initiatives. These route efficiency enhancements are targeted at en route airspace and will enable continued use of en route and arrival metering in the presence of weather. NASA's Dynamic Weather Routes (DWR) concept represents a subset of those technologies and focuses primarily on the cruise phase of flight. It leverages existing air traffic weather, airspace, and traffic data, as well as improvements in navigation, surveillance, communication and digital network technologies, and builds upon existing ATM automation to address the shortcomings associated with strategic traffic flow management initiatives and weather forecasting uncertainties. The potential benefits in the form of time, fuel, and cost savings are significant. This concept of operations synopsis provides a detailed description of DWR, its potential benefits and notional implementation paths.

DWR↗

Analysis of Strategic Conflict Management Approaches as Applied to Simulated UAM Operations

This report presents the results of a comparison analysis of candidate Strategic Conflict Management (SCM) strategies as applied to Urban Air Mobility (UAM) operations. The SCM strategies investigated included: no SCM, resource scheduling (RS), resource flow rates (FR), area-based flow rates (AR), and conflict detection and resolution (CR). The study evaluated each strategy against the same 3 levels of flight demand in a representative airspace construct for the Dallas/Fort Worth region. The study also accounted for different levels of uncertainty in operational planning and equivalent levels of trajectory following error. In the analysis, we compared the SCM strategies’ effectiveness in reducing the need for the tactical conflict management layer to act and looked at the metrics of unmitigated losses-of-separation (LOS), flight delays imposed by strategic planning, and throughput of the overall airspace. The study results indicated that the CR strategy was the most effective at reducing LOS and percentage of flights with LOS, even in the presence of trajectory error when uncertainty is accounted for in planning. Thus, if the objective is to reduce the number of actions that the tactical conflict management layer will have to take, in terms of conflicts that may need to be resolved, CR is the strategy to use. The FR strategy was found to be the worst at reducing LOS and percentage of flights with LOS. Thus, it is not very effective at reducing the actions required by a tactical conflict management layer. In the airspace tested, the demand was high enough to produce unacceptable levels of flight delay and reductions of throughput when the SCM strategies were implemented. This was especially evident at the higher levels of trajectory uncertainty and error. The need to account for expected levels of uncertainty becomes more and more important as the demand level increases and as the level of trajectory error increases. This is because the likelihood of flights with LOS increases as the density of operations increases and as the level of trajectory error increases. Accounting for uncertainty in the SCM strategies improves the strategy effectiveness with respect to LOS but increases delays and reduces throughput. Thus, there is a tradeoff between scalability and allowable levels of uncertainty. That is, we can implement an air traffic management construct that allows high levels of uncertainty, but we can expect that same system to have limits on scalability that may be evident even at small demand levels, such as those used in this study. Therefore, the results in this study indicate that an air traffic system should attempt to implement mechanisms appropriate for reducing uncertainty where possible in order to increase the chances for scalability. And this increased level of predictability of operations needs to be balanced with mechanisms for ensuring flexibility when operational conditions and plans need to change, even though those types of changes should be the exception rather than the rule under normal conditions. The study also introduced a trade space that could serve as a mechanism for selecting the appropriate SCM strategy in a trade-off between uncertainty and error, mean flight delay, and the LOS metrics (which this study equates to the potential for tactical conflict management actions). The optimal solution for a given airspace, demand level, and other factors, could likely be a combination of SCM strategies, although this study only compared the use of a single SCM strategy at a time. The CR strategy appeared to have the best opportunity for scalability by limiting the number of potential tactical actions to nearly zero.

Strategic Conflict Management↗

Investigation and Evaluation of Advanced Spectrum Management Concepts for Aeronautical Communications

With the emergence of new aerial vehicles into the airspace and the continued growth of aviation operations, there will be an increasing demand for voice and data communications within the National Airspace System (NAS). The continued use of existing VHF and UHF frequency allocations is not a sustainable approach, and as a result, a new spectrum management solution is required to support future mission needs. The proposed spectrum management concepts leverage modern advancements such as artificial intelligence (AI) and big data to dynamically optimize the spectrum utilization based on the predicted communications demand throughout the airspace. This technical investigation considers both air-ground and air-air communications networks, and can be applied to both existing applications such as the air traffic control (ATC) system, as well as future applications, such as the emerging Advanced Air Mobility (AAM). To support the evaluation of the proposed concepts and technologies, a modeling and simulation capability is currently under development and will continue to evolve to support new and advanced airspace applications. It is anticipated that this proposed spectrum concept will better serve the spectrum needs of future NAS applications.

Eric J Knoblock↗